Nuneaton Town Centre

Total Page:16

File Type:pdf, Size:1020Kb

Nuneaton Town Centre DESIGN PRINCIPLES FOR NUNEATON TOWN CENTRE BASED ON VICARAGE STREET SITE DEVELOPMENT Leicester 30 mins Warwickshire Boulevard treatment St Nicolas Parish Church Justice Centre to Vicarage Street Birmingham 30 mins Possible hotel sites Housing overlooking 7 the park London 60 mins Coventry 7 15 mins 3 t e e r t S h c ur 1 Ch Realigned Wheat Street 6 with street trees running 3 George Eliot down to the riverfront Gardens NUNEATON 5 2 1 4 6 The town centre opportunity Church Street and Bond Gate you have been waiting for reinforced as a new North/ 6 South spine between church 6 and railway station 2 4 OUR PARTNERSHIP 5 OFFER 6 5 What we will do to What we’re looking for 2 transform Nuneaton: in potential partners: • Work proactively with • Your ideas on generating Reconfigured offices as partners to develop our value in the town centre apartments overlooking town centre assets 5 river and park • Creative approaches to • Use our land to leverage in land use mix, delivery, further investment finance and management • Work to ensure emerging policy supports delivery River Anker waterfront opened up Bridge physically and New residential units over Boardwalk squares with • Retain a long term interest to form a new mixed use, leisure visually opened up to the town centre shopping cafes, restaurants and to sustain the value in the and residential offer riverfront wine bars site • Manage development directly where appropriate VICARAGE STREET 4. Creating new, and reinforcing existing, pedestrian 1. Introducing a new high quality mixed use and cycle-friendly routes through the town centre development in the heart of the town centre OPPORTUNITY 5. Opening up River Anker as a focus for leisure, 2. Opening up new and existing open spaces to food and drink and residential uses This opportunity covers the area between Bridge create a more attractive and safe environment, Street, the River Anker, St Nicolas Parish Church and and added market value 6. Designing high quality streets and public realm Estates and Town Centres Infrastructure & Regeneration the Warwickshire Justice Centre building. with extensive tree planting 024 7637 6249 01926 418621 3. Developing mixed uses along Bridge Street to landandproperty@ [email protected] The design principles for this quarter are applicable reinforce its retail and commercial offer 7. Introducing boulevards around the Ring Road with nuneatonandbedworth.gov.uk to many other areas of the town centre: shared surface crossings to integrate the town centre with its hinterland JOIN US IN OPPORTUNITY SITES IN NUNEATON TOWN CENTRE TRANSFORMING Vicarage Street Site HA Abbey Street Site HA Opportunity Sites Area in Council Ownership 1.6 Area in Council Ownership 1.41 Potential Land Assembly NUNEATON Potential Land Assembly 1.1 Potential Land Assembly 0.91 Commercial & Leisure Total Site Area 2.7 Total Site Area 2.32 (Cinema) The Councils are working together to transform Nuneaton town centre; Potential character: Residential-led Potential character: Leisure led Offices & Public Sector mixed use development and public mixed use development • Creating opportunities by releasing publicly sector hub Retail, Food & Drink Key uses: Leisure (Cinema), Retail, owned land for development Key uses: Office, Public sector hub, Restaurants, Apartments Residential with Retail/ Hotel, Apartments, Education facility • Investment in infrastructure and the Leisure ground floor environment Hotel • Supporting a broader mix of uses through 4 Residential planning policy 5 New & Replacement • Inward investment and local incentive Parking schemes to support new jobs and business growth A 444 7 A 444 Improved Connections 6 2 3 New Station Square Why don’t you join us in this transformation? C t hu Exciting development opportunities exist e r e c r h Queens Road within the town centre for investors, t S S t r e Place e et developers and operators. e Mark g t Bridge Street 1. Warwickshire a r Justice Centre a Abb c ey ...highly i Street ...an attractive V 1 et H 2. St Nicolas Victorian setting with accessible e Stre a Gat re Parish Church a lively street market New fi by rail and road e 8 ld 3. George Eliot R o ...a very ...with extensive e Memorial Gardens t a a public sector land d affordable G 4. Nuneaton Museum place to live d available n &Art Gallery o B 5. Riversey Park 6. Town Hall WHY INVEST 7. Ropewalk Shopping Centre 8. Abbeygate Shopping Centre IN NUNEATON A 444 R 9. Nuneaton Railway Station i v e r TOWN CENTRE? A nk er 1. We’re all working Railway Gateway HA Bus Station Site HA together to achieve Area in Council Ownership 0.18 Area in Council Ownership 1.65 change – from Area in Network Rail 0.15 Potential Land Assembly 0.0 representatives