Uttarakhand Sl

Total Page:16

File Type:pdf, Size:1020Kb

Uttarakhand Sl CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2012-2013 02 03 27- S.R.(PLAN) ONGOING WORKS STATE:- UTTARAKHAND SL. Name of Work Estimated Cost Expenditure Proposed Item of works. NO. With Locality and District. upto Provision March, 2012 For 2012-13 (In Lacs) ………………………………………………………………………………………………………………………………………………….………………………………………… 1. Repairs to remaining portion of stone flooring, Jageshwar group of 11,71,500 10,57,997 1,20,000 Earth work, Lime Concrete work, flagstone flooring etc. Temples, Jageshwar District Almora 2. Repairs to the floor and providing drainage system at Pandukeshwar Temple, Pandukeshwar, District Chamoli 15,30,000 1,90,152 12,80,000 Earth work, L.C.work, flag stone flooring etc. -------- Total Rs. 14,00,000 ASSTT.SUPTDG.ARCHL.ENGINEER SUPERINTENDING ARCHAEOLOGIST CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2012-2013 02 03 27- S.R.( PLAN) NEW WORKS STATE:- UTTARAKHAND SL. Name of Work Tentative Proposed Item of works. NO. With Locality and District. Cost provision (IN LACS) (2012-2013) ………………………………………………………………………………………………………………………………………………….………………………………………… 1. Studies and investigations and suggestion of suitable measures For ensuring stability, safety of visitors at Patal Bhubaneshwar 26,36,990 26,36,990 Studies and investigations and suggestion of suitable Cave, Distt. Pithoragarh. measures for ensuring stability, safety of visitors (Work approved vide D.G.letter No.25-1/2010-C dt. 26,3.2012) 2. Providing stone flooring and repair to eastern compound wall of Sun Temple, Katarmal, Distt. Almora 20,00,000 20,00,000 Earth work, Lime Concrete work, flagstone flooring and repair to retaining wall 3. Construction of retaining wall and providing approach pathway at Lakhamandal temple, Distt. Dehradun 15,00,000 15,00,000 Earth work, Lime.Concrete.work, R.R.stone masonary 4. Conservation of Fort wall at Chandpur Gari, Distt. Chamolil 10,00,000 9,63,100 Earth work, Lime.Concrete.work, R.R.stone masonary Work and pointing. 5. Widening of approach pathway and other repairs of sculpture shed at Mahasu temple, Hanol, Distt. Dehradun. 5,00,000 5,00,000 Dismantling of steps and side walls, reconstruction of Steps and replacing of G.I.sheets of sculpture shed. ------------ Total 76,00,000 SUPERINTENDING ARCHAEOLOGIST CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2012-2013 02 03 27- S.R.( NON PLAN) NEW WORKS STATE:- UTTARAKHAND SL. Name of Work Tentative Proposed Item of works. NO. With Locality and District. Cost provision (IN LACS) (2012-2013) ………………………………………………………………………………………………………………………………………………….………………………………………… 1. Providing retaining wall and landscaping at Dandeshwar temple Jageshwar, Distt. Almora 10,00,000 10,00,000 Earth work, Lime Cement work, R.R.stone masonary landscaping work. 2. Repairs to Baradari, Rudranath temple, Gopeshwar, 5,00,000 5,00,000 Removal of malwa, R.R.stone masonary wall, pointing Distt.Chamoli and plaster work. 3. Repairs to roof of Kirtan mandap, Adbadri group of temple, Distt. Chamoli 10,00,000 10,00,000 Removal of patal stone and rotten rafters and planks ------------- providing wooden rafters, planks and patal stone. Total 25,00,000 SUPERINTENDING ARCHAEOLOGIST CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2012-2013 04 00 27- O.W.