Peshawar Sustainable Bus Rapid Transit
Total Page:16
File Type:pdf, Size:1020Kb
Environmental Monitoring Report Semestral Report For the period January – June 2018 August 2018 PAK: Peshawar Sustainable Bus Rapid Transit Corridor Project Prepared by Peshawar Development Authority, Government of Khyber Pakhtunkhwa for Asian Development Bank. NOTE In this report, "$" refers to US dollars. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Semi-annual Environmental Monitoring Report _________________________________________________________________________ Project Number: 48289-002 January – June 2018 Islamic Republic of Pakistan: Peshawar Sustainable Bus Rapid Transit Corridor Project (Financed by the Asian Development Bank) Prepared by Masood ur Rahman (Environmental Specialist - PMCSC) MM Pakistan Pvt Ltd. Peshawar, Pakistan For Peshawar Development Authority (PDA) Government of Khyber Pakhtunkhwa Submission: August 20, 2018. Semi Annual Environmental Monitoring Report No. 02 Peshawar Sustainable Bus Rapid Transit Corridor Project Table of Contents 1 INTRODUCTION ................................................................................................. 3 1.1 Preamble ...................................................................................................... 3 1.2 Headline Information ................................................................................... 3 2 PROJECT DESCRIPTION AND CURRENT ACTIVITIES .................................. 4 2.1 Project Description ...................................................................................... 4 2.2 Project Contracts and Management ........................................................ 12 2.2.1 Organizations for the Project Management ...................................................... 12 2.2.2 Environmental Safeguard Teams ...................................................................... 13 2.3 Project Activities during Current Reporting Period ............................... 15 2.4 Description of Any Changes to Project Design ...................................... 37 2.5 Description of Any Changes to Agreed Construction Methods ............ 37 3 ENVIRONMENTAL SAFEGUARD ACTIVITIES ............................................... 38 3.1 General Description of Environmental Safeguard Activities ................. 38 3.2 Issues Tracking (Based on Non-Conformance Notices) ........................ 43 3.3 Trends......................................................................................................... 46 3.4 Unanticipated Environmental Impacts or Risks ..................................... 47 4 RESULTS OF ENVIRONMENTAL MONITORING ............................................ 48 4.1 Overview of Monitoring Conducted during Current Period ................... 48 4.2 Trends......................................................................................................... 57 4.3 Summary of Monitoring Outcomes .......................................................... 58 4.4 Material Resources Utilisation ................................................................. 58 4.4.1 Current Period ..................................................................................................... 58 4.5 Waste Management ................................................................................... 59 4.5.1 Current Period ..................................................................................................... 60 4.6 Health and Safety ...................................................................................... 61 4.6.1 Community Health and Safety ........................................................................... 61 4.6.2 Worker Safety and Health ................................................................................... 61 5 FUNCTIONING OF THE SSEMP ...................................................................... 65 5.1 SSEMP Review ........................................................................................... 65 6 GOOD PRACTICE AND OPPORTUNITY FOR IMPROVEMENT ..................... 66 6.1 Good Practice ............................................................................................ 66 6.2 Opportunities for Improvement ................................................................ 68 7 SUMMARY AND RECOMMENDATIONS ......................................................... 69 0 Semi Annual Environmental Monitoring Report No. 02 Peshawar Sustainable Bus Rapid Transit Corridor Project 7.1 Summary .................................................................................................... 69 7.2 Recommendations .................................................................................... 72 1 Semi Annual Environmental Monitoring Report No. 02 Peshawar Sustainable Bus Rapid Transit Corridor Project Abbreviations ADB Asian Development Bank CAP Corrective Action Plan DDR Due Diligence Report EPA Environmental Protection Agency EPCM Engineering, Procurement and Construction Management EIA Environment Impact Assessment EMP Environmental Management Plan GoKPK Government of Khyber Pakhtunkhwa GOP Government of Pakistan Km Kilometer MMP Mott Macdonald Pakistan MoU Memorandum of Understanding NCN Non Conformity Notice NEQS National Environmental Quality Standards PDA Peshawar Development Authority PM Particulate Matter PIU Project Implementation Unit PHA Provincial Horticulture Authority PSBRT Peshawar Sustainable Bus Rapid Transit Corridor PMCSC Project Management Construction Supervision Consultants R-I Reach-01 R-II Reach-02 R-III Reach-03 SSEMP Site Specific Environment Management Plan TBT Tool Box Talks WSSP Water and Sanitation Services Peshawar 2 Semi Annual Environmental Monitoring Report No. 02 Peshawar Sustainable Bus Rapid Transit Corridor Project 1 INTRODUCTION 1.1 Preamble 1. This report represents the Semi - Annual Environmental Monitoring Review (SAEMR) for Peshawar Sustainable Bus Rapid Transit Corridor Project (PSBRT). 2. This report is the second EMR for the project. 1.2 Headline Information 3. Since the inception of the project, a number of environmental issues such as excessive dust emissions, unauthorized debris disposal and traffic congestion etc. have been observed and managed as the outcome of the fast track construction activities of the project. The Contractor has been thoroughly pushed since the commencement of the construction activities by the PDA and PMCSC for the resolution of these issues. 4. One of the constraints which has been repeatedly faced by the project has been the lack of willingness and general lack of cooperation of the Contractor towards the implementation of the Environmental Management Plan (EMP). After making extensive efforts for sensitizing the Contractor, the PMCSC employed different strategies using the provisions of the Contract, such as imposition of fines, linking payments with the performance of the Contractor staff and even issuance of notices for stoppage of work activities to convince him to make necessary expenditures required for the execution of essential environmental control measures. 5. The ADB safeguards team has remained highly supportive and responsive in providing guidance and recommendations to the PDA and Consultant (Engineer) on all safeguard compliance related issues, whenever their advice has been sought during the project construction phase. 6. Currently, the situation with regards to implementation of environmental safeguards along the BRT Corridor is comparatively better as the corridor works such as; concreting of At- grade corridor sections, asphalting of the mixed traffic lanes and launching of girders etc. are nearing completion. However, the situation at the campsites still requires further improvements. 3 Semi Annual Environmental Monitoring Report No. 02 Peshawar Sustainable Bus Rapid Transit Corridor Project 2 PROJECT DESCRIPTION AND CURRENT ACTIVITIES 2.1 Project Description 7. The PSBRT project will provide fast, efficient, reliable and comfortable public transport system to the masses and cost effective urban mobility through the provision of segregated right-of-way infrastructure offering a rapid and frequent service. 8. The BRT route will run from Chamkani to Karkhano market with a total of 32 stations along a total distance of approximately 30 kilometres. The existing infrastructure will be improved with footpaths, bicycle lanes and provision at the stations for bicycle stands to make the journey easy for people using bicycles. Each station will be located within approximately half a kilometre reach, making it convenient for users of the system. Around 450 buses with a capacity of up to 95 people each will be operational on the BRT system and BRT buses will run the entire day with extra buses being used during peak times. 9. On completion, the project will be operated by Trans Peshawar, which is a competent authority working under the Government of Khyber Pakhtunkhwa. Trans Peshawar is a newly established entity and currently it has not attained sufficient technical / engineering capabilities to provide technical support during the construction activities of the Project. Therefore, this