in DCLG Ownership central government to UKTI, Cabe Potential Land Assembly 1.28 Total Site Area 1.65 borough council level Coventry&Warwickshire LEP Mixed use a joined up approach Warwickshire County Council Total Site Area 1.61 Potential character: 9 development has been adopted West Midlands Combined Authority Potential character: Gateway square, making it easier to Bus station Nuneaton & Bedworth Borough Council Transport interchange, Parking Potential anchor uses: engage and invest. reconfiguration, Retail, Leisure, Food & Drink, Apartments Key uses: Transport hub, Parking, 2. The councils are major landowners; up to Parking, Gateway Square a quarter of the town centre is in public ownership and there are several other opportunities in and around the centre. AT THE HEART OF GROWTH LOCAL DEMAND Strong and Growing • It is just 60 minutes to London • Some 10,000 new high quality • The town is closely linked to by train and 45 mins drive from homes will be built in the HORIBA MIRA Technology Leisure Community & Culture 3. Nuneaton is accessible and has a Catchment: three major cities and their Borough over the next 15 years Park, Europe’s most exciting catchment of 3 million people within 20 • Nuneaton has a primary international airports; and automotive R&D campus. A national cinema operator is The council is keen to rationalise actively considering esblishing a and co-locate selected public catchment population of • It is within the • There is a 15% business ‘birth miles of the town; all potential employees, “golden services and amenities in a new around 170,000 Strong and Growing Local presence in Nuneaton town centre visitors and residents. logistics triangle” (M1/M6/ rate’ in Nuneaton – higher than public sector hub in the town • Over 3 million people live Economy: M42) the Warwickshire average Office & Education centre within 20 miles of the town • Nuneaton’s GVA was £1,905 • Some 52 hectares of 4. Planned investment in infrastructure – we’re A Great Place to Live: million in 2015. employment land is being There is ongoing demand from Residential developed which will make a modern specification office space investing in the town; improvements to Highly Accessible: • With an average house price • GVA growth was double the roads and rail network, public realm the national growth during significant contribution to the in the range of 5,000-10,000sqft A variety of tenure and type can • The centre is highly accessible of £135,000 Nuneaton is highly local economy. annually, and interest in third-level complement and enhance the core schemes, and upgrading and developing affordable compared with 2009-14 and exceeded the by road, rail, air and other Warwickshire average education facility with the potential town centre uses, improve security public sector assets modes Warwickshire and national for a startup/innovation hub. and build the evening economy averages.
Recommended publications
  • Download CD7/1 Landscape Character Assessment ( Report)
    CONTENTS 1.0 INTRODUCTION 2.0 METHODOLOGY Inception meeting and data review Desk study and initial mapping Field survey Landscape Characterisation (Stage 1) Settlement Setting / Landscape Capacity Study (Stage 2) 3.0 LANDSCAPE CONTEXT Background National Context County Context The Warwickshire Historic Landscape Characterisation Study Surrounding Authorities Other Reference Material 4.0 OVERVIEW OF THE LANDSCAPE CHARACTER OF THE DISTRICT Physical Influences Human Influences 5.0 CHARACTER OF THE NORTH WARWICKSHIRE LANDSCAPES LCA 1 No Man’s Heath to Warton – Lowlands LCA 2 Little Warton to Fields Farm – Fen Lanes LCA 3 Anker Valley LCA4 Baddesley to Hartshill – Uplands LCA5 Tamworth – Urban Fringe Farmlands LCA6 Wood End to Whitacre – Upper Tame Valley Farmlands LCA7 Church End to Corley – Arden Hills and Valleys LCA8 Blythe Valley – Parkland Farmlands LCA9 Hoggrill’s to Furnace End – Arden Hamlets LCA10 Cole Valley LCA11 Tame Valley Wetlands LCA12 Middleton to Curdworth – Tame Valley Farmland LCA13 Wishaw to Trickley Coppice – Wooded Uplands J/4189/Final Report/Nwarks LCA Final Report Aug 2010.doc SLS 20.08.2010 1 6.0 CAPACITY STUDY 6.1 Atherstone / Mancetter 6.2 Polesworth / Dordon, 6.3 Coleshill 6.4 Old and New Arley 6.5 Grendon / Baddesley Ensor 6.6 Hartshill with Ansley Common, 6.7 Kingsbury 6.8 Water Orton FIGURES Figure 1: Borough Boundary Figure 2: Green Belt Figure 3: RIGs Figure 4: Topography Figure 5: Flood zones Figure 6: Ancient Woodland Figure 7: Ecological Designations Figure 8: Land Use Figure 9: Settlement Patterns Figure
    [Show full text]
  • Archaeological Desk-Based Heritage Assessment and Trial Trench Evaluation on Land at the Old School Site, Polesworth, Warwickshire April 2016
