金輪天地控股有限公司 Voluntary Announcement

Total Page:16

File Type:pdf, Size:1020Kb

金輪天地控股有限公司 Voluntary Announcement Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. GOLDEN WHEEL TIANDI HOLDINGS COMPANY LIMITED 金 輪 天 地 控 股 有 限 公 司 (Incorporated in the Cayman Islands with limited liability) (Stock Code: 1232) VOLUNTARY ANNOUNCEMENT SUCCESS IN BIDDING FOR LEASING AND OPERATIONAL MANAGEMENT CONTRACT: COMMERCIAL SPACE IN FIVE CHANGSHA METRO LINE 4 STATIONS The Company is pleased to announce that Nanjing Golden Wheel Business Management, a wholly- owned subsidiary of the Company, has been informed by Changsha City Land Auction that it has succeeded in the bidding for the leasing and operational management contract in relation to underground commercial space in five stations on Changsha Metro Line 4 for a term of ten years. Upon execution of the leasing and operational management contract, the Group will become an important operator of underground commercial space on Changsha Metro Line 4 in Changsha, the PRC. Golden Wheel Tiandi Holdings Company Limited ( 金 輪 天 地 控 股 有 限 公 司 ) (the “Company”, together with its subsidiaries, the “Group”) is pleased to announce that Nanjing Golden Wheel Business Management Corporation Limited* (南京金輪商業管理股份有限公司) (“Nanjing Golden Wheel Business Management”), a wholly-owned subsidiary of the Company, has been informed by Changsha City Land Auction Company Limited* (長沙市土地拍賣有限公 司) (“Changsha City Land Auction”) that it has succeeded in the bidding for the leasing and operational management contract in relation to underground commercial space in five stations on Changsha Metro Line 4 for a term of ten years. The Company expects to execute the leasing and operational management contract within 30 calendar days from the date of signing the relevant lease confirmation. 1 Further details of the leasing and operational management contract are set out below: Location of the properties: Underground commercial space in the following Changsha metro stations: 1) Bishahu Station* (碧沙湖站) 2) Guanziling Station* (罐子岭站) 3) Shumuling Station* (樹木岭站) 4) Chazishan Station* (茶子山站) 5) Dujiaping Station* (杜家坪站) Lease Term: Ten years from the date of delivery Leasable gross floor area: 21,774.27 square meters Rental payment under contract: RMB1,968,100 for the initial year rental payment (increase by 5% every three years) which equals to RMB20,892,200 in total for ten years for the underground commercial space in five metro stations Scope of operational management: Sub-leasing, operation and property management 2 The Group is an integrated commercial and residential property developer, owner and operator. The principal activities of the Group are property development and property leasing, including leasing of self-owned properties and sub-lease of rented properties, hotel operations and management in the People’s Republic of China (the “PRC”) including Hong Kong. The Group also focuses on projects that are physically connected or in close proximity to metro stations or other transportation hubs. The board of directors of the Company considers that the lease and the operational management of underground commercial space is in line with the business development strategy and plan of the Group. With the success in bidding for the leasing and operational management contract, the Group will become an important operator of underground commercial space on Changsha Metro Line 4 in Changsha, the PRC. The Company will sub-lease, operate and manage the commercial properties on a project basis. This announcement is made by the Company on a voluntary basis and does not constitute for the Company a transaction discloseable under Chapter 14 or Chapter 14A of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited. By Order of the Board Golden Wheel Tiandi Holdings Company Limited Wong Yam Yin Chairman Hong Kong, 11 May 2018 As at the date of this announcement, the Board of Directors of the Company consists of Mr. Wong Yam Yin, Mr. Wong Kam Fai, Mr. Wong Kam Keung, Barry, Mr. Tjie Tjin Fung, and Mr. Janata David as Executive Directors; Mr. Suwita Janata and Mr. Gunawan Kiky as Non- Executive Directors; Mr. Wong Ying Loi, Mr. Lie Tak Sen, Mr. Li Yiu Fai and Mr. Wong Cho Kei, Bonnie as Independent Non-Executive Directors. * For identification purpose only 3 .
