Building Permit(S)

Total Page:16

File Type:pdf, Size:1020Kb

Building Permit(S) Building Permit(s) Issued from 6/1/2013 thru 6/30/2013 ISSUED DATE ID Address PER GROUP PER TYPE PER SUB TYPE Category STATUS Job Value Total Paid Fee Types SSL Ward ANC Zoning Applicant Owner Name Description of Work GREEN 6/4/2013 AH1300552 300 12TH ST NW UNIT WEST SIDE Building Construction Miscellaneous After Hours Permit Issued 36.30 1.65 (MISCEFEE2);16.50 (MISCFILE);16.50 0000 0000 SIDEWALK/STREET (PUBLIC SPACE) AFTER HOURS MONDAY THRU SATURDAY 7:00PM THRU 5:00AM (MISC);1.65 (MISCEFFE) 6-05-2013 THRU 7-012-2013 ANY COMPLAINTS FROM COMMUNITY WILL VOID THIS PERMIT NOISE LEVEL 60DSML. 6/12/2013 B1307601 23 NEW JERSEY AVE SE Building Construction Alteration and NA Permit Issued 1 36.30 1.65 (AAREFEE2);1.65 (AAREFEE);16.50 0000 ARCHITECT OF THE CAPITOL EROSION / SEDIMENT CONTROL ON FEDERAL PROPERTY. No Repair (ALTREPAIR);16.50 (FILINGFEE) Install a 6-way duct bank under the parking lot at the same time relocating the flag pole and light to change curb line allowing for a greater turning radius between the upper and lower parking areas. The work will be completed in 60 foot segments to allow the parking area to remain fully operational. 6/7/2013 B1307613 575 OKLAHOMA AVE NE Building Construction Alteration and NA Permit Issued 1 36.30 16.50 (ALTREPAIR);1.65 (AAREFEE2);16.50 0000 LIVING CLASSROOMS NATIONAL CAPTIAL REG AECOM ON BEHALF OF PEPCO, WILL BE COLLECTING SEDIMENT SAMPLES IN THE No Repair (FILINGFEE);1.65 (AAREFEE) ANACOSITA RIVER UNDER THE DIRECTION OF DDOE (CONTACT RICHARD JACKSON). SEDIMENT SAMPLING WILL BE CONDUCTED IN ACCORDANCE WITH PERMITS ISSUED BY US ARMY CORPS OF ENGINEERS (USACE), NATIONAL PARK SERVICE (NPS), AND DDOE. A TEMPORARY SEDIMENT SAMPLE PROCESS AND STAGING AREA WILL BE REQUIRED ALONG THE SHORELINE. KINGMAN ISLAND PARK ON THE ATTACHED FIGURE HAS BEEN IDENTIFIED AS THE MOST FEASIBLE LOCATION. THIS SERVES AS AN APPLICATION FOR THE CONSTRUCTION OF THE TEMPORARY STAGING AREA. 6/18/2013 TN1300230 0 12TH ST SW Building Construction Miscellaneous Tent Permit Issued 36.30 16.50 (MISCFILE);1.65 (MISCEFEE2);1.65 0000 US USDA PLACE TEN 10X10 POP UP TENTS ON 12TH STREET SW BETWEEN JEFFERSON DRIVE AND (MISCEFFE);16.50 (MISC) INDEPENDENCE AVE. THE PERMIT IS FOR 12TH STREET SW. THIS IS FOR THE US. DEPT OF AGRICULTURE-FARMERS MARKET. 6/5/2013 E43270199 716 MONROE ST NE Building Supplemental Electrical NA Permit Issued 3657 0835 CARTER HASTINGS; Catholic University of America This supplemental permit was issued online. Use the Online Permit View application on DCRA CATHOLIC UNIVERSITY Intranet to view the details and print a copy of the permit. Alternatively, you can copy and OF AMERICA; MITCH paste the following URL into an internet browser. PERMUY https://ospi.dcra.dc.gov/ospi/PrintPermit.aspx?param=zI8IgGJEIleQsSJubYHCtQhUYhfCg50t 6/27/2013 E1306399 391 RHODE ISLAND AVE NW Building Supplemental Electrical NA Permit Issued 88.00 80.00 (MISCITEM22);8.00 (ELECTRICEFEE) 3095 0821 FREDERICK W. BROKAW 391 RHODE ISLAND AVENUE NW LLC 6/28/2013 E1306432 1306 8TH ST NW Building Supplemental Electrical NA Permit Issued 982.30 20.00 (SERVICE3);103.00 (METER1);56.00 0399 0834 DAVID B FARMER 1306 8TH ST LLC (FIXTURES);78.00 (METER3);41.00 (MISCITEM4);40.00 (MISCITEM22);240.00 (WIRING);143.00 (MISCITEM8);89.30 (ELECTRICEFEE);44.00 (MISCITEM5);40.00 (MISCITEM23);44.00 (MISCITEM7);44.00 (MISCITEM6) 6/24/2013 SB1300257 0 P ST NW Building Construction Miscellaneous Soil Boring Permit Issued 36.30 1.65 (MISCEFEE2);1.65 (MISCEFFE);16.50 PAR 03050007 2E UNITED STATES OF AMERICA 3 SOIL BORINGS EXTENDING TO 25 FEET DEEP WILL BE DRILLED TO COLLECT SOIL (MISC);16.50 (MISCFILE) SAMPLES FOR NEW CONSTRUCTION. 6 INCH STEM AUGERS WILL BE USED. IF ENCOUNTERED WATER LEVEL READINGS WILL BE MEASURED BY TYPE. WATER SAMPLES WILL NOT BE OBTAINED. 6/4/2013 PC21058851 109 WALTMAN PL NE Building Post Card Electrical - General NA Permit Issued 22.00 2.00 (POSTELECEFEE);20.00 (POSTCARD6) 3719 0932 4B WAYNE HARRISON Installation of not more than 10 new outlets in a power-limited system for a residential, commercial or industrial project. 6/4/2013 PC25739507 105 WALTMAN PL NE Building Post Card Electrical - General NA Permit Issued 22.00 2.00 (POSTELECEFEE);20.00 (POSTCARD6) 3719 0930 4B WAYNE HARRISON Installation of not more than 10 new outlets in a power-limited system for a residential, commercial or industrial project. 6/4/2013 PC49128319 107 WALTMAN PL NE Building Post Card Electrical - General NA Permit Issued 22.00 2.00 (POSTELECEFEE);20.00 (POSTCARD6) 3719 0931 4B WAYNE HARRISON Installation of not more than 10 new outlets in a power-limited system for a residential, commercial or industrial project. 6/4/2013 PC49458583 103 WALTMAN PL NE Building Post Card Electrical - General NA Permit Issued 22.00 20.00 (POSTCARD6);2.00 (POSTELECEFEE) 3719 0929 4B WAYNE HARRISON Installation of not more than 10 new outlets in a power-limited system for a residential, commercial or industrial project. 6/4/2013 PC61808328 101 WALTMAN PL NE Building Post Card Electrical - General NA Permit Issued 22.00 2.00 (POSTELECEFEE);20.00 (POSTCARD6) 3719 0928 4B WAYNE HARRISON Installation of not more than 10 new outlets in a power-limited system for a residential, commercial or industrial project. 6/25/2013 B1306839 123 WALTMAN PL NE Building Construction New Building NA Permit Issued 105000 659.09 297.54 (NEW1);29.75 (NEWEFEE3);4.10 3719 0935 4B JANICE MARUT PERMIT NEW HAMPSHIRE AVE VENTURES LLC Construct new single family townhouse Eaton residence within PUD per A. C. No (NEW2);0.41 (GRNEFEE);29.75 PUSHERS Order 05-30 (NEWEFEE);297.54 (FILINGFEE) 6/25/2013 B1306840 121 WALTMAN PL NE Building Construction New Building NA Permit Issued 105000 659.09 297.54 (NEW1);29.75 (NEWEFEE);0.41 3719 0937 4B NEW HAMPSHIRE A LLC; New Hampshire Avenue Ventures, LLC LLC Construct new single family townhouse Eaton residence within PUD Per A. C. No (GRNEFEE);297.54 (FILINGFEE);4.10 JANICE MARUT PERMIT Order 05-30 (NEW2);29.75 (NEWEFEE3) PUSHERS 6/25/2013 B1306841 119 WALTMAN PL NE Building Construction New Building NA Permit Issued 105000 629.34 4.10 (NEW2);297.54 (NEW1);29.75 3719 0936 4B 6000 NEW HAMPSH LLC; 6000 New Hampshire Avenue LLC Construct New single family townhouse Eaton residence within PUD per No (NEWEFEE3);297.54 (FILINGFEE);0.41 JANICE MARUT PERMIT A.C. Order 05-30 (GRNEFEE) PUSHERS 6/25/2013 B1306842 117 WALTMAN PL NE Building Construction New Building NA Permit Issued 105000 629.34 0.41 (GRNEFEE);29.75 (NEWEFEE3);4.10 3719 0935 4B 6000 NEW HAMPSH LLC; 6000 New Hampshire Avenue LLC Construct New Single Family Townhouse Eaton residence - within PUD per A. C. order 05-30 No (NEW2);297.54 (NEW1);297.54 (FILINGFEE) JANICE MARUT PERMIT PUSHERS 6/25/2013 B1306843 115 WALTMAN PL NE Building Construction New Building NA Permit Issued 105000 659.09 297.54 (NEW1);29.75 (NEWEFEE);29.75 3719 0934 4B 6000 NEW HAMPSH LLC; 6000 New Hampshire Avenue LLC Construct new Single Family Townhouse-Eaton residence within PUD per A. C. No (NEWEFEE3);4.10 (NEW2);0.41 JANICE MARUT PERMIT Order 05-30 (GRNEFEE);297.54 (FILINGFEE) PUSHERS 6/28/2013 B1307303 6005 MCLEAN PL NE Building Construction New Building NA Permit Issued 105000 659.44 297.54 (FILINGFEE);361.90 (ALTREPAIR) 3719 0916 4B JANICE MARUT PERMIT NEW HAMPSHIRE AVE VENTURES LLC New Single Family attached residence within PUD per Z. C. Order 05-30 No PUSHERS 6/28/2013 B1307304 6003 MCLEAN PL NE Building Construction New Building NA Permit Issued 105000 659.44 297.54 (FILINGFEE);361.90 (ALTREPAIR) 3719 0915 4B JANICE MARUT PERMIT NEW HAMPSHIRE AVE VENTURES LLC New Single Family attached residence within PUD per Z. C. order 05-30 No PUSHERS 6/28/2013 B1307305 6007 MCLEAN PL NE Building Construction New Building NA Permit Issued 105000 659.44 297.54 (FILINGFEE);361.90 (ALTREPAIR) 3719 0917 4B JANICE MARUT PERMIT NEW HAMPSHIRE AVE VENTURES LLC New Single Family attached residence within PUD per A. C. Order 05-30 No PUSHERS 6/28/2013 B1307306 6001 MCLEAN PL NE Building Construction New Building NA Permit Issued 105000 659.44 361.90 (ALTREPAIR);297.54 (FILINGFEE) 3719 0914 4B JANICE MARUT PERMIT NEW HAMPSHIRE AVE VENTURES LLC New Single Family attached residence Eaton with PUD per Z. C. Order 0530 No PUSHERS 6/14/2013 P1305659 107 WALTMAN PL NE Building Supplemental Plumbing and Gas NA Permit Issued 72.60 66.00 (SPRINKLER13D);6.60 (PLUMBINGEFEE) 3719 0931 4B NEW HAMPSHIRE AVE VENTURES LLC 6/14/2013 P1305661 105 WALTMAN PL NE Building Supplemental Plumbing and Gas NA Permit Issued 72.60 6.60 (PLUMBINGEFEE);66.00 (SPRINKLER13D) 3719 0930 4B NEW HAMPSHIRE AVE VENTURES LLC 6/14/2013 P1305662 103 WALTMAN PL NE Building Supplemental Plumbing and Gas NA Permit Issued 72.60 6.60 (PLUMBINGEFEE);66.00 (SPRINKLER13D) 3719 0929 4B NEW HAMPSHIRE AVE VENTURES LLC 6/14/2013 P1305664 101 WALTMAN PL NE Building Supplemental Plumbing and Gas NA Permit Issued 72.60 6.60 (PLUMBINGEFEE);66.00 (SPRINKLER13D) 3719 0928 4B NEW HAMPSHIRE AVE VENTURES LLC 6/24/2013 PC12584711 2431 MARKET ST NE Building Post Card Building NA Permit Issued 36.30 3.30 (BUILDEFEE);33.00 (POSTCARD3) 4327 0005 5C PANATI NICK Panati Nick Installation of 1 temporary construction trailer on private property. 6/26/2013 UT1300060 2431 MARKET ST NE Building Construction Miscellaneous Underground Permit Issued 36.30 1.65 (MISCEFEE2);16.50 (MISCFILE);1.65 4327 0005 5C CWC WDC, LLC CWC WDC LLC Installatioon of 4 Underground Storage Tanks and 8 fuel Dispensers.