    Archaeological desk-based heritage assessment and trial trench evaluation on land at The Old School Site, Polesworth, Warwickshire April 2016 Report No. 16/102 Authors: Mary Ellen Crothers and Jonathan Elston Illustrators: Joanne Clawley Olly Dindol _________________________________________________________________________________ MOLA Northampton MOLA Project Manager: Mark Holmes Bolton House Site Code: POS16 Wootton Hall Park NGR: SK 26365 02535 Northampton NN4 8BN 01604 809800 www.mola.org.uk [email protected] Archaeological desk-based heritage assessment and trial trench evaluation on land at the Old School Site, Polesworth, Warwickshire April 2016 Report No. 16/102 Quality control and sign off: Issue Date Checked by: Verified by: Approved by: Reason for Issue: No. approved: 1 07/06/16 S Parry Draft for client review 2 18/10/16 M Holmes Final version Authors: Mary Ellen Crothers and Jonathan Elston Illustrators: Joanne Clawley and Olly Dindol MOLA Northampton 2016 MOLA Bolton House Wootton Hall Park Northampton NN4 8BN 01604 809 800 www.mola.org.uk [email protected] MOLA Northampton is a company limited by guarantee registered in England and Wales with company registration number 8727508 and charity registration number 1155198. Registered office: Mortimer Wheeler House, 46 Eagle Wharf Road, London N1 7ED. THE OLD SCHOOL SITE, POLESWORTH STAFF Project Manager: Mark Holmes BA MA MCIfA Text: Desk Based Assesment: Mary Ellen Crothers BA MA Text: Fieldwork: Jonathan Elston Fieldwork: Jonathan Elston Esther Poulus MSc George Everest-Dine
    [Show full text]
  • Mira Technology Park
    MIRA TECHNOLOGY PARK Transport Assessment April 2011 MIRA TECHNOLOGY PARK Transport Assessment April 2011 ATC Ref: 10/014‐A Produced by Advance Transportation Consulting Sandy Farm Business Centre The Sands Farnham Surrey GU10 1PX Tel: 01252 782237 Email: [email protected] MIRA Technology Park Transport Assessment CONTENTS 1. INTRODUCTION & SCOPE OF DOCUMENT ................................................................................... 1 Overview ............................................................................................................................................. 1 Transportation Assessment Structure ................................................................................................ 3 2. POLICY CONTEXT ........................................................................................................................ 6 National Planning Policy ..................................................................................................................... 6 Local Plan/Local Development Framework ........................................................................................ 9 Local Transport Plan (LTP 3) .............................................................................................................. 11 3. SITE DESCRIPTION AND EXISTING TRAFFIC AND TRANSPORT CONDITIONS ................................ 14 Development Site Location and Description .................................................................................... 14 MIRA Development Site Access and
    [Show full text]
  • Bibliography19802017v2.Pdf
    A LIST OF PUBLICATIONS ON THE HISTORY OF WARWICKSHIRE, PUBLISHED 1980–2017 An amalgamation of annual bibliographies compiled by R.J. Chamberlaine-Brothers and published in Warwickshire History since 1980, with additions from readers. Please send details of any corrections or omissions to [email protected] The earlier material in this list was compiled from the holdings of the Warwickshire County Record Office (WCRO). Warwickshire Library and Information Service (WLIS) have supplied us with information about additions to their Local Studies material from 2013. We are very grateful to WLIS for their help, especially Ms. L. Essex and her colleagues. Please visit the WLIS local studies web pages for more detailed information about the variety of sources held: www.warwickshire.gov.uk/localstudies A separate page at the end of this list gives the history of the Library collection, parts of which are over 100 years old. Copies of most of these published works are available at WCRO or through the WLIS. The Shakespeare Birthplace Trust also holds a substantial local history library searchable at http://collections.shakespeare.org.uk/. The unpublished typescripts listed below are available at WCRO. A ABBOTT, Dorothea: Librarian in the Land Army. Privately published by the author, 1984. 70pp. Illus. ABBOTT, John: Exploring Stratford-upon-Avon: Historical Strolls Around the Town. Sigma Leisure, 1997. ACKROYD, Michael J.M.: A Guide and History of the Church of Saint Editha, Amington. Privately published by the author, 2007. 91pp. Illus. ADAMS, A.F.: see RYLATT, M., and A.F. Adams: A Harvest of History. The Life and Work of J.B.
