July 5, 2019 - Summer Events!
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
UPPER FALLS Braves, Bunching Their Canoes Together, 5 Before the Perkin’S Enterprise Began Elliot Street in the 1850S
N EWTON U PPER F ALLS N EWTON U PPER F ALLS N EWTON U PPER F ALLS N EWTON U PPER F ALLS N EWTON U PPER F ALLS N EWTON U PPER F ALLS N EWTON U PPER F ALLS N EWTON U PPER F ALLS N EWT chDiscover Historicchch until the present edifice was built. built about the same time as its famous speared salmon and took shad and stone “facing,” while the sidewalk was was the father-in-law of Dr. Joseph unknown. The house appears to be too Other Catholic churches in Needham, neighbor, the old stone barn. NEWTON alewives from tidal waters below a nat- extended out from the bridge on the Huckins Warren of the Warren family pretentious for its original surround- Newton Centre, Wellesley, Lower Falls, ural dam in this area. Above the dam, north side. of doctors. Dr. Warren owned and ings. General Simon Elliot, son of mill and Waban were formed wholly or in 39 The Otis Pettee Square and Depot is fresh water fish were caught. Indian practiced in the building at 344-346 owner Simon Elliot who died in 1793, is part by this parish. named for the man described by one UPPER FALLS braves, bunching their canoes together, 5 Before the Perkin’s enterprise began Elliot Street in the 1850s. During the known to have built a home on the snuff historian as “the principal factor in the worked their way downstream using their operations in 1828 most of the old Civil War, he was personal physician to mill property after the death of his 37 The barn/warehouse at 38-44 Oak development of Newton.” One of the PPER FALLS is one of the many of which look much as they did in branches of saplings to sweep the river Elliot snuff mills and other industrial President Lincoln. -
Tracing the Aqueducts Through Newton
Working to preserve open space in Newton for 45 years! tthhee NNeewwttoonn CCoonnsseerrvvaattoorrss NNEEWWSSLLEETTTTEERR Spring Issue www.newtonconservators.org April / May 2006 EXPLORING NEWTON’S HISTORIC AQUEDUCTS They have been with us for well over a century, but the Cochituate and Sudbury Aqueducts remain a PRESIDENT’S MESSAGE curiosity to most of us. Where do they come from and where do they go? What are they used for? Why Preserving Echo Bridge are they important to us now? In this issue, we will try to fill in some of the blanks regarding these As part of our planning for the aqueducts in fascinating structures threading their way through our Newton, we cannot omit Echo Bridge. This distinctive city, sometimes in clear view and then disappearing viaduct carried water for decades across the Charles into hillsides and under homes. River in Newton Upper Falls from the Sudbury River to To answer the first question, we trace the two Boston. It is important to keep this granite and brick aqueducts from their entry across the Charles River structure intact and accessible for the visual beauty it from Wellesley in the west to their terminus in the provides. From a distance, the graceful arches cross the east near the Chestnut Hill Reservoir (see article on river framed by hemlocks and other trees. From the page 3). Along the way these linear strands of open walkway at the top of the bridge, you scan the beauty of space connect a series of parks and playgrounds. Hemlock Gorge from the old mill buildings and falls th The aqueducts were constructed in the 19 upriver to the meandering water and the Route 9 century to carry water from reservoirs in the overpass downstream. -
National Register of Historic Places Continuation , Sheet Water Supply System Thematic Nomination 9 7 Section Number ___ Page J ___
