Cadenza Document

Total Page:16

File Type:pdf, Size:1020Kb

Cadenza Document City of Perth Building Permits Issued 19/12/18 - 25/12/18 App Year/Number Application Description Primary Property Address Est Value Date Approved Decision Decision Date Increase Exit Dorr Widths on 1st and 2nd Levels Only Unit 1-3/310 William Street 2018/833 to Existing Restaurant Tenancy's PERTH WA 6000 $5,000 21/12/18 Approved - Building Permit Certified 20/12/18 Stage 1 B (Northen Hay Street End): building(s) and building work - Demolition of existing retail tenancies - Construction of new Bondek slab and external canopy to mezzanine childcare space - Construction, of new foyer entrance - Refurbishment of existing plaza area Stage 1C (Southern St Georges Terrace End): - Demoltion of fire egress routes, planter beds and stairs - Construction of new Bondek slab for future retail tenancy "WOODSIDE" - Refurbishment of hard landscalinq and installation 240 St Georges Terrace 2018/846 of 4 sided LED scree PERTH WA 6000 $6,463,875 24/12/18 Approved - Building Permit Certified 21/12/18 Forward works to Towers 2 and 3 (being Buildings D and E) excavation, pile caps and concrete structure 98 Mounts Bay Road 2018/858 to Level 1 (Less than 12.0m above ground floor level) PERTH WA 6000 $3,800,000 19/12/18 Approved - Building Permit Certified 18/12/18 "WOODSIDE" Fit-out of levels 23 and 24 of the existing office 240 St Georges Terrace 2018/869 building PERTH WA 6000 $9,045,823 20/12/18 Approved - Building Permit Certified 20/12/18 Fitout of existing level 1 office tenancy - Vantage 7 Havelock Street 2018/875 Wealth WEST PERTH WA 6005 $234,666 20/12/18 Approved - Building Permit Certified 19/12/18 286 Hay Street 2018/878 Additions and alterations EAST PERTH WA 6004 $60,000 20/12/18 Approved - Building Permit Certified 20/12/18 Internal demolition back to base building / Re- construction of male and female toilets / Creation of new universal accessible toilet (UAT) / Re-location of "CENTRAL PARK" fire hydrant and fire hose reel / Additional on-floor fire 152-158 St Georges Terrace 2018/883 hydrant and fire hose reel to Level 33 PERTH WA 6000 $2,801,066 20/12/18 Approved - Building Permit Certified 19/12/18 Proposed internal fit out work for Cooper and Lourie "BROADWAY FAIR" Optometrist Nedlands in Broadway Fair Shopping 88 Broadway 2018/886 Centre CRAWLEY WA 6009 $130,000 24/12/18 Approved - Building Permit Certified 24/12/18 "WESTRALIA PLAZA" 167 St Georges Terrace 2018/891 Office Fit-out - Level 6 PERTH WA 6000 $80,000 19/12/18 Approved - Building Permit Certified 18/12/18 Refurbishments to existing carpark including the following: Refurbishment of existing bicycle area, provision of cycle path and re-lining of miscellaneous 108 St Georges Terrace 2018/897 car bays PERTH WA 6000 $181,500 21/12/18 Approved - Building Permit Certified 20/12/18 Office fitout: conversion of existing rooms to open plan workspace including new construction of "GOVERNOR STIRLING TOWER" additional meeting/office room, make good and minor 197 St Georges Terrace 2018/898 services changes. PERTH WA 6000 $14,000 20/12/18 Approved - Building Permit Certified 19/12/18 "EXCHANGE TOWER" 3 Barrack Street 2018/906 Office Fit-out works - Level 11, Mitsui E&P Australia PERTH WA 6000 $2,265,716 19/12/18 Approved - Building Permit Certified 18/12/18 Unit 1/143 Adelaide Terrace 2018/911 Barber shop fitout within an existing building EAST PERTH WA 6004 $19,000 21/12/18 Approved - Building Permit Certified 20/12/18 "WATERTOWN BRAND OUTLET C Proposed internal fitout works for cloth retail 'Sakura 840 Wellington Street 2018/914 Watertown' in Watertown - TB07 WEST PERTH WA 6005 $40,000 20/12/18 Approved - Building Permit Certified 19/12/18 City of Perth Building Permits Issued 19/12/18 - 25/12/18 App Year/Number Application Description Primary Property Address Est Value Date Approved Decision Decision Date "ENEX100" 683-703 Hay Street Mall 2018/918 Tenancy Fitout - Microsoft Perth Office PERTH WA 6000 $2,129,659 24/12/18 Approved - Building Permit Certified 21/12/18 30 Delhi Street 2018/919 Fit-out, End Of Trip Facilities WEST PERTH WA 6005 $361,900 21/12/18 Approved - Building Permit Certified 20/12/18 "AXIOM ON HAY" Lot 1-41/1324 Hay Street 2018/920 Proposed 42 solar panels on the roof of the building WEST PERTH WA 6005 $21,243 24/12/18 Approved - Building Permit Certified 21/12/18 25 Tully Road 2018/924 Installation of a pool fence EAST PERTH WA 6004 $2,450 21/12/18 Approved - Building Permit Uncertified 20/12/18 18 Sum: $27,655,898.
