OFFICE SPACE for LEASE 204 St

Total Page:16

File Type:pdf, Size:1020Kb

OFFICE SPACE for LEASE 204 St OFFICE SPACE FOR LEASE 204 St. George Street TORONTO, ONTARIO SHORT TERM ANNEX OFFICE SPACE AVAILABLE Cushman & Wakefield ULC, Brokerage 161 Bay Street, Suite 1500 Toronto, ON M5J 2S1 cushmanwakefield.com OFFICE SPACE FOR LEASE 204 St. George Street ANNEX | TORONTO | ONTARIO Overview Opportunity for a Tenant seeking character Annex space in turnkey condition. Close proximity to St. George Subway Station and Yorkville. Coach House Main House Details Space Available: 7,000 SF Main House 2,618 SF Coach House 3,000 SF Gross Rent: $25.00 PSF Term: 6 Month – 2 Years Occupancy: Immediately Highlights • Full floor and private office opportunities • Seconds to St. George TTC Station, servicing Line 1 (Yonge-University) and Line 2 (Bloor-Danforth) • Walking distance to Bloor, University of Toronto and Yorkville. • Onsite parking available • Challenging uses welcomed Consultants Structural: Coach House Floor Plans Main House Floor Plans Project Name: FIRE EXIT FIRE EXIT Location: DN DN FOYER PORCH Number: R111 Sheet Title: EXISTING STAIR R109 UP 5.6 m x 5.55.6 x m m UP DN UP R108 Scale: R101 Drawn: 4.4 4.8 x m m Checked: Date: FIREPLACE Revisions: R107 No. Description Date 4.4 x 6.2 m m NICHE R104 5.0 4.7 x m m NICHE R102 4.7 x 7.3 m m FIREPLACE R103 FIRE EXIT BUILT -IN BOOKCASE 4.9 m x 5.64.9 x m m R106 4.4 m x 2.34.4 x m m FIREPLACE EXIT FIRE Text in Italics refer to existing information provided by Client to be confirmed by contractor. R105 4.0 m x 4.74.0 x m m Construction North Drawing Number COVERED PORCH Consultants Structural: EXISTING GROUND FLOOR PLAN This drawing shall be used only for the purpose indicated below: Preliminary Tender Permit Construction Project Name: Location: R201 Number: 3.4x 2.1 m m ROOF BELOW KITCHEN OPEN TO BELOW R208 UP Sheet Title: DN 4.9 x 4.1 m m UP R207 DN 4.3 m x 4.44.3 x m m Scale: R202 DN Drawn: 4.6 m x 4.84.6 x m m BUILT-IN Checked: UP R200 Date: Revisions: No. Description Date R204 FIREPLACE 4.7 m x 11.1 m 11.1 x m 4.7 R205 R206 3.3 x 2.0 m m 7.2 m x 4.57.2 x m m FIREPLACE Text in Italics refer to existing information BALCONY provided by Client to be confirmed by contractor. L O W O E O R B F L O F O L R O E W B O E F L I N Construction North Drawing Number L O W O E O R B F This drawing shall be used only for the purpose indicated below: Preliminary Tender Permit Construction EXISTING SECOND FLOOR PLAN OFFICE FOR LEASE 204 St. George Street ANNEX | TORONTO | ONTARIO ST GEORGE STREET SUBJECT SITE LOWTHER AVENUE 3 mins walk to St. George Station 4 Spadina Station St. George Station mins 10 subway ride mins Bay Station to Bloor- subway ride Yonge to Union Station Royal Ontario Museum LEGEND THE PROPERTY IS: SUBWAY STATION • 3 minutes walk to St. George Station BLOOR-DANFORTH SUBWAY LINE • 4 minutes from Bloor-Yonge Station YONGE-UNIVERSITY SUBWAY LINE • 10 minutes from Union Station SPADINA STREETCAR 26 DUPONT BUS • Both subways run every 3 minutes 127 DAVENPORT BUS STUART SYLVESTER* Cushman & Wakefield ULC, Brokerage Associate 161 Bay Street, Suite 1500 416 359 2471 Toronto, ON M5J 2S1 [email protected] cushmanwakefield.com Cushman & Wakefield ULC, Brokerage No warranty or representation, expressed or implied, is made as to the accuracy of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, withdrawal without notice, and to any specific listing condition, imposed by our principals. *Sales Representative **Broker.
