SESSION of 2008 Act 2008-96 1115 No. 2008-96 a SUPPLEMENT SB

Total Page:16

File Type:pdf, Size:1020Kb

SESSION of 2008 Act 2008-96 1115 No. 2008-96 a SUPPLEMENT SB SESSION OF 2008 Act 2008-96 1115 No. 2008-96 A SUPPLEMENT SB 1503 To the act of December 8, 1982 (P.L.848, No.235), entitled “An act providing for the adoption of capital projects related to the repair, rehabilitation or replacement of highway bridges to be financed from current revenue or by the incurring of debt and capital projects related to highway and safety improvement projects to be financed from current revenue of the Motor License Fund,” itemizing additional State and local bridge projects. The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows: Section 1. Short title. This act shall be known and may be cited as the Highway-Railroad and Highway Bridge Capital Budget Supplemental Act for 2008-2009. Section 2. Defmitions. The following words and phrases when used in this act shall have the meanings given to them in this section unless the context clearly indicates otherwise: “Capital project.” A capital project as defined in section 302 of the act of February 9, 1999 (P.L.1, No.1), known as the Capital Facilities Debt Enabling Act, and shall include a county or municipal bridge rehabilitation, replacement or improvement project as set forth in this act. “Department.” The Department of Transportation of the Commonwealth. “Secretary.” The Secretary ofTransportation of the Commonwealth. Section 3. Total authorization for bridge projects. (a) Total projects—The total authorization for the costs of the projects itemized pursuant to this act and to be financed from current revenue or by the incurring ofdebt shall be $1,966,906,000. (b) State projects.—The authorization for capital projects in the category of highway bridge projects and forestry and State parkbridge projects to be constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt or from current revenue, itemized in this act under the category of State bridges, shallbe $1,538,916,000. (c) Non-State projects.—The authorization for non-State highway bridge projects to be constructed by municipalities and to be financed in part with grants not exceeding 80% of the non-Federal share of the costs made to the local government municipalities by the department from current revenues itemized in this act under the category of local bridges shall be $427,990,000. Section 4. Itemization of bridge projects. The individual capital projects in the category of highway projects to be constructed by the Department of Transportation, its successors or assigns, and to be fmanced from current revenue or by the incurring of debt are 1116 Act2008-96 LAWS OF PENNSYLVANIA hereby itemized, together with their estimated fmancial costs, in the following sections. Section 5. Adams County. (a) Local Bridges (1) Cumberland Township, T-348 over CSX Transportation, Bridge Replacement 1,115,000 (Base Project Allocation - $940,000) (Land Allocation - $75,000) (Design and Contingencies - $100,000) (2) Cumberland and Freedom Townships, T-402 over Marsh Creek, Bridge Replacement 2,175,000 (Base Project Allocation - $1,600,000) (Land Allocation - $75,000) (Design and Contingencies - $500,000) (b) State Bridges (1) SR 0030, East King Street over Beaver Creek, AbbottstownBorough, Bridge Replacement 420,000 (Base Project Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (2) SR 0194, PA 194 over Branch of Beaver Creek, BerwickTownship, Bridge Replacement 187,000 (Land Allocation - $24,000) (Design and Contingencies - $163,000) (3) SR 0194, PA 194, Bridge No.125 over Tributary of Beaver Creek, Berwick Township, Bridge Replacement 117,000 (Land Allocation - $15,000) (Design and Contingencies - $102,000) (4) SR 