Arborfield Green Reserved Matters Parcel U1 and V2 S / Design

Total Page:16

File Type:pdf, Size:1020Kb

Arborfield Green Reserved Matters Parcel U1 and V2 S / Design Arborfield Green Reserved Matters Parcel U1 and V2 S / Design & Access Statement August 2018 1.0 Introduction & Background ii Contents1.0 Introduction & Background iii SECTION 1 SECTION 2 SECTION 3 SECTION 4 Introduction & Background Design Response Compliance with Policy & the OPA The Environment & The Future 1.1 Purpose of the Statement­­ 2.1 Overall Design Objectives 3.1 Compliance with Policy and the OPA 4.1 Building for Life Standard 1.2 The Outline Application 2.2 Density 3.2 Compliance with the Design Code 4.2 Adapting for The Future 1.3 Reference to Other Documentation 2.3 Access and Circulation 4.3 Making Safer Places: Secure by Design 1.4 Location and Immediate Context 2.4 Managing the Car 4.4 Sustainability 1.5 Site Analysis 2.5 Refuse Strategy 1.6 Summary of Opportunities & Constraints 2.6 Townscape and Massing 1.7 Dialogue, Process and Design Development 2.7 Tenure Integration 1.8 The Reserved Matters Application 2.8 Creating Distinct Character 2.9 Landscape Proposals 1.0 Introduction & Background 1 1.1 Purpose of the Statement In October 2014 Crest Nicholson Operations Ltd, on behalf of the Arborfield Garrison Landowners Consortium (AGLC), submitted an Outline hybrid planning application (HPA) for the redevelopment of Arborfield Garrison. The site was identified by Wokingham Borough Council (WBC) in 2010 as capable of delivering an infrastructure-rich and high quality new village with associated transport and green community infrastructure. Outline planning consent was subsequently granted in April 2015, subject to a number of conditions (app ref: 0/2014/2280). This Design and Access statement is submitted in support of the Reserved Matters Application for the next phase of development (Parcels U1 and V2S). The outline consent states: Approval of details of the appearance, landscaping, layout and “ scale of development (hereafter called ‘the reserved matters’) for each phase shall be submitted to and approved in writing by the Local Planning Authority before any development in that phase begins and the development shall be carried out as approved. ” The Reserved Matters are: • Layout • Scale • Appearance of the Buildings • Landscaping Illustrative Masterplan (OPA, Jan 15) - NTS 1.0 Introduction & Background 2 Parcel U1 and V2S This statement explains the process and decisions behind the design proposals for Parcel U1 and V2S. It shows how the design team have Parcel U1 and V2S resolved the often competing issues of: • Access and Circulation (site specific and within the wider context) • Managing the Car • Building Typologies • Creating Character • Making Safer Places • Landscaped Spaces • Density • Sustainability • Compliance with Wokingham Design Standards & Technical Housing Standards – Nationally Described Space Standard • Compliance with the landscape led Garden Village Principles described in the Outline Planning Application • Compliance with the Design Code – Northern Gateway Character Area • Compliance with the approved Parameter Plans and in accordance Approved Design and Access Statement with the principles outlined in the OPA Design and Access Statement (AGLC/HPA/DOC/O2 rev A), and the Design and Access Statement Addendum (AGLC/HPA/DOC/02 rev A Addendum) - (Jan 2015) including updated Street Hierarchy (24.03.15) The design considers a wide range of issues from ‘environmental considerations’, to those of lifestyle choices. Key Planning application boundary Land within applicant’s ownership outside of the application boundary Site Boundary Parameter Plan (AGLC/HPA/DOC/3/PL05) - NTS Approved Design and Access Statement Addendum rev A 1.0 Introduction & Background 3 1.2 The Outline Application Key Arborfield Green – History SANGs Areas (S1, S2 and S3) 38.41 ha (94.91 acres) The outline approval consists of a sustainable mixed-use development Residential Development Areas that may comprise: Residential development or potential allotment site • Up to 2000 residential dwellings (including 80 units of extra care District Centre (Mixed use) (Use classes A1, A2, A3, A4, A5, B1, D1 housing and housing within new district centre) and D2 with residential above) Parcel U1 • District Centre (up to 7500 m2 gross floor space) with associated Neighbourhood centre to be located in and V2S development cells V2 or U1. Specific siting and configuration to be agreed at parking, transport interchange and village square reserved matters stage. • Neighbourhood Centre to provide up to 300 m2 gross floor space Extra Care building located in cell R. Existing nursery use to be retained with associated parking and servicing in cell L or relocated to an alternative location within the site. • Secondary School for up to 1500 pupils (class D1), including sports Primary School Land pitches and indoor swimming pool V2S • Up to 3 form primary school Secondary School Land U1 As part of the main hybrid application, the SANG was also approved Primary Street Network Secondary Street in full detail. Network (Indicative) Associated provision of: • Car parking • Public open spaces including