(PLAN) NEW WORKS STATE:- UTTARAKHAND SL. Name of Work Tentative Proposed Item of works. NO. With Locality and District. Cost provision (IN LACS) (2012-2013) ………………………………………………………………………………………………………………………………………………….………………………………………… 1. Construction of compound wall and removal of earth deposit through land slide at Staff Quarter at Jageshwar Distt. Almora 7,00,000 7,00,000 Earth work, C.C., R.R.stone masonary etc 2. Providing and fixing glass in Aluminium frame in laboratory at Director(Science) Office, Distt. Dehradun 7,00,000 7,00,000 Fixing glass in Aluminium frame 3. Repairs and maintenance of Circle Office building, Dehradun 1,00,000 1,00,000 Minor repairs and maintenance --------- Total Rs. 15,00,000 SUPERINTENDING ARCHAEOLOGIST CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2012-2013 02 03 27- O.W.(NON PLAN) NEW WORKS STATE:- UTTARAKHAND SL. Name of Work Tentative Proposed Item of works. NO. With Locality and District. Cost provision (IN LACS) (2012-2013) ………………………………………………………………………………………………………………………………………………….………………………………………… 1. Repairs to sculpture shed at Lakhamandal temple, Distt.D.Dun 5,00,000 5,00,000 Removal of patal stone,rotten rafters and planks providing wooden rafters, planks and patal stone. 2. Providing ramp for physically challenged visitors at group of Temples, Jageshwar, Distt. Almora 3,00,000 3,00,000 Earth work, R.R. stone masonary, providing railing etc. 3. Providing shed for store at Circle Office, Distt. Dehradun 2,00,000 2,00,000 Providing shed. ----------- Total 10,00,000 ---------- SUPERINTENDING ARCHAEOLOGIST .
Recommended publications
  • THE AGONISING COST of HAM-HANDED DEVELOPMENT Relevant For: Environment | Topic: Disaster and Disaster Management
    Source : www.thehindu.com Date : 2021-02-12 THE AGONISING COST OF HAM-HANDED DEVELOPMENT Relevant for: Environment | Topic: Disaster and disaster management Following flash floods at Chamoli in Uttarakhand, defence personnel are looking for missing persons in a mélange of rock, mud, water, and debris, airlifting rations to inaccessible villages, and repairing bridges and telecommunication networks. Social scientists are assessing the disaster’s impact on the region’s economy. Scientists and policy makers are debating whether climate change or unchecked development in an ecologically fragile region was primarily responsible for the disaster and the death toll. News reports of ancient temples having been swept away in the Alakananda’s raging waters are bringing back traumatic memories of the Kedarnath floods in 2013. All these developments show the profound significance attached to this region and they prompt a historian to ask two fundamental and interrelated questions: How did the Uttarakhand Himalayas emerge as a deva bhumi and how did it develop into a focus of Hindu pilgrimage? A study of the archaeological record and inscriptional evidence suggests that many and varied agents and processes played important roles in gradually transforming this borderland into a sacred landscape. Artefacts found in the Himalayan foothills that are datable to the period extending from 300 BCE and 600 CE include an Ashokan rock edict, brick altars for conducting ashvamedha yagnas, coin hoards, and sculptures. Scientist warns of water build-up near Uttarakhand disaster zone The forms of these artefacts and their find-spots indicate deepening contact between communities living in the Gangetic plains and in the foothills.