Recommended publications
  • Perth Cbd Office Market Overview September 2014
    RESEARCH PERTH CBD OFFICE MARKET OVERVIEW SEPTEMBER 2014 HIGHLIGHTS Although vacancy is increasing, Prime grade net incentive levels There were three major office leasing activity is being stimulated have risen to circa 25% which is transactions within the Perth CBD by tenants taking advantage of the expected to favour tenant during the first half of 2014, competitive rental rates and migration to higher quality totalling $569.5 million. incentives on offer. premises and into the CBD. KEY FINDINGS SUPPLY & DEVELOPMENT The effects of a soft Perth CBD leasing market during 2013/14 have materialised with negative net absorption The Perth CBD vacancy rate increased to 11.8% (188,536m2) of –70,626m2 recorded for the twelve months to July as at July 2014 (PCA). 2014, resulting in a rise in the vacancy rate to 11.8%. 2 Approximately 169,080m of Office space in the Perth CBD increased Sub-lease/Backfill office supply is currently under by 8,195m2 (0.51%) during the six construction in the Perth CBD. months to July 2014, with a further Limited backfill space has entered the 2 18,507m forecast to become available market over the past six months due to Tenant demand remains soft, over the second half of the year (see pg. low levels of new supply, however, though a pickup is expected in 3 supply map for further details). The 2015. backfill is likely to make an impact in late bulk of new supply is due for completion 2014 and 2015 as new developments 2 in 2015 and comprises 154,150m of reach completion.
    [Show full text]
  • Discovering Perth's Iconic Architecture Tom
    BUILT PERTH DISCOVERING PERTH’S ICONIC ARCHITECTURE TOM MCKENDRICK AND ELLIOT LANGDON CONTENTS Introduction 3 St George’s Cathedral 60 CIVIC HOSPITALITY Western Australian Museum 4 Yagan Square 62 City of Perth Library 6 Royal George Hotel 64 Perth Town Hall 8 Indiana Cottesloe 66 Parliament House 10 Former Titles Office 68 The Bell Tower 12 Old Treasury Buildings 70 Barracks Arch 14 OFFICE City Beach Surf Club 16 QV1 72 Fremantle Prison 18 Allendale Square 74 Perth GPO 20 Former David Foulkes Government House 22 Taylor Showroom 76 Council House 24 Palace Hotel and Criterion Hotel 26 108 St Georges Terrace 78 Fremantle Arts Centre 28 London Court 80 Perth Children’s Hospital 30 Gledden Building 82 Fremantle Town Hall 32 Supreme Court of Western SELECTED HOUSING STYLES 84 Australia 34 RESIDENTIAL Fremantle Ports Administration Mount Eliza Apartments 86 Building 36 Paganin House 88 BRIDGE STYLES 38 32 Henry Street Apartments 90 EDUCATION Warders’ Cottages 92 Victoria Avenue House 94 West Australian Ballet Heirloom by Match 96 Company Centre 40 Blue Waters 98 Winthrop Hall 42 Soda Apartments 100 St George’s College 44 Cloister House 102 ENTERTAINMENT Chisholm House 104 Regal Theatre 46 INDUSTRIAL His Majesty’s Theatre 48 ‘Dingo’ Flour Mill 106 Perth Stadium 50 Perth Concert Hall 52 Glossary 108 Perth Arena 54 Acknowledgements 110 State Theatre Centre of About the authors 110 Western Australia 56 Index 111 SPIRITUAL Cadogan Song School 58 INTRODUCTION In the relatively short space of time in Perth, the book is a gentle tap on can only serve as a guide because since the Swan River Colony was the shoulder, a finger which points many of the records are incomplete established, Perth has transformed upwards and provides a reminder of or not public information.