sports pitches, informal / incidental open space, children’s play areas including multi use games areas (MUGA), skate park, community gardens / allotments • Landscaping buffer areas • New roads, footpaths, cycleways and bridleways • Sustainable urban drainage systems including flood alleviation works Land Use Parameter Plan (Rev L) - NTS 1.0 Introduction & Background 4 1.3 Reference to Other Documentation This statement should be read in conjunction with a number of Outline Planning Approved Drawings documents relating to the Outline Planning Approval (0/2014/2280), as follows: Outline Planning Approved Drawings Numbers: • Site Boundary Parameter Plan (PL05 rev D) • Land Use Parameter Plan (PL06 rev L) • Density Parameter Plan (PL08 rev J) • Building Storey Heights Parameter Plan (PL09 rev P) • Movement and Access Parameter Plan (PL10 rev L) • Open Space Parameter Plan (PL11 rev L) • Demolition Plan (PL15 rev E) • OPA Design and Access Statement, January 2015 (Rev A AGLC/HPA/DOC/02 rev A) • DAS Addendum Document, January 2015 (AGLC/HPA/DOC/02 rev A Addendum) Reserved Matters Application Documents PL06 (rev L) Land Use Parameter Plan - NTS Building Storey Heights Parameter Plan - NTS • Design Access Statement (DAS) • Parcel U1 and V2S Reserved Matters Application drawings (GSA) • For full list of Planning Application drawings, reports and strategies, refer to Savills covering letter Movement and Access Parameter Plan - NTS Open Space Parameter Plan - NTS 1.0 Introduction & Background 5 1.3 Reference to Other Documentation In preparing this Design and Access Statement regard has also been given to the guidance provided in third party documents including the following: • Wokingham Borough Council Residential Design Guide • Wokingham SuDS Strategy, (WBC, April 2016) • Department for Communities and Local Government – Manual for Streets, 2007 • English Partnerships – Car Parking, What works where? 2006 • CABE – By Design, Better Place to Live, 2000 • Secured By Design – New Homes, 2014 • Lifetime Homes 2010 – 10% provision across Site • Affordable Housing – Supplementary Planning Document (WBC, July 2013) • Parking Standards Study Report (WBC, October 2011) • Arborfield and Newland Village Design Statement • Barkham Village Design Statement • Technical Housing Standards – Nationally Described Space Standard • Building for life 12 (January 2015) Other relevant documents: • Design Code – Northern Gateway Character Area, produced by GSA 1.0 Introduction & Background 6 1.4 Location and Immediate Context The Arborfield Green site lies approximately 4 km to the south west of Wokingham town and 5 km south of the M4 motorway, Junction 11. It is close to the nearby settlements of Arborfield and Arborfield Cross and Barkham. The site consists of Hazebrouck Barracks to the north and Rowcroft Barracks to the south. Existing Residential areas are located centrally at the Married Officers’ Quarters and to the west at Biggs Lane. Parcel U1 and V2s is located within the north western corner of the Proposed site, with Parcel U2 to the south, and the new primary school to the new Primary west. The current Isaac Newton Road, which will be part of the new School local bus route, forms the northern boundary to Parcel U1. The green grid acts as the boundary to development to the east of V2S, whilst V2S there will be residential development extending north of V2S into parcel V2N. U1 Lake Wokingham M4 Arborfield Cross Proposed Sang California Country Park Proposed California Proposed District Country Centre Secondary School Park Site location in context - NTS Aerial photograph indicating the Immediate Context (Parcel U1 and V2s edged in red) - NTS 1.0 Introduction & Background 7 1.5 Site Analysis Parcels U1 and V2S are located on the site of the former Hazebrouck Barracks. The demolition plan approved as part of the OPA in 2015, indicates that a number of buildings have been demolished ready for the development of these parcels. These buildings include the former location for the REME Museum of Technology. The detailed design of Parcel U1 and V2S has followed an extensive process of analysis and design development including the following: • Site visits and analysis • Preparation of constraints and opportunities • Analysis of wider area Parcel U1 • Preparation of a ‘Study of Local Character’ and V2S • Preparation of a ‘Study of Local Housing Developments’ • A Study of Garden Villages • Arborfield & Newland Village Design Statement and the Barkham Village Design Statement (Both U1 and V2s fall within the Barkham Parish) • Analysis of Standards such as WBC Design Guide and Parking Standards • Community Consultation Approved Demolition Plan - NTS 1.0 Introduction & Background 8 1.5 Site Analysis 1 2 1 3 4 5 2 3 4 5 1.0 Introduction & Background 9 1.5 Site Analysis 6 7 9 6 7 8 10 8 9 10 1.0 Introduction & Background 10 1.5 Site Analysis Extracts from Research Document (Study of Local Vernacular) Extracts from Research Document (Study of Local Developments) 1.0 Introduction & Background 11 1.6 Summary of Opportunities & Constraints Key Constraints of the Parcel U1 and V2S site include the following: • The 1:100 flood zone surrounds the site to the south and east.