    [Show full text]
  • Adopt a Heritage Project - List of Adarsh Monuments
    Adopt a Heritage Project - List of Adarsh Monuments Monument Mitras are invited under the Adopt a Heritage project for selecting/opting monuments from the below list of Adarsh Monuments under the protection of Archaeological Survey of India. As provided under the Adopta Heritage guidelines, a prospective Monument Mitra needs to opt for monuments under a package. i.e Green monument has to be accompanied with a monument from the Blue or Orange Category. For further details please refer to project guidelines at https://www.adoptaheritage.in/pdf/adopt-a-Heritage-Project-Guidelines.pdf Please put forth your EoI (Expression of Interest) for selected sites, as prescribed in the format available for download on the Adopt a Heritage website: https://adoptaheritage.in/ Sl.No Name of Monument Image Historical Information Category The Veerabhadra temple is in Lepakshi in the Anantapur district of the Indian state of Andhra Virabhadra Temple, Pradesh. Built in the 16th century, the architectural Lepakshi Dist. features of the temple are in the Vijayanagara style 1 Orange Anantpur, Andhra with profusion of carvings and paintings at almost Pradesh every exposed surface of the temple. It is one of the centrally protected monumemts of national importance. 1 | Page Nagarjunakonda is a historical town, now an island located near Nagarjuna Sagar in Guntur district of Nagarjunakonda, 2 the Indian state of Andhra Pradesh, near the state Orange Andhra Pradesh border with Telangana. It is 160 km west of another important historic site Amaravati Stupa. Salihundam, a historically important Buddhist Bhuddist Remains, monument and a major tourist attraction is a village 3 Salihundum, Andhra lying on top of the hill on the south bank of the Orange Pradesh Vamsadhara River.
    [Show full text]
  • 40648-033: Infrastructure Development Investment Program
    Initial Environment Examination Project Number: 40648-033 May 2014 IND: Infrastructure Development Investment Program for Tourism – Tranche 2 Submitted by Government of Uttarakhand, Dehrdaun This report has been submitted to ADB by the Government of Uttarakhand, Dehradun and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB. Response Matrix Development of Tourism Infrastructure Facilities At Tiger Falls and Lakhamandal Temple – Lot 1 Yamuna Circuit S.No. From ADB Remarks/Response 1 Please check and revise page numbers in the table of Table of contents revised contents, which seems off. accordingly. 2 In table 1 the reference to the SPS 2009 mentions F1 Revised accordingly at as a impact category, this should be 'FI', as in i, for relevant para in table 1, page financial intermediary. 11 3 Who will undertake the study referred to in para 119? Revised accordingly at relevant para and appendix 7, page 92 1 Infrastructure Development Investment Program for Tourism Uttarakhand (IDIPT:UK) Development of Tourism Infrastructure Facilities At Tiger Falls and Lakhamandal Temple – Lot 1 YamunaCircuit Initial Environment Examination Environmental Assessment Document Revised Initial Environmental Examination (IEE) Loan Number: 2833 April 2014 Infrastructure Development Investment Programme for Tourism, Uttarakhand Subproject –Development of Tourism Infrastructure Facilities At Tiger Falls and Lakhamandal Temple – Lot 1 Yamuna Circuit Prepared by the Government of Uttarakhand for the Asian Development Bank This IEE is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.
    [Show full text]
  • Government of India Ministry of Culture Lok Sabha Starred Question No.80 to Be Answered on 23.7.2018
    GOVERNMENT OF INDIA MINISTRY OF CULTURE LOK SABHA STARRED QUESTION NO.80 TO BE ANSWERED ON 23.7.2018 BASIC FACILITIES TO TOURISTS +*80. SHRI ASHOK MAHADEORAO NETE: Will the Minister of CULTURE be pleased to state: (a) whether the Government is providing / proposes to provide basic facilities like drinking water, toilets, parking, road connectivity and guides etc. to the tourists visiting monuments, historical temples and world heritage sites to promote tourisms in the country; (b) If so, the details thereof, monument-wise; (c) whether the Government has taken/proposes to take any steps for the beautification of the famous and very ancient cave and temple of tribal god, Lingojango located at Kachadgarh, taluka Salkesa district Gondiya of Gadchiroli and in other tourist attractions located in tribal dominated areas of the country including Maharashtra; and (d) if so, the details thereof, State/UT-wise including the action taken on the requests received from public representatives in this regard? ANSWER MINISTER OF STATE (INDEPENDENT CHARGE) FOR CULTURE AND MINISTER OF STATE FOR ENVIRONMENT, FOREST AND CLIMATE CHANGE (DR. MAHESH SHARMA) (a)to(d) A statement is laid on the table of the House. STATEMENT REFERRED TO IN REPLY TO PART (a) TO (d) OF THE LOK SABHA STARRED QUESTION NO.80 FOR 23.7.2018 (a)&(b) Tourist facilities are provided as per the requirement and feasibility at the different monuments / sites of national importance which also includes World Heritage properties in the country. Further, amenities like drinking water, toilets are provided at all ticketed and World Heritage Monuments. The Archaeological Survey of India has identified 100 monuments as Adarsh Smarak for upgradation of amenities and for providing additional facilities like Wi-Fi, cafeteria, interpretation centre, brail signage, toilets etc.
