State of New York Public Service Commission Case 19 STATE OF NEW YORK PUBLIC SERVICE COMMISSION CASE 19-E-0065 – Proceeding on Motion of the Commission as to the Rates, Charges, Rules and Regulations of Consolidated Edison Company of New York, Inc. for Electric Service. CASE 19-G-0066 – Proceeding on Motion of the Commission as to the Rates, Charges, Rules and Regulations of Consolidated Edison Company of New York, Inc. for Gas Service. JOINT PROPOSAL October 16, 2019 TABLE OF CONTENTS Page Procedural Setting ................................................................................................................2 Overall Framework ..............................................................................................................5 A. Term ...........................................................................................................................5 B. Rates and Revenue Levels ........................................................................................6 1. Electric ...............................................................................................................6 a. Supply and Supply-related Charges and Adjustments, Monthly Adjustment Clause and NYPA Surcharge ................................................6 b. Revenue Decoupling Mechanism (“RDM”) .............................................9 c. PJM OATT Charges ...............................................................................10 d. Other Charges .........................................................................................11 e. Tax Cuts and Jobs Act of 2017 (“Tax Act”) ...........................................11 f. Business Cost Optimization (“BCO”) and Productivity .........................12 g. Pension/Other Post Employment Benefits (“OPEBs”) ...........................12 2. Gas ...................................................................................................................13 a. Revenue Decoupling Mechanism ...........................................................14 b. Gas Cost Factor / Monthly Rate Adjustment ..........................................14 c. Non-Firm Revenues ................................................................................17 d. Lost and Unaccounted For Gas ...............................................................19 e. Other Charges .........................................................................................21 f. Oil-to-Gas and Area Growth Conversion Programs Discontinued ........22 g. Tax Cuts and Jobs Act of 2017 ...............................................................22 h. Business Cost Optimization and Productivity ........................................23 i. Pension/OPEBs .......................................................................................23 C. Computation and Disposition of Earnings ...........................................................23 1. Earnings Sharing Threshold .............................................................................23 2. Earnings Calculation Method ..........................................................................24 3. Disposition of Shared Earnings .......................................................................25 D. Capital Expenditures and Net Plant Reconciliation ............................................26 1. Electric .............................................................................................................26 i a. Net Plant Reconciliation .........................................................................26 b. Reporting Requirements .........................................................................28 c. Non-Wires Alternative (“NWA”) Adjustment Mechanism....................28 2. Gas ...................................................................................................................30 a. Net Plant Reconciliation .........................................................................30 b. Reporting Requirements .........................................................................32 c. NPA Adjustment Mechanism .................................................................32 3. AMI ..................................................................................................................34 a. Net Plant Reconciliation .........................................................................34 b. Reporting Requirements .........................................................................35 4. New Customer Service System (“CSS”) .........................................................35 a. Net Plant Reconciliation .........................................................................35 b. Stakeholder Meetings .............................................................................35 c. Reporting Requirements .........................................................................35 5. Additional Common Capital Reporting ...........................................................36 E. Other Deferral Accounting and Reconciliation Mechanisms .............................36 1. Property Taxes (Electric and Gas) ...................................................................36 2. Pensions/OPEBs (Electric and Gas) ................................................................37 3. Environmental Remediation (Electric and Gas) ..............................................38 4. Non-Officer Management Variable Pay (Electric and Gas) ............................39 5. Adjustments for Competitive Services (Electric and Gas) ..............................39 6. East River Major Maintenance Cost Reserve (Electric) ..................................39 7. East River Interdepartmental Rent (Electric) ...................................................40 8. Other Transmission Revenues (Electric) .........................................................40 9. NEIL Dividends (Electric) ...............................................................................40 10. Brownfield Tax Credits (Electric) ...................................................................41 11. Proceeds from the Sales of SO2 Allowances (Electric)...................................41 12. BQDM Program and REV Demo Project Costs (Electric) ..............................41 13. Municipal Infrastructure Support (Other Than Company Labor) (Electric and Gas) ............................................................................................42 14. Long Term Debt Cost Rate (Electric and Gas) ................................................43 15. Energy Efficiency (“EE”) (Electric and Gas) ..................................................44 ii 16. CSS O&M (Electric and Gas) ..........................................................................45 17. Sales and Use Tax Refunds 2019 (Electric and Gas) ......................................45 18. Taxes on Health Insurance (Electric and Gas) .................................................46 19. Congestion Tolling Program (Electric and Gas) ..............................................46 20. Prevailing Wage Law (Electric and Gas) .........................................................46 21. NYC Local Law 97 (Electric and Gas) ............................................................46 22. NWA (Electric) ................................................................................................47 23. Major Storm Cost Reserve (Electric) ...............................................................47 a. Major Storm Reserve Funding ................................................................47 b. Costs Chargeable to the Major Storm Reserve .......................................48 24. SmartCharge Program (Electric) ......................................................................50 25. NY Facilities Agreement (Gas) .......................................................................51 26. Research and Development Expense (Gas) .....................................................51 27. Pipeline Safety Acts (Gas) ...............................................................................51 28. Gas Service Lines (Gas)...................................................................................52 29. White Plains Gate Station (Gas) ......................................................................52 30. Additional Reconciliation/Deferral Provisions ................................................52 31. Discontinued Deferrals/Reconciliations ..........................................................53 a. World Trade Center (Electric and Gas) ..................................................53 b. System Peak Reduction (Electric) ..........................................................53 c. Energy Efficiency (Electric and Gas) .....................................................53 d. Electric Vehicles - O&M (Electric) ........................................................53 e. Pipeline Integrity Costs – New York Facilities Charges (Gas) ..............54 F. Additional Accounting Provisions .........................................................................54 1. Depreciation Rates and Reserves .....................................................................54 a. Depreciation Rates (Electric and Gas) ....................................................54 b. Reserve Deficiency (Electric and Gas) ...................................................54 2. Interest on Deferred Costs ...............................................................................55 3. Prospective Property Tax Refunds and Credits ...............................................55
Recommended publications
  • Thesis, Dissertation
    AN EXPLORATION OF SMALL TOWN SENSIBILTIES by Lucas William Winter A thesis submitted in partial fulfillment of the requirements for the degree of Master of Architecture in Architecture MONTANA STATE UNIVERSITY Bozeman, Montana April 2010 ©COPYRIGHT by Lucas William Winter 2010 All Rights Reserved ii APPROVAL of a thesis submitted by Lucas William Winter This thesis has been read by each member of the thesis committee and has been found to be satisfactory regarding content, English usage, format, citation, bibliographic style, and consistency and is ready for submission to the Division of Graduate Education. Steven Juroszek Approved for the Department of Architecture Faith Rifki Approved for the Division of Graduate Education Dr. Carl A. Fox iii STATEMENT OF PERMISSION TO USE In presenting this thesis in partial fulfillment of the requirements for a master’s degree at Montana State University, I agree that the Library shall make it available to borrowers under rules of the Library. If I have indicated my intention to copyright this thesis by including a copyright notice page, copying is allowable only for scholarly purposes, consistent with “fair use” as prescribed in the U.S. Copyright Law. Requests for permission for extended quotation from or reproduction of this thesis in whole or in parts may be granted only by the copyright holder. Lucas William Winter April 2010 iv TABLE OF CONTENTS 1. THESIS STATEMENT AND INRO…...........................................................................1 2. HISTORY…....................................................................................................................4 3. INTERVIEW - WARREN AND ELIZABETH RONNING….....................................14 4. INTERVIEW - BOB BARTHELMESS.…………………...…....................................20 5. INTERVIEW - RUTH BROWN…………………………...…....................................27 6. INTERVIEW - VIRGINIA COFFEE …………………………...................................31 7. CRITICAL REGIONALISM AS RESPONSE TO GLOBALIZATION…………......38 8.