Recommended publications
  • Arborfield and Newland Parish Council Written
    ARBORFIELD AND NEWLAND PARISH COUNCIL WRITTEN REPRESENTATION HIGHWAYS ENGLAND'S RESPONSE APPLICATION BY THE HIGHWAY (NOW HIGHWAYS ENGLAND) FOR AN ORDER GRANTING DEVELOPMENT CONSENT FOR THE PROPOSED M4 JUNCTIONS 3 TO 12 SMART MOTORWAY 1.1 I am writing to you to seek some assurance on a matter that we raised in our original Statement of Reason, submitted in July. 1.2 One of the issues of concern to the Council was that of reflected noise from new noise barriers that might be incorporated into the scheme. Specifically, we were aware that Earley Town Council was seeking new noise barriers on the northern side of the scheme between junctions 10 and 11. 1.3 We were heartened by the publication of the Statement of Common Ground (SOCG) between Earley Town Council and Highways England, in which the Town Council accepted that there would be no significant adverse noise impact from the scheme. The SOCG also, most helpfully, confirmed what is shown on the proposal maps: that the only new noise barriers proposed in or close to the parish of Arborfield and Newland are two short lengths across Mill Lane underbridge. We were not, therefore proposing to trouble the Examining Authority further. 1.4 However it has come to light that individual Councillors from Early may still wish to appear at the Examination and press for additional noise barrier. This is a matter of great concern to our residents living with in the noise envelope of the M4 motorway, and they have asked us to intervene on their behalf. 1.5 Rather than generate further work for the Council,
    [Show full text]
  • Arborfield Cross Relief Road) Compulsory Purchase Order 2018
    WOKINGHAM BOROUGH COUNCIL THE WOKINGHAM BOROUGH COUNCIL (ARBORFIELD CROSS RELIEF ROAD) COMPULSORY PURCHASE ORDER 2018 DRAFT STATEMENT OF REASONS 85 1. Introduction 1.1. On [ ] 2018 Wokingham Borough Council (the “Council” and the “Acquiring Authority”) resolved to make the Wokingham Borough Council (Arborfield Cross Relief Road) Compulsory Purchase Order 2018 (the “Order”) to acquire land and interests over land within the Arborfield area and to enable the delivery of a new relief road known as the Arborfield Cross Relief Road (the “ACRR”). 1.2. The Order is made pursuant to sections 239, 240, 246, 250 and 260 of the Highways Act 1980 (the “1980 Act”) for the acquisition of all interests (except mining interests and others specifically excluded) in the land shown coloured pink (the “Order Land") on the plan attached to the Order (the “Order Plan”), and as described in the Schedule to the Order. The land proposed to be acquired pursuant to the Order is also described in greater detail in section 2 below. Further detail as to the powers under which the Order is made are found in section 3 below. 1.3. The Order Land is split into fields, supporting both arable and pasture farming, interspersed with a number of small woodland blocks. The Order Land is described further in section 2 of this Statement of Reasons. 1.4. The Order is being sought so that the Council can assemble in its ownership the Order Land to facilitate and enable the construction, on schedule, of a new section of highway linking the A327 Reading Road in the north and the A327 Eversley Road in the south east, along with associated necessary works (the “Scheme”).
