Summary of the sand mining Project- District

S.No. Information Details 1. Project name Sand Mining Projects of District Jamui of two river Stretches namely

Stretch-1-Kiul river (14 Ghats)

Stretch-2- Ulai river (3 Blocks)

2. Mining Lease Area Stretch 1(Kiul river):- Total mining lease Area – 193.94 Hectare or 479.23 Acres Stretch 2 (Ulai river):- Total mining lease Area – 58.27 Hectare or 143.98 Acres Grand Total - 252.21 hectares or 623.22 acre 3. Location of mine Villages (Stretch-1-Kiul river):- Tola Auriya Ghat (G1), Tola Dumri(G-2), Tola Balthar(G-3), Jitjhingoi-Kolhua (G-4), Nimarang (G-5), Kalyanpur (G-6), Bihari(G- 7), Khairma(G-8), Daulatpur(G-9)), Lakhanpur(G-10) Nabinagar (G11), Majhwe (G12), Chancho Ballopur (G13), Parsa Pakri (G14), (Stretch-2-Ulai river):- Gangra Ratanpur-Gidhaur (G15), Sair Balidoh (G16), Purani Bazar (G17) District : Jamui State : 4. River/Nalla/Nadi River Kiul & Ulai 5. Minerals of mine Sand 6. Proposed Production Stretch 1(Kiul river):- Production –Approx. 21.1 Lakh cubic meter (2116800 cubic meter) or 38.1 Lakh tonnes (3810240 tonnes) per annum. Stretch 2 (Ulai river):- Production - Approx. 7.05 Lakhs cubic meter (705600 cubic meter) or 12.7 Lakh tonnes (1270080 tonnes) per annum.

Total:- Approx. 28.2 Lakhs cubic meter (2822400 cubic meter) or 50.8 Lakh tonnes (5080320 tonnes) per annum 7. Method of mining Semi-mechanized using excavators/JCBs as well as manual 8. Drilling or Blasting No 9. No of working days 250 days 10. Water demand Domestic Water : 2.0 KLD Dust Suppression : 8.0 KLD Green Belt Development :3.0 KLD Total Water Requirement: 13.0 KLD 11. Man Power 120 12. Nearest railway station Details are given in Annexure-II for each Ghats, Refer Annexure-II

13. Nearest state Details are given in Annexure-II for each Ghats, Refer Annexure-II highway/national highway 14. Nearest air port Details are given in Annexure-II for each Ghats, Refer Annexure-II