NPS Form 10-900 0MB No. 10244018 (Rev. 8-86) United States Department of the Interior National Park Service National Register of Historic Places Registration Form This form is for use in nominating or requesting determinations of eligibility for individual properties or districts. See instructions in Guidelines for Completing National Register Forms (National Register Bulletin 16). Complete each item by marking "x" in the appropriate box or by entering the requested information. If an item does not apply to the property being documented, enter "N/A" for "not applicable." For functions, styles, materials, and areas of significance, enter only the categories and subcategories listed in the instructions. For additional space use continuation sheets (Form 10-900a). Type all entries. 1. Name of Property historic name Water Supply System of Metropolitan Boston, Themptir Mult.ipTp___________ other names/site number_______Properti es Submi ssi on_________________________________ 2. Location street & number Multiple N/ft I not for publication city, town See District Data Sheet iv ft I vicinity state MA code county code 027, 017, Norfolk. (J2T 3. Classification Ownership of Property Category of Property Number of Resources within Property I I private G3 building(s) Contributing Noncontributing fXI public-local f"Xi district buildings I I public-State I [site __ ____ sites I I public-Federal r~Xl structure Qfi A structures I I object . objects .Total Name of related multiple property listing: Number of contributing resources previously listed in the National Register >ee Continuation Sheet 4. State/Federal Agency Certification As the designated authority under the National Historic Preservation Act of 1966, as amended, I hereby certify that this H nomination l_j request for determination of eligibility meets the documentation standards for registering properties in the National Register of Historic Places and meets the procedural and professional requirements set forth in 36 CFR Part 60. -
1975 Charles River Pathway Plan
CHARLES RIVER PATHWAY PLAN COVER: Artist’s view of the Charles River c. 1900 1 Mayor Theodore D. Mann City Hall Newton, Massachusetts Dear Mayor Mann: We, the Chairman of the Newton Conservation Commission and the City of Newton Planning Director, submit herewith the "CHARLES RIVER PATHWAY PLAN" as prepared by Planning Consultant, William D. Giezentanner. We are most grateful to you and James M. Salter, Chief Administrative Officer, for the interest you have shown in the project's funding, and we value your assistance with the plan's presentation to Newton residents. We are indebted to the following agencies and groups for their contributions to and interest in the completed planning study: the Ford Foundation, the Newton Planning Department staff, members of the Conservation Commission, the Metropolitan District Commission, Aldermanic City Planning Committee, the Aldermanic Finance Committee and the entire membership of the Board of Aldermen; Charles River Watershed Association, Inc., Newton Conservators, Inc., Newton Historic District Study Committee, Newton Upper Falls Improvement Association, American Legion Nonantum Post 440, Chestnut Hill Garden Club, Woman's Club of Newton Highlands, Upper Falls Senior Citizens Group; the News-Tribune, Newton Graphic, Newton Times, Newton Villager and Transcript. We believe that with the substantial citizen interest and participation in this planning venture, in terms of both time and money, the forecast is excellent that the CHARLES RIVER PATHWAY PLAN RECOMMENDATIONS will be accomplished. 2 CHARLES RIVER PATHWAY PLAN Prepared for: NEWTON CONSERVATION COMMISSION By William D. Giezentanner with a Grant from the Ford Foundation July 1975 The studies for this project were carried out under the general supervision of the Newton Conservation Commission and the Newton Planning Department and were financed by a grant from the Ford Foundation matched with an appropriation by the City of Newton Board of Aldermen. -
Echo Bridge Historic Railing Reconstruction Attachment 1 – Analysis of Historical Significance
Echo Bridge Historic Railing Reconstruction Attachment 1 – Analysis of Historical Significance Echo Bridge, constructed in 1876-1877 by the Boston Water Board, “possesses integrity of location, design, setting, materials and workmanship and important associations with the development of a major water system to serve Boston’s growing population in the late nineteenth century.” 1 Developments like Back Bay and Fenway depended on such water for their growth. It is 475 feet in length and consists of seven arches, five of 37’ span and one of 38’ over Ellis Street in the mill village of Newton Upper Falls. The seventh and largest arch is 130’ in length, “described by F.H. Barrett, a Boston Water Works engineer, as the second longest masonry arch on this continent and one of the largest stone arches in the world.” 