m«r~ GOVERNMENT OF , • 0.. ~ ...r.'~ Q41d'{OI ,Qif va- ~(04dF4~QUdCiif 'R;tI(04

  • 1st & 2nd floor, HEPC Building, No.34, Cathedral Garden Road, Nungambakkam, Chennai - 600034 11.05.201611030

    To Sri N.V.Seshagiri Rao Managing Director Sudheer Bio Products Private Limited H.No.I-44, Backside of AG&SG College Thothlavalluru Road, Near Yakamuru-521 165, . Sub: Grain based Distillery Plant (60 KLPD) along with Captive Power Plant (2.5 MW) a Parts of 526,532,534,536,538,556 & 557, Village Peddavaram, Mandai . District Krishna. Andhra Pradesh by Mis Sudheer Bio Products Pvt. Ltd. Environmental Clearance-Certified Copy of Compliance Report-Reg.

    Ref: 1.MoEF F.No. J-ll 0 111171120 11-1A II (1) dated 15.01.2013. 2. Your Letter dated 29.02.2016. Sir

    With the 2110 cited above, please find enclosed a copy of the Certified Compliance Report and this has the approval of the Addl.PCCF(C) vide diary no.572 dated 10.05.2016.

    Yours faithfully

    (Dr.C.Kaliyaperu Director (S)

    l-ncl: As above -- MONITORING REPORT PART I

    DATA SHEET I Project Type

    -. River valley /Mining / Industry /

    ( ._-----_. Thermal/Nuclear / other S_p_ecify Industry Grain based Distillery Plant (60 KLPD) along with Captive Power Plant (2.5 MW) a Parts of 526,532,534,536,538,556 & 557, Village Peddavaram, MandaI Nandigama, District Krishna, Andhra Pradesh by M/s Sudheer Bio Products Pvt. Ltd. - Environmental :2 _," ,.__.-._._---._.- Name of the project Clearance reg. ~ _) Clearance letter (s) / OM No. ---- and F.NoJ-110111171/2011 IA" (I), Dated: 15th _"-'" dated January, 2013 4 Locations a. Taluk(s) Peddavaram Village, NandigamaMandal r-- District. Krishna District b. State (s) Andhra Pradesh c. ._-_-_.... _ Latitudes /Longitudes 16°46' 3.56" N 80° 8' 55.91" E -_ I 5 I ----.--~ Address of correspondence a. Address of concerned project Chief The Managing Director Engineer (with Pin Code & telephone / D.No: 1- telex /fax numbers) 44,Yakamuru, T.V.Road, Thotlavalluru Mandal,Krishna Dist, A.P - 521165, Ph.No:08676-232693, Fax No:08676 - '_'-- 234793 b. Address of Executive Project Engineer/ The Managing Director Manager (with Pin Code / fax numbers) The D.No: 1-44, Yakarnuru, T.V.Road, Thotlavalluru Mandai.Krishna Dist, A.P - 521165, Ph.No:08676-232693, Fax No:08676 - 234793. 6 Salient features: a. Manufacturing grind based RS/ENA/Ethanol ----- Sal ient features of the project and installation of captive power plant i b. of the environmental management Air. Water and Noise Pollution to be managed I and sol id waste management, green belt _p_lans develo_p_ment 7 Breakup of the project area: a. Project area 27 acres 8

    _._--_ ....._--_. Break up of project affected popu lation with enumeration of those losing - ---..._-_ I houses/dwelling units only, -~'- agricultural land only, both dwelling linits and agricultural land and Land less labourers/artisans No a SC,ST/Adivasis No

    --_.------No . --_.--_ b Others ~--=1 1 j 9 Financial Details: - I i a Project cost as originally planned and subsequent revised estimates and the Rs. 63.89 crores years of price reference : b Allocations made for environmental management plans, with item wise and year wise breakup I Rs. 18.00 crores \ c· Benefit cost ratiolinternal rate of ---- return and the years of assessment NA d Whether © includes the cost of environmental management as shown NA -- in (b)above Land cost:Rs.2.1 0 crores, Plant & Machinery

    yet to be implemented _._------e Total expenditure on the Project so far f Actual expenditure incurred on the environmental management plans so Nil far \ Nil 10 Forest land requirement a The status of approval for a diversion ------of forest land for non-forestry use Nil b The status of compensatory Nil ---~--.-.._-_--- afforestation,if any Nil --.------~.- c The status of clear felling d Comments on the viability and sustainabi Iity of compensatory afforestation programme in the light of --- actual field experience so far Nil The status of clear felling in non-forest II area (such as submergence area of reservoir, approach road), if any, with

    ---_,..,•..._---_- ----" Nil quantitative information Construction not yet started ------12 Status of construction: Nil ------a Date of completion Date of completion (actual and lor Nil -~-'--'-'------,.-_ planned) Due to poor market conditions and 60 KLPD Reasons for the delay if the project is grain based distillery is not viable to operate: 13 yet to start. now it has been proposed to implement 75 KLPD directly.

