Balancing Electricity Supply and Demand Is a 24/7

Total Page:16

File Type:pdf, Size:1020Kb

Balancing Electricity Supply and Demand Is a 24/7 ConnectionsMay 2017 Cover Page 2 Page 2 Page 4 Managing the Flow Energy Planning MyAccount Helps Manage Yearly Price Changes of Electricity Process Underway Energy Use Can Go Up or Down Tending the Grid Idaho Power Balancing Operator Leader Kresta Davis-Butts leads a team of people who work around the clock to match electricity production with our customers’ energy needs. Balancing Electricity Supply and Demand is a 24/7 Job Moving electricity from where energy sources with the ups and downs Every time someone plugs in a cell it’s generated to your home or of customer demand. Imagine a large phone charger, starts an irrigation pump business requires a complex water tank with thousands of spigots or switches off a light, the demand balancing act that goes on constantly being turned on and off. on the grid — called system load — 24 hours a day, every day. Coming into the tank are hundreds of fluctuates. Often, it happens behind the hoses keeping the tank full. You have scenes, when a furnace fan turns on Electricity is a constant, powerful force control of some of those hoses — but not or a dishwasher completes its task, for that affects nearly every aspect of our all of them — and your job is to maintain example. lives. But it can’t be stored in large a constant water level in the tank. volumes, and excess energy doesn’t just The amount of energy coming on to the evaporate. It has to go somewhere. “It’s really an art. You are constantly system must match that system load balancing the system, and every every second of every day. That’s where Idaho Power’s Load Serving situation is so unique,” said Kresta In the spring, overall demand for Operations team comes in. They balance Davis-Butts, Balancing Operator Leader. a dizzying array of constantly changing electricity is relatively low across our (continued on page 2) Like us at facebook.com/idahopower • Follow us at twitter.com/idahopower (@idahopower) • Watch us on youtube.com/idahopower News Feed Balancing Electricity (continued from page 1) News Feed region, but the amount of energy Idaho Power controls many of Long-range Planning Process being generated is high. Think the resources on our system. We Enters Final Phase of all the water that has been have the ability to adjust the rolling down the Snake River amount of energy coming from Every two years, Idaho since March, spinning hydro gas or coal plants. Usually we can Power completes a 20- turbines, while spring breezes adjust the output of hydro plants, year resource plan for keep wind turbines churning, not too, although the volume of water serving our customers’ just in Idaho but throughout the going downstream this year has future power supply Northwest. limited our ability to do that. needs. This Integrated Resource Plan (IRP) is Idaho Power uses its own That’s not the case for wind and developed with input resources — 17 hydroelectric solar projects; Idaho Power is from an advisory dams on the Snake River and required to purchase all of the council representing its tributaries, three gas-fired energy these projects generate numerous customer plants and a share of output from whether it is needed or not. This groups via public three coal plants — to serve that can limit our flexibility when meetings. The 2017 IRP will be electrical demand. Energy also trying to manage the system, submitted to regulators in June. comes from large wind, solar and especially when faced with a geothermal projects that sell their growing amount of energy from The plan’s long-term focus provides time to energy to Idaho Power. Dozens these sources that literally ramp identify resource needs and new investments. of smaller projects push energy up or down in seconds. The two-year revision cycle allows us to onto the grid, as well. All of this coming and going respond to changing forecasts, technological Additional energy can be is constantly monitored and advances and other shifts in the energy market. purchased from outside of managed from a large room The result carefully considers the cost, reliability our area and delivered via full of video screens. Single and environmental responsibility of existing high-voltage transmission workstations have up to a dozen and future power supply resources. lines. Energy also moves across video monitors, and an entire Idaho Power’s system. For wall lays out Idaho Power’s idahopower.com/irp example, another utility may grid, showing the connections move electricity from the Pacific between substations and Northwest to its customers in highlighting outages and other Understand Your Energy Use Utah. potential trouble spots. with myAccount Just like Idaho Power load serving operators balance resources in real-time, you can keep an eye on your energy use