    [Show full text]
  • Citation Resources Ltd and Its Subsidiaries
    CITATION RESOURCES LTD AND ITS SUBSIDIARIES Consolidated Interim Financial Statements For the Half Year Ended 31 December 2012 ABN 90 118 710 50 For personal use only Table of Contents Corporate Directory 1 Director’s Report 2 Auditors’ Independence Declaration 8 Consolidated Statement of Profit or Loss and Other Comprehensive Income 9 Consolidated Statement of Financial Position 10 Consolidated Statement of Changes in Equity 11 Consolidated Statement of Cash Flows 12 Notes to the Condensed Interim Consolidated Financial Statements 13 Director’s Declaration 21 Independent Auditor’s Review Report 22 For personal use only Corporate Directory Citation Resources Ltd ABN 90 118 710 508 Directors Mr Brett Mitchell (Executive Director) Mr Michael Curnow (Non-Executive Director) Ms Sophie Raven (Non-Executive Director, appointed 13 December 2012) Company Secretary Ms Sophie Raven Registered Office Level 21, Allendale Square 77 St George Terrace Perth WA 6000 Business Office Level 21, Allendale Square 77 St George Terrace Perth WA 6000 Bankers Bankwest 108 St Georges Terrace Perth WA 6000 Share Registrar Security Transfer Registrars Pty Limited 770 Canning Highway Applecross WA 6953 Auditors Grant Thornton Audit Pty Ltd Level 1, 10 Kings Park Road West Perth WA 6005 Internet Address www.citation.net.au For personal use only ASX Ticker code Shares - CTR Listed options – CTRO, CTROA 1 Directors’ Report The Directors present their report of Citation Resources Ltd and its controlled entities (“the Group” or “the Company”) for the half year ended 31 December 2012 (“the period”). The consolidated entities consist of Citation Resources Ltd and the entities controlled any time during the period.
    [Show full text]
  • Property Portfolio 2009 31 DECEMBER 2009 Property Portfolio 2009
    2009 Property Portfolio 2009 31 DECEMBER 2009 Property Portfolio 2009 about stockland We have a long and proud history of creating places that Ervin Graf, 1952 meet the needs of our customers and communities OUR ProperTY PorTFOLIO OUR STorY This portfolio identifies all of our Ervin Graf founded Stockland in 1952 with a vision We recognise our responsibilities to the environment and are properties and projects across to “not merely achieve growth and profits but to striving to become a leader in sustainable business practices. Australia and the United Kingdom. make a worthwhile contribution to the development Our positive and adaptable team shares Graf’s vision of making a worthwhile contribution to our community. Stockland is one of Australia’s of our cities and great country”. leading diversified property groups. We work hard, we expect a lot of one another, and we seek Pursuing that vision has seen Stockland grow to become We’re active in retail, office and true work-life balance. For over half a century, we’ve worked one of Australia’s leading diversified property groups – industrial property, as well as hard to grow our diverse portfolio of assets and projects while developing and managing a large portfolio of residential residential communities, maintaining a conservative balance sheet. It’s proven to be a community, apartment, retirement living, retail, office and apartments and retirement living. sound approach and we’re now Australia’s largest diversified industrial assets. property group and a top 50 ASX listed company. More information on Stockland’s activities is available at With the benefit of our diverse property skills, we connect www.stockland.com together property styles in shared locations, to create communities of uncommon diversity and connectedness; places that inspire people to gather, to share and to live life.
    [Show full text]
  • Perth Cbd Office Market Overview March 2015
    RESEARCH PERTH CBD OFFICE MARKET OVERVIEW MARCH 2015 HIGHLIGHTS A significant increase in backfill By the end of 2015, it is expected A depreciating Australian dollar and space will make an impact in 2015. that the vacancy rate will be in lower interest rates should attract New developments completing excess of 20%, as new supply international investor interest into during the year will add 149,601m2 comes online against a backdrop the Perth market. of NLA to the market. of soft demand conditions. KEY FINDINGS SUPPLY & DEVELOPMENT By July 2015, 52,502m2 of new supply is to be Total CBD stock increased to 2 2 completed, followed by 97,099m in the second half of 1,625,118m as at January 2015, following the completion of two the year. Overall, 62% of this new development has office buildings. been pre-committed. Approximately 149,600m2 of office supply is currently under As of late 2014, Perth CBD saw the construction and due for completion completion of refurbishment works at 565 Sub-lease/Backfill in 2015. Hay Street (Public Trustee Building) and Late 2014 saw Aurecon move to 861 Hay the newly developed 861 Hay Street Street leaving 5,144m2 of backfill space The Perth CBD recorded negative resulting in an increase to gross supply at 256 Adelaide Terrace. A significant net absorption in the six months during the six months to January 2015 of increase in backfill space in Perth CBD is to January 2015, prime falling by 24,097m2. There were also withdrawals 2 likely to make an impact in 2015 as new -13,786m and secondary recording of 3,283m2 arising over the same period.