    14 Date of site visit: a The dates on which the project was monitored by the Regional Office on -_.------previous occasions, if any 3.5.2016. b Date of site visit for this monitoring report 15 Details of correspondence with project authorities for obtaining action plans, information and status of compliance to safeguards

    Director (5) Certified copy of the Compliance Report

    Subject: Grain based Distillery Plant (60 KLPD) along with Captive Power Plant (2.5 MW) a Parts of 526,532,534,536,538,556 & 557, Village Peddavaram, MandaI Nandigama, District Krishna, Andhra Pradesh by Mis Sudheer Bio Products Pvt. Ltd. - Environmental Clearance reg.

    Ref: F.No. J-II011117112011-IA II (I)

    Present status of the Project

    The Project authorities (PA) have done the Bhoomi Puja on 18-02-2016. They have erected concrete boundary pillars around their project site. One old small shed which was there before purchasing of the project site as informed. Otherwise no activities has been started at the site.

    Date of Monitoring: 3.5.2016

    Part - A. SPECIFIC CONDITIONS:

    SI.No CONDITIONS COMPLIANCE i) Environment clearance accorded is for Agreed to Comply. grain based distillery unit (60 KLPD) The PA assured that only grains only and no molasses based distillery will be used and molasses without unit shall be operated without prior permission of the Ministry. permission from the Ministry -- ii) Permission shall be obtained from the Complied. The PA have obtained State Forest Department regarding the permission from the Prl. Chief impact of the proposed unit on the Conservator of Forests, surrounding reserve forest VIZ. State Forest Dept. A.P Vide their RF, Venkataya Palem letter no RC.No.20323/20 11- RF, Gingupalle RF, Kuntimaddi RF F3,dated 13-12-2011 and Gudimetla RF ------+------I iii) Measures shall be taken to mitigate Agreed to Comply. PM 10 levels in the ambient air and a The project construction activities time bound action plan shall be has not been started and they have submitted. Bagfilter along with stack agreed to implement and control the of adequate height shall be provided to ambient air as well as emission coal I biomass fired boiler to control levels within the limit and also particulate emission within 50 assured that at no time, the emission Il1g/NM~. At no time, the emission levels will go beyond the levels should go beyond the prescribed prescribed standards. Further standards. In the event of failure of any assured that in the event of failure pollution control system adopted by of any pollution control system the unit, the respective unit shall not be adopted by the unit, the respective restarted until the control measures are unit will not be restarted until the rectified to achieve the desired control measures are recti tied t1 I--__ +-e_f_ti_c_ie_n_c"'-y_. ---+_a_c_h_ie_v_e_t_h_e_d_e__:_s_ir_e_d__:_e_ff__i_:__ci__:_e~n_.__'cyL._...__ iv) In plant control measures for checking Agreed to Comply. fugitive ermssions from all the The project construction activities' vulnerable sources shall be provided. has not been started and they have Fugitive emissions shall be controlled agreed to implement and control the by providing closed storage, closed fugitive emissions and also agreed handling & conveyance of to provide closed storage, closed chemicals/materials, multi-cyclone handling & conveyance of separator and water sprinkling system. chemicals/materials. multi-cyclone Dust suppression system including separator and water sprinkling water sprinkling system shall be system. Further agreed to provide provided at loading and unloading dust suppression system including areas to control dust ermssions. water sprinkling system at loading Fugitive emissions in the work zone and unloading areas to control dust environment, product, raw materials emissions. Fugitive emissions in the storage area etc. shall be regularly work zone environment, product monitored and records shall be raw materials storage area etc. Also maintained. The elTI1SSlOnS shall will be regularly monitored and conform to the limits imposed by A P records will be maintained. Agreed Pollution Control Board (APPCB). to control and maintain the emissions levels within the the limits stipulated by A P Pollution Control Board (APPCB) .

    1--__ +- -1- . ._. ---...-.-- v) Pucca approach road to project site Agreed to Comply. shall be constructed pnor to The project construction activities commencing construction activity of has not been started and they have the main distillery so as to avoid agreed to make Pucca approach fugitive emissions. road to project site pnor to commencing construction activity of the main distillery so as to avoid I

    I--__ +- -l-__:__£_~_~~~_:___fugitive emissions. ._ vi) The gaseous emISSIOns from DO set Agreed to Comply. shall be dispersed through adequate The project construction activities stack height as per CPCB guidelines. has not been started and they have Acoustic enclosure shall be provided to agreed to provide an adequate stack the DO sets to mitigate the norse height as per the CPCB guidelines pollution. to DO sets and also an acoustic enclosures will be provided to the DO sets to mitigate the noise pollution. vii) The company shall upload the status of Agreed to Comply. The compliance of the stipulated facilities/plant construction

    environmental clearance conditions, activities are yet to be established.-- including results of monitored data on The PA have agreed to upload the its website and shall update the same status of compliance of the periodically. It shall simultaneously be stipulated environmental clearance sent to the Regional Office of MOEF, conditions, including results of the respective Zonal office of CPCB monitored data on their website and and the APPCB. The levels of PMIO, alsol update the same periodically. S02, NOx, CO and HC (Methane) in Further they informed that the ambient air shall be monitored and monitored data will be displayed at a convenient location near simultaneously sent to the Regional the main gate of the company and at Office of MOEF, the respective important public places. Zonal office of CPCB and the APPCB. The levels of PMi(J, S02, NOx, CO and HC (Methane) III ambient air also will be monitored and displayed at a convenient location near the main gate of the