0194, PA 194, Bridge No.126 over Tributary of Beaver Creek, Berwick Township, Bridge Replacement 131,000 (Land Allocation - $17,000) (Design and Contingencies - $114,000) (5) SR 4014 over Tributary of Conewago Creek, Butler Township, Bridge Replacement 70,000 (Base Project Allocation - $70,000) (6) SR 3004, Marsh Creek Road over SR 0015, Cumberland Township, Bridge Rehabilitation 230,000 (Base Project Allocation - $175,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000) (7) SR 0134, Taneytown Road over SR 0015, Cumberland Township, Bridge Rehabilitation 230,000 (Base Project Allocation - $175,000) (LandAllocation - $5,000) SESSION OF 2008 Act2008-96 1117 (Design and Contingencies - $50,000) (8) SR 0016, Waynesboro Pike over Miney Branch of Toms Creek, Hamiltonban Township, Bridge Rehabilitation 1,700,000 (Base Project Allocation - $745,000) (Design and Contingencies - $955,000) (9) SR 1009 overTributary ofMud Run, Huntington Township, Bridge Replacement 70,000 (Base Project Allocation - $70,000) (10) PA 94 over Bermudian Creek, Latimore Township, Bridge Rehabilitation 1,755,000 (Base Project Allocation - $1,600,000) (LandAllocation - $55,000) (Design and Contingencies - $100,000) (11) SR 1007 over Bennudian Creek, Latimore Township, Bridge Rehabilitation 626,000 (Base Project Allocation - $500,000) (LandAllocation - $5,000) (Design and Contingencies - $121,000) (12) SR 0016, Waynesboro Parkway over Toms Creek, Liberty Township, Bridge Rehabilitation 3,622,000 (Base Project Allocation - $1,716,000) (Design and Contingencies - $1,906,000) (13) SR 2001, Bon-Ox Road over Stambaugh Run, Mt. Pleasant Township, Bridge Rehabilitation 647,000 (Base Project Allocation - $647,000) (14) SR 2001 over Tributary of White Run, Mt. Pleasant Township, Bridge Replacement 761,000 (Base Project Allocation - $389,000) (LandAllocation - $40,000) (Design and Contingencies - $332,000) (15) SR 3003, Hunterstown Road over SR 0015, Straban Township, Bridge Rehabilitation 230,000 (Base Project Allocation - $175,000) (LandAllocation - $5,000) (Design and Contingencies - $50,000) (16) SR 0394, PA 394 over Tributary of Beaver Creek, Straban Township, Bridge Replacement 770,000 (Base Project Allocation - $550,000) (Land Allocation - $40,000) (Design and Contingencies - $180,000) (17) SR 0394 over SR 0015, Straban Township, Bridge Rehabilitation 230,000 (Base Project Allocation - $175,000) (LandAllocation - $5,000) (Design and Contingencies - $50,000) 1118 Act 2008-96 LAWS OF PENNSYLVANIA (18) SR 3001, Old Harrisburg Road, Bridge No.270 over Tributary of Conewago Creek, Straban Township, Bridge Replacement 70,000 (Base Project Allocation - $70,000) (19) SR 3001, Old Harrisburg Road, Bridge No.271 over Tributary of Conewago Creek, Straban Township, Bridge Replacement 70,000 (Base Project Allocation - $70,000) Section 6. Allegheny County. (a) Local Bridges (1) Ben Avon Borough, Spruce Street over Spruce Run, Bridge Replacement 500,000 (Base Project Allocation - $312,000) (LandAllocation - $12,000) (Design and Contingencies - $176,000) (2) Carnegie Borough, Carothers Street over Chartiers Creek, Bridge Rehabilitation 1,946,000 (Base Project Allocation - $1,520,000) (Land Allocation - $10,000) (Design and Contingencies - $416,000) (3) City of Pittsburgh, Sixth Street over Allegheny River, 10th Street Bypass, Bridge Rehabilitation 362,000 (Base Project Allocation - $275,000) (Design and Contingencies - $87,000) (4) City of Pittsburgh, Seventh Street overAllegheny River, 10th Street Bypass, Bridge Rehabilitation 362,000 (Base Project Allocation - $275,000) (Design and Contingencies - $87,000) (5) City of Pittsburgh, Ninth Street over Allegheny River, 10th Street Bypass, Bridge Rehabilitation 362,000 (Base Project Allocation - $275,000) (Design and Contingencies - $87,000) (6) City of Pittsburgh, South Tenth Street over Railroad and 1-376,Bridge Rehabilitation 1,553,000 (Base Project Allocation - $1,350,000) (LandAllocation - $8,000) (Design and Contingencies - $195,000) (7) City of Pittsburgh, Chartiers Avenue over PAT Airport Busway, Bridge Replacement 1,178,000 (Base Project Allocation - $900,000) (Land Allocation - $8,000) (Design and Contingencies - $270,000) (8) City of Pittsburgh, South Negley Avenue over Railroad and PAT Busway, Bridge Replacement 1,178,000 (Base Project Allocation - $900,000) (Land Allocation - $8,000) SESSION OF 2008 Act2008-96 1119 (Design and Contingencies - $270,000) (9) Collier Township, Thorns Run Road overThorns Run, Bridge Replacement 580,000 (Base Project Allocation - $352,000) (Land Allocation - $20,000) (Design and Contingencies - $208,000) (10) Crescent Township, Access Road over Flaugherty Run, Bridge Rehabilitation 540,000 (Base Project Allocation - $360,000) (LandAllocation - $12,000) (Design and Contingencies - $168,000) (11) Fawn Township, Dawson Road over Bull Creek, Bridge Replacement 758,000 (Base Project Allocation - $552,000) (Land Allocation - $10,000) (Design and Contingencies - $196,000) (12) Findlay Township, Imperial - Burgettstown Road over North Fork Montour Run, Bridge Rehabilitation 546,000 (Base Project Allocation - $340,000) (Land Allocation - $10,000) (Design and Contingencies - $196,000) (13) Findlay Township, Steubenville - Enlow Road No.04 over Montour Run, Bridge Replacement 526,000 (Base Project Allocation - $308,000) (LandAllocation - $50,000) (Design and Contingencies - $168,000) (14) Forward Township, Pangburn Hollow Road No.03 over PerryMill Run, Bridge Replacement 104,000 (Base Project Allocation - $84,000) (Land Allocation - $2,000) (Design and Contingencies - $18,000) (15) Forward Township, Pangburn Hollow Road No.08 over PerryMill Run, Bridge Replacement 104,000 (Base Project Allocation - $84,000) (Land Allocation - $2,000) (Design and Contingencies - $18,000) (16) Forward Township, Pangbum Hollow Road No.13 over PerryMill
Recommended publications
  • Bridges & River Shores
    1. Renaissance Pittsburgh Downtown Pittsburgh Walking Tour Hotel Situated on a peninsula jutting into an intersection of rivers, Bridges & River Shores 2. Byham Theater 13 11 the city of 305,000 is gemlike, surrounded by bluffs and bright 3. Roberto Clemente, 13 yellow bridges streaming into its heart. 10 Andy Warhol, and 3 Rachel Carson Bridges “Pittsburgh’s cool,” by Josh Noel, Chicago Tribune, Jan. 5, 2014 N 4. Allegheny River 12 15 14 5. Fort Duquesne Bridge 9 3 15 FREE TOURS Old Allegheny County Jail Museum 6. Heinz Field 8 8 Open Mondays through October (11:30 a.m. to 1:00 p.m.) 7. PNC Park 7 3 (except court holidays) 8. Roberto Clemente and Downtown Pittsburgh: Guided Walking Tours Willie Stargell Statues 2 Every Friday, May through September (Noon to 1:00 p.m.) 9. Allegheny Landing 1 4 • September: Fourth Avenue & PPG Place 10. Alcoa Corporate Center 11. Andy Warhol Museum DOWNTOWN’S BEST 12. Downtown Pittsburgh Special Places and Spaces in a 2-Hour Walk Not free. A guidebook is included. Space is limited. Skyscrapers (view) 6 5 Advance paid reservations are required. 13. David L. Lawrence Convention Center August: every Wednesday, 10:00 a.m. to Noon Other dates by appointment 14. Pittsburgh CAPA (Creative and Performing Arts) 6–12 SPECIAL EVENTS Not free. Reservations are required. Space is limited. 15. Allegheny Riverfront August Fridays at Noon Park Sept. 20 (Sat.): Cul-de-sacs of Shadyside Walking Tour–– A Semi-Private World Oct. 11 (Sat.): Bus Tour of Modernist Landmarks on first certified “green” convention center, with natural one building to the other.