Recommended publications
  • Energy Star Qualified Buildings
    1 ENERGY STAR® Qualified Buildings As of 1-1-03 Building Address City State Alabama 10044 3535 Colonnade Parkway Birmingham AL Bellsouth City Center 600 N 19th St. Birmingham AL Arkansas 598 John L. McClellan Memorial Veterans Hospital 4300 West 7th Street Little Rock AR Arizona 24th at Camelback 2375 E Camelback Phoenix AZ Phoenix Federal Courthouse -AZ0052ZZ 230 N. First Ave. Phoenix AZ 649 N. Arizona VA Health Care System - Prescott 500 Highway 89 North Prescott AZ America West Airlines Corporate Headquarters 111 W. Rio Salado Pkwy. Tempe AZ Tempe, AZ - Branch 83 2032 West Fourth Street Tempe AZ 678 Southern Arizona VA Health Care System-Tucson 3601 South 6th Avenue Tucson AZ Federal Building 300 West Congress Tucson AZ Holualoa Centre East 7810-7840 East Broadway Tucson AZ Holualoa Corporate Center 7750 East Broadway Tucson AZ Thomas O' Price Service Center Building #1 4004 S. Park Ave. Tucson AZ California Agoura Westlake 31355 31355 Oak Crest Drive Agoura CA Agoura Westlake 31365 31365 Oak Crest Drive Agoura CA Agoura Westlake 4373 4373 Park Terrace Dr Agoura CA Stadium Centre 2099 S. State College Anaheim CA Team Disney Anaheim 700 West Ball Road Anaheim CA Anahiem City Centre 222 S Harbor Blvd. Anahiem CA 91 Freeway Business Center 17100 Poineer Blvd. Artesia CA California Twin Towers 4900 California Ave. Bakersfield CA Parkway Center 4200 Truxton Bakersfield CA Building 69 1 Cyclotron Rd. Berkeley CA 120 Spalding 120 Spalding Dr. Beverly Hills CA 8383 Wilshire 8383 Wilshire Blvd. Beverly Hills CA 9100 9100 Wilshire Blvd. Beverly Hills CA 9665 Wilshire 9665 Wilshire Blvd.
    [Show full text]
  • Modernization | Supplement
    >Modernization | Supplement Modernized by ™ The hidden data The birthplace of Data center Inside Intel: From center sector the Internet surgery fab to data center > Why build new, when > First came AOL, then > Changing a live > They used it to you can upgrade what Infomart; now it's time facility without going build chips. Now it's you already have? for Stack Infrastructure down isn't easy simulating them INSIDE EcoStruxureINSIGHTS IT delivers into your data center architecture. Looking for a better way to manage your data centers in the cloud and at the edge? EcoStruxure™ IT — the world’s first cloud-based DCIM — delivers visibility and actionable insights, anywhere, any time. ecostruxureit.com ©2019 Schneider Electric. All Rights Reserved. Schneider Electric | Life Is On and EcoStruxure are trademarks and the property of Schneider Electric SE, its subsidiaries, and affiliated companies. 998_20464516_GMA-US 998_20464516_GMA-US.indd 1 1/23/19 4:40 PM A Special Supplement to DCD February 2019 Modernized by Contents Giving your facilities a new lease of life Features 4-5 The hidden data ome people want low-investment fixes like airflow shiny new things. improvements). And some center sector Others make a point buildings are such prime locations 6-7 From AOL to Stack of sweating their that there's no choice but to refit. Infrastructure assets and keeping equipment in use Stack Infrastructure is presiding 8-9 Advertorial: Suntil it has more than paid for itself. over a rebuild of a facility once modernize or Neither group is right. owned by AOL in the early days of outsource? When a facility is no longer the commercial Internet (p6), and capable of maintaining its peak a couple of New York skyscrapers 10-11 Data center performance, a full replacement house data centers that have been surgery can be hard to justify, but there will upgraded multiple times.