    [Show full text]
  • Uttarakhand Emergency Assistance Project: Rehabilitation of Damaged Roads in Dehradun
    Initial Environmental Examination Project Number: 47229-001 December 2014 IND: Uttarakhand Emergency Assistance Project Submitted by Uttarakhand Emergency Assistance Project (Roads & Bridges), Government of Uttarakhand, Dehardun This report has been submitted to ADB by the Program Implementation Unit, Uttarkhand Emergency Assistance Project (R&B), Government of Uttarakhand, Dehradun and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB. Initial Environmental Examination July 2014 India: Uttarakhand Emergency Assistance Project Restoration Work of (1) Tyuni–Chakrata-Mussoorie–Chamba–Kiriti nagar Road (Package No: UEAP/PWD/C23) (2) Kalsi- Bairatkhai Road (Package No: UEAP/PWD/C24) (3) Ichari-Kwano-Meenus Road (Package No: UEAP/PWD/C38) Prepared by State Disaster Management Authority, Government of Uttarakhand, for the Asian Development Bank. i ABBREVIATIONS ADB - Asian Development Bank ASI - Archaeological Survey of India BOQ - Bill of Quantity CTE - Consent to Establish CTO - Consent to Operate DFO - Divisional Forest Officer DSC - Design and Supervision Consultancy DOT - Department of Tourism CPCB - Central Pollution Control Board EA - Executing Agency EAC - Expert Appraisal Committee EARF - Environment Assessment and Review Framework EC - Environmental Clearance EIA - Environmental Impact Assessment EMMP - Environment Management and Monitoring Plan EMP - Environment Management Plan GoI - Government of India GRM - Grievance Redressal Mechanism IA -
    [Show full text]
  • IND: Infrastructure Development Investment Program for Tourism – Tranche 2
    Involuntary Resettlement Due Diligence Report Project Number: 40648-033 May 2014 IND: Infrastructure Development Investment Program for Tourism – Tranche 2 Submitted by Department of Tourism, Government of Uttarakhand This report has been submitted to ADB by the Government of Uttarakhand, Dehradun and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB. Development of Tourism Infrastructure Facilities of Lakhamandal Temple Involuntary Resettlement Due Diligence Report ---------------------------------------------------------- Document Stage: Draft for Consultation Loan Number: 2833 /IND April ,2014 Package no- UKIDIPT/DDN/03 India: Infrastructure Development Investment Programme for Tourism, Uttarakhand Subproject –Development of Tourism Infrastructure Facilities of Lakhamandal Temple The DDR document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Involuntary Resettlement Due Diligence Report 0 Development of Tourism Infrastructure Facilities of Lakhamandal Temple ABBREVIATIONS ADB - Asian Development Bank IDIPT - Infrastructure Development Investment Programme for Tourism UTDB - Uttarakhand Tourism Development Board BPL — Below poverty line DSC — Design and Supervision Consultants GRC — Grievance Redress Committee PIU — Program Implementation Unit PMC — Program Management Consultants PMU — Project Management Unit LAA — Land Acquisition
    [Show full text]
  • PINCODE List Updated 31-3-2018