    [Show full text]
  • NON-TIDAL BENTHIC MONITORING DATABASE: Version 3.5
    NON-TIDAL BENTHIC MONITORING DATABASE: Version 3.5 DATABASE DESIGN DOCUMENTATION AND DATA DICTIONARY 1 June 2013 Prepared for: United States Environmental Protection Agency Chesapeake Bay Program 410 Severn Avenue Annapolis, Maryland 21403 Prepared By: Interstate Commission on the Potomac River Basin 51 Monroe Street, PE-08 Rockville, Maryland 20850 Prepared for United States Environmental Protection Agency Chesapeake Bay Program 410 Severn Avenue Annapolis, MD 21403 By Jacqueline Johnson Interstate Commission on the Potomac River Basin To receive additional copies of the report please call or write: The Interstate Commission on the Potomac River Basin 51 Monroe Street, PE-08 Rockville, Maryland 20850 301-984-1908 Funds to support the document The Non-Tidal Benthic Monitoring Database: Version 3.0; Database Design Documentation And Data Dictionary was supported by the US Environmental Protection Agency Grant CB- CBxxxxxxxxxx-x Disclaimer The opinion expressed are those of the authors and should not be construed as representing the U.S. Government, the US Environmental Protection Agency, the several states or the signatories or Commissioners to the Interstate Commission on the Potomac River Basin: Maryland, Pennsylvania, Virginia, West Virginia or the District of Columbia. ii The Non-Tidal Benthic Monitoring Database: Version 3.5 TABLE OF CONTENTS BACKGROUND ................................................................................................................................................. 3 INTRODUCTION ..............................................................................................................................................
    [Show full text]
  • Connecting the Loop Plan (2003)
    CONNECTING THE LOOP THREE RIVERS PARK Defining Strategies for Implementation Presented by the Riverlife Task Force Pittsburgh May 2003 CONNECTING THE LOOP THREE RIVERS PARK Defining Strategies for Implementation n August 2002, Mayor Tom Murphy issued a challenge to the Riverlife Task TABLE OF CONTENTS Force: How can we link Pittsburgh’s three rivers with a continuous system of BACKGROUND 3 trails and riverfront parkland for people of all ages? Which trails are currently ELEMENTS OF THE LOOP 4 TRAIL SEGMENT ANALYSIS 7 connected? Which are not? How do we establish connections that do not yet APPENDIX 87 exist? What exciting destinations can we create along the shoreline? I. PROJECT SUMMARY 88 I II. ANTICIPATED PROBABLE COSTS 94 After walking the entire shoreline within the bounds of Three Rivers Park, we hired III. EXCERPTS FROM RIVERLIFE 96 a team of architects, landscape architects and civil engineers to present options DESIGN GUIDELINES and propose solutions for riverfront trails, bridge connections and water landings. Connecting the Loop presents a range of ways to establish a continuous trail system with acquisition, design and construction that can be phased over the next decade. We offer this as a resource for property owners, planners, developers, public agencies and non-profit organizations, and we urge them to seize moments of opportunity to undertake projects, large and small. For the Riverlife Task Force, the plan will also serve as a guide as we work with public and private stakeholders to develop long and short-term priorities. We are proud to present Connecting the Loop and we invite you to work with us to return Pittsburgh’s greatest asset to the public — its rivers and miles of shoreline.