    [Show full text]
  • Green Belt Review
    "Double click to insert client logo or delete this" Bracknell Forest Borough Council and Wokingham Borough Council Green Belt Review FINAL REPORT June 2016 Amec Foster Wheeler Environment & Infrastructure UK Limited ii © Amec Foster Wheeler Environment & Infrastructure UK Limited Report for Copyright and non-disclosure notice The contents and layout of this report are subject to copyright Max Baker owned by Amec Foster Wheeler (© Amec Foster Wheeler Head of Planning Environment & Infrastructure UK Limited 2016) save to the Bracknell Forest Borough Council extent that copyright has been legally assigned by us to Time Square another party or is used by Amec Foster Wheeler under Market Street licence. To the extent that we own the copyright in this report, Bracknell it may not be copied or used without our prior written RG12 1JD agreement for any purpose other than the purpose indicated in this report. The methodology (if any) contained in this report is provided to you in confidence and must not be disclosed or copied to third parties without the prior written agreement of Amec Foster Wheeler. Disclosure of that information may Main contributors constitute an actionable breach of confidence or may otherwise prejudice our commercial interests. Any third party Robert Deanwood who obtains access to this report by any means will, in any Clive Harridge event, be subject to the Third Party Disclaimer set out below. Polly Neal Third-party disclaimer Issued by Any disclosure of this report to a third party is subject to this disclaimer. The report was prepared by Amec Foster Wheeler at the instruction of, and for use by, our client named on the front of the report.
    [Show full text]
  • ARBORFIELD CROSS RELIEF ROAD: REPORT on CONSULTATION Final Report
    ARBORFIELD CROSS RELIEF ROAD: REPORT ON CONSULTATION Final Report 31/01/2014 Revised: 28/02/2014 Confidentiality: Public Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Final Date 03/02/2014 01/03/2014 18/03/2014 Prepared by Signature Checked by Signature Authorised by Signature Project number 10395858 Report number File reference N:\10395858 - Arborfield Bypass Transport Study\C Documents\Reports Project number: 10395858 Dated: 31/01/2014 2 Revised: 28/02/2014 Arborfield Cross Relief Road: Report on Consultation Final Report 31/01/2014 Client Wokingham Borough Council Shute End Wokingham RG40 1BN Consultant WSP Group Mountbatten House Basingstoke RG21 4HJ UK Tel: +44 1256 318 822 Fax: +44 1256 318 700 www.wspgroup.co.uk Registered Address WSP UK Limited 01383511 WSP House, 70 Chancery Lane, London, WC2A 1AF 3 Table of Contents Executive Summary........................................................................... 5 1 Introduction ............................................................................ 6 2 Methodology .......................................................................... 7 3 Consultation Findings - Stakeholder Meetings .................... 12 4 Consultation Findings – Feedback Forms ........................... 13 5 Consultation Findings – Exhibitions & Written Responses .. 42 6 Consultation Findings – Summary ....................................... 53 Appendices Appendix A: Consultation Materials Appendix B: Consultation Findings Appendix C: Figures Project number: 10395858 Dated: 31/01/2014 4 Revised: 28/02/2014 Executive Summary Wokingham Borough Council (WBC) is committed to the development of 3,500 new homes at Arborfield Garrison by 2026. The Council’s Core Strategy identifies a requirement to enhance the A327 in order to effectively mitigate the traffic growth impacts that will be generated by the development of the Arborfield Garrison and the South of M4 Strategic Development Locations (SDLs).