    Name of the Circle:- Uttarakhand Dehradun NSH SL NO NAME OF PO STATUS PINCODE District 1 DEHRADUN Gazetted GPO GPO 248001 Dehradun 2 Mothrowala BO 248001 Dehradun 3 Kanwali BO 248001 Dehradun 4 Balawala BO 248001 Dehradun 5 Harrawala BO 248001 Dehradun 6 Bhaniawala BO 248001 Dehradun 7 K.P Shetra BO 248001 Dehradun 8 AJABPUR TSO 248121 Dehradun 9 Banjarawala BO 248121 Dehradun 10 ARAGHAR NDTSO 248001 Dehradun 11 ARHAT BAZAR NDTSO 248001 Dehradun 12 BHOGPUR SO 248143 Dehradun 13 Badogal BO 248143 Dehradun 14 Haldwari BO 248143 Dehradun 15 Dharkot BO 248143 Dehradun 16 Itharna BO 248143 Dehradun 17 Sangaon BO 248143 Dehradun 18 Thano BO 248143 Dehradun 19 C.D.A.(AF) NDTSO 248001 Dehradun 20 N.I.V.H NDBO 248001 Dehradun 21 CANNAUGHTPLACE NDTSO 248001 Dehradun 22 CLEMENT TOWN TSO 248002 Dehradun 23 Mohebbewala BO 248002 Dehradun 24 DEFENCE COLONY TSO 248012 Dehradun 25 Doon University NDBO 248012 Dehradun 26 DALANWALA NDTSO 248001 Dehradun 27 DEHRADUN CITY NDTSO 248001 Dehradun 28 DEHRADUN KUTCHERY NDTSO 248001 Dehradun 29 DILARAM BAZAR NDTSO 248001 Dehradun 30 DOIWALA SO 248140 Dehradun 31 Bullawala BO 248140 Dehradun 32 Badonwala BO 248140 Dehradun 33 Doodhli BO 248140 Dehradun 34 FatehpurTanda BO 248140 Dehradun 35 Khairi BO 248140 Dehradun 36 Lachhiwala BO 248140 Dehradun 37 Markhamgrant BO 248140 Dehradun 38 Nagal Bulandawala BO 248140 Dehradun 39 Nagal Jawalapur BO 248140 Dehradun 40 Resham Majri BO 248140 Dehradun 41 GOVINDGARH NDTSO 248001 Dehradun 42 HATHI BARKALA NDTSO 248001 Dehradun 43 I I P - SO 248005 Dehradun 44 Badripur- BO
    [Show full text]
  • Archealogical Survey Report
    Project : Environmental Studies for Vishnugad – Pipalkoti Hydro-electric Project Page: 1 Document : 2008026/EC/TOC Date: Feb 2009 Draft Archaeological Survey Report Revision: R3 TABLE OF CONTENTS S.No Description Page No Executive Summary i – vii 1. Introduction and Background 1-2 1.1 Introduction 1 1.2 Project Background 1 1.3 Outline of The Report 2 2. Archaeological History 3-17 2.1 Historical Background 3 2.2 Brief History of Alaknanda Valley 5 2.3 Historical Archaeology 12 2.4 Temple Architecture 14 3. Baseline Archaeological Status 18-52 3.1 Physical Setting 18 3.2 Geology 18 3.3 Geography 21 3.4 Climate 21 3.5 Soil 21 3.6 Flora & Fauna 21 3.7 Archaeological Exploration Result 23 4. Archaeological Impact Assessment & Mitigation Measures 53-61 4.1 Impact on Archaeological sites in Project Influence Area (PIA) 53 4.2 Impact on Archaeological sites in Project Immediate Affected 56 Area(PIAA) 4.3 Impact on Archaeological sites in Project Affected Area(PAA) 56 4.4 Recommendations 57 4.5 Management/Conservation Measures required to be taken by 58 THDC 4.6 Heritage Eco-View Point 60 Bibliography Environment & Ecology Department Project : Environmental Studies for Vishnugad – Pipalkoti Hydro-electric Project Page: 2 Document : 2008026/EC/TOC Date: Feb 2009 Draft Archaeological Survey Report Revision: R3 List of Tables Table No. Title Table -1.1 Salient Features of Vishnugad- Pipalkoti Hydroelectric Project Table- 3.1 Startigraphy along Alaknanda valley from Deoprayag to Badrinath passing through Pipalkoti-Vishnugad project area (Chamoli)
    [Show full text]