    [Show full text]
  • NOTICES Obtain a Permit from the Department Prior to Cultivating, DEPARTMENT of AGRICULTURE Propagating, Growing Or Processing Hemp
    1831 NOTICES obtain a permit from the Department prior to cultivating, DEPARTMENT OF AGRICULTURE propagating, growing or processing hemp. General Permit Standards and Requirements for K. Hemp has been designated a controlled plant in Hemp Pennsylvania and its propagation, cultivation, testing, transportation, warehousing and storage, processing, dis- Recitals. tribution and sale is of a statewide concern. This Notice amends and replaces the previous Notice L. This General Permit establishes rules and require- ‘‘General Permit Standards and Requirements for Hemp’’ ments for the distribution and sale of hemp planting published in the December 5, 2020 Pennsylvania Bulletin materials, and for the propagation, cultivation, testing, (50 Pa.B. 6906, Saturday, December 5, 2020). transportation, warehousing, storage, and processing of hemp as authorized by the Act. A. The Act relating to Controlled Plants and Noxious Weeds (‘‘Act’’) (3 Pa.C.S.A. § 1501 et seq.) authorizes the M. This General Permit does not and may not abrogate Department of Agriculture (Department) through the the provisions of the act related to industrial hemp Controlled Plant and Noxious Weed Committee (Commit- research, at 3 Pa.C.S.A. §§ 701—710, including, permit- tee) to establish a controlled plant list and to add plants ted growers must still submit fingerprints to the Pennsyl- to or remove plants from the controlled plant list vania State Police for the purpose of obtaining criminal (3 Pa.C.S.A. § 1511(b)(3)(ii)(iii)). history record checks. The Pennsylvania State Police or its authorized agent shall submit the fingerprints to the B. The Act provides for publication of the noxious weed Federal Bureau of Investigation for the purpose of verify- and the controlled plant list and additions or removals or ing the identity of the applicant and obtaining a current changes thereto to be published as a notice in the record of any criminal arrests and convictions.
    [Show full text]
  • Pennsylvania Nonpoint Source Program Fy2003 Project Summary
    Rev.1/30/03 PENNSYLVANIA NONPOINT SOURCE PROGRAM FY2003 PROJECT SUMMARY Base Program/District Staff Project Title: Conservation District Mining Program Project Number: 2301 Budget: $ 125,000 Lead Agency: Western Pennsylvania Coalition for Abandoned Mine Reclamation (WPCAMR) Location: Western Pennsylvania bituminous coal region Point of Contact: Garry Price, BWM or Bruce Golden, Regional Coordinator, Western Pennsylvania Coalition for Abandoned Mine Reclamation The purpose of the WPCAMR is to promote and facilitate the reclamation and remediation of abandoned mine drainage (AMD) in western Pennsylvania. Through this project the Regional Coordinator will continue to develop an education program, coordinate AMD remediation activities, generate local support for remediation efforts, and assist watershed associations and conservation districts in the development of watershed management plans and in securing funding for AMD remediation. The Watershed Coordinator will continue to assist with the development and implementation of funded projects. Project Title: Conservation District Mining Program Project Number: 2302 Budget: $ 118,000 Lead Agency: Eastern Pennsylvania Coalition for Abandoned Mine Reclamation (EPCAMR) Location: Anthracite and northern bituminous regions of Pennsylvania Point of Contact: Garry Price, BWM or Robert Hughes, Eastern Pennsylvania Coalition for Abandoned Mine Reclamation EPCAMR was formed to promote and facilitate the reclamation and remediation of land and water adversely affected by past coal mining practices in eastern Pennsylvania. EPCAMR is a complimentary organization to the Western Pennsylvania Coalition. The EPCAMR Regional Coordinator will continue efforts to organize watershed associations, develop an education program, coordinate AMD remediation activities, generate local support for remediation efforts, and assist watershed associations and conservation districts in the development of watershed management plans and in securing funding for AMD remediation.