Recommended publications
  • 5G for Trains
    5G for Trains Bharat Bhatia Chair, ITU-R WP5D SWG on PPDR Chair, APT-AWG Task Group on PPDR President, ITU-APT foundation of India Head of International Spectrum, Motorola Solutions Inc. Slide 1 Operations • Train operations, monitoring and control GSM-R • Real-time telemetry • Fleet/track maintenance • Increasing track capacity • Unattended Train Operations • Mobile workforce applications • Sensors – big data analytics • Mass Rescue Operation • Supply chain Safety Customer services GSM-R • Remote diagnostics • Travel information • Remote control in case of • Advertisements emergency • Location based services • Passenger emergency • Infotainment - Multimedia communications Passenger information display • Platform-to-driver video • Personal multimedia • In-train CCTV surveillance - train-to- entertainment station/OCC video • In-train wi-fi – broadband • Security internet access • Video analytics What is GSM-R? GSM-R, Global System for Mobile Communications – Railway or GSM-Railway is an international wireless communications standard for railway communication and applications. A sub-system of European Rail Traffic Management System (ERTMS), it is used for communication between train and railway regulation control centres GSM-R is an adaptation of GSM to provide mission critical features for railway operation and can work at speeds up to 500 km/hour. It is based on EIRENE – MORANE specifications. (EUROPEAN INTEGRATED RAILWAY RADIO ENHANCED NETWORK and Mobile radio for Railway Networks in Europe) GSM-R Stanadardisation UIC the International
    [Show full text]
  • Leading New ICT Building a Smart Urban Rail
    Leading New ICT Building A Smart Urban Rail 2017 HUAWEI TECHNOLOGIES CO., LTD. Bantian, Longgang District Shenzhen518129, P. R. China Tel:+86-755-28780808 Huawei Digital Urban Rail Solution Digital Urban Rail Solution LTE-M Solution 04 Next-Generation DCS Solution 10 Urban Rail Cloud Solution 15 Huawei Digital Urban Rail Solution Huawei Digital Urban Rail Solution Huawei LTE-M Solution for Urban Rail Huawei and Alstom the Completed World’s Huawei Digital Urban Rail LTE-M Solution First CBTC over LTE Live Pilot On June 29th, 2015, Huawei and Alstom, one of the world’s leading energy solutions and transport companies, announced the successful completion of the world’s first live pilot test of 4G LTE multi-services based on Communications- based Train Control (CBTC), a railway signalling system based on wireless ground-to-train CBTC PIS CCTV Dispatching communication. The successful pilot, which CURRENT STATUS IN URBAN RAIL covered the unified multi-service capabilities TV Wall ATS Server Terminal In recent years, public Wi-Fi access points have become a OCC of several systems including CBTC, Passenger popular commodity in urban areas. Due to the explosive growth Information System (PIS), and closed-circuit in use of multimedia devices like smart phones, tablets and NMS LTE CN television (CCTV), marks a major step forward in notebooks, the demand on services of these devices in crowded the LTE commercialization of CBTC services. Line/Station Section/Depot Station places such as metro stations has dramatically increased. Huge BBU numbers of Wi-Fi devices on the platforms and in the trains RRU create chances of interference with Wi-Fi networks, which TAU TAU Alstom is the world’s first train manufacturer to integrate LTE 4G into its signalling system solution, the Urbalis Fluence CBTC Train AR IPC PIS AP TCMS solution, which greatly improves the suitability of eLTE, providing a converged ground-to-train wireless communication network Terminal When the CBTC system uses Wi-Fi technology to implement for metro operations.
    [Show full text]
  • Changsha Metro Map Pdf
    Changsha metro map pdf Continue Construction of the 4th Changsha metro line began in late 2014, and the trial operation began on May 26, 2019. This is Changsha's third metro line, after Line 1 and Line 2. The entire route is 33.5 km, with 25 stations. It connects the eastern and western banks of the Xiangjiang River, and is an important part of the Changsha Union Jack shaped metro plan. The first phase of Line 4 stretches from Guangziling station to Dugiaping station. It connects Changsha in Wangcheng, Yuelu, Tianxin, and Yuhua districts, and Changsha County. Each of the 25 stations along the 33.5-kilometre course is underground and includes 13 shuttle stations. The extension of Line 4 was approved by the National Development and Reform Commission in March 2017. It is 14.26 km long and will have eight stations. Metro Line 4 offers several types of tickets at the same prices and preferential policies with previous lines. Click to find out more tickets and preferential information in June 2019, Craig Moore reports from Changsha: Changsha Metro had a pretty basic, formulaic start, but with the expansion of the network and design improvements, it has become an impressive system, and along with additional non-metro rail provision, Hunan Capital now has an interesting urban rail trail. The 84.0 km network has 62 stations and runs from 0630-2300 with an 8/9min production base, 1435 gauge and overhead power supplies. Rates are at a distance and cost from 2-6 yuan. Line 1 runs from north to south from the Keifu area, through the main central corridor to the southern terminal in Shanshuangtan.