anytime you want. By signing up for myAccount, you can access your account information 24/7: view your bill, request service, set up Budget Pay or complete a Home Profile to understand how you’re using energy. You can control your spending on energy and know what you are paying for, when and why. Know your house, know your use and know you are in control. To register online at the Idaho Power website, look for the “myAccount” button on the left of the top navigation panel on the home page. myAccount idahopower.com/myaccount 2 Why Prices Change Screens showing weather radar renewable developers by selling Each Year and forecasts are constantly energy into the market. To match customer prices with the being updated. The amount of The load serving operators try wind and solar energy coming to minimize that excess energy company’s costs of providing safe, reliable onto the system is displayed. while ensuring there is enough electric service, your bill changes on June The numbers tick up and down reserve power on the system to 1 each year with two price adjustments constantly as the weather make sure all of our customers that can go up or down. changes. have the electricity they need, “We manage the system with even if the wind stops blowing or Annually, Idaho Power files with the Idaho three goals: compliance, storm clouds block the sun. Public Utilities Commission (IPUC) for review reliability and economic benefit and approval of two price changes, the Fixed While all of that is going on, Cost Adjustment (FCA) and the Power Cost for the company and our operators must make sure customers,” said Chris Nebrigich, Adjustment (PCA), and must approve them energy has a path to where it’s before we can implement them. Balancing Operator Leader. needed even when a route is “Intermittent resources (wind unavailable due to unplanned and solar) make all three more and planned (maintenance) complicated.” outages. They develop day-ahead Intermittent resources make plans to ensure enough energy operating the system more is available for purchase if it’s expensive. Renewable projects needed, while also factoring in like wind and solar have a laundry list of considerations: contracts mandated by federal the market price of energy, the law, with fixed prices that cost of coal and natural gas, increase over time. Balancing regulatory restrictions on how we the system often requires us manage river flows, weather and to decrease use of lower-cost unexpected drops or spikes in resources. When the region has system load. FCA an oversupply of energy, prices “All of the operators on these desks plummet — sometimes to zero. • The FCA separates certain revenue work closely together,” Kresta collection related to fixed-cost recovery So there is little opportunity said. “It’s really a team effort.” to recoup the costs we pay to from energy sales to eliminate financial disincentives for Idaho Power to invest in efforts that promote wise use of energy, like demand-side management and energy efficiency programs. • If, because of lower energy use per customer during the prior year, we collect less than the fixed-cost per customer amount authorized by the IPUC, we’re allowed to collect the difference through a surcharge. • If, because of higher energy use per customer during the prior year, we collect more than the authorized amount, we’re allowed to refund the difference to customers through a credit. The FCA is filed each year on or near March 15 and only affects residential and small general service customers. (continued on page 4) 3 Price Change (continued from page 3) PCA The PCA is an annual filing that updates customer prices to reflect the current variable costs and benefits of operating the electric system. Neither Idaho Power nor its shareholders receive any financial return on the PCA; money collected from the surcharge can be used only to pay power-supply expenses. • It forecasts anticipated fuel costs, costs to purchase power and customer benefits from sales of surplus energy for the coming April through March. • It “trues up” last year’s forecasted costs with the costs actually incurred Coming from Mike the previous April through March. Prices are established by adding the forecast and the true-up to align actual collection with actual costs. Customers also benefit when we sell surplus energy to the wholesale market when we have more than we need to serve customers. The money from those sales is deducted from our power-supply costs and reduces the prices customers pay through the PCA. The PCA is filed each year on or around April 15 and applies to all customers. idahopower.com/rates Connections is published monthly to inform From The Electric Kitchen May 2017 our customers about services we provide, programs we offer and industry issues impacting Side Dish our service area in southern Idaho and eastern Easy Spicy Green Beans Oregon.
