Herring Bay and Rockhold Creek
Total Page:16
File Type:pdf, Size:1020Kb
HERRING BAY & ROCKHOLD CREEK, MD FACT SHEET as of February, 2018 AUTHORIZATION: The Herring Bay & Rockhold Creek project was authorized by the River & Harbor Act of July 3, 1930 modified 1938. TYPE OF PROJECT: Navigation CONTRIBUTION TO CHESAPEAKE BAY: Contributes to Executive Order 13508 goals by innovatively protecting environmental habitat, improving water quality, and expanding public access within the Chesapeake Bay watershed. PROJECT PHASE: Operation and Maintenance CONGRESSIONAL INTEREST: Senators Cardin and Van Hollen (MD), Representative Hoyer (MD-5) NON-FEDERAL SPONSOR: Anne Arundel County, Maryland BACKGROUND: This project is located in Anne Arundel County, on the western shore of the Chesapeake Bay, south of Annapolis, Maryland. The project provides for a channel 7 feet deep and 60 feet wide from the 7-foot contour in Herring Bay to the vicinity of the county wharf on Rockhold Creek, with a turning basin of the same depth, 100 feet wide and 150 feet long at the head of the channel, and two stone breakwaters both approximately 900 feet long on each side of the entrance channel. The project length is 7,300 feet. This project was last dredged in 2009. The project was last surveyed in November 2017 and has shoaled to a controlling depth of 5.6 feet. STATUS: None U.S. ARMY CORPS OF ENGINEERS – BALTIMORE DISTRICT 2 Hopkins Plaza, Baltimore, MD 21201 http://www.nab.usace.army.mil Page 1 of 3 BUDGET: Funds Data ($1,000’s) Total Allocation for FY 2017 0 President Budget for FY 20181 0 Allocation for FY 20182 TBD President Budget FY 20191 0 1 The President typically sends the budget to Congress in February each year. Upon release, budget amounts for the USACE Civil Works programs and specified projects are posted online at the HQUSACE website in a Program Budget Press Book at http://www.usace.army.mil/Missions/CivilWorks/Budget.aspx. 2 The allocation amount for a project is determined after enactment of the Energy and Water appropriations or after public release of an approved FY work plan should there be no appropriations (i.e., a full year continuing authority is enacted). SCHEDULE: FY 2017 Completed Work: None FY 2018 Scheduled Work: None FY 2018 Capability: None For more information regarding the Herring Bay & Rockhold Creek, MD contact Danielle Szimanksi, CENAB-OPN, (410) 962-6064, e-mail [email protected]. U.S. ARMY CORPS OF ENGINEERS – BALTIMORE DISTRICT 2 Hopkins Plaza, Baltimore, MD 21201 http://www.nab.usace.army.mil Page 2 of 3 U.S. ARMY CORPS OF ENGINEERS – BALTIMORE DISTRICT 2 Hopkins Plaza, Baltimore, MD 21201 http://www.nab.usace.army.mil Page 3 of 3 .