    [Show full text]
  • 2007 Labeled Buildings List Final Feb6 Bystate
    ENERGY STAR® Qualified Buildings and Manufacturing Plants As of December 31, 2007 Building/Plant Name City State Building/Plant Type Alabama Calhoun County Administration Building Anniston AL Courthouse Calhoun County Court House Anniston AL Courthouse 10044 Birmingham AL Office Alabama Operations Center Birmingham AL Office BellSouth City Center Birmingham AL Office Birmingham Homewood TownePlace Suites by Marriott Birmingham AL Hotel/Motel Roberta Plant Calera AL Cement Plant Honda Manufacturing of Alabama, LLC Lincoln AL Auto Assembly Plant Alaska Elmendorf AFB, 3MDG, DoD/VA Joint Venture Hospital Elmendorf Air Force Base AK Hospital Arizona 311QW - Phoenix Chandler Courtyard Chandler AZ Hotel/Motel Bashas' Chandler AZ Supermarket/Grocery Bashas' Food City Chandler AZ Supermarket/Grocery Phoenix Cement Clarkdale AZ Cement Plant Flagstaff Embassy Suites Flagstaff AZ Hotel/Motel Fort Defiance Indian Hospital Fort Defiance AZ Hospital 311K5 - Phoenix Mesa Courtyard Mesa AZ Hotel/Motel 100 North 15th Avenue Building Phoenix AZ Office 1110 West Washington Building Phoenix AZ Office 24th at Camelback Phoenix AZ Office 311JF - Phoenix Camelback Courtyard Phoenix AZ Hotel/Motel 311K3 - Courtyard Phoenix Airport Phoenix AZ Hotel/Motel 311K4 - Phoenix North Courtyard Phoenix AZ Hotel/Motel 3131 East Camelback Phoenix AZ Office 57442 - Phoenix Airport Residence Inn Phoenix AZ Hotel/Motel Arboleda Phoenix AZ Office Bashas' Food City Phoenix AZ Supermarket/Grocery Biltmore Commerce Center Phoenix AZ Office Biltmore Financial Center I Phoenix AZ
    [Show full text]
  • Chapter 5. Historic Resources 5.1 Introduction
    CHAPTER 5. HISTORIC RESOURCES 5.1 INTRODUCTION 5.1.1 CONTEXT Lower Manhattan is home to many of New York City’s most important historic resources and some of its finest architecture. It is the oldest and one of the most culturally rich sections of the city. Thus numerous buildings, street fixtures and other structures have been identified as historically significant. Officially recognized resources include National Historic Landmarks, other individual properties and historic districts listed on the State and National Registers of Historic Places, properties eligible for such listing, New York City Landmarks and Historic Districts, and properties pending such designation. National Historic Landmarks (NHL) are nationally significant historic places designated by the Secretary of the Interior because they possess exceptional value or quality in illustrating or interpreting the heritage of the United States. All NHLs are included on the National Register, which is the nation’s official list of historic properties worthy of preservation. Historic resources include both standing structures and archaeological resources. Historically, Lower Manhattan’s skyline was developed with the most technologically advanced buildings of the time. As skyscraper technology allowed taller buildings to be built, many pioneering buildings were erected in Lower Manhattan, several of which were intended to be— and were—the tallest building in the world, such as the Woolworth Building. These modern skyscrapers were often constructed alongside older low buildings. By the mid 20th-century, the Lower Manhattan skyline was a mix of historic and modern, low and hi-rise structures, demonstrating the evolution of building technology, as well as New York City’s changing and growing streetscapes.