    [Show full text]
  • Arborfield & Newland Village Design Statement
    Arborfield & Newland Village Design Statement THE FOUNDATION FOR FUTURE DEVELOPMENT 1 Contents HEADING PAGE Map of Arborfield & Newland 1 Contents 2 Introduction 3 4 Design Statement Design Guidelines 5 – 12 Designs In The Settlement Area 13 – 22 Arborfield Cross Conservation Area 23 – 24 Arborfield & Newland Area of Special Character 25 Arborfield & Newland VDS Creation 26 – 27 Acknowledgements 28 Appendices 29 – 48 • Appendix 1 – How Arborfield has evolved 29 – 34 • Appendix 2 – The Parish Today 35 – 39 • 40 – 43 Appendix 3 – Transport • Appendix 4 – VDS Article 44 • Appendix 5 – VDS Correspondence 45 – 46 • Appendix 6 – VDS Presentation Material 47 – 48 2 Introduction The rural setting of Arborfield & Newland defines its character. The attractive landscape comprising farmland and woodland is punctuated with small settlements, hamlets and individual dwellings. Together these settlements form the vibrant modern community of Arborfield with many active societies and activities focused on a small number of centres. With a long history, the area has a variety of architectural styles introduced over the ages. Houses in Arborfield & Newland tend to sit in small, cohesive groups in terms of their style and there are some common characteristics that define the area: • Low density housing with ample outside space • Properties set back from the roads • No more than two stories • Extensive use of local red brick amongst older properties • Development merged into natural green spaces Among these cohesive groups are more modern developments, built from the 1950s (Anderson and Emblem Crescent) through to the mid-2000s, which have higher density and less variety in design. Arborfield consists of a number of settlements that evolved over time.
    [Show full text]
  • List of Local Wildlife Sites in Wokingham 2018.Pdf
    Thames Valley Environmental Records Centre Sharing environmental information in Berkshire and Oxfordshire Local Wildlife Sites in Wokingham, Berkshire - 2017 This list includes Local Wildlife Sites. Please contact TVERC for information on: site location and boundary area (ha) designation date last survey date site description notable and protected habitats and species recorded on site Site Code Site Name District Parish SU76B04 Highgrove Copse Wokingham BC Swallowfield SU76B05 St. Leger's Copse, Collin's Copse Wokingham BC Swallowfield SU76C04 Wood North of Beech Hill Wokingham BC Swallowfield Coverts/Clayhill SU76C05 Norman's Shaw Wokingham BC Swallowfield SU76C07 Wood and Ditch/Moat Wokingham BC Swallowfield SU76D02 Woods Between Whitehouse and Wokingham BC Shinfield Highlands SU76D04 Clare's Green Road Grasslands Wokingham BC Shinfield SU76E01 Great Lea Pond Wokingham BC Shinfield SU76G01 The Marshes, Riseley Wokingham BC Swallowfield SU76H01 Cuckoo Pen Wokingham BC Swallowfield SU76H02 Great Wood Wokingham BC Swallowfield SU76I06 The Grove Wokingham BC Shinfield SU76J01 Shinfield Park, Nore's Hill Wokingham BC Shinfield SU76J02 Pearmans Copse Wokingham BC Shinfield SU76L02 Wheeler's Copse.Featherstone Wokingham BC Swallowfield Copse SU76M01 Farley Hill Woods, Great Copse and Wokingham BC Swallowfield New Plantation SU76M03 Long Copse (South) and Robin Wokingham BC Arborfield and Hood Copse Newland SU76M04 Wyvol's Copse Wokingham BC Swallowfield SU76M06 Spring Copse and Long Copse Wokingham BC Arborfield and (North) Newland SU76N01
    [Show full text]
  • Cultural Heritage Gazetteer
    HIGHWAYS AGENCY – M4 JUNCTIONS 3 TO 12 SMART MOTORWAY APPENDIX 7.1 – CULTURAL HERITAGE GAZETTEER Site HER/Ref Name Description Number number 1 MLO99241 Land South of the M4 and East of Pit Walled Garden Farm, Hillingdon {Neolithic pits} 2 MLO99241 Land South of the M4 and East of Pit Walled Garden Farm, Hillingdon {Neolithic pits} 3 MLO10495 Holloway Lane Enclosure, pit 4 MLO10507 Holloway Lane Quarry 5 MLO11303 The Parkway Enclosure, moated Site 6 MLO84980 Cranford House Stables Wall, stable 7 MLO84981 Walls to north of stables Wall 8 MLO84982 Cranford Park Bridge Road Bridge 9 MLO84986 Church of St. Peter and St. Paul Commemorative monument, effigy, parish church 10 MLO85161 Church of St. Dunstan Church, commemorative monument 11 MLO85162 Curved wall to south of west end Wall, courtyard of stables 12 MLO85164 Walls to north of Church of St. Wall Peter and St. Paul 13 MLO85174 Monument to William and Tombstone Elizabeth Brookes in Churchyard of Church of St. Peter and St. Paul 14 MLO85188 Ha-ha wall to south and south Wall west of Cranford House Stables 15 MLO85190 Cellars of Former Cranford Cellar House 16 MLO85269 Wall to south of east end of Wall stables 17 MLO85270 Garden walls to west of Cranford Garden wall House stables 18 MLO85273 Wall to south of churchyard of Wall Church of St. Peter and St. Paul 20 MLO14464 M4 widening scheme Grubenhaus 21 MLO25606 Longford To Cursus 22 MLO17551 Holloway Lane Findspot 23 MLO17552 Holloway Lane Field System 24 MLO17992 Holloway Lane Trackway ENVIRONMENTAL STATEMENT APPENDICES CULTURAL HERITAGE
    [Show full text]