1 Plans stated: “The bridge is to be built in a most substantial manner of granite and brick work. The piers, arches and abutments up to the level of the conduit will be of granite, and above this there will be a handsome face-brick parapet, formed by pilasters into panels, and capped with a heavy granite coping, the whole surmounted by an ornamental railing.” 2 These railings atop the bridge are made of cast iron and consist of decorative railing posts spaced 8’ apart with pipe rails forming the top rail, bottom rail and crossing intermediate rails. There are decorative cast iron rosettes halfway between each post. As eloquently stated in its National Registry Nomination Form, “Echo Bridge is a graceful and handsomely constructed bridge of granite and brick which adds to the rugged beauty of Hemlock Gorge. -
32Nd Annual New England Conference on Industrial Archeology
32nd Annual New England Conference on Industrial Archeology Hosted by the Southern New England Chapter for Industrial Archeology (SNEC-SIA) at Clark University, Jefferson Academic Center, Room 218, Worcester, Massachusetts Saturday, March 30, 2019 SCHEDULE 8:30-9:25 A.M. Registration 9:25-9:30 Greetings and Opening Remarks Stilted Segmental Arch: Architectural Sara Wermiel, Ph.D 9:30-10:00 A.M. Symbol of Industry Jamaica Plain, MA Robert Dermody Mt. Hope Bridge: New England’s First 10:05-10:35 A.M. Bristol, RI Major Suspension Bridge 10:35-10:50 A.M. 15-minute break Making Places: Beyond the Historic Renée Tribert 10:50-11:20 A.M. Resource Survey Hamden, CT Building Community with Industrial John Mayer 11:25-11:55 A.M. History – A Project Report from Amesbury, MA Amesbury, Massachusetts 12:00-1:30 P.M. Luncheon Break The Arkwright Bridge: A Rehabilitation Emeline Young 1:30-2:00 P.M. Feasibility Assessment Barrington, RI The Preservation Challenges of Echo Barbara Kurze 2:05-2:35 P.M. Bridge Boston, MA 2:35-2:50 P.M. 15-minute break The Institute for Industrial Art and John Schroeder, Ph.D. 2:50-3:20 P.M. History – An Overview and Archeology North Andover, MA Opportunities The “Eblana” Brewery in the Great Patrick Powers 3:25-3:55 P.M. Brewery Landscape of Roxbury and Revere, MA Jamaica Plain, Boston 1 PAPER ABSTRACTS and BIOs Stilted Segmental Arch: Architectural Symbol of Industry As factories as a building type evolved in the 19th century, their architecture ran the gamut from plain to elaborate. -
Open PDF File, 2.18 MB, for Newton with Appendices
NEWTON’S HERITAGE LANDSCAPES: A COMMUNITY-BASED RECONNAISSANCE REPORT Newton Planning & Development Department Newton Community Preservation Committee City of Newton Setti D. Warren Mayor PROJECT TEAM Newton Planning & Development Department Amy Yuhasz, Community Development Program Manager Alice Ingerson, Community Preservation Program Manager Brian Lever, Senior Preservation Planner Newton History Museum (Jackson Homestead) Susan Abele, Curator of Manuscripts & Photographs Newton Parks & Recreation Department Carol Schein, Open Space Coordinator Project Consultants Shary Page Berg, Landscape Preservation Consultant Gretchen G. Schuler, Preservation Planner City of Newton Planning & Development Department City Hall, 1000 Commonwealth Avenue Newton, MA 02459 April 2009, final revisions March 2010 This report is also available online here: http://www.newtonma.gov/Planning/docs/10April12%20Heritage%20Landscape %20Inventory%20FINAL%20REPORT.pdf Cover Photographs : Charles River at Echo Bridge, Coletti-Magni Park and Washington Park CONTENTS Introduction . 1 Methodology . 2 Newton History . 3 Heritage Landscape Themes and Priority Landscapes . .. 7 Waterways and Their Associated Landscapes Charles River Cheesecake Brook Crystal Lake Village Centers and Their Defining Features Villages Railroad Stations Branch Libraries Community Spaces Outside Village Centers Neighborhoods Small Parks and Triangles Community-wide Issues Existing Resource Documentation and Planning Tools . 33 Inventory of Historic and Archaeological Assets State and National -
Echo Bridge Railings