    I, company and at important public places. !-v~i~ii-)--r'-r-ot-a-l--fr-e-sh--w--at-e-r--re-q-u-ir-e-m-e-n-t--fr-o-m-r~R-e-fu-r-b-e-lo-w--.------~ ground water source/ They have obtained permission shall not exceed 10.83KLIKL of from the Irrigation dept. As well as alcohol (i.e. 650 m3/day) for distillery from state ground water dept for and cogeneration unit (2.5 MW) and drawl of water from river Krishna prior permission for drawl of water and assured that water drawl wi II shall be obtained from the concerned not exceed 10.83 kllkl of alcohol. A authorities. A copy of permission shall copy of the same were submitted to be submitted to the Ministry'S the RO, Bangalore. Govt. Of A.P. Regional office at Bangalore. Explore the possibility of using surface water onlv. --._--_------'------+------ix) Water consumption shall be reduced by Agreed to comply. adopting 3R's (reduce, reuse and They have agreed to implement recycle) concept in the process. 3R's (reduce, reuse and recycle ) concept in the process. x) Spent wash generation shall not exceed Agreed to comply. 6 KLlKL of alcohol. Spent wash shall As informed that the spent wash be treated through decanter and generation will not exceed 6 KLlKL concentrated in multi-effect evaporator of alcohol and the spent wash will (MEE) followed by dryer to form be treated through decanter and DOGS. Spentlees, effluent from bottle concentrated III multi-effect washing, utilities and cogeneration unit evaporator (MEE) followed by shall be treated in eff1uent treatment dryer to form Distilley Dry Grain plant (ETP) and water quality of Soluble (DOGS) and also' Zero' treated effluent shall meet the norms effluent discharge concept will be prescribed by CPCB/SPCB and adopted. L_ ~_re_C~yICI_e_/r_e_u_se_.N_o ef_fl_u_e_n_tfr_o_1n_L ~ r----,------~-~--- --~-.------_- -- distillery and co-generation power plant shall be discharged outside the factory premises and 'Zero' effluent discharge concept shall be adopted. xi) Process effluent/any waste water shall Agreed to comp Iy. not be allowed to mix with storm They have assured that at any point water. Storm water drain shall be of time process effluent will not be passed through guard pond. mixed with others effluents i including storm water and also assured that storm water drain will be passed through guard pond. xii) Spent wash shall be stored In Agreed to comply impervious lagoon with HDPE lining They informed that the spent wash as per CPCB guidelines and shall be storage will be restricted to 5 days kept 111 proper condition to prevent capacity and the spent wash will be ground water pollution. Storage stored in covered storage tank of capacity of spent wash lagoon shall be one days storage capacity (260 for 5 days. cum). It will be made impervious by providing 500 micron HOPE lining as per CPCB speciti~_~!i_ons.__ Xiii) Adequate numbers of ground water Agreed to Comply. quality monitoring stations by The water quality around the providing piezometers around the storage tank will be regularly project area shall be set up. Sampling monitored through peizo meters and trend analysis monitoring must be after commencement of production made on monthly basis and report and also the monitored data will be submitted to SPCB and this Ministry. submitted the Ministry's Regional The ground water quality monitoring Office at Chennai and APPCB for pH, BOD. COD. Chloride, Sulphate and Total Dissolve Solids shall be monitored and report submitted to the Ministry's Regional

    ~ __ ~~_~_~L_Office at Bangalore and APPCB. -4 __ xiv) No storage of wet cake shall be done at Agreed to Comply. site to avoid odour problem. An They assured that they will not additional dryer shall be installed so store wet cake in the plant premises that at any time wet cake is not sold to avoid odour problem. Further then wet cake shall be converted into assured that an additional dryer also dry cake by operating additional dryer. will be installed so that at any time wet cake is not sold then, wet cake will be converted into dry cake by operating additional dryer xv) Biomass/coal storage shall be done in Agreed to comply. such a way that it does not get air They informed that biomass/coal borne or fly around due to wind. For will be stored in sheds to avoid air this, it shall be kept in wet form. borne or fly around the site due to wind and for this the biomass/coal will be kept in wet form. xvi) Fly ash shall be stored separately as per Agreed to comply. CPCB guidelines so that it shall not As informed that the fly ash adversely affect the air quality, generated will be given/disposed to becoming air borne by wind or water brick manufacturer/ cement plants regime during rainy season by flowing when coal is used as fuel. Further along with the storm water. Direct informed tha direct exposure of exposure of workers to fly ash & dust workers to fly ash & dust will be shall be avoided. avoided

    t------t------:__-:------:---:-:---:------::----:-:--t-----:-----;------

    I xvii) As proposed, ash shall be transferred in Agreed to comply. the covered truck. Ash shall be As informed that the ash generated I transferred to the brick manufacturing. will be given to brick manufacturers A tie-up with brick manufacturers to be and for this an agreement was made made in the form of agreement. with the cement manufacturers. Copy of ash utilization letter/agreement made with the