    [Show full text]
  • 48A Bus Time Schedule & Line Route
    48A bus time schedule & line map 48A Atherstone View In Website Mode The 48A bus line (Atherstone) has 2 routes. For regular weekdays, their operation hours are: (1) Atherstone: 6:28 AM - 9:24 PM (2) Nuneaton: 6:56 AM - 9:47 PM Use the Moovit App to ƒnd the closest 48A bus station near you and ƒnd out when is the next 48A bus arriving. Direction: Atherstone 48A bus Time Schedule 32 stops Atherstone Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 6:28 AM - 9:24 PM Bus Station, Nuneaton Hareƒeld Road, Nuneaton Tuesday 6:28 AM - 9:24 PM Fire Station, Nuneaton Wednesday 6:28 AM - 9:24 PM Newtown Road, Nuneaton Thursday 6:28 AM - 9:24 PM Manor Court Road, Nuneaton Friday 6:28 AM - 9:24 PM Stanley Road, Nuneaton Saturday 6:36 AM - 9:24 PM Charles Street, Nuneaton Arrow Road, Nuneaton Queen Elizabeth Road, Nuneaton 48A bus Info Direction: Atherstone Holly Stitches Road, Nuneaton Stops: 32 Trip Duration: 25 min Walnut Close, Nuneaton Line Summary: Bus Station, Nuneaton, Fire Station, Nuneaton, Manor Court Road, Nuneaton, Stanley Tuttle Hill, Nuneaton Road, Nuneaton, Arrow Road, Nuneaton, Queen Camp Hill Road, Nuneaton Elizabeth Road, Nuneaton, Holly Stitches Road, Nuneaton, Walnut Close, Nuneaton, Tuttle Hill, Arlon Avenue, Nuneaton Nuneaton, Arlon Avenue, Nuneaton, Craddock Drive, Nuneaton, St Annes Rc Church, Nuneaton, Victoria Craddock Drive, Nuneaton Road, Nuneaton, School Hill, Hartshill, Post O∆ce, Hartshill, Michael Drayton Junior School, Hartshill, St Annes Rc Church, Nuneaton Oldbury View, Hartshill, Green, Hartshill,
    [Show full text]
  • Introduction
    Weddington Road,Weddington, Nuneaton 01 INTRODUCTION /ŶƚƌŽĚƵĐƟŽŶ 'ůĂĚŵĂŶĞǀĞůŽƉŵĞŶƚƐ>ƚĚŚĂƐƐƵĐĐĞƐƐĨƵůůLJŝŶǀĞƐƚĞĚŝŶĐŽŵŵƵŶŝƟĞƐƚŚƌŽƵŐŚŽƵƚƚŚĞh<ĨŽƌŽǀĞƌϯϬLJĞĂƌƐ͕ĚĞǀĞůŽƉŝŶŐŚŝŐŚƋƵĂůŝƚLJĂŶĚƐƵƐƚĂŝŶĂďůĞƌĞƐŝĚĞŶƟĂů͕ ĐŽŵŵĞƌĐŝĂůĂŶĚŝŶĚƵƐƚƌŝĂůƐĐŚĞŵĞƐ͘ƉƌŽĐĞƐƐŽĨƉƵďůŝĐĐŽŶƐƵůƚĂƟŽŶŝƐďĞŝŶŐƵŶĚĞƌƚĂŬĞŶďLJ'ůĂĚŵĂŶĞǀĞůŽƉŵĞŶƚƐ>ƚĚŝŶŽƌĚĞƌƚŽƉƌĞƐĞŶƚƚŚĞĞŵĞƌŐŝŶŐĚĞǀĞůŽƉŵĞŶƚ ƉƌŽƉŽƐĂůĨŽƌůĂŶĚƚŽƚŚĞƐŽƵƚŚŽĨtĞĚĚŝŶŐƚŽŶZŽĂĚ͕tĞĚĚŝŶŐƚŽŶƚŽƚŚĞůŽĐĂůĐŽŵŵƵŶŝƚLJ͘tĞĂƌĞƉƌŽƉŽƐŝŶŐĂŶĞǁƌĞƐŝĚĞŶƟĂůĚĞǀĞůŽƉŵĞŶƚŽĨƵƉƚŽϳϳϱŚŽŵĞƐ͕ĂůŽĐĂů ĐŽŶǀĞŶŝĞŶĐĞƐƚŽƌĞƚŽŐĞƚŚĞƌǁŝƚŚŶĞǁŐƌĞĞŶŝŶĨƌĂƐƚƌƵĐƚƵƌĞ͘dŚĞƉƵƌƉŽƐĞŽĨƚŚŝƐĐŽŶƐƵůƚĂƟŽŶƉƌŽĐĞƐƐŝƐƚŽŽƵƚůŝŶĞƚŚĞĚĞƚĂŝůƐŽĨƚŚĞĚƌĂŌƐĐŚĞŵĞĂŶĚƐĞĞŬĐŽŵŵĞŶƚƐ ĨƌŽŵƚŚĞůŽĐĂůĐŽŵŵƵŶŝƚLJǁŚŝĐŚǁŝůůďĞĐŽŶƐŝĚĞƌĞĚďĞĨŽƌĞƚŚĞŽƵƚůŝŶĞƉůĂŶŶŝŶŐĂƉƉůŝĐĂƟŽŶŝƐƐƵďŵŝƩĞĚƚŽEƵŶĞĂƚŽŶĂŶĚĞĚǁŽƌƚŚŽƌŽƵŐŚŽƵŶĐŝů͘ ^ŝƚĞĞƐĐƌŝƉƟŽŶ dŚĞƐŝƚĞĐŽŵƉƌŝƐĞƐϰϳ͘ϳϱŚĂŽĨĂƌĂďůĞůĂŶĚƐƵďͲĚŝǀŝĚĞĚďLJĮĞůĚŚĞĚŐĞƌŽǁƐĂŶĚŝƐůŽĐĂƚĞĚ ƚŽƚŚĞǁĞƐƚŽĨtĞĚĚŝŶŐƚŽŶ͕EƵŶĞĂƚŽŶ͘^ŝƚĞĂĐĐĞƐƐŝƐƉƌŽƉŽƐĞĚŽītĞĚĚŝŶŐƚŽŶZŽĂĚ ǁŚŝĐŚƌƵŶƐƉĂƐƚƚŚĞŶŽƌƚŚĞƌŶƐŝƚĞƉĞƌŝŵĞƚĞƌ͘,ĞĚŐĞƌŽǁĞŶĐůŽƐĞĚĨĂƌŵůĂŶĚůŝĞƐƚŽƚŚĞ ǁĞƐƚǁŚŝůƐƚƚŚĞǁĞůůƚƌĞĞĚtĞĚĚŝŶŐƚŽŶŽƵŶƚƌLJtĂůŬĂďƵƚƐƚŚĞĞĂƐƚĞƌŶƉĞƌŝŵĞƚĞƌ͘dŚĞ ZŝǀĞƌŶŬĞƌĂŶĚƚŚĞŵĂŝŶůŝŶĞƌĂŝůĐŽƌƌŝĚŽƌĨŽƌŵĂƌŽďƵƐƚĞĚŐĞƚŽƚŚĞƐŽƵƚŚ͘ Housing Need ǀĞƌLJŽƵŶĐŝůŝƐƌĞƋƵŝƌĞĚďLJƚŚĞ'ŽǀĞƌŶŵĞŶƚƚŽďŽŽƐƚƐŝŐŶŝĮĐĂŶƚůLJƚŚĞƐƵƉƉůLJŽĨŚŽƵƐŝŶŐ ĂŶĚƚŽŵĂŬĞƉůĂŶŶŝŶŐĚĞĐŝƐŝŽŶƐŝŶƚŚĞůŝŐŚƚŽĨĂƉƌĞƐƵŵƉƟŽŶŝŶĨĂǀŽƵƌŽĨƐƵƐƚĂŝŶĂďůĞ ĚĞǀĞůŽƉŵĞŶƚ͘EƵŶĞĂƚŽŶĂŶĚĞĚǁŽƌƚŚŽƌŽƵŐŚŽƵŶĐŝůŝƐƌĞƋƵŝƌĞĚƚŽƉƌŽǀŝĚĞĞŶŽƵŐŚ ŚŽƵƐŝŶŐůĂŶĚƚŽŵĞĞƚŝƚƐĨƵůůĨƵƚƵƌĞŚŽƵƐŝŶŐŶĞĞĚƐ͘ƉƉƌŽǀĂůŽĨƚŚŝƐĚĞǀĞůŽƉŵĞŶƚǁŝůů ŚĞůƉƚŽǁĂƌĚƐŵĞĞƟŶŐƚŚĞŚŽƵƐŝŶŐŶĞĞĚǁŝƚŚŝŶƚŚĞůŽĐĂůĂƵƚŚŽƌŝƚLJĂƌĞĂ͘ Why is the site suitable for development? dŚĞƐŝƚĞŝƐƐƵƐƚĂŝŶĂďůLJůŽĐĂƚĞĚǁŝƚŚĞĂƐLJĂĐĐĞƐƐƚŽĂǁŝĚĞƌĂŶŐĞŽĨĞdžŝƐƟŶŐĐŽŵŵƵŶŝƚLJ Site
    [Show full text]
  • Summer 2017 Issue 2
    Summer 2017 Issue 2 Escape 20th Birthday Celebrations July marked a very special time for the charity. Escape originated from two voluntary organisations which were both founded in 1997 by Artistic Directors Robin Wade and Karen Williams. Robin established the Escape project in her front room, supporting adults through weekly ceramic workshops and Karen Williams established Community Art in Action: creative workshops supporting adults with learning disabilities. Both of these groups still flourish today,Stratford Escape every Wednesday and Paper Moon every Tuesday. The 20th Birthday celebration resulted in a three day exhibition involving Escape work from across all the project venues and activities. It was attended by over 2000 people and was a great opportunity to bring the Escape family of staff, volunteers and participants all together. Leading up to the celebrations, Escape ran a competition to ‘Name The Steer’ the fantastic sculpture created by Rachel Higgins which now resides outside the Slaughterhouse. The winning entry was ‘Metallic Moo’ won by Oliver Hughes from The Willows Primary School. Robin Wade Retirement At this time we say a fond farewell to Robin, who after 20 years of passion and dedication is now retiring. Robin speaks fondly about Escape: “Many changes have taken place for Escape over the past twenty years and so many creative talents have been realised. From