    [Show full text]
  • METROS/U-BAHN Worldwide
    METROS DER WELT/METROS OF THE WORLD STAND:31.12.2020/STATUS:31.12.2020 ّ :جمهورية مرص العرب ّية/ÄGYPTEN/EGYPT/DSCHUMHŪRIYYAT MISR AL-ʿARABIYYA :القاهرة/CAIRO/AL QAHIRAH ( حلوان)HELWAN-( المرج الجديد)LINE 1:NEW EL-MARG 25.12.2020 https://www.youtube.com/watch?v=jmr5zRlqvHY DAR EL-SALAM-SAAD ZAGHLOUL 11:29 (RECHTES SEITENFENSTER/RIGHT WINDOW!) Altamas Mahmud 06.11.2020 https://www.youtube.com/watch?v=P6xG3hZccyg EL-DEMERDASH-SADAT (LINKES SEITENFENSTER/LEFT WINDOW!) 12:29 Mahmoud Bassam ( المنيب)EL MONIB-( ش ربا)LINE 2:SHUBRA 24.11.2017 https://www.youtube.com/watch?v=-UCJA6bVKQ8 GIZA-FAYSAL (LINKES SEITENFENSTER/LEFT WINDOW!) 02:05 Bassem Nagm ( عتابا)ATTABA-( عدىل منصور)LINE 3:ADLY MANSOUR 21.08.2020 https://www.youtube.com/watch?v=t7m5Z9g39ro EL NOZHA-ADLY MANSOUR (FENSTERBLICKE/WINDOW VIEWS!) 03:49 Hesham Mohamed ALGERIEN/ALGERIA/AL-DSCHUMHŪRĪYA AL-DSCHAZĀ'IRĪYA AD-DĪMŪGRĀTĪYA ASCH- َ /TAGDUDA TAZZAYRIT TAMAGDAYT TAỴERFANT/ الجمهورية الجزائرية الديمقراطيةالشعبية/SCHA'BĪYA ⵜⴰⴳⴷⵓⴷⴰ ⵜⴰⵣⵣⴰⵢⵔⵉⵜ ⵜⴰⵎⴰⴳⴷⴰⵢⵜ ⵜⴰⵖⴻⵔⴼⴰⵏⵜ : /DZAYER TAMANEỴT/ دزاير/DZAYER/مدينة الجزائر/ALGIER/ALGIERS/MADĪNAT AL DSCHAZĀ'IR ⴷⵣⴰⵢⴻⵔ ⵜⴰⵎⴰⵏⴻⵖⵜ PLACE DE MARTYRS-( ع ني نعجة)AÏN NAÂDJA/( مركز الحراش)LINE:EL HARRACH CENTRE ( مكان دي مارت بز) 1 ARGENTINIEN/ARGENTINA/REPÚBLICA ARGENTINA: BUENOS AIRES: LINE:LINEA A:PLACA DE MAYO-SAN PEDRITO(SUBTE) 20.02.2011 https://www.youtube.com/watch?v=jfUmJPEcBd4 PIEDRAS-PLAZA DE MAYO 02:47 Joselitonotion 13.05.2020 https://www.youtube.com/watch?v=4lJAhBo6YlY RIO DE JANEIRO-PUAN 07:27 Así es BUENOS AIRES 4K 04.12.2014 https://www.youtube.com/watch?v=PoUNwMT2DoI
    [Show full text]
  • LINCE GROUP MANUAL CONTENTS 目录 企业简介 Enterprise Introduction 04 企业文化 Corporate Culture 06
    LINCE GROUP MANUAL CONTENTS 目录 企业简介 Enterprise Introduction 04 企业文化 Corporate Culture 06 组织结构 Organization Chart 08 技术研发能力 Technical Developmentability 10 检测试验能力 Inspection And Test Capabilities 12 质量体系 Quality System 18 企业荣耀 Enterprise Honor 19 客户关系 Customer Relationship Management 20 机车产品 Locomotive Products 24 地铁产品 Metro Products 26 矿车产品 Dumper Products 28 通风冷却 Ventilation System 32 结构件 Structure Parts 44 制动系统部件 Braking System Parts 54 电子电器 Electric & Electronic Products 58 减振器 Dampers 64 新材料 / 内装 New Materials/Interior Parts 66 铸造件 Casting 76 电机 New Materials/Interior Parts 80 涂料涂装 Paint Coating 82 2 3 ENTERPRISE INTRODUCTION 株洲联诚集团有限责任公司是中国目前最专业的轨道交通装备部件制造 商和供应商之一。系国家 3A 级信用企业、国家火炬计划高新技术企业、湖 企业简介 南省轨道交通装备冷却工程技术研究中心、湖南省复合材料工程技术研究中 心,“联诚及图”为中国驰名商标,并已在欧盟注册。现拥有 20 万平方米的 生产车间和 3420 名员工,总资产 18.67 亿元,2014 年完成工业总产值 32 亿元。已通过 IRIS、EN15085、ISO9001、ISO/IEC17025、DIN6701、 ISO14001、0HSMS18001体系认证,拥有国家认可的实验室、博士后工作站。 公司重点服务于铁路机车、动车组、城轨车辆、重型机械及新能源五大 产业领域,具有 30 多年的轨道交通装备部件研制历程,拥有通风冷却系统、 结构件焊接、减振装置、制动系统部件、电阻装置、复合材料、传感装置、 空气干燥、铸造、涂料涂装系列的先进研发、设计、验证平台和多条高效生产线。 公司先后完成国际最先进的大功率交传机车和高速动车组的多个系统和关键 部件研发制造,已成为轨道交通装备行业的关键部件供应商、中国轨道交通 装备部件行业领先者。 Zhuzhou Lince Group Co., Ltd. is one of the most professional manufacturers and suppliers of railway transportation equipment parts in China at present., It is an enterprise certified with national AAA grade credit, a high and new-tech enterprise of National Torch Plan, cooling engineering technology research center for railway transportation equipment of Hunan province, composite materials engineering technology research center of Hunan province. Lince logo was awarded as Chinese well-known trademark, and was registered in EU. Lince owns a 200,000 square meter factory and employed 3420 people. The total asset of Lince is 1.867 billion CNY.