    [Show full text]
  • As Lower Manhattan Rebuilds, a New Map Takes Shape
    ID NAME: Nxxx,2004-07-04,A,024,Bs-BW,E2 3 7 15 25 50 75 85 93 97 24 Ø N THE NEW YORK TIMES METRO SUNDAY, JULY 4, 2004 CITY A Status Report: As Lower Manhattan Rebuilds, a New Map Takes Shape By DAVID W. DUNLAP and GLENN COLLINS Below are projects in and around ground DEVELOPMENT PLAN zero and where they stood as of Friday. Embassy Goldman Suites Hotel/ Sachs Bank of New York BUILDINGS UA Battery Park Building Technology and On the World Trade Center site City theater site 125 Operations Center PARKS GREENWICH ST. 75 Park Place Barclay St. 101 Barclay St. (A) FREEDOM TOWER / TOWER 1 2 MURRAY ST. Former site of 6 World Trade Center, the 6 United States Custom House 0Feet 200 Today, the cornerstone will be laid for this WEST BROADWAY skyscraper, with about 60,000 square feet of retail space at its base, followed by 2.6 mil- Fiterman Hall, lion square feet of office space on 70 stories, 9 Borough of topped by three stories including an obser- Verizon Building Manhattan PARK PL. vation deck and restaurants. Above the en- 4 World 140 West St. Community College closed portion will be an open-air structure Financial 3 5 with wind turbines and television antennas. Center 7 World The governor’s office is a prospective ten- VESEY ST. BRIDGE Trade Center 100 Church St. ant. Occupancy is expected in late 2008. The WASHINGTON ST. 7 cost of the tower, apart from the infrastruc- 3 World 8 BARCLAY ST. ture below, is estimated at $1 billion to $1.3 Financial Center billion.
    [Show full text]
  • Executive Summary
    Executive Summary A. INTRODUCTION The New York State Department of Transportation (NYSDOT), in cooperation with the Federal Highway Administration (FHWA), proposes to reconstruct a portion of Route 9A between Chambers and West Thames Streets in Lower Manhattan. This area is being considered for reconstruction as a result of the terrorist attacks of September 11, 2001, that destroyed the World Trade Center (WTC) and severely damaged or destroyed additional nearby structures and transportation infrastructure including portions of Route 9A. The proposed project, which is being reviewed under the National Environmental Policy Act (NEPA) as a supplement to the 1994 Route 9A Reconstruction Project Final Environmental Impact Statement (FEIS), is one of several federally funded Lower Manhattan recovery projects proposed in response to the devastation of September 11, 2001. As a transportation cornerstone in this recovery effort, the project is intended to provide a safe and efficient transportation facility that meets the goals and objectives established for Route 9A, prior to and since September 11, 2001. The proposed project takes into consideration the redevelopment efforts in Lower Manhattan; specifically, those at the WTC Site. These other initiatives have resulted in a new set of existing and future conditions, such as the WTC Memorial, which could not be foreseen in the 1994 FEIS. Therefore, while the project’s goals and objectives from the 1994 FEIS still apply, they have been updated and expanded to reflect this new set of conditions. B. PROJECT IDENTIFICATION / LOCATION Located near the Hudson River between Battery Place and 59th Street in Manhattan (see Figure S-1), Route 9A (also known as West Street) is a six- to eight-lane principal urban arterial with a continuous bikeway and walkway.
    [Show full text]
  • Chapter 7: Social and Economic Conditions
    MTA New York City Transit Fulton Street Transit Center DEIS CHAPTER 7: SOCIAL AND ECONOMIC CONDITIONS 7.1 OVERVIEW The Fulton Street Transit Center (FSTC) would be constructed within a vibrant retail, commercial and residential neighborhood in Lower Manhattan. Pursuant to Presidential Executive Order (EO) 13274 - Environmental Stewardship and Transportation Infrastructure Project Reviews, this chapter presents the potential impacts of construction and operation of the FSTC on the social and economic conditions in that neighborhood. These conditions include: land use, zoning and public policy; economic conditions such as employment opportunities and business activity; and, neighborhood character, including population, housing and recreation and cultural facility characteristics. Two (2) critical planning issues shaping the future of Lower Manhattan are the lack of regional transit connectivity; and the transformation of the area from a daytime commercial community to a 24-hour residential and commercial community. The events of September 11 had significant consequences for both these planning issues and have reinforced the importance of revitalization for Lower Manhattan. In addition to the assessment of the potential environmental impacts of the FSTC, this chapter also presents a summary of current revitalization policies and plans that are influencing transportation strategies, along with residential and economic development, within Lower Manhattan. The discussion of social and economic impacts evaluates potential impacts analyzed in other chapters of the Environmental Impact Statement (EIS), including traffic and transportation, noise and air quality, safety and indirect development impacts. The analysis evaluates both benefits and/or adverse impacts associated with the FSTC that may affect socioeconomic and community characteristics, either temporarily during construction, or permanently during operation.