    [Show full text]
  • February Mayflyer
    Mayflyer Donegal Trout Unlimited February 2018 Vol. 48 # 1 What’s of location). On the 22ⁿd, Lancaster County Conservan- FEBRUARY cy, Harvey’s Gardens, and DTU are sponsoring a lecture by Doug Tallamy, 7 PM at Franklin & Marshall College. MEETING Emerging Professor Tallamy knows everything about our native plants – those we’ve lost, those we need to protect, and FEBRUARY 21 Winter Part Two the value of each to our ecosystem. Adding just a few of these plants to our gardens can help sustain our local 7:00 PM As you read this, the groundhog should be telling us there wildlife. will be six more weeks of Winter. That’s his usual FARM & HOME prediction. I’ll be checking my garden in four weeks just April activities compete with the official start of the fishing to be sure I don’t miss the first hints of Spring. While we season in our part of the state. The 7th will be a busy day. CENTER wait for the ice to get off the river and the streams to The Donegal F&C Association will hold their annual warm, DTU can offer you a few activities to lift your Fishing Derby at the Presbyterian Church. This is a great 1383 ARCADIA RD spirits. event to take any children in your family. In the evening, I hope you will join me at our Spring Fundraiser. This LANCASTER There are two remaining Winter Fly Tying Gatherings – year we will be at the Double Tree by Hilton on Willow Feb. 10 and March 10. We meet at the Stauffers of Kissel Street Pike.
    [Show full text]
  • Penndot Announces 2018 Allegheny County Highway and Bridge Improvement Projects
    FOR IMMEDIATE RELEASE March 5, 2018 PennDOT Announces 2018 Allegheny County Highway and Bridge Improvement Projects Pittsburgh, PA – PennDOT is pleased to announce the 2018 Allegheny County transportation improvement project list for state-owned roads and bridges. District 11 will invest an estimated $208 million on 68 projects to improve, preserve or rehabilitate transportation infrastructure including 42 bridges (37 structurally deficient) in Allegheny County in 2018. Additionally, 102 miles of roadway will be paved or resurfaced and more than $21 million will be invested in tunnel maintenance and improvements. Approximately 59 projects will be bid this year valued at an estimated $171 million. “After a challenging winter, Construction season is underway and PennDOT is excited to announce the schedule of new projects starting in 2018,” said District Executive Cheryl Moon- Sirianni. “Additionally, major roadway, bridge and tunnel projects continue this year as PennDOT makes significant investments to our regional infrastructure.” Here’s a preview of the improvements scheduled for 2018 in Allegheny County: Projects continuing from 2017 with minor work remaining I-376 Fort Pitt Tunnel Ceiling Removal Only minor work to complete a fire suppression system remains in 2018 in the outbound Fort Pitt Tunnel on this $14.51 million project in the City of Pittsburgh. Completed work on the project includes tunnel ceiling removal, concrete repairs to the tunnel walls, waterline and standpipe improvements, electrical updates, drainage upgrades, and reroofing of the north portal building. I-376 – Beaver County to Pittsburgh Airport Resurfacing on the Clinton Bridge and a portion of I-376 at the Beaver County line remains on this $66.34 million project.