Recommended publications
  • Recreational Use Associated with the Snake River in the Hells Canyon
    5HFUHDWLRQDO 8VH $VVRFLDWHG ZLWK WKH 6QDNH 5LYHU LQ WKH +HOOV &DQ\RQ 1DWLRQDO 5HFUHDWLRQ $UHD Hh uhyy7 Srp rhvSr pr6hy 7HFKQLFDO 5HSRUW $SSHQGL[ ( Ari h !! 5HYLVHG-XO\ Cryy8h8yr A@S8I (& &RS\ULJKWE\,GDKR3RZHU&RPSDQ\ Idaho Power Company Recreational Use Associated with the Snake River TABLE OF CONTENTS Table of Contents............................................................................................................................. i List of Tables ................................................................................................................................. iii List of Figures................................................................................................................................ iii List of Appendices ........................................................................................................................ vii Abstract............................................................................................................................................1 1. Introduction.................................................................................................................................3 1.1. Associated Studies and Technical Reports ........................................................................3 1.2. USFS–HCNRA Boating-Related Regulations...................................................................4 1.2.1. Types of Watercraft Allowed in the HCNRA...........................................................4 1.2.2. Boating Regulation
    [Show full text]
  • View Annual Report
    Stepping Forward Entering a new era for energy. 2009 Annual Report $2.64 $2.51 $2.17 $1.86 IDACORP is stepping forward on $1.50 all fronts ensuring your company is positioned to succeed in a new era for energy. 2005 2006 2007 2008 2009 Earnings Per Share (Diluted) Current Annual Dividend $1.20 2009 Highlights Thousands of Dollars, Except Per Share Amounts 2009 2008 % Change 9.5% 8.9% 7.5% 6.8% Electric Utility Revenues $1,045,996 $956,076 9.4 6.2% Other Revenue $3,804 $4,338 <12.3> Total Operating Revenues $1,049,800 $960,414 9.3 Net Income $124,350 $98,414 26.4 Earnings Per Diluted Common Share $2.64 $2.17 21.7 2005 2006 2007 2008 2009 Dividends Paid Per Common Share $1.20 $1.20 -- Return on Total Assets $4,238,727 $4,022,845 5.4 Year-End Equity Number of Employees (full time) 1,994 2,073 <3.8> 36.4% 20.8% IDACORP, Inc.—Boise, Idaho-based and formed in 1998—is a holding 16.5% 16.1% 13.6% company comprised of Idaho Power Company, a regulated electric 10.7% utility; IDACORP Financial, a holder of affordable housing projects and other real estate investments; and Ida-West Energy, an operator of small hydroelectric generation projects that satisfy the requirements 2005 2006 2007 2008 2009 of the Public Utility Regulatory Policies Act of 1978. IDACORP’s origins -0.1% -5.6% -13.0% lie with Idaho Power and operations beginning in 1916. Today, Idaho Power employs 1,994 people to serve a 24,000 square-mile service area -25.9% in southern Idaho and eastern Oregon.
    [Show full text]
  • FORM 10-K (Mark One)
    Table of Contents UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 10-K (Mark One) X ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the fiscal year ended December 31, 2013 OR TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the transition period from ................... to ................................................................. Exact name of registrants as specified in Commission their charters, address of principal executive IRS Employer File Number offices, zip code and telephone number Identification Number 1-14465 IDACORP, Inc. 82-0505802 1-3198 Idaho Power Company 82-0130980 1221 W. Idaho Street Boise, ID 83702-5627 (208) 388-2200 State of incorporation: Idaho Name of exchange on SECURITIES REGISTERED PURSUANT TO SECTION 12(b) OF THE ACT: which registered IDACORP, Inc.: Common Stock, without par value New York Stock Exchange SECURITIES REGISTERED PURSUANT TO SECTION 12(g) OF THE ACT: Idaho Power Company: Preferred Stock Indicate by check mark whether the registrants are well-known seasoned issuers, as defined in Rule 405 of the Securities Act. IDACORP, Inc. Yes (X) No ( ) Idaho Power Company Yes ( ) No (X) Indicate by check mark if the registrants are not required to file reports pursuant to Section 13 or Section 15(d) of the Act. IDACORP, Inc. Yes ( ) No (X) Idaho Power Company Yes ( ) No (X) Indicate by check mark whether the registrants (1) have filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrants were required to file such reports), and (2) have been subject to such filing requirements for the past 90 days.