    [Show full text]
  • Trenchless for Gas Infrastructure 2020 Spring/Summer
    TRENCHLESS FOR GAS INFRASTRUCTURE 2020 SPRING/SUMMER World Record 42-Inch Gas Main CIPL Save Time. Make Money. TRY THE BET TER WAY TO BORE. Subsite HDD Guidance systems can improve the accuracy and efficiency of your bores. Our exclusive Green Ops™ process leverages modern data-sharing technology to give you a clear plan, more control, and faster reporting for safer, more productive jobs. Learn more at subsite.com and ask your Ditch Witch® dealer. © 2020 The Charles Machine Works, Inc. your single source for trenchless rehab & Replacement. HammerHead Trenchless provides precision-manufactured equipment, a comprehensive range of trenchless materials and supplies, and all the training and support you need to replace underground gas pipelines with minimal excavation. Offering only the best and most innovative trenchless technologies available in the gas industry, our responsive team is by your side throughout the life of your quality HammerHead equipment to ensure your success on every job. TOUGH EQUIPMENT. TRUSTED SUPPORT. visit hammerheadtrenchless.com or call 800.331.6653 PIPE BURSTING | PNEUMATIC PIERCING TOOLS | PIPE EXTRACTION | PIPE SLITTING ©2020 Charles Machine Works HG12_8.375x10.875-5.indd 1 3/6/2020 11:54:58 AM CONTENTS FEATURES: Chair – Babs Marquis 11 20 [email protected] Publication Advisor – George Ragula [email protected] PUBLISHER New World Record 42-Inch Direct Pipe® Installation under Gas Main CIPL the Calumet River 662 Dudley Avenue Records are made to be broken, and the world record Part of a multi-faceted project to retrofit a 36-inch Winnipeg, MB Canada CIPL in summer 2019 of a 42-Inch Cast Iron Gas Main steel gas transmission line in Chicago involved a R3M 1R8 in a complex layout buried under 8 lanes of the Garden record-setting 1500-foot installation under the State Parkway in East Orange NJ was a breakthrough Calumet River.
    [Show full text]
  • Helpful Study Guide (PDF)
    WASTEWATER STABILIZATION POND (WWSP) STUDY GUIDE ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF WATER OPERATOR TRAINING AND CERTIFICATION PROGRAM http://dec.alaska.gov/water/opcert/index.htm Phone: (907) 465-1139 Email: [email protected] January 2011 Edition Introduction This study guide is made available to examinees to prepare for the Wastewater Stabilization Pond (WWSP) certification exam. This study guide covers only topics concerning non-aerated WWSPs. The WWSP certification exam is comprised of 50 multiple choice questions in various topics. These topics will be addressed in this study guide. The procedure to apply for the WWSP certification exam is available on our website at: http://www.dec.state.ak.us/water/opcert/LargeSystem_Operator.htm. It is highly recommended that an examinee complete one of the following courses to prepare for the WWSP certification exam. 1. Montana Water Center Operator Basics 2005 Training Series, Wastewater Lagoon module; 2. ATTAC Lagoons online course; or 3. CSUS Operation of Wastewater Treatment Plants, Volume I, Wastewater Stabilization Pond chapter. If you have any questions, please contact the Operator Training and Certification Program staff at (907) 465-1139 or [email protected]. Definitions 1. Aerobic: A condition in which “free” or dissolved oxygen is present in an aquatic environment. 2. Algae: Simple microscopic plants that contain chlorophyll and require sunlight; they live suspended or floating in water, or attached to a surface such as a rock. 3. Anaerobic: A condition in which “free” or dissolved oxygen is not present in an aquatic environment. 4. Bacteria: Microscopic organisms consisting of a single living cell.
    [Show full text]
  • Safety Evaluation of the Zhaoli Tailings Dam a Seepage, Deformation and Stability Analysis with Geostudio
    UPTEC ES 16 031 Examensarbete 30 hp September 2016 Safety Evaluation of the Zhaoli Tailings Dam A seepage, deformation and stability analysis with GeoStudio Johan Bäckström Malin Ljungblad Abstract Safety Evaluation of the Zhaoli Tailings Dam Johan Bäckström and Malin Ljungblad Teknisk- naturvetenskaplig fakultet UTH-enheten The mining industry produce large amount of mine waste, also called tailings, which must be kept in tailings dams. In this thesis the safety and stability of a tailings dam Besöksadress: have been studied, where some of the tailing material is being used as filling material. Ångströmlaboratoriet Lägerhyddsvägen 1 The dam has been modelled and simulated using the software Geostudio. To evaluate Hus 4, Plan 0 the safety and stability of the dam seepage, stress and strain as well as slope stability have been simulated with SEEP/W, SIGMA/W and SLOPE/W, which are different Postadress: modules in the Geostudio software. Box 536 751 21 Uppsala The results show that the dam is stable for all tested scenarios. However, in this Telefon: thesis many simplifications and assumptions have been made so it is recommended to 018 – 471 30 03 do a more detailed study to confirm the safety of the dam. The dam should also be Telefax: simulated for earthquakes before a definite evaluation can be made. 018 – 471 30 00 This master thesis has been conducted in cooperation with Vattenfall AB, Energiforsk Hemsida: AB, Uppsala University and Tsinghua University in Beijing, China. The project has http://www.teknat.uu.se/student been carried out on the planned Zhaoli ditch tailing dam in the Shanxi Province, China.