  • Statutory Consultation Responses Masterplan
    CONSULTATION SUMMARY – STATUTORY CONSULTATION RESPONSES MASTERPLAN – SUPPLEMENTARY PLANNING DOCUMENTS Topic Respondent Comments Council Response Traffic Hampshire County Council (FC/STAT/2) Concern about possible adverse impact on Noted. Outside of scope of SPD. Discussions North Hampshire. Seeking meeting to to take place as appropriate. discuss possible mitigation measures. (Arborfield) See also Infrastructure SPD. Sport England (FC/STAT/27) Welcomes attention paid to sport and Noted. Sport recreation in the SPDs. Council studies form foundation for effective strategy for sport, open space and recreation. (General) Para 1c(v). Should be clarified to include as Up to date standards will apply up to date standards as possible. (General) Playing field land should not be lost to Noted. SANG. (North Wokingham) Theatres Trust (FC/STAT/26) Not particularly relevant to Trust’s work. Noted. Performance space may be a Theatre Provision (General) requirement in proposed Community building. Reading Borough Council (FC/STAT/3) Support strategic planning in this way. Noted. Strategic Planning Assume archaeology constraints will be Noted and confirmed. addressed through Managing Delivery DPD. Bracknell Forest Council (FC/STAT/24) Little consideration appears to have been The highway measures for the SDLs were Traffic given to cross boundary traffic impacts. discussed at the Examination in Public and (N/S Wokingham) found to be sound. Park and Ride – implications for that Outside of scope of SPD. Discussions to take planned at Jennetts Park not considered. place as appropriate. Note: This is a summary of the key issues. Analysis of issues raised will be always based on the original correspondence which is available for inspection at Shute End during normal office hours.
    [Show full text]
  • Consultation Document Consultation Document
    M4 J3 to J12 Smart Motorway M4 J3 to J12 Smart Motorways – All LaneConsultation Running Document The Introduction of Variable Mandatory Speed Limits Consultation Document ii M4 J3 to J12 smart motorway Consultation Document Summary of the Consultation Topic of this The implementation of variable mandatory speed limits consultation: (VMSL) between junctions 3 to 12 of the M4 motorway. Scope of this We are keen to have your comments on the implementation consultation: of variable mandatory speed limits for the M4 smart motorway scheme between junctions 3 and 12; specifically on how the proposal could affect your organisation or those you represent. It is important to note that this is not consultation on the actual policy of using variable mandatory speed limits or all lane running. Use of these traffic management features is already settled Government policy. We are therefore seeking views on the proposal set out below. Geographical The proposed smart motorway scheme will enable proactive scope: management of the M4 carriageway, including slip roads and motorway to motorway intersections between junctions 3 (the junction with the A312) and 12 (the junction with the A4) on this major section of motorway. General Information To: The consultation is aimed at any affected stakeholder groups or individuals. Body/bodies responsible for The Highways Agency. the consultation: Duration: The consultation will last for a period of 6 weeks commencing on 12 January 2015. The consultation will close on 22 February 2015. Please ensure responses arrive
    [Show full text]
  • (Public Pack)Agenda Document for Council, 16/06/2020 19:00
    Public Document Pack The Annual Meeting of the COUNCIL will be held virtually on TUESDAY 16 JUNE 2020 AT 7.00 PM Susan Parsonage Chief Executive Published on 8 June 2020 Note: The Council has made arrangements under the Coronavirus Act 2020 to hold this meeting virtually via Microsoft Teams. The meeting can be watched live using the following link: https://youtu.be/Rkgba4Jb-mo This meeting will be filmed for inclusion on the Council’s website. Please note that other people may film, record, tweet or blog from this meeting. The use of these images or recordings is not under the Council’s control. Our Vision A great place to live, learn, work and grow and a great place to do business Enriching Lives Champion outstanding education and enable our children and young people to achieve their full potential, regardless of their background. Support our residents to lead happy, healthy lives and provide access to good leisure facilities to complement an active lifestyle. Engage and involve our communities through arts and culture and create a sense of identity which people feel part of. Support growth in our local economy and help to build business. Safe, Strong, Communities Protect and safeguard our children, young and vulnerable people. Offer quality care and support, at the right time, to prevent the need for long term care. Nurture communities and help them to thrive. Ensure our borough and communities remain safe for all. A Clean and Green Borough Do all we can to become carbon neutral and sustainable for the future. Protect our borough, keep it clean and enhance our green areas.