    ------i------Madras Cements Limited. ------xviii) Fire fighting system shall be as per Agreed to comply. norms and cover all areas where They have obtained NOC from fire alcohol IS produced, handled and service department and agreed to stored. Provision of foam system for establish Fire fighting system. fire fighting shall be made to control I .. fire from the alcohol storage tank. r~-ixy--r-Risk Assessment shall be carried to Refer below. I assess the tire and explosion risk due No details made available during to storage of alcohol and report the visit. I submitted to the Ministry and its ;; Regional Office at Bangalore within six months. ~! x~)-~~O~c-c-u-p-a~ti-o-n-al:--:--h-e-a~lt-h--su-r-v-e-il-Ia-n-c-e,_A-g-r-e-e-d-t-o-c-o-ln-p-l-y-.------~ I I programme shall be undertaken as They informed that an Occupational I, regular exercise for all the employees. health surveillance (OHS) i The first aid facilities III the programme will be undertaken for I occupational health centre shall be all the employees. Further the OHS strengthened and the regular medical centre will be equipped with I test records of each employee shall be required facilities and staffs and the maintained separately. regular medical test will be I conducted and records of each I employee will also be maintained l separately. x-~-i)----Dedicated parking facility for loading Agreed to comply. r and unloading of material shall be They informed that an area of 2 ac provided in the factory premises. Unit of land IS allocated for parking

    --~- shall develop and implement good facility and agreed to maintain L ---- traffic management system for their good traffic management systelnt~)~ incoming and outgoing vehicles to avoid traffic congestion on public f----I-----~-~------L------_1_------avoid congestion on the public road. road. ----~ - xxii) As proposed. green belt shall be Agreed to comply. ! developed in 9 acres out to total land They have agreed to develop green l 27 acres and plantation shall be done as belt in 9 ac of land as per the CPCB per the CPCB guidelines in guidelines and also in consultation consultation with DFO. Thick with DFO. Also agreed to develop greenbelt with suitable plant species thick greenbelt with suitable plant shall be developed around the proposed specres around the proposed distillery to mitigate the odour distillery unit to mitigate the odour I-x-x-i-ii-)-I-'~,--r~bt~~n~ommitmentsmade during the ,:;~!:~n;o comply.· -~------I Public Hearing / Public consultation They have agreed to implement all meeting held on 22nd March, 2012 shall the commitments made during the be satisfactorily implemented and Public Hearing / Public consultation adequate budget provision should be meeting held on 22nd March. 2012 made accordingly. and for this have also agreed to

    allocate adequate bUQ~!: __ -- xxiv) At least 5 % of the total cost of the Agreed to comply. project should be earmarked towards They have agreed to allocate 5% of the Enterprise Social Commitment the total cost for CSR activities and based on locals need and item-wise also agreed to implement. No details along with time bound action information was provided about the plan should be prepared and submitted submission of time bound action to the Ministry's Regional Office at plan to the MoEF,RO. Bangalore. Implementation of such program should be ensured accordingly in a time bound manner. xxv) The company shall submit within three Refer below. months their policy towards Corporate They have prepared policy towards Environment Responsibility which Corporate Environment shall inter-alia address (i) Standard Responsibility recently and shown a I operating process / procedure to being copy of the same during the visit. into focus any infringement/deviation/violation of environmental or forest norms/conditions, (ii) Hierarchical system of Administrative order of the Company to deal with environmental issues and ensuring compliance to the environmental clearance conditions and (iii) System of reporting of non• compliance/violation environmental norms to the Board of Directors of the company and/or stakeholders of shareholders. xxvi) Provision shall be made for the Agreed to comply. housing for the construction labour They have agreed to provide all within the site with all necessary basic facilities to construction infrastructure and facilities such as fuel labours during plant construction for cooking, mobile toilets, mobile stage. They informed that the sewage treatment plant, safe drinking structures will be of temporary in water, medical health care, creche etc. nature. Also assured to manage the The housing may be in the form of construction wastes properly to temporary structure to be removed avoid the impact on the surrounding after the completion of the project. All environment. the construction wastes shall be I managed so that there is no impact on r the surrounding environment.