Call-to-Action: Support Echo Bridge Railing Reconstruction Today By Lee Fisher, Chairman of the Echo Bridge Railing Committee State Representative Ruth Balser secured $250,000 in state Background funds for the project. In 2008, temporary chain link fencing was installed to keep the Echo Bridge Promenade open and cho Bridge's handsome granite and brick design safe. But then nothing happened… and the historic cast iron contributes to the rugged beauty of surrounding railings have continued to deteriorate. EHemlock Gorge, one of the first of five parks acquired by the Metropolitan Park Commission in 1893. Today, you can make a difference by registering your The bridge is on the National and State Registers of support for a new initiative to reconstruct the railings and Historic Places and it is the second longest masonry arch on by helping spread the word in Newton. the continent. Once a major tourist destination, it continues to serve as a popular spot for hikers, artists and nature lovers Current Situation Echo Bridge was built to carry water to the growing City of Boston and now serves as a back-up water route, last used in 2010. Both Echo Bridge and the Sudbury Aqueduct, which is housed inside the Bridge, are structurally sound, and the water supply for metropolitan Boston is safe and secure. Therefore, with total cost of replacing the railings estimated at $1.44 million, MWRA could not justify dedicating ratepayer dollars to fully fund a reconstruction of the historic railings, which are not linked to the safety of the public water supply. -
National Register of Historic Places Inventory — Nomination Form
NEWTON, MASSACHUSETTS MRA HISTORIC DISTRICTS Area A Newton Upper Falls Historic District 90 Area B Newton Highlands Historic District 47 Area C Newton Lower Falls Historic District 15 Area D Putnam Street Historic District 20 Area E Webster Park Historic District 24 Area F West Newton Hill Historic District 74 Area G Newtonvllle Historic District 141 Area H Our Lady Help of Christians Historic District 4 Area I Hyde Avenue Historic District 5 Area J Farlow & Kenriek Parks Historic District 8 (Boundary Increase) Area K Crystal Lake A Pleasant Street Historic District 23 Area L Union Street Historic District 5 Area M Sumner & G1bbs Street Historic District 16 Area N Lasell Neighborhood Historic District 59 Area 0 Old Chestnut H111 Historic District 46 Area P Newton Theological Institute Historic District 28 Area 0 Gray Cliff Historic District 8 TOTAL PROPERTIES WITHIN DISTRICTS 713 INDIVIDUALS (See Individual Data Sheet) 105 TOTAL PROPERTIES IN MULTIPLE RESOURCE AREA NOMINATION 818 Existing Individual NR properties In Newton 13 Farlow & Kenriek Parks Historic District 164 GRAND TOTAL 995 Newton, Mass. Multiple Resource Area DATA SHEET FOR INDIVIDUALS Address S-B-L Historic Name Date Style Village Inven . # Area (SF) 121 Adena Road 34-28-5 Henry Gane House 1860s Mansard WN 3201 7,404 473 Auburn St. 41-12-12 Whlttemore's Tavern; Bourne House ; c.1724 Georgian AU 4255 12,243 400 Beacon St. 63-16-16 Dupee Estate 1880 Stick variant CH CH-9A, 10 364,199 945 Beacon St. 64-26-21 1893 Colonial Revival Cen NC-43 28,994 1008 Beacon St. -
Open Space & Recreation Plan
Open Space and Recreation Plan 2015 - 2022 Town of Wellesley, MA 1 Table of Contents 1. Executive Summary .............................................................................. 6 2. Introduction ........................................................................................... 8 A. Statement of Purpose ..................................................................................................................................................... 8 B. Planning Process and Public Participation ...................................................................................................................... 9 1. Public Participation .................................................................................................................................................... 9 C. Researchers and Writers .............................................................................................................................................. 10 3. Community Setting.............................................................................. 11 A. Regional Context .......................................................................................................................................................... 11 B. History of the Community .............................................................................................................................................. 14 1. Settlement and Early Land Use ..............................................................................................................................