Recommended publications
  • Bathurst Track Project 2005 Oct 12 Web
    Bathurst Street Track Reconstruction 2005 Starting – October 17 On October 17, 2005, the City of Toronto – Works and Emergency Services and the Toronto Transit Commission (TTC) will begin work to replace streetcar tracks on Bathurst Street between Harbord Street and the Bathurst Station. The track portion of this project is scheduled for completion by the end of November 2005. This is a continuation of the overall track replacement program scheduled this year for Bathurst Street. (*Dates subject to change) This track project will not include the intersection of Harbord Street as it has already been completed in recent years. Traffic Lane Restrictions: Temporary traffic and parking restrictions will occur along sections of Bathurst Street during phases of the construction. Harbord to Bloor: Bathurst Street will be reduced to one southbound traffic lane through the construction zone; northbound lanes will be closed to traffic. Bathurst Stn area: Bathurst Street will be closed between Bloor Street and London Street for a period of time (approx. 2 weeks) to accommodate work in this area. A southbound traffic lane will be reopened as soon as conditions permit. Rail Storage: Prior to the October 17th start date, the new rail presently stored in the northbound curb lane on Bathurst Street north of Harbord Street will be relocated to the northbound curb lane just south of Harbord Street. Transit Service Changes during reconstruction: (See map on next page). Effective Monday, October 17: During the track reconstruction portion of this project there will be no streetcar or bus service on Bathurst Street between Harbord Street and the Bathurst Station.
    [Show full text]
  • Attachment 4 – Assessment of Ontario Line
    EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively.
    [Show full text]
  • Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
    The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C.
    [Show full text]
  • Official Plan Review: Transportation Policies
    January 2020 PH13.3 Attachment 6 Five-Year Official Plan Review TRANSPORTATION POLICIES PHASE 2 -PUBLIC & STAKEHOLDER CONSULTATION SUMMARY REPORT DILLON CONSULTING LIMITED i Phase 2 Executive Summary In the fall of 2018, the City of Toronto (the City) retained Dillon Consulting Limited (Dillon) to design and deliver a consultation program to garner stakeholder and public feedback on draft amendments to the Official Plan (OP) Transportation Policies. The review and revision of existing transportation policies is part of the City’s Five-Year Official Plan Review process, and as such, the consultation program was designed to solicit feedback city-wide. The Consultation program was broken into two phases and this report summarizes the engagement for Phase 2. The consultation program was focused on four transportation policy topics: Transit, Cycling, Automated Vehicles and Shared Mobility, and Street Related Map and Schedules. Phase 2 Consultation began with a stakeholder workshop in April, 2019. Four public meetings (one in each district: North York, Etobicoke, Scarborough and Downtown) occurred in May, 2019. An additional stakeholder meeting was held in May, 2019 in an effort to reach out to advocates, organizations and academic researchers promoting accessibility and safety for vulnerable road and transit users, including the elderly, women, children, and people living with disabilities. A statutory public open house was held on November 26, 2019. The stakeholder and public meetings followed the same general format: a presentation of the transportation policies under review, a summary of What We Heard from the Phase 1 consultation and proposed key policy changes. This was combined with breakout discussion tables to examine each of the four policy topics under review in more detail.