small beginnings Escape has grown through the decades and we have all had an extraordinary journey. Timing has been everything; receiving funding through Big Lottery, the Town Trust Challenge and the Arts Council gave us the opportunity to build on all our previous work within the community and allow as many people as possible to share in what we do.
    [Show full text]
  • Industrial/ Open Storage Land 2 Acres (8,100 Sq.M) to LET Haunchwood Park, Bermuda Road, Nuneaton, CV10 7QG
    Industrial/ Open Storage Land 2 Acres (8,100 sq.m) TO LET Haunchwood Park, Bermuda Road, Nuneaton, CV10 7QG PROPERTY HIGHLIGHTS • 2 acres storage to let • Secure palisade fence • Sub divisible from 1 acre • Close to motorway network • Flexible lease options available • Design and build option may be available LOCATION BERMUDA CONNECTION Nuneaton oers a strategic location for distribution Bermuda Connection is a proposed scheme focused occupiers in the West Midlands being conveniently on tackling congestion in and around West Nuneaton located some four miles North of the M6 motorway. The by creating a direct 1.3mile highway link between West M6 can be accessed by the A444 at Junction 3 of the Nuneaton and Griff Roundabout.More details available M6. Alternatively, the M69 motorway at Hinckley can be at www.warwickshire.gov.uk/bermudaconnection. accessed at Junction 1 for access to the motorway At the time of publication of these particulars a final network in a northerly direction. decision has yet to be taken regarding the implementation of the Bermuda Connection scheme DESCRIPTION This 2 acre site consist of cleared open storage land with a concrete base to part and a secure palisade fence. B U L L HEATH END ROAD R IN RENT G B E R M £60,000 per annum U D A R GEORGE ELIOT O HOSPITAL A SERVICES D A444 All mains services connected. TENURE The site is available on a new lease on flexible terms as whole or from 1 acre. Alternatively design and build proposals available on request. A444 M42 A444 A38 J8 A5 Nuneaton M6 BIRMINGHAM M69 M1 J7 Bedworth M6 A5 J6 A45 J2 A34 A41 M6 Solihull COVENTRY A435 J19 A452 A45 Rugby M1 M42 A46 A45 J3a A445 M45 M40 J17 A429 Redditch A423 Leamington Spa A45 A435 Warwick Daventry J15 VAT ROAD LINKS Bromwich Hardy stipulate that prices are quoted M6 Junction 3 5.1 miles exclusive of V.A.T.