    [Show full text]
  • Pond Infiltration and Watertable Mounding
    GEO-SLOPE International Ltd, Calgary, Alberta, Canada www.geo-slope.com Pond Infiltration and Watertable Mounding 1 Introduction The objective of this illustration is show how to model the filling of a pond with a liner. The zone below the liner remains unsaturated and the watertable deep in the profile mounds, due to percolation from the base of the pond. The modeling can help evaluate the effectiveness of lining the reservoir with a clay liner. Not only can the final, steady-state condition be established for both scenarios, but the rise in the watertable with time can be determined by conducting a transient analysis. Feature Highlights Transient boundary conditions Watertable viewing over time Unit flux boundary conditions Unsaturated flow 2 Geometry and boundary conditions The containment facility is located on top of a hill, with a stream at the bottom of the embankment, as shown below. Since the change in the regional system needs to be evaluated with time, a transient analysis will be conducted. 12 11 10 9 ) 8 m ( 7 n o i 6 t a v 5 e l E 4 3 2 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance (m) Figure 1 Problem configuration Before conducting a transient analysis, it is sometimes helpful to know the long-term, steady-state solution, so you know the conditions where the system is eventually going to stabilize. It can also be helpful as a point of reference to compare against your transient results, which can help you determine if the steady-state solution is reasonable or too far in the future to be considered obtainable.
    [Show full text]
  • Introduction to Ponds, Lagoons, and Natural Systems Study Guide December 2013 Edition
    Wisconsin Department of Natural Resources Wastewater Operator Certification Introduction to Ponds, Lagoons, and Natural Systems Study Guide December 2013 Edition Subclass D Wisconsin Department of Natural Resources Bureau of Science Services, Operator Certification Program PO Box 7921, Madison, WI 53707 http://dnr.wi.gov/ The Wisconsin Department of Natural Resources provides equal opportunity in its employment, programs, services, and functions under an Affirmative Action Plan. If you have any questions, please write to Equal Opportunity Office, Department of Interior, Washington, D.C. 20240. This publication is available in alternative format (large print, Braille, audio tape. etc.) upon request. Please call (608) 266-0531 for more information. Printed on 12/06/13 Introduction to Ponds, Lagoons, and Natural Systems Study Guide - December 2013 Edition Preface This operator's study guide represents the results of an ambitious program. Operators of wastewater facilities, regulators, educators and local officials, jointly prepared the objectives and exam questions for this subclass. How to use this study guide with references In preparation for the exams you should: 1. Read all of the key knowledges for each objective. 2. Use the resources listed at the end of the study guide for additional information. 3. Review all key knowledges until you fully understand them and know them by memory. It is advisable that the operator take classroom or online training in this process before attempting the certification exam. Choosing a Test Date: Before you choose a test date, consider the training opportunities available in your area. A listing of training opportunities and exam dates is available on the internet at http://dnr.wi.gov, keyword search "operator certification".