    [Show full text]
  • Magnum, CIM Take $390M for Verizon Building Condo Conversion
    The Insider’s Weekly Guide to the Commercial Mortgage Industry In This Issue 1 Magnum, CIM Take $390M for Verizon Building Condo Conversion 1 HFZ Scores $185M From Mexican Bank to Revamp South Beach Hotel 3 Steiner’s Brooklyn Residential Tower Gets $390M Construction Loan 4 Now Is Not Prime Time on the CMBS Channel 5 FHA and HUD to Undergo Further Revamp, Fannie Mae Unfazed 6 Chetrit Closes on $191.9M Purchase of Hotel Carter With $150M From Athene Annuity 7 Bancorp Provides 80 Percent LTC Acquisition Loan to Blue Rock And Partner “Though underwriting has clearly loosened up since the financial crisis, there is still a floor on how aggressive lenders will be” —Drew Anderman From Q&A on page 12 Magnum, CIM Take $390M HFZ Scores $185M for Verizon Building From Mexican Bank Condo Conversion to Revamp South Beach Hotel HFZ Capital refinanced The Shore Club, A partnership of Ben Shaoul and Los been rebranded as 100 Barclay Street. a luxury hotel in Miami’s South Beach neigh- Angeles-based CIM Group closed on a $390 The units will be built in the top 22 floors of borhood, Mortgage Observer Weekly has ex- million loan they will use to convert a Lower the 31-story building, which sits at the corner clusively learned. With the $185 Manhattan office building into of Vesey Street about a block from 1 World MOW million provided by Banco MOW fancy condominiums, Trade Center. EXCLUSIVE Inbursa, the Mexican bank run EXCLUSIVE Mortgage Observer The three-year loan is Libor-based, by Carlos Slim, the hotel will Weekly has learned.
    [Show full text]
  • MHC Mendon Campus Study Report
    Conditions Assessment, Historical Analysis, and Adaptive Reuse Town Hall Campus Study Mendon Center Historic District Town of Mendon, Massachusetts Table of Contents Cover Page Table of Contents Consultant Team Section 1 Cover Letter / Executive Summary Section 2 – Conditions Analysis Town Hall Conditions Analysis Historical Analysis Sketch Structural Field Report and Photo Index Plumbing, Fire Protection, HVAC, and Electrical Reports (G-G-D) Union Chapel Conditions Analysis Structural Field Report and Photo Index Plumbing, Fire Protection, HVAC, and Electrical Reports (G-G-D) Fire Station Conditions Analysis Structural Field Report and Photo Index Plumbing, Fire Protection, HVAC, and Electrical Reports (G-G-D) Existing Building Code Report (Code Red) Site Analysis Zoning Summary (Warner Larson) Civil Existing Conditions Study (Nitsch) Section 3 – Existing Floor Plans A1-01: Fire Station A1-02: Union Chapel A1-03: Town Hall Basement A1-04: Town Hall First Floor A1-05: Town Hall Second Floor Existing Site Plan Analysis Section 4 – Space Needs Space Needs Narrative Space Needs Program Table of Contents Mendon Town Hall Campus Study CBI Job No.: 16036 June 30, 2016 Section 5 – Adaptive Reuse Plans Proposed Site Plan A1-01a: Fire Station Preferred Option A A1-02a: Union Chapel Preferred Option A A1-03a: Town Hall Basement Preferred Option A A1-04a: Town Hall First Floor Preferred Option A A1-04b: Town Hall First Floor Option B A1-04c: Town Hall First Floor Option C Town Hall MEP Narratives Union Chapel MEP Narratives Fire Station MEP Narratives Section 6 – Estimate Town Hall Option A Estimate Union Chapel Option A Estimate Fire Station Option A Estimate Site Work Estimate Consultant Team CBI Consulting Inc.