    [Show full text]
  • Q4 2020 Investor Information
    Bank of America Power, Gas, & Solar Leadership Conference Q4 2020 Investor Information March 2-3, 2021 Forward-Looking Statements In addition to the historical information contained in this presentation, this presentation contains (and oral communications made by IDACORP, Inc. and Idaho Power Company may contain) statements, including, without limitation, earnings guidance and estimated key operating and financial metrics, that relate to future events and expectations and, as such, constitute forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Any statements that express, or involve discussions as to, expectations, beliefs, plans, objectives, outlook, assumptions, or future events or performance, often, but not always, through the use of words or phrases such as “anticipates,” “believes,” “continues,” “could,” “estimates,” “expects,” “guidance,” “intends,” “potential,” “plans,” “predicts,” “projects,” “targets,” or similar expressions, are not statements of historical facts and may be forward-looking. Forward-looking statements are not guarantees of future performance and involve estimates, assumptions, risks, and uncertainties. Actual results, performance, or outcomes may differ materially from the results discussed in the statements. In addition to any assumptions and other factors and matters referred to specifically in connection with such forward-looking statements, factors that could cause actual results or outcomes to differ materially from those contained in forward-looking statements
    [Show full text]
  • Hells Canyon Complex Total Dissolved Gas Study
    Hells Canyon Complex Total Dissolved Gas Study Ralph Myers Project Limnologist Sharon E. Parkinson Principal Engineer Technical Report Appendix E.2.2-4 March 2002 Revised July 2003 Hells Canyon Complex FERC No. 1971 Copyright © 2003 by Idaho Power Company Idaho Power Company Hells Canyon Complex Total Dissolved Gas Study TABLE OF CONTENTS Table of Contents ............................................................................................................................. i List of Tables...................................................................................................................................ii List of Figures .................................................................................................................................ii List of Appendices .........................................................................................................................iii Abstract ........................................................................................................................................... 1 1. Introduction ................................................................................................................................ 2 2. Study Area.................................................................................................................................. 3 3. Plant Operations ......................................................................................................................... 4 4. Methods.....................................................................................................................................
    [Show full text]
  • Understanding the 1984 Swan Falls Settlement
    UNDERSTANDING THE 1984 SWAN FALLS SETTLEMENT CLIVE J. STRONG & MICHAEL C. ORR FULL CITATION: Clive J. Strong & Michael C. Orr, Understanding the 1984 Swan Falls Settlement, 52 IDAHO L. REV. 223 (2016). This article Copyright © 2016 Idaho Law Review. Except as otherwise expressly provided, permission is hereby granted to photocopy this article for classroom use, provided that: (1) Copies are distributed at or below cost; (2) The author of the article and the Idaho Law Review are properly identified; (3) Proper notice of the copyright is affixed to each copy; and (4) Notice of the use is given to the Idaho Law Review. UNDERSTANDING THE 1984 SWAN FALLS SETTLEMENT CLIVE J. STRONG & MICHAEL C. ORR TABLE OF CONTENTS I. INTRODUCTION ............................................................................................... 224 II. BACKGROUND ................................................................................................ 226 III. THE SWAN FALLS CONTROVERSY AND SETTLEMENT ....................... 230 A. The Lawsuits ............................................................................................ 231 B. The Legislative Subordination Battle ....................................................... 234 C. The Negotiations ...................................................................................... 235 D. The Settlement “Framework” ................................................................... 237 E. The “Trust” Concept ................................................................................. 239
    [Show full text]
  • Idaho Falls Power
    INTRODUCTION The first public utility in America began over Although Idaho Falls was not the first community to own and 120 years ago. The efforts of the early electrical operate its municipal utility, it is one of the oldest public power pioneers have allowed the nation’s municipal utilities communities in the Northwest. The city of Idaho Falls is to give inexpensive, reliable electric power to millions celebrating the past 100 years of providing its residents of Americans in the twentieth century. Today municipal ownership in its electric power system. This report municipal utilities give over 2,000 communities a will provide some interesting facts about the pioneers who sense of energy independence and autonomy they can installed a tiny electric generator on an irrigation canal in the carry into the twenty-first century. fall of 1900, establishing the beginning of the Idaho Falls municipal utility. Lucille Keefer pictured in front of the falls, is one of the more endearing images of Idaho Falls’ hydroelectric history. The Pennsylvania-born school teacher was the wife of the project’s construction superintendent. THE CANAL ERA The original 1900 power plant generated electricity from the water tumbling out of an irrigation ditch. When the Utah and Northern Railroad extended its tracks During the 1880s and 1890s, lumberyards, flourmills, to the rapids on the Snake River in 1879, the small town livestock auction houses, newspapers, banks, and clothing of Eagle Rock (now Idaho Falls) was established. The stores sprouted up along the railroad tracks. Population turn of the century not only brought more people to the surged as merchants and professionals flocked to the city to newly formed community but new developments as well.