    [Show full text]
  • RE'01 Guide to Toronto
    A Requirements Engineer’s Guide to Toronto Dave Wortman Department of Computer Science University of Toronto [email protected] This document is a brief visitors guide to Toronto for attendees of the Requirements 01 Conference. It is intended as a local supplement to the various official Toronto guides that the attendees will receive. Getting Around Toronto Walking Toronto is generally a clean, safe city. It is entirely practical to walk to many of the locations mentioned in this guide. TTC The Toronto Transit Commission (TTC) operates a network of subways, busses and streetcars that provide con- venient transportation throughout Toronto. There are two major subway lines. The Yonge/University/Spadina line is a U-shaped loop that runs under Yonge Street and University Avenue in the downtown area. There are subway stations where major cross streets intersect Yonge St. and University Ave. The subway stations closest to the Royal York Hotel are in Union Station, at King and University and at King and Yonge. The Bloor/Danforth line runs east/west underneath Bloor Street. There are free interchanges between these two subway lines at the Yonge/Bloor station and at the St. George station and the Spadina station. Street car or bus lines run east and west on major streets. There are two TTC streetcar lines that start in Union Station. The Harborfront 509 line runs through the Harbor Front area along Queens Quay to the CNE grounds. The Spadina 510 line runs along Queens Quay and then north along Spadina Ave to Bloor St. The Bay bus that runs north and south on Bay St is a convenient way to reach many of the places described in this guide.
    [Show full text]
  • Reception and Pre-Conference Locations 1
    RECEPTION AND PRE-CONFERENCE LOCATIONS 1 GENERAL RESOURCES 1 ARRIVING FROM PEARSON INTERNATIONAL AIRPORT 2 ARRIVING FROM BILLY BISHOP TORONTO CITY AIRPORT 4 USING PUBLIC TRANSIT: THE TTC 6 GETTING FROM THE HOTEL TO THE LIBRARY 6 GETTING FROM THE LIBRARY TO THE HOTEL 9 GETTING FROM THE HOTEL TO THE MULTI-FAITH CENTRE 9 GETTING FROM THE MULTI-FAITH CENTRE TO THE HOTEL 11 GETTING FROM THE MULTI-FAITH CENTRE TO THE LIBRARY 12 MAPS 12 RECEPTION AND PRE-CONFERENCE LOCATIONS LIBRARY: Reception, library Tour, NCC Workshop ​ MULTI-FAITH CENTRE: Pre-Conference Meetings (CTP, ERMB, OCLC CJK User Goup) ​ GENERAL RESOURCES Apps to enhance your visit in Toronto: http://www.seetorontonow.com/mobile-app/ ​ Visitor Information Services: www.toronto.ca ​ Information on Toronto public transit: https://www.tripadvisor.ca/Travel-g155019-s303/Toronto:Ontario:Public.Transportation.html 1 ARRIVING FROM PEARSON INTERNATIONAL AIRPORT Pearson International Airport (YYZ) is Toronto’s main international airport as well as the busiest airport in Canada. It’s located on the west side of the city and has easy links to downtown Toronto through a dedicated air-rail link as well as public transit. Option 1: Union Pearson Express (UP Express) Union Pearson Express is a dedicated air-rail link that speeds travelers from Toronto Pearson International Airport to the downtown of Toronto. The travel time from Pearson to downtown Toronto (Union Station) is about 25 minutes How to find the Union Pearson Express Stations: https://www.upexpress.com/public/UPExpress_Directions.pdf UP Express daily schedule: https://www.upexpress.com/SchedulesStations/UnionStationMiniSchedule ● Trains run every 15 minutes, starting from about 5:30 a.m.