    [Show full text]
  • Sewickley Creek Watershed Conservation Plan
    Sewickley Creek Watershed Conservation Plan August 2003 SewickleySewickley CreekCreek WatershedWatershed ConservationConservation PlanPlan SewickleySewickley CreekCreek WatershedWatershed ConservationConservation PlanPlan SewickleySewickley CreekCreek WatershedWatershed ConservationConservation PlanPlan SewickleySewickley CreekCreek WatershedWatershed ConservationConservation PlanPlan The Pennsylvania Rivers Conservation Program Sewickley Creek Watershed Conservation Plan August 2003 Prepared for: Prepared by: Sewickley Creek Watershed Association Watershed Assistance Center P.O. Box 323 246 South Walnut Street Youngwood, PA 15697 Blairsville, PA 15717 724-925-3621 724-459-0953 www.sewickleycreek.com www.paconserve.org Funding provided in part by: Pennsylvania Department of Conservation & Natural Resources Bureau of Recreation & Conservation Keystone Recreation, Park & Conservation Fund Sewickley Creek Watershed Conservation Plan Table of Contents TABLE OF CONTENTS Title Page i Table of Contents ii Acknowledgments vi Executive Summary viii Project Background viii Purpose viii Planning Process ix Implementation ix Management Recommendations x Chapter Summaries xi Project Area xii Land Resources xiii Water Resources xiv Biological Resources xv Cultural Resources xvi Acronyms xvii List of Tables xx List of Figures xxii Watershed Definition xxiii Project Area Characteristics 1-1 Location 1-1 Size 1-1 Climate 1-1 Topography 1-1 Major Tributaries 1-2 Socio-Economic Profile 1-2 Land Use 1-2 Land Use Regulation 1-4 Demographics and Population
    [Show full text]
  • Jjjn'iwi'li Jmliipii Ill ^ANGLER
    JJJn'IWi'li jMlIipii ill ^ANGLER/ Ran a Looks A Bulltrog SEPTEMBER 1936 7 OFFICIAL STATE September, 1936 PUBLICATION ^ANGLER Vol.5 No. 9 C'^IP-^ '" . : - ==«rs> PUBLISHED MONTHLY COMMONWEALTH OF PENNSYLVANIA by the BOARD OF FISH COMMISSIONERS PENNSYLVANIA BOARD OF FISH COMMISSIONERS HI Five cents a copy — 50 cents a year OLIVER M. DEIBLER Commissioner of Fisheries C. R. BULLER 1 1 f Chief Fish Culturist, Bellefonte ALEX P. SWEIGART, Editor 111 South Office Bldg., Harrisburg, Pa. MEMBERS OF BOARD OLIVER M. DEIBLER, Chairman Greensburg iii MILTON L. PEEK Devon NOTE CHARLES A. FRENCH Subscriptions to the PENNSYLVANIA ANGLER Elwood City should be addressed to the Editor. Submit fee either HARRY E. WEBER by check or money order payable to the Common­ Philipsburg wealth of Pennsylvania. Stamps not acceptable. SAMUEL J. TRUSCOTT Individuals sending cash do so at their own risk. Dalton DAN R. SCHNABEL 111 Johnstown EDGAR W. NICHOLSON PENNSYLVANIA ANGLER welcomes contribu­ Philadelphia tions and photos of catches from its readers. Pro­ KENNETH A. REID per credit will be given to contributors. Connellsville All contributors returned if accompanied by first H. R. STACKHOUSE class postage. Secretary to Board =*KT> IMPORTANT—The Editor should be notified immediately of change in subscriber's address Please give both old and new addresses Permission to reprint will be granted provided proper credit notice is given Vol. 5 No. 9 SEPTEMBER, 1936 *ANGLER7 WHAT IS BEING DONE ABOUT STREAM POLLUTION By GROVER C. LADNER Deputy Attorney General and President, Pennsylvania Federation of Sportsmen PORTSMEN need not be told that stream pollution is a long uphill fight.