  • 4 Years Achievements of the Ministry of Culture
    4 Years Achievements of the Ministry of Culture [2014-15, 2015-16, 2016-17 and 2017-18] 1. 100 Adarsh Monuments • A total of 100 Adarsh Monuments were identified for providing improved visitor amenities, especially for the physically challenged, besides cleanliness, drinking water, and interpretation centres, cafeteria, souvenir shop, wi-fi, garbage disposal etc. The civic amenities are being augmented at these sites. • 25 ASI sites were launched as “Adarsh Smarak” on 26th December, 2014. (List of 25 Adarsh Monuments at Annexure 1). • ASI has also identified above 25 Adarsh Monuments to provide Wi-Fi facility, which would be available free of cost for the first 30 minutes and thereafter it is chargeable on additional usage. • 75 more Adarsh Monuments protected by ASI have been identified and included in the list of “Adarsh Smarak” and the same are also being included in ‘Swachh Paryatan Mobile App’ launched by the Ministry of Tourism on 24th September 2016. (List of 75 Adarsh Monuments at Annexure 2). 2. ‘Swachh Bharat- Swachh Smarak’ • The ASI has ranked top 25 Adarsh Monuments on the basis of Cleanliness parameters such as amenities like toilets, green lawns, Polythene Free Zone, signage for awareness, disabilities access, drinking water and provision for garbage bins etc. • “Rani ki Vav (Gujarat)” a World Heritage Site has been awarded as the cleanest iconic place in the country. 4 Years Achievements of the Ministry of Culture Page 1 • The Ministry also observes Swachhta Pakhwada twice in a year in the Month of April and September since 2016 to spread awareness about the need and importance of cleanliness in all the domains.
    [Show full text]
  • High School and Inter
    Class 9 Class 10 Class 11 Class 12 Total District School Name Boys Girls Total Boys Girls Total Boys Girls Total Boys Girls Total Boys Girls Total UTTARKASHI GOVT H.S.S JHALA 10 15 25 25 14 39 0 0 0 0 0 0 35 29 64 UTTARKASHI GOVT. HIGHER SEC. SCHOOL MALLA 13 20 33 20 22 42 0 0 0 0 0 0 33 42 75 UTTARKASHI GOVT GIRLS HIGHER SECONDARY SCHOOL BHATWARI 0 53 53 0 72 72 0 0 0 0 0 0 0 125 125 UTTARKASHI GOVT. INTER COLLEGE BHATWARI 40 0 40 51 0 51 102 103 205 120 106 226 313 209 522 UTTARKASHI HIGHER SEC. SCHOOL GHORSALI 24 32 56 23 21 44 15 31 46 23 20 43 85 104 189 UTTARKASHI G.I.C MANERI 49 37 86 45 27 72 64 39 103 34 40 74 192 143 335 UTTARKASHI GOVT INTER COLLEGE NETALA 22 31 53 33 24 57 29 32 61 39 29 68 123 116 239 UTTARKASHI GOVT INTER COLLEGE BHANKHOLI 27 20 47 27 30 57 19 22 41 27 29 56 100 101 201 UTTARKASHI GOVT HIGHER SECONDARY SCHOOL PATA 4 12 16 8 14 22 0 0 0 0 0 0 12 26 38 UTTARKASHI B.N.K.B.A.S.S.S KOTBANGLOW UTTERKASHI 25 18 43 25 11 36 0 0 0 0 0 0 50 29 79 UTTARKASHI GOVT INTER COLLEGE SALD 20 18 38 15 24 39 30 30 60 12 17 29 77 89 166 UTTARKASHI G.H.S.S SANGLAI 8 16242321440 0 0 0 0 0 31 37 68 UTTARKASHI GOVT INTER COLLEGE JOSHIYARA 19 24 43 27 35 62 34 35 69 58 52 110 138 146 284 UTTARKASHI RISHIRAM SIKSAN SANSTHAN JOSIYARA 77 46 123 68 60 128 10 6 16 2 5 7 157 117 274 UTTARKASHI A.S.S.S.D.D.L.T.I.C JOSHIYARA 46 24 70 67 28 95 100 35 135 101 24 125 314 111 425 UTTARKASHI GOVT HR SEC.