    [Show full text]
  • Review of Metrolinx's Big Move
    REVIEW OF METROLINX’S BIG MOVE Michael Schabas, First Class Partnerships Limited Neptis Foundation December 2013 Review of Metrolinx’s Big Move Michael Schabas, First Class Partnerships Limited ISBN 978-0-9739888-8-8 Suite 501 1240 Bay Street Toronto, Ontario M5R 2A7 +1 416 972 9199 [email protected] www.neptis.org ©2013 Neptis Foundation Review of Metrolinx’s Big Move 1 To Tony Coombes, 1937-2013, who created better cities with his patient observation, meticulous analysis, and thoughtful perspective. Review of Metrolinx’s Big Move 2 Review of Metrolinx’s Big Move 3 FOREWORD This report began as a question asked by Tony Coombes, the founding executive director of the Neptis Foundation, who passed away earlier this year. It then continued as a conversation between Tony and Michael Schabas, the report’s author. Both Tony and Michael were colleagues during the early days of the Canary Wharf project, when Canada’s powerhouse development company, Olympia and York (O&Y), set out to build a new city centre in east London. Tony hired Michael as O&Y’s Vice-President of Transport, to conceive, plan, and make the business case for the Jubilee Line Extension that would link London’s Underground to the new city, and to upgrade the Docklands Light Railway. Many years later, Michael and Tony reconnected during one of Michael’s visits to Toronto, his hometown. Metrolinx had just released The Big Move, the $36 billion regional transit plan. Questions were raised as the two began a series of conversations about the Plan. • What evidence suggests
    [Show full text]
  • West Station Reference Concept Design
    West Station Reference Concept Design Open House and Online Consultation #1 February 19th, 2013 2 West Station Reference Concept Design Report Table of Contents 1. Executive Summary ....................................................................................................5 1.1 Summary of consultation methods.........................................................................5 2. Public Notification........................................................................................................5 2.1 Canada Post drops ................................................................................................5 2.3 Online promotion ...................................................................................................6 3. Summary of Comments Received ...............................................................................6 3.1 Accessibility........................................................................................................6 3.2 Connectivity........................................................................................................6 3.3 Service communications.....................................................................................6 3.4 Maintenance and future planning .......................................................................6 3.5 Neighbourhood integration .................................................................................6 3.6 Safety.................................................................................................................7
    [Show full text]
  • History of the Toronto Transit Commission
    History Of The Toronto Subway System James B. Alcock 1 2 TABLE OF CONTENTS Chapter Page Introduction 5 Before the TTC: Omnibus and Toronto Street Railway 6 Public Transit: Toronto Civic Railways 6 TTC: The early years 7 TTC: Post-war years 7 Subway boom 8 “Network 2011” 13 The St. Clair Controversy 17 ‘Transit City’ Plan 17 Transit Rebellion 22 ‘One City’ Plan 23 One City’ Proposed Lines 25 Subway Revival 25 'SmartTrack' Plan 27 Revival of the Queen Street Subway and LRT Lines 28 Long Term Transit Plan 28 TTC Official Opening Dates 30 TTC History Timeline 30 MAPS Metropolitan Toronto Subways 1966 9 Metropolitan Toronto ‘GO Urban’ I.C.T.S. Plan 1972 14 Metropolitan Toronto ‘Network 2011’ Subways Plan 1985 15 City of Toronto Subways 2004 21 City of Toronto Subways 2014 24 City of Toronto Subways & L.R.T. Today 29 3 4 History of the Toronto Subway System Introduction The Toronto Transit Commission (TTC) is the public transport authority that operates buses, streetcars, subways, and rapid transit lines in Toronto, Ontario, Canada. The TTC operates 149 surface transit routes, of which 148 routes make 243 connections with a subway or rapid transit station during the morning rush hour. 11 of these are streetcar (tram) routes and the remainder are buses. In 2005, the TTC carried 431,220,000 passengers, 2,368,000 passengers daily (1,397,000 revenue passengers). The TTC employed 10,650 personnel in 2005. The TTC operates the third most heavily-used urban mass transit system in North America (after New York City's New York City Transit Authority and the Mexico City Metro).
    [Show full text]
  • Arrivals - How to Get There Airport
    Arrivals - How to get there Airport If you are coming from the Toronto Pearson International Airport, the public transit system called the TTC (www.ttc.ca ) will bring you to within a short walk of the TTX for CDN$3.25. Toronto Pearson International Airport has 2 terminals called Terminal 1 and Terminal 3, so you will arrive at one of those 2 terminals. PURCHASING BUS TICKETS: You can purchase single fare tokens for the TTC bus at Toronto Pearson International Airport from the TTC vending machines located in Terminal 1 and Terminal 3. They are located inside the terminals near the public transit area of the ground transportation level, just inside from the TTC bus stops. In Terminal 1 the TTC vending machines are located close to doors “S” or “R” on the Ground Level. This is very close to where the actual bus stop is located (at column “R”). Use cash or major credit cards anytime of the day or night to purchase tickets. When you enter the bus you deposit the ticket or token in the farebox next to the driver. As an alternative you can always deposit $3.25 cash in the fare box (but no change will be given, since the driver does not carry any cash). Canada only has $1 and $2 coins (smallest paper bill is $5), which are easy to deposit in the farebox. You should be able to obtain Canadian coins from the Currency Exchange offices within the airport CATCHING THE BUS: For Terminal 1 the TTC bus stop is located outside doors “S” or “R” (at column “R”) on the Ground Level.