    [Show full text]
  • Evaporation Pond Seepage Soil Solution
    from the soil surface. The subcores were fitted and sealed with plexiglass ends and set up to measure Permeability. Drainage water having an electrical conductivity (EC) of 10 dS/m (6100 ppm total dissolved salts) was applied to the cores for three days to ensure saturation and uniform electrolyte concentration. Biological activity was minimized in some of the cores by the addition of chlo- roform to the percolating drain water. Percolating drainage water having pro- gressively larger EC values was applied over periods of one to five days in an effort to exaggerate variations in evaporation pond salinity resulting from evaporation lnfiltrometers (left)were installed in Kings County and fresh drain water additions. The sa- evaporation pond to estimate seepage. Rainfall, evaporation, drainage flows, and changes in pond linity of inflow and outflow water was water levels (herebeing checked by co-author Blake measured periodically along with the per- McCullough-Sanden)were also measured. meability of each subcore. The sodium adsorption ratio (SAR) is an index of the relative concentration of sodium, calcium, and magnesium in the Evaporation pond seepage soil solution. When soil salinity is low, permeability has been shown to increase Mark E. Grismer o Blake L. McCullough-Sanden as the SAR value of the inflow solution in- creases. Past studies, however, have typi- cally considered SAR values of 30 or less. Rates of seepage from operating evaporation In this study, SAR values of the inflow so- ponds decline substantially as they age and as lution increased in the same stepwise fashion as EC, with values ranging from salinity increases 210 to 660.
    [Show full text]
  • Imaging Hydrologic Processes in Headwater Riparian Seeps with Time-Lapse Electrical Resistivity
    Case Study/ Imaging Hydrological Processes in Headwater Riparian Seeps with Time-Lapse Electrical Resistivity by Mark R. Williams1, Anthony R. Buda2, Kamini Singha3, Gordon J. Folmar2, Herschel A. Elliott4,and John P. Schmidt5 Abstract Delineating hydrologic and pedogenic factors influencing groundwater flow in riparian zones is central in understanding pathways of water and nutrient transport. In this study, we combined two-dimensional time-lapse electrical resistivity imaging (ERI) (depth of investigation approximately 2 m) with hydrometric monitoring to examine hydrological processes in the riparian area of FD-36, a small (0.4 km2) agricultural headwater basin in the Valley and Ridge region of east-central Pennsylvania. We selected two contrasting study sites, including a seep with groundwater discharge and an adjacent area lacking such seepage. Both sites were underlain by a fragipan at 0.6 m. We then monitored changes in electrical resistivity, shallow groundwater, and nitrate-N concentrations as a series of storms transitioned the landscape from dry to wet conditions. Time-lapse ERI revealed different resistivity patterns between seep and non-seep areas during the study period. Notably, the seep displayed strong resistivity reductions (∼60%) along a vertically aligned region of the soil profile, which coincided with strong upward hydraulic gradients recorded in a grid of nested piezometers (0.2- and 0.6-m depth). These patterns suggested a hydraulic connection between the seep and the nitrate-rich shallow groundwater system below the fragipan, which enabled groundwater and associated nitrate-N to discharge through the fragipan to the surface. In contrast, time-lapse ERI indicated no such connections in the non-seep area, with infiltrated rainwater presumably perched above the fragipan.
    [Show full text]
  • Salinity in Livestock Ponds Summary Report Brian Hauschild, 2020 Big Sky Watershed Corps Musselshell Watershed Coalition
    Salinity in Livestock Ponds Summary Report Brian Hauschild, 2020 Big Sky Watershed Corps Musselshell Watershed Coalition Introduction Much of Central Montana is underlain by salt-laden, Cretaceous marine shales. Saline conditions in Petroleum County are concentrated in the Colorado Group bedrock formation, as shown in Figure 4. The formation is characterized by shallow soils with highly soluble salt loads in the groundwater. In 2011, catastrophic floods flushed salts out of the groundwater and into the surface water. This geological condition can be compounded by certain land-use practices. Cropping systems, especially the prominent crop-fallow patterns, can also create a local perched water table to enhance surface evaporation, leaving salt to concentrate on the soil surface. The saline groundwater and saline surface run-off contribute soluble salts to the local watersheds and ponded water. When land-use management creates local saline conditions, the condition is known as saline seep. Dryland saline seeps, which can impair soil and water quality, were recognized as an issue in the latter half of the 20th century. Impacted areas are dependent upon local stratigraphy and geomorphology, but fallow periods in cultivated fields during wet years can be a major factor for their presence. After 2011, saline seeps became noticeably more prevalent and many livestock ponds have become unusable. This has been a major burden for producers who rely on potable water for their cattle. Seeps and ponds can sometimes be reclaimed through techniques like planting perennial forage in groundwater recharge areas to reduce salt leaching. However, climatic factors may enable the underlying problem to persist well into the 21st century, so collecting and understanding data is critical.