    [Show full text]
  • Design Advisory Committee Agenda MARTIN MILEHAM CHIEF
    Design Advisory Committee Notice of Meeting 16 November 2017 4.00pm Committee Room 1 Ninth Floor Council House 27 St Georges Terrace, Perth Agenda ORDER OF BUSINESS AND INDEX 1 Declaration of Opening 2 Apologies and Members on Leave of Absence 3 Confirmation of minutes – 19 October 2017 4 Correspondence 5 Disclosure of Members’ interests 6 Reports 6.1 - Design Advisory Committee – Election of Presiding Member 6.2 - 108 (Lots 58, 59, 60, F9 And F10) St Georges Terrace, Perth – Retrospective Approval for Change of Use to ‘Office’ For Levels 21, 50 and 51 Including Minor Bonus Plot Ratio 6.3 - 240 (Lot 3000) St Georges Terrace, Perth – Alterations to Woodside Plaza 7 Motions of which Previous Notice has been given 8 General Business 8.1 - Responses to General Business from a Previous Meeting 8.2 - New General Business 9 Items for consideration at a future meeting Outstanding Reports: 10 Closure MARTIN MILEHAM CHIEF EXECUTIVE OFFICER 9 November 2017 This meeting is not open to members of the public Please convey apologies to Governance on 9461 3250 or email [email protected] DESIGN ADVISORY COMMITTEE Established: 17 February 2004 Members: Deputy: David Karotkin (Presiding Member) Peter Hobbs Warren Kerr Peter Ciemitis Robina Crook Malcolm Mackay Vacant Stuart Pullyblank State Government Architect or Nominee N/A Director Planning and Development City Architect Quorum: Four Terms Expire: October 2019 Review: Every two years Role: The Design Advisory Committee has been appointed by the Council in accordance with the requirements of Clause 40 of the City Planning Scheme No. 2, which was gazetted on 9 January 2004.
    [Show full text]
  • Sustainability It’S How We Do Business Contents
    2020 ESG REPORT AUSTRALIA Sustainability It’s how we do business Contents 04 We’re breaking the plastic habit 40 Social 06 Who we are 42 Our response to COVID-19 08 Our mission 46 Bringing our spaces to life 09 Our values 48 Creating better connections 10 Our stakeholders 51 Our people 52 Diversity 12 Environment 54 Industry leadership 14 We measure because it matters 56 Employee benefits 14 The impact of COVID-19 on building 57 Training and education performance 58 Brookfield Women’s Network 20 NABERS Energy ratings 60 Brookfield Cares 22 Developing with purpose 30 Single use plastics initiative 64 Governance 32 Coffee cup recycling 68 Our GRESB performance 33 Misfortune cookies 70 Health and safety 34 We’re reducing waste. Every day. 74 Our approach to Supply Chain 37 An industry first in sustainability Management and Modern Slavery 38 What’s next? 76 Looking ahead 78 GRI content index 84 Appendix ABOUT THIS REPORT This annual sustainability report is for the 2020 calendar year reporting period. The report covers Brookfield Properties’ Australian operations and the assets managed by Brookfield Properties Australia. Resource consumption (energy, water, and carbon emissions) is reported for all operational office assets on an operational control basis. Retail and non-office assets are excluded from the resource consumption metrics. This report has been prepared in accordance with the GRI Standards: Core option. For questions relating to our sustainability report or performance, please contact [email protected] 2 Brookfield Properties | 2020 Sustainability Report Brookfield Properties | 2020 Sustainability Report 3 plastic syringes, based on the double-dose In this, our 2020 Sustainability Report, we are We’re requirement.
