Mr. Hemant B Patel, No. 6, Copper Beach Road, Panaiyur, , -600 119.

Contact No. : 98840 73700

Our Ref. : MoEF&CC/CRZ/03.19

The Member Secretary & Director, EAC for Projects Related to Coastal Regulation Zone (CRZ), Ministry of Environment, Forest and Climate Change, Indira Paryavaran Bhawan, 6th Floor, Jal Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. 27th June 2018 Respected Sir,

Sub : Post Facto CRZ Clearance for Permissible Activity – Residential Building Survey No. 5 (5/29 as per Patta) of Sholinganallur Village (earlier Taluk, Kancheepuram District) at Door No. 6, Copper Beach Road, Panaiyur, Sholiganallur in Greater Chennai Corporation Area, - reg. Ref. : MoEF&CC Notification S.O 1002(E) dated 6th March 2018.

I,Hemant B Patel, had constructed a Residential Building with a with a Built-up Area of 2226.26 sq.m (2 BHK in Ground, 3 BHK in First Floors & Covered Area in Second Floor) over an Extent of 2,090.32 sq.m in Survey Nos. 5 (5/29 as per Patta) of Sholinganallur Village (earlier Tambaram Taluk, Kancheepuram District) at Door No. 6, Copper Beach Road, Panaiyur, Sholiganallur in Greater Chennai Corporation Area (which is expanded in the Year 2011) was completed in the Year 2008. It is accessible from the (ECR)/SH-49 Chennai-Puducherry Section.

The Project Site is located in-between 12o53’29.75”-12o53’31.56” North Latitude and 80o14’54.85”- 80o14’56.63” East Longitude - Survey of Topo Sheet No. 66 D/1 & 5. The Plot Area falls between 477-525 m from the High Tide Line (HTL), the Building Area falls between 502-520 m from HTL. There are authorized Structures and approved Road between the Plot and the Sea shore. Since 2011-12, the Corporation of Chennai is collecting the Property Tax vide Receipt No. 15-198-04403-000. There is a EB connection to the House.

There is a swimming pool of 62.60 sq. m area which is at a distance of 490 m from HTL. There is a Lawn and Green Belt along the boundaries. The Construction is in compliance with DTCP/CMDA Norms. The total Project Cost was Rs.38.50 Lakhs.

Presently, the water demand is 4.0 KLD (maximum) for about 5 occupants and is being met by the local Water Supply Agencies. Water demand includes 1.0 KLD for Domestic Use, 1.5 KLD for Green Belt and another 1.5 KLD as make-up water for the swimming Pool. There is no ground water drawl at the Plot. The Corporation is going to provide the Water & Sewerage connections in the Division after the recent expansion of the Corporation Area.

The domestic sewage of 0.8 KLD is being treated in a Septic Tank (2.4 x 3.0 x 2.5 m) followed by Dispersion Trench. The Municipal Solid Wastes including Biodegradable Wastes to the tune of 2.0 kg/day is being collected by the Corporation and disposed suitably. The standby DG set of 60 KVA capacity is equipped inbuilt acoustic measures and stack of adequate height (5.0 m) as per CPCB/TNPCB Norms.

/2/

The Plot Site falls in the CRZ-III & Non-CRZ Areaa vide Coastal Zone Management Plan of Tamil Nadu Sheet No. 3(3). The Residential Building, partly, is a permissible activity in the provisions of Coastal Regulation Zone (CRZ) Notification, 2011 vide Para 4(i)(d) – Projects less than 20,000 sq.m Built-up Area shall be approved by the concerned State or UT Planning Authorities with the recommendation from the concerned CZMA. However, as per Para 2(iii) of MoEF&CC Notification S.O 1002(E) dated 6th March 2018, it requires Post Facto Clearance from MoEF&CC. Accordingly, I am now applying to the Ministry for the CRZ Clearance. I shall be very thankful to you, if you could kindly persue my application and accord the CRZ Clearance at the earliest.

Thanking you,

Encl. : as stated above.