    [Show full text]
  • The Springs and Seeps of Tennessee
    The Springs and Seeps of Tennessee What are Springs and Seeps? between the point where the water 3 percent of the Earth's fresh water Below the Earth's surface, enters the ground and the point is found in streams, lakes, and sometimes just inches, sometime where it comes to the surface. These reservoirs. The remaining miles, deep, lies 97 percent of our reentry points are usually through 97 percent is underground. Ground freshwater. This water may have porous layers of sand or gravel water is the safest and most reliable come from the last rain- or snowfall, sandwiched between harder, less source of available freshwater. It is or it could have been hidden deep in permeable, layers of soil or rock or the primary water source for the earth for a million years. through cracks and fissures in the 50 percent of the American Occasionally, rock formations underlying rock. Seep and spring population. In rural areas, intersect this vast underground water may remain underground for 95 percent of the people depend on network of reservoirs, permitting many years, or even centuries, before ground water for their water supply. these hidden pools of water to once it resurfaces. During this time again see the light of day. The spots underground it reaches a Rare and Unique Plants and Animals where water flows back to the temperature much cooler than typical Springs vary by their rate of flow, surface are typically known as seeps surface waters in the summer and whether the water is acidic or basic, or springs. much warmer in the winter.
    [Show full text]
  • The Unique Hydrology of the Souris River Basin: a Prairie Pothole Region
    The Unique Hydrology of the Souris River Basin: A Prairie Pothole Region Hydrology is the scientific study of how water moves and is distributed across land. The effects of rainfall and snowmelt on river flows and reservoir levels are part of the unique hydrology that characterizes the Souris River basin. The Souris River basin is part of the Prairie Pothole Region, which stretches across Alberta, Saskatchewan, and Manitoba in Canada, and extends into North and South Dakota, Iowa, Minnesota, and Montana in the United States. What makes this region unique is the presence of shallow wetlands, or potholes, that were left behind during the last glacial period in North America. This pothole topography can be found across the majority of the Souris River basin. Kettles and Kames Fill-and-Spill Hydrology Shallow potholes, called kettles, are sometimes surrounded Under normal conditions, much of the watershed does not by irregularly-shaped earth mounds called kames. Kettles contribute to the Souris River directly because the kettle often contain sediment or vegetation, and can be dry lakes can store water and keep it from reaching the river. during summer months. During the spring snowmelt, they However, with large amounts of precipitation from snow can fill with water and form small kettle lakes. Kettle lakes or rain, the small kettle lakes can fill and expand outwards are often isolated from streams and rivers, and the water in until they begin to spill into one another, and eventually into these kettle lakes usually reduces over time through the Souris River. This is what happened in June 2011 when natural processes.
    [Show full text]
  • Environmental Monitoring Report BAN: Southwest Area Integrated Water
    Environmental Monitoring Report Project No.34418-013 Semi-Annual Report June 2015 BAN: Southwest Area Integrated Water Resources Planning and Management Project Prepared by Bangladesh Water Development Board for the People’s Republic of Bangladesh and the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH Ministry of Water Resources Bangladesh Water Development Board SOUTHWEST AREA Integrated Water Resources Planning and Management Project Bangladesh Water Development Board ADB Loan 2200-BAN (SF) / GON Grant 0036 BAN ENVIRONMENT MONITORING REPORT Period: January- June, 2015 June, 2015 ACRONYMS AND ABBREVIATIONS ADB Asian Development Bank BWDB Bangladesh Water Development Board DAE Department of Agricultural Extension DFR Draft Final Report DOE Department of Environment DOF Department of Fisheries DPHE Department of Public Health Engineering DTW Deep Tube Well EAP Environmental Action Plan ECA Environment Conservation Act ECC Environmental Clearance Certificate ECR Environment Conservation Rules EIA Environmental
    [Show full text]