    [Show full text]
  • Prepared by the Delaware Valley Regional Planning Commission
    Prepared by the Delaware Valley Regional Planning Commission BUCKS COUNTY FLOOD RECOVERY AND MITIGATION STRATEGY Prepared for the U.S. Department of Commerce Economic Development Administration Prepared by the Delaware Valley Regional Planning Commission This Economic Adjustment Strategy was accomplished by staff of the Delaware Valley Regional Planning Commission through Economic Development Administration Adjustment Strategy Grant No. 01-09-58005. The statements, findings, conclusions, recommendations, and other data in this report are solely those of the Delaware Valley Regional Planning Commission and do not necessarily reflect the views of the Economic Development Administration. The background flood map is used in part solely for state affairs only. courtesy FEDERAL INSURANCE ADMINISTRATION SEPTEMBER 1998 DELAWARE VALLEY REGIONAL PLANNING COMMISSION Publication Abstract TITLE Date Published: September 1998 Bucks County Flood Recovery and Mitigation Strategy Publication No. 98032 Geographic Area Covered: Bucks County Key Words: Floods, Flooding, Floodplain, Flood Prone, Flood Proofing, Regulations, Impervious Coverage, Watersheds, Sub-Basin 2, Emergency Management, Neshaminy Creek, Buck Creek, Brock Creek, National Flood Insurance Program, Levee, Dam, Floodwall, Acquisition, Relocation, Army Corps of Engineers, Delaware River Basin Commission ABSTRACT This report provides a flood recovery and mitigation strategy for those flood prone communities in Bucks County. As an element of a flood mitigation plan for eastern Pennsylvania, which
    [Show full text]
  • Brook Trout Outcome Management Strategy
    Brook Trout Outcome Management Strategy Introduction Brook Trout symbolize healthy waters because they rely on clean, cold stream habitat and are sensitive to rising stream temperatures, thereby serving as an aquatic version of a “canary in a coal mine”. Brook Trout are also highly prized by recreational anglers and have been designated as the state fish in many eastern states. They are an essential part of the headwater stream ecosystem, an important part of the upper watershed’s natural heritage and a valuable recreational resource. Land trusts in West Virginia, New York and Virginia have found that the possibility of restoring Brook Trout to local streams can act as a motivator for private landowners to take conservation actions, whether it is installing a fence that will exclude livestock from a waterway or putting their land under a conservation easement. The decline of Brook Trout serves as a warning about the health of local waterways and the lands draining to them. More than a century of declining Brook Trout populations has led to lost economic revenue and recreational fishing opportunities in the Bay’s headwaters. Chesapeake Bay Management Strategy: Brook Trout March 16, 2015 - DRAFT I. Goal, Outcome and Baseline This management strategy identifies approaches for achieving the following goal and outcome: Vital Habitats Goal: Restore, enhance and protect a network of land and water habitats to support fish and wildlife, and to afford other public benefits, including water quality, recreational uses and scenic value across the watershed. Brook Trout Outcome: Restore and sustain naturally reproducing Brook Trout populations in Chesapeake Bay headwater streams, with an eight percent increase in occupied habitat by 2025.
    [Show full text]
  • Selected Streamflow Statistics for Streamgage Locations in and Near Pennsylvania
    Prepared in cooperation with the Pennsylvania Department of Environmental Protection Selected Streamflow Statistics for Streamgage Locations in and near Pennsylvania Open-File Report 2011–1070 U.S. Department of the Interior U.S. Geological Survey Cover. Tunkhannock Creek and Highway 6 overpass downstream from U.S. Geological Survey streamgage 01534000 Tunkhannock Creek near Tunkhannock, PA. (Photo by Andrew Reif, USGS) Selected Streamflow Statistics for Streamgage Locations in and near Pennsylvania By Marla H. Stuckey and Mark A. Roland Prepared in cooperation with the Pennsylvania Department of Environmental Protection Open-File Report 2011–1070 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior KEN SALAZAR, Secretary U.S. Geological Survey Marcia K. McNutt, Director U.S. Geological Survey, Reston, Virginia: 2011 For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment, visit http://www.usgs.gov or call 1–888–ASK–USGS. For an overview of USGS information products, including maps, imagery, and publications, visit http://www.usgs.gov/pubprod To order this and other USGS information products, visit http://store.usgs.gov Any use of trade, product, or firm names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Although this report is in the public domain, permission must be secured from the individual copyright owners to reproduce any copyrighted materials contained within this report. Suggested citation: Stuckey, M.H., and Roland, M.A., 2011, Selected streamflow statistics for streamgage locations in and near Pennsyl- vania: U.S.
    [Show full text]