    Part-B. GENERAL CONDITIONS: ,------.------.------SI.No CONDITIONS COMPLIANCE t----f---~------+_------i) The Project authorities shall strictly Agreed to comply. adhere to the stipulations made by the The PA have obtained CFE from SPCB A P Pollution Control Board. and it is valid up to Oct.20 18 and also they have agreed to implement all the stipulations made by the PCB. ii)---+-N-o---f~u-rt-h-e-r--e-x-p-a-n-sl-o-n---o-r+-A-g~r-e-ed-to-c-ol-n-p-Iy-.~------~ modifications in the plant shall be They have assured that no further carried out without prior approval of expansion will be taken up without the Ministry of Environment and pnor permission from the Ministry. Forests. In case of deviations or Now they are planning to go for an alterations In the project proposal expansion from 60 KLPD to 7f"KLPD from those submitted to this Ministry and for this only they have requested a for clearance, a fresh reference shall Certified Copy of Compliance Report. be made to the Ministry to assess the adequacy of conditions imposed and to add additional environmental protection measures required, if any. iii) The National Ambient Air Quality Agreed to comply. Emission Standards issued by the The PA have agreed to follow the Ministry vide G.S.R. No.826 (E) National Ambient Air Quality dated 16thNovember, 2009 shall be Emission Standards issued by the followed. Ministry vide G.S.R. No.826 (E) dated 16thNovember, 2009 . iv) The locations of ambient air quality Agreed to comply. monitoring stations shall be decided The PA informed that the ambient air in consultation with the A P Pollution quality monitoring stations will be Control Board (APPCB) and it shall decided in consultation with the A P be ensured that at least one station is Pollution Control Board (APPC) installed In the upwind and having at least one station is installed downwind direction as well as where in the upwind and downwind direction maximum ground level as well as where maximum ground

    ~ __ ~ concentrations are anticipated._L ~~ level concentrations~~~~~~~~~~. are anticipated. ___ v) The overall noise levels In and Agreed to comply. around the plant area shall be kept The PA have agreed to provide noise well within the standards by control measures including acoustic providing norse control measures hoods, silencers, enclosures etc. on all including acoustic hoods, silencers, sources of noise generation and also enclosures etc. on all sources of noise assured to keep the noise levels as per generation. The ambient noise levels E(P)Act. shall conform to the standards prescribed under Environment (Protection) Act, 1986 Rules, 1989 viz. 75 dBA (day time) and 70 dBA ~ __~_~_~(night time).~ 4- ___ vi) The Company shall harvest rainwater Agreed to comply. from the roof-tops of the buildings The PA have agreed to establ ish rain and storm water drains to recharge water harvesting arrangements for both the ground water and use the same rain water as well as roof top collection water for the process activities of the to recharge the ground water. ~--~~~~~~~~~~~~~--~~----~------project to conserve fresh water. vii) The Company shall obtain Agreed to comply. Authorization for collection, storage They have agreed to obtain an and disposal of hazardous waste authorization for collection, storage under the Hazardous Waste and disposal of hazardous waste under (Management, Handling and Trans- the Hazardous Waste (Management, boundary Movement) Rules, 2008 Handling and Trans-boundary and its amendment time to time and Movement) Rules, 2008 from APPCB prior permission from APPCB shall and implement. be obtained for disposal of solid / hazardous waste including boiler ash. viii) During transfer of materials, spillages Agreed to comply. shall be avoided and garland drains The PA have agreed to provide garland be constructed to avoid mixing of drains to avoid spillages during transfer accidental spillages with domestic of materials and also to avoid mixing wastewater and storm water drains. of accidental spillages with domestic wastewater and storm water drains. ix) Usage of Personnel Protection Agreed to comply. Equipments by all employees / They have agreed to provide Personnel workers shall be ensured. Protection Equipments to all employees / workers. X) Training shall be imparted to all employees on safety and health Agreed to comply. aspects of chemicals handling. Pre• The PA have agreed to impart training employment and routine periodical to all employees on safety and health medical examinations for all aspects of chemicals handling. Also employees shall be undertaken on informed that pre-employment and regular basis. Training to all routine periodical medical employees on handling of chemicals examinations for all employees will be I shall be imparted. undertaken on regular basis and record will be maintained. xi) The company shall also comply with Agreed to comply. all the environmental protection They have agreed to implement all the measures and safeguards proposed in recommendations made 111 the

    I the project report submitted to the EIA/EMP in respect of environmental I Ministry. All the recommendations management risk mitigation measures made in the EIA/EMP in respect of and public hearing relating to the environmental management, risk project. mitigation measures and public hearing relating to the project shall be f-----_--+_iInp1emented. xii) The company shall undertake CSR Agreed to comply. activities and all relevant measures They have agreed to undertake CSR

    'I for improving the socio-economic activities and all relevant measures for conditions of the surrounding area. improving the socio-economic i conditions of the surrounding area. xiii) -rrhe company shall undertake eco- Agreed to comply. developmental measures including They have agreed to undertake eco• I community welfare measures in the developmental measures including ! project area for the overall community welfare measures 111 the , ! improvement or-the environment. project area for the overall improvement of the environment. A separate Environmental Agreed to comply . I. Management Cell equipped with full They have agreed to establish a fledged laboratory facilities shall be separate Environmental Management sct up to carry out the Environmental Cell equipped with full fledged i Management and Monitoring laboratory facilities to carry out the : functions. Environmental Management and

    ----r------'---'------+--:.___::_:::_:_:_:__:__::_:_=~_:_:_:__:__:_:_:::__:_:__:.__Monitoring functions. _ xv) The company shall earmark sufficient Agreed to comply. funds for capital cost and recurring They have allocated an amount of cost per annum to implement the RS.18 Cr as capital cost and RS.2 Cr as I conditions stipulated by the Ministry recurnng cost towards environment

