BUILT to SPECIFIC OCCUPIER REQUIREMENTS [email protected] Oxford with Bus Stops in Close Proximity to the Scheme
Total Page:16
File Type:pdf, Size:1020Kb
a ready workforce. ready a and new housing. new and provided be will Buildings B8). and B2 B1c, classes (Use space floor employment of providing Bicester of areas housing major the to proximity close in is 9 Link • facilities all of access easy within road perimeter Bicester’s onto fronts 9 Link The site is approximately 36 acres and has outline planning permission for 520,000 sq ft ft sq 520,000 for permission planning outline has and acres 36 approximately is site The will be underway during 2016. during underway be will for occupation within 12 months of agreed design. agreed of months 12 within occupation for strategically located a short distance from Junction 9 of the M40. the of 9 Junction from distance short a located strategically Bicester is also home to the UK’s largest self-build residential project which which project residential self-build largest UK’s the to home also is Bicester • ready be can and requirements occupier individual match to ft sq 80,000 from Link 9 Bicester is a major new distribution, production and headquarters development, development, headquarters and production distribution, new major a is Bicester 9 Link 10,000 new homes by 2031. by homes new 10,000 Bicester has been awarded Garden Town status which will deliver at least least at deliver will which status Town Garden awarded been has Bicester • OVERVIEW and 13% work in logistics, compared with 5% across Oxfordshire. across 5% with compared logistics, in work 13% and Approximately 12% of those employed in Bicester work in manufacturing manufacturing in work Bicester in employed those of 12% Approximately • with the national average (64.8%). average national the with A high proportion of Bicester’s population is of working age (67%) compared compared (67%) age working of is population Bicester’s of proportion high A • Indicative layout and CGI and layout Indicative to rise to 50,000 within the next 15 years. 15 next the within 50,000 to rise to JUNCTION 9 JUNCTION M40 M40 projected is which 30,000 over just is Bicester of population current The • www.albionland.co.uk to go information further For residential development. residential EMPLOYMENT AND HOUSING AND EMPLOYMENT Network Bicester Network and park business use mixed acre 50 proposed a supermarket, healthcare centre, hotel and 150,000 sq ft of employment uses. employment of ft sq 150,000 and hotel centre, healthcare supermarket, Network 401 Brackley 401 Network a 25 acre mixed use development to comprise a Sainsbury Sainsbury a comprise to development use mixed acre 25 a designer outlet with more than 6 million visitors a year. a visitors million 6 than more with outlet designer Bicester is internationally known due to the strong branding of Bicester Village Village Bicester of branding strong the to due known internationally is Bicester (133,000 sq ft) and first Line (130,000 sq ft). sq (130,000 Line first and ft) sq (133,000 Network M40 Banbury M40 Network where bespoke buildings were provided for CTG/UTC CTG/UTC for provided were buildings bespoke where supply should increase substantially. increase should supply to 50,000 by 2031. The town already offers a skilled workforce and the workforce workforce the and workforce skilled a offers already town The 2031. by 50,000 to with recent and current projects including: projects current and recent with Bicester is rapidly expanding with the town’s population set to increase from 30,000 30,000 from increase to set population town’s the with expanding rapidly is Bicester region the in developers commercial active most the of one is Land Albion distribution/logistics. Hartridge Engineering Hartridge high technology and science based industries, advanced manufacturing and and manufacturing advanced industries, based science and technology high t Dentressangle t Norber Volvo in growth strong with economy regional dynamic a of heart the at is Bicester Tesco CTG/UTC First Line First Sainsbury a comprehensive redevelopment of the town centre. town the of redevelopment comprehensive a and Park Retail Village Bicester famous world the of expansion including town the Manitowoc Filters Water Brita M40 and Bicester town. This has already encouraged further development within within development further encouraged already has This town. Bicester and M40 the to improvements junction road as well as Oxford and London to connection working with Albion Land include: Land Albion with working projects have recently been completed to support this growth including a new rail rail new a including growth this support to completed been recently have projects from benefited have who Occupiers requirements. their meets development the available land supply