    [Show full text]
  • Agenda Document for Council Minute Book, 22/09/2016 11:45
    Public Document Pack MINUTES OF COMMITTEE MEETINGS FOR THE PERIOD 9 August 2016 to 9 September 2016 Andy Couldrick Chief Executive Published on 14 September 2016 Our Vision A great place to live, an even better place to do business Our Priorities Improve educational attainment and focus on every child achieving their potential Invest in regenerating towns and villages, support social and economic prosperity, whilst encouraging business growth Ensure strong sustainable communities that are vibrant and supported by well designed development Tackle traffic congestion in specific areas of the Borough Improve the customer experience when accessing Council services The Underpinning Principles Offer excellent value for your Council Tax Provide affordable homes Look after the vulnerable Improve health, wellbeing and quality of life Maintain and improve the waste collection, recycling and fuel efficiency Deliver quality in all that we do PAGE NO. Decisions , 09/08/2016 Executive - Individual Member Decisions 5 - 6 Decisions , 09/08/2016 Executive - Individual Member Decisions 7 - 8 Minutes of meeting Thursday, 11 August 2016 of Health and Wellbeing Board 9 - 14 Minutes of meeting Wednesday, 17 August 2016 of Planning Committee 15 - 22 Decisions , 24/08/2016 Executive - Individual Member Decisions 23 - 24 Decisions , 24/08/2016 Executive - Individual Member Decisions 25 - 26 Minutes of meeting Thursday, 1 September 2016 of Executive 27 - 32 Minutes of meeting Wednesday, 7 September 2016 of Licensing and Appeals 33 - 36 Committee Minutes , 08/09/2016
    [Show full text]
  • Tree Watch Tree Watch
    Wokingham District Veteran Tree Association Tree Watch Issue 225555 May 2015 On 27th May we had 7163 trees in our database and 9470 photographs Welcome to the twenty-fifth issue of Tree Watch – in which I have both good news and bad news to report. After a very successful and well attended AGM (see page 2), we had the devastating news that the iconic black mulberry in Elms Road, Wokingham had been felled (see page 7). Then more good news. We received a cheque for £430 from the green token scheme at Waitrose. This is not only very welcome, but also very timely as it will fund our website renewal (due in August). In the last issue we wondered whether the 4 row lime avenue in Barkham (shown here) was unique. See page 3. The next issue of Tree Watch will be August 2015 and the copy deadline is 31st July. If you have comments or responses to anything in this issue or contributions for future issues please send them to: Elaine Butler - datamanager @ wdvta.org.uk Main items in this issue:- p2 AGM, Letter from Angus Ross p8 Profile – Jane Sellwood p3 New committee p8 Acronym - VETree p3 Lime Avenues p9 Species in Focus – Black Mulberry p3 Tree Warden Activities p10 Fee Young’s Science Column - Pollen p5 Veteran Tree Survey p11 Did you know? –pollen allergy p6 Extending our survey into Bracknell p12 WDVTA Facebook page p7 Sadly departed – Black Mulberry MRN 2039 p12 Help with computing Events – June - August 2015 Sunday 14 th June – A walk around Shinfield led by Patricia Green (WDVTA coordinator for Shinfield) 14:00 Saturday 11 th July 10:30 – Butterflies of Pamber Forest – walk in ancient woodland Saturday 1 st August – Annual Earley Green Fair – 10:00–16:00 These are all EEG events see www.earleyenvironmentalgroup.co.uk For up-to-date information - see the events page on our website – wdvta.org.uk/events.php WDVTA –Tree Watch – 25 Page 1 of 13 AGM Kerry Clissold More than 40 members attended our 8th AGM which was held in the Emmbrook Room at Dinton Pastures on the 31 st March.
    [Show full text]