    [Show full text]
  • (COE1) Comments/Responsens/Attachments U.S. Army Corps of Engineers
    Idaho Power Company Responses to Comments U.S. ARMY CORPS OF ENGINEERS—COE1 Hells Canyon Complex Page 1 Responses to Comments Idaho Power Company U.S. Army Corps of Engineers—COE1 Page 2 Hells Canyon Complex Idaho Power Company Responses to Comments U.S. Army Corps of Engineers—COE1 Hells Canyon Complex Page 3 Responses to Comments Idaho Power Company U.S. Army Corps of Engineers—COE1 Page 4 Hells Canyon Complex Idaho Power Company Responses to Comments RESPONSE TO COMMENT COE1-1 Comment noted. Please see Exhibit B for more information regarding IPC’s proposal for flood control requirements in the license application. RESPONSE TO COMMENT COE1-2 The flood control routine incorporated into the CHEOPS operations model uses the U.S. Army Corps of Engineer’s (ACOE) 1998 modified procedure. This methodology is presented in Exhibit B. The flood control target elevations calculated by the model are based on observed flows through the HCC, providing a theoretical drawdown of Brownlee Reservoir during this period. This theoretical drawdown is not influenced by day-to-day influences or human intervention. By establishing this theoretical operation, other reservoir operation scenario comparisons can be made on a consistent basis. It is not IPC’s intention to change the general flood control requirements for the HCC in the new license. IPC is currently working with Chan Modini of the ACOE’s Hydrologic Engineering Branch (in Portland, OR) to develop an updated flood control article for the new license. The article would be based on the 1998 modified procedure for determining the flood control draft at Brownlee Reservoir.
    [Show full text]
  • Swan Falls Project Consultation Appendix
    Idaho Power Company Consultation Technical Appendix CONSULTATION SUMMARY, RELATED CHARTS, AND CORRESPONDENCE APPLICATION FOR NEW LICENSE SWAN FALLS PROJECT FERC NO. 503 Narrative Summary of Idaho Power Company’s Consultation Efforts New License Application for the Swan Falls Hydroelectric Project Consultation Appendix Swan Falls Project June 2008 FERC No. 503 © 2008 Idaho Power Idaho Power Company Consultation Appendix TABLE OF CONTENTS Table of Contents............................................................................................................................. i Introduction......................................................................................................................................1 Consultation Overview ....................................................................................................................1 Informal Consultation ......................................................................................................................2 First Stage Formal Consultation Pursuant to 18 CFR § 16.8...........................................................5 Formal Consultation Package, Including Study Recommendations—March 2005 ..................5 Aquatic Resources ...............................................................................................................5 Wildlife Resources...............................................................................................................6 Botanical Resources.............................................................................................................6
    [Show full text]
  • American Falls Reservoir Is the Largest Reservoir of the Project
    Finding of No Significant Impact Final Environmental Assessment Maintenance and Rehabilitation of Spillway and Dam Structures at American Falls Dam, Minidoka Project, Power County, Idaho U.S. Department of the Interior Bureau of Reclamation Pacific Northwest Region Snake River Area Office PN FONSI # 19-4 Introduction The Bureau of Reclamation (Reclamation) has prepared this Finding of No Significant Impact (FONSI) to comply with the Council of Environmental Quality (CEQ) regulations for implementing procedural provisions of the National Environmental Policy Act (NEPA). This document briefly describes the proposed action, other alternatives considered, the scoping process, Reclamation’s consultation and coordination activities, mitigation, and Reclamation’s finding. The Final Environmental Assessment (EA) fully documents the analyses of the potential environmental effects of implementing the changes proposed. Location and Background The Minidoka Project (Project) was authorized by the Secretary of the Interior in 1904 and was the first Reclamation project constructed in Idaho. It is located in the Snake River Basin in the southeastern part of the state. American Falls Dam, completed in 1927, is a 94-foot-high composite concrete and earth gravity-type dam on river mile 714.7 of the Snake River near American Falls, Idaho. With a storage capacity of 1,700,000 acre-feet, American Falls Reservoir is the largest reservoir of the Project. The dam itself is located in Power County, Idaho, but the reservoir stretches northeast into both Bingham and Bannock Counties. American Falls Dam and Reservoir comprise a multi-purpose facility from which principle benefits include irrigation, power generation (through a powerplant owned and operated by Idaho Power), flood control, fish and wildlife resources, and recreation.