to accommodate rapid expansion. Significant infrastructure infrastructure Significant expansion. rapid accommodate to supply land available the Albion Land works closely with the occupier to ensure every aspect of the the of aspect every ensure to occupier the with closely works Land Albion development due to the town’s exceptional road and train connections coupled with with coupled connections train and road exceptional town’s the to due development 20 years experience of delivering the highest quality bespoke facilities for occupiers. occupiers. for facilities bespoke quality highest the delivering of experience years 20 Bicester is at the forefront of Oxfordshire’s growth plans. The town is a focus for for focus a is town The plans. growth Oxfordshire’s of forefront the at is Bicester over with company development property commercial leading a is Land Albion ABOUT THE DEVELOPER THE ABOUT BICESTER 262,210 SQ FT SQ 262,210 FT SQ 146,390 FT SQ 94,130 UNIT 1 1 UNIT 2 UNIT 3 UNIT TERMS SAT NAV: OX26 5AF Build-to-suit opportunities available on A MAJOR NEW DISTRIBUTION, PRODUCTION flexible leasehold or freehold terms from M5 M6 A4421 BIRMINGHAM M42 Coventry A14 80,000 to 520,000 sq ft. Please contact A4095 AND HEADQUARTERS DEVELOPMENT To: Link 9, Bicester M42 Birmingham Up to 520,000 sq ft M45 A4095 on 36 acres the joint agents for further details. (A43 & M42) SK IM M5 M Warwick IN G D IS M40 H Northampton R WWW.LINK9.CO.UK O A A6 D M40 A1 A46 A423 M1 A5 A4095 A46 Bicester D North OA N R TO N U ROAD B A L L AC Banbury E KT A429 A43 HO N R A N J13a L R BICESTER O A M1 E D Bicester DISTRIBUTION G • M40 junction 9 (10 min/5.3 miles) PARK D Milton I R A421 Keynes B R A J10 H Launton A4421 M40 Link 9 A5 Luton C • M1 junction 15a (34 min/27 miles) A44 Bicester Bicester Bicester BICESTER A418 Village Town B4030 A1 • M42 junction 3a (40 mins/44 miles) J9 A41 Aylesbury M40 Chesterton A41 A34 M1 A41 A4421 A429 A40 • M25 junction 1a (1hr 5 mins/60 miles) Oxford A40 A418 A41 A4010 A413 J20 A420 To: M25 Little RAIL High Wycombe Chesterton Aylesbury M40 A41 A34 M40 Watford Train links to Bicester are unrivalled in the To: Swindon Oxford (A34) M4 London (M25) local area with 2 stations in the town - Slough LONDON Bicester Village (5 min drive/1.6 miles) and Reading A41 Wendlebury J13 M4 HEATHROW M4 M25 AIRPORT Bicester Parkway (4 min drive/1.5 miles). J9 Direct links to: • London Marylebone (48 mins) • Birmingham (1 hr 7 mins) • Oxford Parkway (9 mins) The proposed new east/west link to connect East Anglia with the South East Midlands and Thames Valley will create a major transport interchange at Bicester. Tom Barton Chris White James Haestier [email protected] [email protected] [email protected] BUS Peter Monks The S5 bus service links Bicester to BUILT TO SPECIFIC OCCUPIER REQUIREMENTS [email protected] Oxford with bus stops in close proximity to the scheme. 80,000 TO 520,000 SQ FT Sources for figures www.trailine.com and google Misrepresentation Act Ready for occupation in 12 months from agreed design The accuracy of any description, dimensions, references to condition, necessary permissions for use and occupation and other details contained herein is not guaranteed and is for general guidance only and prospective purchasers or tenants must not rely on them as statement of fact or representations and must satisfy themselves as to their accuracy. Neither VSL & Partners, White Commercial or Colliers nor any of their employees or representatives has any authority to make or give any representation or warranty or enter into any contract whatever in relation to the Property. Rents quoted in these particulars may be subject to VAT in addition. The reference to any mechanical or electronic equipment or other facilities at the Property shall not constitute a representation (unless otherwise stated) as to its state or condition or that it is capable of fulfilling its intended WWW.LINK9.CO.UK FREEHOLD OR LEASEHOLD Indicative CGI function. Prospective tenants/purchasers should satisfy themselves as to the fitness of such equipment for their requirements. 06/16. Designed and produced by Barques Design. www.barques.co.uk a ready workforce. ready a and new housing. new and provided be will Buildings B8). and B2 B1c, classes (Use space floor employment of providing Bicester of areas housing major the to proximity close in is 9 Link • facilities all of access easy within road perimeter Bicester’s onto fronts 9 Link The site is approximately 36 acres and has outline planning permission for 520,000 sq ft ft sq 520,000 for permission planning outline has and acres 36 approximately is site The will be underway during 2016. during underway be will for occupation within 12 months of agreed design. agreed of months 12 within occupation for strategically located a short distance from Junction 9 of the M40.