    [Show full text]
  • Now Leasing Level 28, 108 St Georges Terrace, Perth Level 28, 108 St Georges Terrace - for Lease
    NOW LEASING LEVEL 28, 108 ST GEORGES TERRACE, PERTH LEVEL 28, 108 ST GEORGES TERRACE - FOR LEASE 108 ST GEORGES TERRACE INFORMATION MEMORANDUM – LEVEL 28, 108 ST GEORGES TERRACE, PERTH 2 ASKING COMMERCIAL TERMS PROPERTY DESCRIPTION PREMISE SUMMARY Construction Date: 1989 LEVEL/SUITE NLA (SQM) NET RENT $/SQM + GST Last Major Refurbishment: 2014 LEVEL 28 862.20 $650 Levels: 53 Typical Floor Plate: 866 sqm FITOUT Level 28 is a modern, whole floor tenancy fitted out to very high Total NLA: 39,024 sqm SUMMARY standard, with 15 offices and 31 open plan workstations. Building Owner: Brookfield Office Properties LEASE TYPE Sublease through to January 2024 or longer, via a direct lease with the Landlord, subject to surrender. 108 St Georges Terrace is a landmark Perth CBD office tower, commanding a prime OUTGOINGS $/ Estimated at $193.10/sqm plus GST for the current financial position on the corner of William Street and St Georges Terrace. At its foot, stands SQM + GST year. the beautifully restored Palace, Perth’s finest example of Victoria Architecture. CARPARKING TBC. Taking advantage of the excellent natural light and views of the Swan River and the AVAILABILITY & city, Level 28 is a turn key solution. It is fitted, furnished and cabled and available COST immediately. AMENITY & Conference facilities on both the ground floor and Level 51. Tenants have access to the full suite of amenities within 108 St Georges Terrace, ACCESSIBILITY including modern end of trip facilities, 24 hour security, an onsite, outstanding Premium Grade end of trip facilities incorporating secure property management team and concierge.
    [Show full text]
  • Building and Development Applications Received For
    BUILDING AND DEVELOPMENT APPLICATIONS RECEIVED FOR THE PERIOD 05/12/2018 to 11/12/2018 Attached for your information is a list of building, planning, health and event applications received for last week. APPLICATION TYPE APPLICATION LODGED ADDRESS DESCRIPTION VALUE NUMBER 5/12/2018 256 St Georges Terrace PERTH WA 6000 Extension of time for the approved directional sign for the 'Wilson $18,000 DA 2018/5448 Public Carpark' and minor amendment to LED screen 5/12/2018 880-884 Hay Street Existing under awning lightbox $19,000 DA 2018/5458 PERTH WA 6000 5/12/2018 "ECONOMIC HOUSE" New Ground Floor Tenancy (52m2 NLA) within existing forecourt $500,000 DA 2018/5459 102 James Street space NORTHBRIDGE WA 6003 5/12/2018 Unit 8/160 St Georges Terrace PERTH WA 6000 Proposed Japanese Takeaway - Tenancy G18 $100,000 BPC 2018/856 5/12/2018 98 Mounts Bay Road PERTH WA 6000 Forward works to Towers 2 and 3 (being Buildings D and $3,800,000 BPC 2018/858 E) excavation, pile caps and concrete structure to Level 1 (Less than 12.0m above ground floor level) 5/12/2018 161 James Street Coconut Grove Tavern $0 OCCP 2018/866 NORTHBRIDGE WA 6003 5/12/2018 "THE ATRIUM" Installation of external signage "FLUOR" $6,000 BPC 2018/868 168-170 St Georges Terrace PERTH WA 6000 5/12/2018 "RAINE SQUARE" Medical consultancy fit-out within existing Wentworth building $304,899 BPC 2018/870 300 Murray Street PERTH WA 6000 5/12/2018 "UNIVERSITY HALL" Replacement for the fire detection and occupant warning system in $537,636 BPC 2018/871 130 Winthrop Avenue Building A, B, C, D and Currie Hall.
    [Show full text]
  • AUSTRALIAN CBD OFFICE Top Sales Transactions - 2011 Calendar Year
    RESEARCH JJJAAANNNUUUAAARRRYYY 222000111222 AUSTRALIAN CBD OFFICE Top Sales Transactions - 2011 Calendar Year HIGHLIGHTS • Commercial sales activity across Australia’s major CBD office markets has steadily increased since the lull of 2008 with $5.6 billion of sales $10million+ transacting during 2011, taking the market beyond the $5.5 billion recorded in 2007. In addition there was in excess of $750 million of properties under negotiation or in due diligence at year’s end. This is largely due to the surge in off-shore investment capital seeking prime, passive assets within Sydney and Melbourne, but also a marked increase in activity from unlisted groups and syndicates in all capitals. • Following a more reticent offshore buyer in H2 2010, predominantly on the back of the persistently high $AUD, overseas interest picked up steam once again in 2011, making up 36% (or $2.01 billion) of all CBD deals and 50% of deals in Sydney and Melbourne combined. Unlisted funds and Syndicates were the second most active buyer type in 2011, making up 29% (or $1.62 billion) of national CBD sales. • The market remains somewhat stratified with demand for modern, passive assets continuing to place some downward pressure on prime yields. However activity has also noticeably increased in the middle tier of the market. If this demand from the syndicators, value add funds and select developers continues, seeking greater exposure to value-add and repositioning opportunities, this broadening purchaser profile bodes well for the market in a global environment that remains uncertain. JANUARY 2012 AUSTRALIAN CBD OFFICE Top Sales Transactions - 2011 Calendar Year SYDNEY CBD OFFICE MARKET The steady increase in annual transaction Vendor: Commonwealth Property Office Fund volumes since 2008 has continued in 2011, 1.