    : or Environment and Forests as well management I pollution control i i I as the State Government along with measures and assured that this amount ' ,! t,I,1,Cimplementation schedule for all will not be diverted for any other I the conditions stipulated herein. The purpose. runds so earmarked for environment I _____! ~1]_anagement I pollution control _ measures shall not be diverted for any ! other purpose. xvi) A copy of the clearance letter shall be Complied. --1 sent by the project proponent to They informed that a copy of Ee was I concerned Panchayat, sent to Peddavaram gram Panchayat. ZilaParisad/Municipal Corporation, Urban local Body and the local NGO, if any, from who suggestions / representations. if any, were received while processing the proposal. 1---+------+------"------xvii) The project proponent shall also Complied. submit SIX monthly reports on the They are submitting SIX monthly status of compliance of the stipulated compliance reports to RO and also Environmental Clearance conditions agreed to upload after commissioning including results of monitored data of the project. (both in hard copies as well as by e• mail) to the respective Regional Office of MoEF, the respective Zonal Office of CPCB and the A P Pollution Control Board. A copy of Environmental Clearance and SIX monthly compliance status report shall be posted on the website of the

    companL_y_.-"------t------"----- xviii) The environmental statement for each Agreed to comply. financial year ending 31st March in Form- V as IS mandated shall be submitted to the A P Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance of environmental clearance conditions and shall also be sent to the Bangalore Regional Offices of MoEF bye-mail. xix) The project proponent shall inform Complied. the public that the project has been They had given an advertisements in accorded environmental clearance by two local news papers and submitted the Ministry and copies of the the same to RO. clearance letter are available with the SPCB/Committee and may also be seen at Website of the Ministry at http://envfor.nic.in.This shall be

    '--- _ ___l advertised within seven days--"-- from the--' " _ "

    date of issue of the clearance letter, atleast in two local newspapers that are widely circulated in the region of which one shall be in the vernacular language of the locality concerned and a copy of the same shall be forwarded to the concerned Regional Office of the Ministry, xx The project authorities shall inform Agreed to comply. the Regional office as well as the Ministry, the date of financial closure and final approval of the project by the concerned authorities and the date __1 Qistart of the roject.

    This has the approval of Addl.PCCF(C) vide diary no. --- dt ----

    Director (S)

    - -- - . ------,_,'<;10"0"':1''' ~~:'!:I! ~~~~ ,po';) Iho<> .~. ,g0s><>-f,1 »o,S ()~; ;;'..r::Q~ n':"'J~ lSI ~lj,1l~~ ..li~f~",~ ~oe '~~l)?m~ mn;:..c r, =q>l'l '""";> <:'oe .~W:, O<:-:;.r: ~t~fs!....-:~ {';';~ C)l(''l'''1' "":b,, t"(l..oo.~ Q.~ I? f!1";_~ ::;...~ ·'?-:'2 I ~"'~ o~ mC)lO<;:,q; _,.90;:..:! 09~ ...."c;:l ~)..;:lr •.:::'9':: I ~o.<:S'iXl "9Qa ~~I: "'Of! Cf'::;~. ;..~("~c: ~'")f)9o-.:;: : r~n;t~ ~ot- ,~t.D r:0('I'; ;?Crf'09)" ·09~ ...~\~ ~::~ :;>"<,,, (l,J~1l "":b,, ">'5' 0",-,"::'9':;:r;---.z~'i-- r.~(" Y·oJ.~"...""'~ o~'ll ,., 't'i:''' PI' o~' ;i~~:~~~~~~'-~2~ ~ ~~~t4' ~ 'O~;O~~~. ,,~ :'lz:! ....?:-::-: '~~.~:" ::..'-:~: ~~::;,,:~J~ r~..c~._",,;~.,' :':");'..C';~ ""_-: r. ,~~?~~9 :":'j~'~.:: :("'';:;-'/~':";~'~.,_ .:';-("~

    ~'\:l~'ry ~F::~ ~:': ,')-.( ...... ~I ~::- ~:.,,~~ •..;_-::; .. , '-:.! q* '7()~ mC" '~J7"'C"~-:" .;.::--: 7..".:....-:- .•1,.':1~':-·Y. "''''" ;J;x<,rr.,,-,..:.; C?('\~~.t1' ~~~7 _p....c ....7~: :"';~~ '~";'~CO:",! :.-:~--:-.r:r: -;Q;-~·G~~$~~;'~'";~G~~~~.~~~~~~ w roJ:)G& cr~CO....'sacr~. ~CG~