    [Show full text]
  • Verizon Building”
    Equity Office (Investors/Analysts): Equity Office (Media): Beth Coronelli Terry Holt 312.466.3286 312.466.3102 For Immediate Release Equity Office Signs Agreement to Acquire 1095 Avenue of the Americas “Verizon Building” CHICAGO (April 5, 2005) -- Equity Office (NYSE: EOP) announced today that it has signed an agreement to acquire the office tower of 1095 Avenue of the Americas, known as the Verizon Building, in New York for approximately $505 million. The closing is contingent upon approval by the New York Public Service Commission and the Attorney General of New York. Closing is anticipated in the fourth quarter of 2005. “We believe our national relationship with Verizon, our experience in managing large telecommunications data centers, and our financial strength provided us with unique advantages in securing this building,” commented Richard Kincaid, Equity Office’s president and chief executive officer. “This asset is a tremendous addition to our portfolio, and enhances our operating platform in New York City, as well as nationally.” Equity Office plans to acquire 1.03 million square feet, or nearly 80% of the office tower, including approximately 30,000 square feet of retail space. Verizon (NYSE: VZ) plans to retain ownership of roughly 200,000 square feet. As part of the agreement, Verizon signed a short-term lease for approximately 1 million square feet of office space at the building. This lease will enable Verizon to plan and execute its departure from the building during 2006. The 41-story office tower is located on Sixth Avenue between 41st and 42nd streets in Midtown Manhattan. The building sits across the street from the New York Public Library and Bryant Park, and is within blocks of Grand Central Station, Penn Station and a myriad of other public transportation sites.
    [Show full text]
  • 1.Introduction
    1.Introduction The original idea for a world trade center in New York is generally credited to David Rockefeller, one of industrialist John D. Rockefeller's many grandsons. In fact, the idea was proposed soon after World War II, a decade before Rockefeller ever got involved, but he was the one who actually got the ball rolling. In the 1950s and '60s, while serving as chairman of Chase Manhattan Bank, Rockefeller was dedicated to revitalizing lower Manhattan. He hoped to energize the area with new construction, in much the same way his father revitalized midtown Manhattan in the 1930s with Rockefeller Center. As part of his plan, David Rockefeller proposed a complex dedicated to international trade, to be constructed at the east end of Wall Street. Rockefeller believed that the trade center, which would include office and hotel space, an exhibit hall, a securities and exchange center and numerous shops, would be just the thing to spur economic growth in the area. The original World Trade Center featured landmark twin towers(1 WTC and 2 WTC), which opened on April 4, 1973. The North Tower (left), with antenna spire, is 1 WTC. The South Tower (right) is 2 WTC 33 2.Contruction of the World Trade Center The construction of the World Trade Center was conceived as an urban renewal project, spearheaded by David Rockefeller, to help revitalize Lower Manhattan. On September 20, 1962, the Port Authority announced the selection of Minoru Yamasaki as lead architect, and Emery Roth & Sons as associate architects. Originally, Yamasaki submitted to the Port Authority a concept incorporating twin towers, but with each building only 80 stories tall.
    [Show full text]
  • Counting Condos
    July 3, 2012 Counting Condos New development condos have been in the spotlight recently, thanks in part to the success of Extell Development’s One57. In May, Extell announced that the building (after hitting the market six months earlier) had sold 50 percent of its units, and had reached a milestone of $1 billion in sales. The 90-story glass tower, which topped off last month, also announced that one of its penthouses had sold for somewhere between $90 and $100 million, a new high mark for condo prices in New York City. Extell president Gary Barnett told The Real Deal that the lack of new construction in the last few years has helped drum up demand for his project. “For the next couple of years, we’re probably the only game in town — especially for that kind of quality,” he said. But One57 isn’t the only new development in the city doing well. The median listing price for new development condos in Manhattan grew by 10 percent in May to $1.49 million, up from the same period of last year, according to a report released by listings aggregator StreetEasy. Contract activity and median sales prices for new homes in Manhattan and Brooklyn also increased year-over-year, the report said. This month, The Real Deal mapped out all of the major Manhattan and Brooklyn for-sale buildings with at least five sponsor units still on the market. We found around 55 buildings in Manhattan, and roughly 20 in Brooklyn. We also took stock of the projects currently in the pipeline and slated to hit the market in the next several years.
    [Show full text]