    [Show full text]
  • Revised Plan May 2017 White
    www.warwickshirewildlifetrust.org.uk ACTION for WILDLIFE Warwickshire, Coventry and Solihull Local Biodiversity Action Plan REVISED PLAN MAY 2017 WHITE-CLAWED CRAYFISH Austropotamobius pallipes 1. INTRODUCTION The white-clawed crayfish (also known as the Atlantic stream crayfish) is the only native species of freshwater crayfish in the UK. It lives in a variety of aquatic habitats that include streams, rivers, lakes, canals, reservoirs and water-filled quarries, preferring those without too much sediment and minimal pollution. Good refuges and cover, e.g. rocks, stones, aquatic vegetation, tree roots and bank cavities are important for its survival and lifecycle. © Tracey Doherty It is generally nocturnal, feeding on a range of vegetation, animal matter and detritus. Young crayfish are predated on by fish; larger crayfish are taken by birds, especially Grey Heron (Ardea cinerea), as well as mammals such as rat (Rattus norvegicus), mink (Neovison vison) and otter (Lutra lutra). The young can also fall prey to predatory insects such as dragonfly nymphs and diving beetle larvae. Maturation takes 3-4 years, with adults rarely exceeding 10cm in body length. For identification purposes, it is worth noting that at least six further species of crayfish have been introduced into Britain, with the American signal crayfish (Pacifastacus leniusculus) now accounting for an increasingly high proportion of crayfish records in the sub-region. Other non-native species include the noble (Astacus astacus), red swamp (Procambarus clarkii), spiny-cheeked (Orconectes limosus), virile (Orconectes virilis), and Turkish narrow-clawed crayfish (Astacus leptodactylus), some of which are recorded within the Severn and Humber River Basins. The introduction and spread of these non-native species has impacted the survival of white clawed crayfish, which is out-competed for food and habitat by these more aggressive species.
    [Show full text]
  • Go Wild in the Tame Valley Wetlands
    Tame Valley Wetlands in the Tame Valley Wetlands! An Educational Activity & Resource Pack Written and illustrated by Maggie Morland M.Ed. for TVWLPS ©2016 2 Contents Notes for Teachers & Group Leaders Page About the Tame Valley Wetlands Landscape Partnership Scheme 6 Introduction to this Educational Resource Pack 10 The Tame Valley Wetlands and the National Curriculum 11 Health and Safety – Generic Risk Assessment 12 Information Pages 20 Things you may not know about The River Tame 16 The Tame Valley Wetlands Landscape Partnership Scheme Area 18 Tame Valley Wetlands - A Timeline 19 A Countryside Code 22 Love Your River – Ten Point Plan (Warwickshire Wildlife Trust) 25 Places to Visit in the Tame Valley Wetlands Area 26 Activity Pages 1 Where does the river come from and go to? - (source, tributaries, confluence, 33 settlement, maps ) 2 Why does the river sometimes flood? - (water supply, rainfall, urban runoff, make a river 35 model) 3 When and how has the Tame Valley Wetlands area changed over time? - (local history, using timeline, river management, environmental change, mineral extraction, power 37 generation, agriculture, defence, transport, water supply, food, natural resources, industry) 4 How is the Tame Valley Wetlands area used now? - (Land use, conservation) 38 5 How can I be a naturalist and study habitats like John Ray? – (Explore habitats using all your senses, observation, recording, sketching, classification, conservation) 39 6 Food chain and food web games – (food chains/webs) 43 7 What lives in, on and by the Tame Valley