    :,"(,,"1 ~'J"~r::',~.''''l 'r~,;:r' :~:;~;~;_~/:~C~\'-:'~J~ ,'..:;- ::~;~(. ~) ~-j;l~::-J7·';;;o(!' c.'~ ~ "~-:9;: -;;;-.'~ ~:"-.J';:~ i ':', ~~ ~fiJ2 ~orh~ ! ;~~,>?;~~;~;:~~~~:~~~~~,.L~.:' ",c.;,'2~~~~V,.9~"'''' . .. ~:~,:~:,;~~~~:,;'~,,,~": ':o:li;:~,l{OQ,!ilc:.' ~Il""~ '>Oq.;o , . ' ., ;'A,·oMioWlIJ' ·~:;..--;I ");;·~-:r. ~~';! ~O;;ri~ '~\"?:nJ).'" r:lf? ~~C'. t? :~~~~~?~t90):' 9" ~~ "''''1M'lb.~I.!", .. ~l"\!~ '~';9 ~().,L'n~ ~~>?G') 'C<:;; :;0(9(0 :")".l?~..o~ PQ;fOl .,9~~~ )Jrt .cJ.J.Jo-.")Q ~~~<::' ':0;; ;C~~;(1r;-:~ <:;b::'lo..s\?!~ .cP,....,~ $:''l.s~;',0 p~i5~,:,o-:: '!:~~\I~'I"~~9:i[~~~;~'J.~:,..;-::;~;;'~,,~~:-;~:~~ r:.:'.r, ':]cv'~a~:;.r:J P~9 'cpw~ j100 ~o.s~~iI~:: ?";.:JQ;-./ .lM! op..c?O Ot'lO~q~ 'C"c:..n; ~',\!';:I S:~O~ 7~n ~;,f~~ :;i~':'~ C'C'W'I'~C f$'tp\; $r:;o..,..l ,r':"'7Jt::r; ~ cm~"'2:-:'..}t 'ii~""''''''''''-:! 9ro,J] (f"'~cy:c..C:! s;t_i1o..s:·~C:t~7 ~~ c;'Io~l'>O~'-::;.t;! ;0::;:• o~~~ m~J~o:-p ~Q~~I ~9~~':;"-:£'_-;: ~"C' '''5)'P,s olJ<;1"'Ql'oO()Pj> olJQ-C'> <:'Sl'<;:,o<>.cp'C.:,~~ ;~ O<;::OS~ dl~ cr;~ ~np'?9...t. 'm.-:;'W..t::: ~~"1o..sc,"S'oe .~'t:.t::("(j)C'>I('$,.~~.P ~ ;;::-("o.:too;,: ~ Ot;n..!./o,::: C',...~QO~n~l'}:-;' :Q'=":"'~ ",5' ~I?~='9-'<>""'':> ""'7).'0 ,"0(" <>~~j;'>O()e ,.,~,O~".~ J)::OMet; Nf):>Os::{'O:: CP~G m..raS'~o9 ..1..'on..."jt~1T.; ~e.'~'?Qt! 9yS} CQ~lJeO :ocio\"~g~~~~ ~fl;''>l;! PO(" "'0. ;9,,;,,,>,>,01.0 C?ivo~ m!~9")O~ ~.~~ >JCI'p...~ ~9:''7,v9'''' ~>" c;,.g?~ '~SX>$!'cn ~~': :~'::I:'l ,?';.,05?o~;J,9" 1'1'01:'", ri~~ 'cp...J.~ «(~~ op~ 09Y~ ~ "cli;:ot;:' S'p.~(I') (;i91~ mJ.s1 (;'00; ~c-)o1sroy::) ~,,~.sQ!'".:..m~ 00';'..".Ie' ()~ '~~fJi~ $::'~ ~,;,eC't;:_';o:-~~ i.J t~~~ !!':'>-':' ~ n?c;~'~,~:)r'~[: 0<:1(';'"[ '~~ 'tp..Qov("~ft ~Qc;3~ ~ fS!~ ,>",09 n,3..0~ o:'Z~ ~:.os:'f<:lcFl 'OOVO~ p'looC>;C ·~~OC'jS~-; o'p~n ~.s ~~:~ pi,r;n ~~.., ~C()j)s! ,,;;,~90S':;0" .. '>"'>OI! c,o.o~l;';>"1'..01 ·~O'" 9~ ~~~ ~~ ~'o::.• ~C"(;i~~~o~):'~ ~~~~~~~:;p.~~~:~ ~~~ ~':'~ c;~"o"m)": 09,1.'~ )9.•:";0/1Qoo;;0 '':"4" ~~ ~-;;~ O.o"::\ifi :m~::1 t;c,c-r;? O~9(J ~:>r:tO(~f::' ~'\lV on?,o~ t7t"'~%-o~('J ..!JC?r:q ~t.oq:" 9~ t.J~~~!~o~~ ",~:O\1() -c:~~~(!~(! !:;~n /_, ,.9~"''>OI' "on "... .'1'::' ~~~;~n,~~~~~;~~::~;::~ o.~ ...~ ..o :h?- ';)o';:'Ja~·~~WO~~! ~~ O?..z'9fl tta~'"1 ',(!! I ~~n ~$:""J? ('It~,1i ";!;'J...J:i ~:~:::o.\.'..if~",>n?~ 7~7: ! ~n;';;;5P..s ~~o~..o C?~"o.V "'cot:O~ ~l:::"1o..s 'mp~ ~..t"J~~1 ''?r.,'cy"o 9~ ~90$."'.P~~ .,..00~..:J '9;: ';:'~ ~::-- ""::t"":;(', ,..; ....;:.':T...~.~."-, : f~<7Io,>,~~~e "'cn"''''t> '~..w; ,,,S1,gil '(')j m ..."'Z?.,~~,..?oJ:;? :m~::'! :,?':..:::;('~ 1'),:-;-:"'';l'''-; C'O'-~~C~\") + '"n.;: ")is.:;, ~ <);91-'>09'"<<'2J'09109r<;Cj::'90"~ ,.9:1>...... ?""-: ,:--.:r. -,'~9'):---'-,~,.~.. ~ OS;,,_C!'\7n ,.?OJ~~~ )."=';,. ~..uO()Q 'Qo~()~ oeJ'~.Ae' 90 m~t-::~ ~ .u:;:'?r;;~m::'!\"; & C'Q~ t";C"::'c·:" tj.....~~..; (') 3"1.~;; ~:~:.~ S::-;,' ::-:-:':0 ,,;;~., C\'Ot,,~'?~'91:9Q ;9'2:X:J MD?"" ::-<'.':S'C' ~.., ,g~,,~ C'I".~'>O~'"~'" :c~,::cz ...~~~ ~o QOQc:..' CY"...;o ~?yS ~.(':;::::,~::::;",;-.:;:~~ a;19~ staC'9 ~5'oC~ r?:~~ t:c: 91..."tO~~ '~:'1....~ ::o;_tn --_"_ ~;~ ~~P~~Q~-~~'::!.oco;)~,;;y; ~m!.n 'C);l(~~QS!'C' :-n~~ w;,;~r;;''1~~:,..s C?~"';7 :-;,..c;'X'7 ;-?~ ~~ <:iC"('2 ....--z c~ ...,.99\..;.:0 .~- ...:::.:..:.~ --_.,-"... _ .._ •.._._--_.,.,_ f;~ f]~.~";..: :n~~':7 "'" J ~~