    [Show full text]
  • AECOM Report 1.Dot
    RER New Stations Initial Business Case SPADINA Barrie Corridor July 2016 Draft Draft: v1.2 Metrolinx Client ref: 150400 RER New Stations Initial Business Case SPADINA Draft Prepared by: Prepared for: Urban Strategies Inc. Metrolinx 197 Spadina Avenue, Suite 600 97 Front Street West Toronto, ON Canada M5T 2C8 Toronto, ON M5J 1E6 RER New Stations Initial Business Case June 2016 Note to the reader: The Initial Business Case (IBC) represents a primary input into the evaluation and recommendation of New Stations. Final recommendation of new station site selection considers, in addition to the four cases of the IBC, network fit, and other strategic considerations including priorities of the various levels of government. Network fit addresses system-wide issues and impact on the overall performance of the rail corridor. IBC results do not represent the final recommendations of the GO RER New Stations Evaluation process. IBC results inform the process outlined in the GO RER New Stations Summary and Ranking Report, which is to be posted in the near future. For more information visit: http://www.metrolinx.com/en/regionalplanning/newstations/ The final list of recommended stations is included in the June 28, 2016 GO Regional Express Rail Update report to Metrolinx Board of Directors. 97 Front Street West 97, rue Front Ouest Toronto, Ontario M5J 1E6 Toronto (Ontario) M5J 1E6 RER New Stations Initial Business Case: Spadina– draft Executive Summary This Initial Business Case (IBC) examines the potential for a new GO station, Spadina, along the GO Barrie line. The station is proposed immediately south of Front Street West, between Bathurst Street and Spadina Avenue in the North Bathurst Yard.
    [Show full text]
  • Restaurants the Larger Downtown Area of Toronto Has Enough Restaurants to Meet Any Preference and Budget
    Restaurants The larger downtown area of Toronto has enough restaurants to meet any preference and budget. Below is a list of neighborhoods with a high concentration of restaurants in walking distance of each other, with some suggestions. Public transit directions are from “Union Station” (for subway) or from streetcar stop on Queen’s Quay. Harbourfront King Street West This is the area around the hotel, right on the waterfront. All On King St W (west of Spadina Ave) are a few very good restaurants, restaurants are within walking distance from the conference hotel. which are a bit spread out. Take 510 Spadina Station streetcar until King St. Il Fornello (Italian) $$$ 207 Queen's Quay W, (416) 861-1028 Crush Wine Bar (Steak/Seafood) $$$ Pearl Harbourfront (Dim Sum) $$$ Inside the Queen's Quay 455 King Street W, (416) 977-1234 Terminal building on the second floor. Brassaii (International) $$$ 207 Queen's Quay W, (416) 203-1233 461 King St. W, (647) 955-4872 Watermark Irish Pub (Pub Food) $$ Decent Pub fare. Large Lee (Asian Fusion) $$$ Tapas style cuisine by celebrity chef Susur Lee. outside dining area. This is the location of the student dinner on 603 King Street W, (416) 504-7867 Tuesday. Blowfish (Fusion) $$$ Stylish restaurant with Japanese Fusion cuisine. 207 Queen's Quay W, (416) 214-2772 668 King St W, (416) 860-0606 Against the Grain $$ (Gastropub) Recently opened stylish restaurant with a large patio on the waterfront. Good food, reasonably Queen Street West priced. Local brews. The location is about 1km East of the Westin, past the Redpath Sugar Refinery.
    [Show full text]