    [Show full text]
  • Appendix B1: A5 Growth Corridor
    5km Distance buffer from A5 STAFFORDSHIREA 1 5 1 Polesworth Tamworth Appendix B1: A5 Growth Corridor Areas of Recent Major Road Improvements: Borough 2 A A5 / A444 / A47 - MIRA 4 2 47 A B M1 / M6 / A14 - Catthorpe Interchange (to be completed Autumn 2016) 69 3 4 M 5 4 4 4,5 A Motorways Trunk Roads 3 7 8 ! 42 Current Railway Stations and M LEICESTERSHIRE Atherstone Earl Shilton Railway Lines North 6 7 Hinckley 69 ! Warwickshire 6 A5 M Future Railway Stations and Bosworth HS2 Route (Phases 1 and 2) Borough A47 Borough Canals 21 25 Urban Areas A M 1 County Boundaries 8 A 22 Hinckley 11 District/Borough Boundaries 25 (Coloured administrative areas show "LEP City Deal" areas.) 13,14,15,16 23 10 9 A47 0 1 2 3 4 5 1:55,000 9 24 (When printed at 10 12 Blaby A1 paper size.) SOLIHULL 11 Kilometres Nuneaton District This map is for illustrative purposes only. ´ 12 © Crown Copyright and database right 2015. Ordnance Survey 100019520. 4 Produced by the WCC Corporate 4 4 GIS Team, A 13 69 25 June, 2015. M 15 14 Coleshill Nuneaton 16 and Bedworth A 1 17 5 M Borough Harborough WARWICKSHIRE District Bedworth 26 M6 28 D Current Employment Sites 29 D Future Employment Sites / Major Expansion 8 Future Major Housing Developments Lutterworth Red text signifies those sites without full planning permission 9 6 M Future Employment Staffordshire: Figures: Warwickshire: Housing Units: 27 Tamworth Borough: = Development Site North Warwickshire Borough: Rugby A45 * in Warwickshire 1 Relay Park - 1 Land on South Side of Grendon Road 143 2 Centurion Park 421 * 2 Orchard, Dordon 360 Borough 3 Dairy House Farm, Spon Lane 85 Warwickshire: 4 Land at Old Holly Lane including Durno's 620 A 4 North Warwickshire Borough: Nurseries 4 3 Kingsbury Link - 5 Rowland Way 88 4 4 Hall End Farm 750 6 Britannia Works, Coleshill Road 54 5 Birch Coppice (Phases 1-3) (inc.
    [Show full text]
  • Limited and Guild Realisations Limited (Formerly Republic (Retail) Limited) - Both in Administration (Together ‘The Companies’)
    Ernst & Young LLP 1 Bridgewater Place, Water Lane Leeds LS11 5QR T el: 0113 298 2200 Fax: 0113 298 2201 www.ey.com/uk TO ALL KNOWN CREDITORS 8 April 2013 Ref: RHK/JPS/TRJ/AE/PCF11.1 Direct line: 0113 298 2496 Direct fax: 0113 298 2206 Email: [email protected] Dear Sirs Republic (UK) Limited and Guild Realisations Limited (formerly Republic (Retail) Limited) - both in Administration (together ‘the Companies’) Further to my appointment as Joint Administrator of the Companies, I attach a copy of my statement of proposals in accordance with paragraph 49 of Schedule B1 to the Insolvency Act 1986. As you will note from the proposals, there is no prospect of any funds becoming available to unsecured creditors of either of the Companies other than by virtue of the prescribed part. As a consequence, I do not propose to summon meetings of creditors. If, however, creditors whose debts amount to at least 10% of total debts of either of the Companies make a request in the prescribed form within 8 business days of these proposals being sent out, a meeting will be held in that company. Copies of the prescribed form (Form 2.21B) are enclosed in case you wish to request a meeting. I would draw your attention to the provisions of Rule 2.37 of the Insolvency Rules 1986 which provide that if a meeting is requested, it will only be held if the expenses of summoning and holding such a meeting are paid by the creditor or creditors making the request and if security is first deposited with me for payment.
    [Show full text]