    [Show full text]
  • (E.3.2-35) Ice Formation on Brownlee Reservoir and Potential Effects on Big Game Populations
    Ice Formation on Brownlee Reservoir and Potential Effects on Big Game Populations R. Ryel Ryel and Associates North Logan, UT N. Mesner Dept. of Geography & Earth Resources Utah State University S. Jensen White Horse Associates Smithfield, UT Technical Report Appendix E.3.2-35 December 2001 Revised July 2003 (Minor Typographical Changes) Hells Canyon Complex FERC No. 1971 Copyright © 2003 by Idaho Power Company Ice Formation on Brownlee Reservoir and Potential Effects on Big Game Populations Technical Report Appendix E.3.2-35 Final Draft December 2001 Prepared for: Idaho Power Company Boise, Idaho Prepared by: R. Ryel Ryel and Associates North Logan, Utah N. Mesner Department of Geography and Earth Resources Utah State University Logan, Utah S. Jensen White Horse Associates Smithfield, Utah Brownlee Reservoir Ice—Effects on Big Game Table of Contents Table of Contents...................................................................................................i List of Tables.........................................................................................................ii List of Figures........................................................................................................ii ABSTRACT.......................................................................................................... 1 1.0 INTRODUCTION........................................................................................... 2 1.1. Background .............................................................................................
    [Show full text]
  • Greenpower Energy
    Idaho Power’s Green Power Product Content Label This label is part of our Green-e Energy certification and is provided to participants each year. The label shows the anticipated sources of Green Power for 2019. 2019 Prospective Product Content Label 1 100% Green-e Energy Certified New2 Renewables Generation facilities’ location: Idaho, Oregon, or Washington Energy Resource Mix: 50% Solar, 50% Wind 1. These figures reflect the renewables that we plan to provide. Actual figures may vary according to resource availability. Before August 1 of next year, we will provide a Historical Product Content Label to report the actual resource mix of the green power purchased for the previous calendar year. 2. New Renewables come from generation facilities that first began commercial operation within the past 15 years. How does Green Power compare to the standard energy mix? Hydro 46.4% Idaho Power’s 2018 mix of resources supplying Idaho Power customers included: Hydroelectric (46.4%), Purchased Power (28.6%), Coal (17.5%), Purchased and Natural Gas & Diesel (7.5%). Power (Purchased Power includes energy originally generated from renewable 28.6% facilities. Idaho Power sells its Renewable Energy Certificates (REC) from these resources and proceeds benefit all customers. Because Idaho Power does not retain the RECs, the electricity is not counted as renewable energy delivered to customers.) Coal 17.5% How is green power sold? Green Power is sold in blocks of 100 kilowatt-hours (kWh) or matches 100 Natural Gas & Diesel percent of your energy (kWh) use. 7.5% What’s the average energy use for a home? The average home in Idaho Power’s service area uses about 950 kWh per month (Idaho Power 2018).
    [Show full text]