    '. ,i ~... [~in_i ,~)I:>-- .. ;,-,,, jSS3S BSI"j oq 01puno, o;e sunep -wn)! l1:);)U Sl?q ,~du"'''\\vAnA MONDAY 21 JANtJAR¥-;fbl qoos aseo lJl 's3Juanb'ElSUO~:: l?unc"~··-·-J·-·~-,_[n"l . '.. '.. . ,.~:::.;:.. e ,('~\ieist,~he"said'"d'~~,~j~pr~~i_i~_/':"""'''''..C5~'''-.-,,''-,;:;;''''rt:7TJTl'":QV.'"5Yn It: ..- "rrr'rr ~ireo !"tS'S'Ut:T;) rron ~ elll- e r a s c c r e t a r country taking' the total countries like India are pay• C0\1ntry.i\.r01lIld3,OOO l y K R, number to 2,826. "We set 'H!:fe_ for faulty ;<,;'ci('s of the ployees irom the ccu n try machallder and others pa a target of Rs 3 lakh crore q~stern ecol~ies. How- participated in the confer- ticip a t ed in the confe i cnce on the-first day where enef' CITIZENS FORUM DEMANDS . . , .'.~ RELEASE OF DUES TO Express News Service after the release of fl11~'dSto the Clearance has been to. civic body which is facing se• Products Private Limited by the Ministry of Environment & Forests : The Vijayawa• vere financial crisis. cia ~itizens Forum, a new (MOEF), Government of India, New Delhi for establishment 61 TPA secretary Mv An• Distillery Plant (60 KLD) & Power Plant (25 MW) in Sy.Nos.Pans of apolitical body formed by janeynlu found fault with the various people's associa• 526, 532, 534, 535, 538, 556 & 557 Peddavararn Village, statement made by the mu• Nandigama Mandai, Krishna DISlrict, Andhra Pradesh Th¥~ tions, which is led by the Tax nicipal administration and PayersA."SOCiation (TPA), on mental Clearance has been aCCordedby the Ministry viele urban development minister Order No. F.No.J·ll0l1/171!2011 IA 11(1)Daled 15th January, 2013. Sunday demanded the gov• M Mahecdhar Reddv who ernment to release the funds claimed that there were no Copy of the clearance letter is available WI!/) the Andhra P which are due to the Vi• dues to the VM C from the gov• Pollution Control Board and may also seen [11 website of Ministry Environment and Forests at hl1p:envfor nie.1ll jayawada Municipal Corpo• ernment. TIle meeting de• ration (YMe). manded that local MiAs and PROJECT PROPONENT TPA president V Sambi MP moun! pressure on the Mis. Sudheer 8io Products Private limited Reddy said development in government to release the D.No.l,44, Yakarnuru, lV. Road, the citycould be expected only dues to the V:r-.IC. ThotJavaliuru Mandai Dist . .521165,

    .,L_. ~ __ • __ •...•.. _. __ -- ..--.._. L_. ._. _

    .~