    [Show full text]
  • ANSWERED ON:01.08.2016 Identification of Heritage Sites Sivaprasad Dr
    GOVERNMENT OF INDIA CULTURE LOK SABHA UNSTARRED QUESTION NO:2491 ANSWERED ON:01.08.2016 Identification of Heritage Sites Sivaprasad Dr. Naramalli Will the Minister of CULTURE be pleased to state: (a) whether in 2002, the Ministry of Culture and Tourism had identified 72 heritage sites for overall development from tourism point of view and quite a substantial amount of work had been undertaken and the peace of work, slow down considerably in since 2004; (b) if so, the details thereof and the reasons therefor; (c) whether the Government has any plan to revive the works left half-way through at all the said 72 heritage sites and also to take up further upgradation of all such places; and (d) if so, the details thereof and the time by which the said work is likely to be completed? Answer MINISTER OF STATE, CULTURE AND TOURISM (INDEPENDENT CHARGE) (DR. MAHESH SHARMA) (a)to(d) From time to time, on priority basis, different monuments and sites of the Archaeological Survey of India are being taken up for developing tourist facilities and amenities. At present, 100 monuments/sites have been identified to be developed as Adarsh Smarak. The details of 100 centrally protected monuments identified and included in the list of 'Adarsh Smarak' in the country (State/UT-wise) is at Annexure. Besides, basic tourist amenities, Adarsh Monuments are provided with additional facilities like Wi-Fi, cafeteria, interpretation centre, brail signage, modern toilets etc. However, these identified facilities would be monument specific on the basis of actual requirement and feasibility on case to case basis.
    [Show full text]
  • Garhwal Travel Guide - Page 1
    Garhwal Travel Guide - http://www.ixigo.com/travel-guide/garhwal page 1 Pleasant weather. Carry Light woollen, umbrella. Garhwal When To Max: 30.4°C Min: 23.1°C Rain: 613.7mm Situated in the state of Uttaranchal, Sep VISIT Pleasant weather. Carry Light woollen, Garwhal comprises of various small umbrella. picturesque towns. The region is Max: 30.3°C Min: 21.3°C Rain: 242.3mm http://www.ixigo.com/weather-in-garhwal-lp-1000273 marked by the splendid beauty of Oct the breathtaking Himalayas. Known Jan Pleasant weather. Carry Light woollen. as Garhwal Himalayas, it is called Cold weather. Carry Heavy woollen. Max: 29.1°C Min: 16.6°C Rain: 41.4mm the abode of Gods (Dev Bhoomi) Famous For : HillHill StationNature / Max: 20.2°C Min: 6.8°C Rain: 43.6mm WildlifePlaces To Nov and is home to the holy rivers VisiMountainCity Feb Cold weather. Carry Heavy woollen. Ganga and Yamuna. Cold weather. Carry Heavy woollen, Max: 25.8°C Min: 11.7°C Rain: 6.3mm Garwhal extends up to the astounding snow umbrella. clad peaks in the Indo Tibetan boundary and Max: 22.8°C Min: 9.4°C Rain: 56.3mm Dec Cold weather. Carry Heavy woollen. constitutes seven districts of the state. The Mar Max: 22.3°C Min: 7.9°C Rain: 7.6mm region is surrounded by magnificent Cold weather. Carry Heavy woollen. mountains, valleys, splendid waterfalls and Max: 27.4°C Min: 13.1°C Rain: 44.4mm an alluring array of fauna and flora. Garwhal is one of the highly visited hill regions for its Apr What To spellbinding beauty and charm.
    [Show full text]