    [Show full text]
  • Summarized List of Projects Open to Foreign Investment of Changsha in 2018
    SUMMARIZED LIST OF PROJECTS OPEN TO FOREIGN INVESTMENT OF CHANGSHA IN 2018 Project Investment Contact Cooperation Funds Name of Project No. Project Name Project Profile Preliminary Work Person & Mode (RMB Ten Unit Thousand ) Contact Person I. Development Projects in Key Districts and Urban-Rural Integration Pilot Towns (22 Projects) 1. Development Projects in Key Districts (18 Projects) Hunan Financial Center is located at the west bank of Xiang River, Changsha. It is the core district of the starting area of the national Xiangjiang New Area - Binjiang New Town. The planning area is 2.8 square kilometers, and the total building area is 6,800,000 square meters. It neighbors Xiang River in the east, Yinshan Road in the west, the Fisherman’s Wharf in the south and Beijincheng Park in the north. Under the leadership of the government, developed and operated by Changsha Pilot Investment Holdings Group, a national regional financial center based on the central and covering the west will be built. It has gathered the national headquarters of Bank of Changsha, Bank of Sanxiang and Jixiang Life Insurance, the provincial branches of China Minsheng Bank, SPD Bank and CGB, and more than 20 headquarters of different Commerce financial institutions such as Kaiyuan Securities, Orient Asset and Changyin 58 Bureau of Yuelu Development and Lin Yuan Consumer Finance. It is proposed to introduce financial enterprise headquarters to District Construction Project infrastructure 152111247 reside in for development or strengthful developers for cooperative development and Project of Hunan completed; Concept planning of 09 construction. Changsha Pilot 1 Financial Center Cooperation / Hunan Financial Center A4 block is located at the east of Xiaoxiang Middle Road, the south of Guyue Road, Binjiang New in Hunan basically completed; investment Wang Lang the west of Binjiang Landscape Road and the north of the Sixth Branch.
    [Show full text]
  • Design and Application of Risk Early Warning System for Subway Station Construction Based on Building Information Modeling Real-Time Model
    Hindawi Advances in Civil Engineering Volume 2021, Article ID 8898893, 12 pages https://doi.org/10.1155/2021/8898893 Research Article Design and Application of Risk Early Warning System for Subway Station Construction Based on Building Information Modeling Real-Time Model Qianlong Tang,1,2 Mingfeng Lei ,3 Binbin Zhu ,4 Limin Peng,4 Weimin Wu,4 and Chenghua Shi4 1School of Civil Engineering, Central South University, Changsha, China 2Jiangxi Transportation Vocational and Technical College, Nanchang, China 3School of Civil Engineering, Central South University, Key Laboratory of Engineering Structure of Heavy Haul Railway (Central South University), Changsha 410075, China 4School of Civil Engineering, Central South University, Changsha, China Correspondence should be addressed to Mingfeng Lei; [email protected] and Binbin Zhu; [email protected] Received 20 May 2020; Revised 12 January 2021; Accepted 1 March 2021; Published 19 March 2021 Academic Editor: Doddy Prayogo Copyright © 2021 Qianlong Tang et al. +is is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. +e problems faced by subway stations in the construction process are more complex than those by overground buildings. +erefore, the construction risk for such structures is highly unpredictable and the risk management is difficult. Building in- formation modeling (BIM) technology has strong visualization, simulation, and integration characteristics that make it conducive to the development of a risk early warning system for underground engineering. According to the functional requirements of risk early warning for subway stations, a risk early warning system based on a BIM real-time construction model is designed in this study for a subway station construction.
    [Show full text]