    [Show full text]
  • BUILDING and DEVELOPMENT APPLICATIONS RECEIVED for the PERIOD 20/01/2021 to 26/01/2021
    BUILDING AND DEVELOPMENT APPLICATIONS RECEIVED FOR THE PERIOD 20/01/2021 to 26/01/2021 Attached for your information is a list of building, planning and technical applications received for last week. LODGEMENT PROCESSED / APPLICATION APPLICATION RENEWED ADDRESS DESCRIPTION TYPE VALUE NUMBER 21/01/2021 "CENTRAL PARK" Facade Modifications DA $18,900,000.00 2020/5387 152-158 St Georges Terrace PERTH WA 6000 20/01/2021 "TELSTRA CENTRE" Fitout OCCP $0.00 2020/689 80 Stirling Street PERTH WA 6000 20/01/2021 "CCI" Construction of EOT Facilities BPC $220,000.00 2020/703 180 Hay Street EAST PERTH WA 6004 20/01/2021 227 Newcastle Street Solar Panel Installation BPC $27,237.00 2021/13 NORTHBRIDGE WA 6003 20/01/2021 9 Havelock Street Proposed fitout of existing tenancy - G.04 BPC $120,000.00 2021/14 WEST PERTH WA 6005 20/01/2021 "BROOKFIELD PLACE" Offices - Brookfield Office Relocation Works (Level 3) BPC $548,815.00 2021/15 125-137 St Georges Terrace PERTH WA 6000 20/01/2021 108 St Georges Terrace Office Alterations (Part Floor) BPC $260,000.00 2021/16 PERTH WA 6000 20/01/2021 13 Aberdeen Street Occupancy permit for change of use from office to OCCP $0.00 2021/18 NORTHBRIDGE WA 6003 hairdresser 25/01/2021 900 Hay Street Performance Solution for ROW Walkway & Ramp BPC $1,000.00 2021/19 PERTH WA 6000 25/01/2021 1 Ord Street Office Refurbishment BPC $42,500.00 2021/20 WEST PERTH WA 6005 22/01/2021 "BUTTERWORTH BUILDING" Internal modification to Stables bar BPC $98,868.00 2021/22 886-890 Hay Street PERTH WA 6000 22/01/2021 "ALLENDALE SQUARE" Removal
    [Show full text]
  • Western Australia Mineral and Petroleum Statistics Digest 2012
    WESTERN AUSTRALIA MINERAL AND PETROLEUM STATISTICS DIGEST 2012 Disclaimer Information provided in this Digest is made available without charge, as a public service, in good faith. The information provided is derived from sources believed to be reliable and accurate at the time of publication. However, use of the information in the Digest is at your own risk. The Digest is provided solely on the basis that users will be responsible for making their own assessment of the information provided therein and users are advised to verify all representations, statements and information for decisions that concern the conduct of business that involves monetary or operational consequences. Each user waives and releases the Department of Mines and Petroleum and the State of Western Australia and its servants to the full extent permitted by law from all and any claims relating to the use of the material in the Digest. In no event shall the Department of Mines and Petroleum or the State of Western Australia be liable for any incidental or consequential damages arising from any use or reliance on any material in the Digest. Copyright © 2013 Copyright in this document is reserved to the State of Western Australia. Reproduction except in accordance with copyright law is prohibited. LIST OF FIGURES, TABLES AND MAPS FIGURES Figure 1 Mining Investment 5 Figure 46 Nickel Quantity 16 Figure 2 New Capital Investment 5 Figure 47 Heavy Mineral Sands Value of Production 16 Figure 3 Mineral Exploration Expenditure 5 Figure 48 Gold Production 16 Figure 4 Petroleum
    [Show full text]