Uttarakhand Sl
Total Page:16
File Type:pdf, Size:1020Kb
CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2012-2013 02 03 27- S.R.(PLAN) ONGOING WORKS STATE:- UTTARAKHAND SL. Name of Work Estimated Cost Expenditure Proposed Item of works. NO. With Locality and District. upto Provision March, 2012 For 2012-13 (In Lacs) ………………………………………………………………………………………………………………………………………………….………………………………………… 1. Repairs to remaining portion of stone flooring, Jageshwar group of 11,71,500 10,57,997 1,20,000 Earth work, Lime Concrete work, flagstone flooring etc. Temples, Jageshwar District Almora 2. Repairs to the floor and providing drainage system at Pandukeshwar Temple, Pandukeshwar, District Chamoli 15,30,000 1,90,152 12,80,000 Earth work, L.C.work, flag stone flooring etc. -------- Total Rs. 14,00,000 ASSTT.SUPTDG.ARCHL.ENGINEER SUPERINTENDING ARCHAEOLOGIST CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2012-2013 02 03 27- S.R.( PLAN) NEW WORKS STATE:- UTTARAKHAND SL. Name of Work Tentative Proposed Item of works. NO. With Locality and District. Cost provision (IN LACS) (2012-2013) ………………………………………………………………………………………………………………………………………………….………………………………………… 1. Studies and investigations and suggestion of suitable measures For ensuring stability, safety of visitors at Patal Bhubaneshwar 26,36,990 26,36,990 Studies and investigations and suggestion of suitable Cave, Distt. Pithoragarh. measures for ensuring stability, safety of visitors (Work approved vide D.G.letter No.25-1/2010-C dt. 26,3.2012) 2. Providing stone flooring and repair to eastern compound wall of Sun Temple, Katarmal, Distt. Almora 20,00,000 20,00,000 Earth work, Lime Concrete work, flagstone flooring and repair to retaining wall 3. Construction of retaining wall and providing approach pathway at Lakhamandal temple, Distt. Dehradun 15,00,000 15,00,000 Earth work, Lime.Concrete.work, R.R.stone masonary 4. Conservation of Fort wall at Chandpur Gari, Distt. Chamolil 10,00,000 9,63,100 Earth work, Lime.Concrete.work, R.R.stone masonary Work and pointing. 5. Widening of approach pathway and other repairs of sculpture shed at Mahasu temple, Hanol, Distt. Dehradun. 5,00,000 5,00,000 Dismantling of steps and side walls, reconstruction of Steps and replacing of G.I.sheets of sculpture shed. ------------ Total 76,00,000 SUPERINTENDING ARCHAEOLOGIST CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2012-2013 02 03 27- S.R.( NON PLAN) NEW WORKS STATE:- UTTARAKHAND SL. Name of Work Tentative Proposed Item of works. NO. With Locality and District. Cost provision (IN LACS) (2012-2013) ………………………………………………………………………………………………………………………………………………….………………………………………… 1. Providing retaining wall and landscaping at Dandeshwar temple Jageshwar, Distt. Almora 10,00,000 10,00,000 Earth work, Lime Cement work, R.R.stone masonary landscaping work. 2. Repairs to Baradari, Rudranath temple, Gopeshwar, 5,00,000 5,00,000 Removal of malwa, R.R.stone masonary wall, pointing Distt.Chamoli and plaster work. 3. Repairs to roof of Kirtan mandap, Adbadri group of temple, Distt. Chamoli 10,00,000 10,00,000 Removal of patal stone and rotten rafters and planks ------------- providing wooden rafters, planks and patal stone. Total 25,00,000 SUPERINTENDING ARCHAEOLOGIST CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2012-2013 04 00 27- O.W.(PLAN) NEW WORKS STATE:- UTTARAKHAND SL. Name of Work Tentative Proposed Item of works. NO. With Locality and District. Cost provision (IN LACS) (2012-2013) ………………………………………………………………………………………………………………………………………………….………………………………………… 1. Construction of compound wall and removal of earth deposit through land slide at Staff Quarter at Jageshwar Distt. Almora 7,00,000 7,00,000 Earth work, C.C., R.R.stone masonary etc 2. Providing and fixing glass in Aluminium frame in laboratory at Director(Science) Office, Distt. Dehradun 7,00,000 7,00,000 Fixing glass in Aluminium frame 3. Repairs and maintenance of Circle Office building, Dehradun 1,00,000 1,00,000 Minor repairs and maintenance --------- Total Rs. 15,00,000 SUPERINTENDING ARCHAEOLOGIST CONSERVATION PROGRAMME IN RESPECT OF OFFICE OF THE SUPERINTENDING ARCHAEOLOGIST, ARCHAEOLOGICAL SURVEY OF INDIA, DEHRADUN CIRLCE, DEHRADUN FOR THE FINANCIAL YEAR 2012-2013 02 03 27- O.W.(NON PLAN) NEW WORKS STATE:- UTTARAKHAND SL. Name of Work Tentative Proposed Item of works. NO. With Locality and District. Cost provision (IN LACS) (2012-2013) ………………………………………………………………………………………………………………………………………………….………………………………………… 1. Repairs to sculpture shed at Lakhamandal temple, Distt.D.Dun 5,00,000 5,00,000 Removal of patal stone,rotten rafters and planks providing wooden rafters, planks and patal stone. 2. Providing ramp for physically challenged visitors at group of Temples, Jageshwar, Distt. Almora 3,00,000 3,00,000 Earth work, R.R. stone masonary, providing railing etc. 3. Providing shed for store at Circle Office, Distt. Dehradun 2,00,000 2,00,000 Providing shed. ----------- Total 10,00,000 ---------- SUPERINTENDING ARCHAEOLOGIST .