Breathing Apparatus Used : SCUBA Set Surface Supply of Demand Value KMB 18B KMB Superlight 17B Superlight 37
Total Page:16
File Type:pdf, Size:1020Kb
DIVER’S NAME ; ASHISH SINGH FATHER’ NAME : Narender DATE OF BIRTH : 05.04.1984 MARRITAL STATUS : Married NATIONALITY : Indian Contact email : [email protected] Cell : +91 9813361363 Personal Details Date of Birth: 05.04.1984 Passport: H 8741732 CDC Nationality: Indian MT-24888 (seaman book) Languages English & Hindi Dive Medical: In date Nearby Airport INDIRA GANDHI Education Graduation INTERNATIONAL AIRPORT,NEW DELHI(INDIA) Qualifications CLASS II COMMERCIAL AIR DIVER EFA, CLASS III COMMERCIAL AIR DIVER PSSR, PST, CHAMBER OPERATOR HUET, FPFF, Equipment Experience : Breathing Apparatus Used : SCUBA Set Surface Supply of Demand Value KMB 18B KMB Superlight 17B superlight 37 Profile Under water cutting Clamping job Spool peace installation Pipe line installation & repairing Pre Engineering Survey Construction of quay wall and brake water ,Block placing & Mud lifting Underwater Pile Inspection and cleaning Laying of Pipeline Anode fixing Use of Tool Pneumatic tools Broco cutting Hydraulic Tools Pile Inspection Survey Videography Propeller Inspection Work History Company Vessels Project NAME ,WORK Position Duration Advance offshore INDIA Offshore Construction job Air Diver 02-Apir-20- Client: ONGC Removed the pullhead of a 10-inch pipeline. Apir-2014 (GSPC,PUNJLOAD) LB- Secondly, applied Pigg-launcher and Mahesh -1 attached pipes of booster-pump on Pigg- launcher's voles. After 15 hours of launching pigg, removed Pigg-launcher and put on the blank on pipeline head. Then Date reviewed 05.11.2013 after 36 hours of completion of hydro- test, blank was replaced with diffuser. After then filled up the structure of diffuser with concrete. Advance offshore INDIA 15-jan-11- Client: ONGC Offshore Construction job Mar-2014 (GSPC,PUNJLOAD) Pipe line work use mad lift, use 3’tone,air lift Air Diver LB- Bag with belt, hook on in barge davit and Mahesh -1 Flaxy float. Laying out pipe line, inspection Is field joint. Advance offshore INDIA 11-Dec-09- Client: ONGC Offshore Construction job jan-2014 (GSPC,PUNJLOAD) Pipe line work use mad lift, use 3’tone,air lift Air Diver LB- Bag with belt, hook on in barge davit and Mahesh -1 Flaxy float. Laying out pipe line, inspection Is field joint. DCN OFFSCHORE PROJET NAME- ZAKUM ISLAND offshore 01 -Sep- 04- ( ABU DABHI) Offshore Construction job Nov-2013 Client: ADGAS Construction of brake water Agrport placing Air Diver And Inspection placing x blocks. Diving Shit pilling-clamp fixing, fender, Container Anode fixing and inspection of pilling jetty Block placing , Inspection Dead Marin Anker ( D.M.A ) palace and Recovery . Overseas ast LLc/ Barj-mr- PROJET NAME- Rwais Refinery 20-Jun-05- Divetech Marine 05 Offshore Construction job Air Diver Aug-2013 Spool peace installation, Pipe line repairing, Client: Brouge Sea Water Intake Pipe Line. 3 Meter Dia 300Meter long into 15 sections PVC Pipe Installation, Removal of pulling head, pipe alignment, pipe joining& tightening. Pipes sinking, Recovery of weight chain, Block placing, Ratchet Belts tightening. Final Video inspection Overseas ast LLc/ Barj-mr- PROJET NAME- Rwais Refinery Divetech Marine 05 Offshore Construction job Air Diver 25-APR- Spool peace installation,Sea Water Intake 09-Jun-2013 Client: Brouge Pipe Line. 3 Meter Dia 300Meter long into 15 sections PVC Pipe Installation, Removal of pulling head, pipe alignment, and pipe joining& tightening. Pipes sinking, Recovery of weight chain, Block placing, Ratchet Belts tightening. Final Video inspection Date reviewed 05.11.2013 Offshore Construction job Reliance petroleum MGR on jacket and Riser , DSV Pipeline Installation of permanent oil (Jamnagar) 05 Jan- PAWAN Boom. Free span inspection. Air Diver 25 -Mar-2013 SUTH Relocation of Anodes for riser clamp Gujarat, INDIA. installation and obstruction removal, Under water cutting with Broco PROJET NAME – DAS ISLAND Offshore Air Diver Offshore Construction job Shit pilling-clamp fixing, fender, DCN OFFSCHORE RCG -280 , Anode fixing and inspection of pilling jetty 24 Aug – 21 – ( ABU DABHI) SRP Block placing , Agrport placing and Inspection Dead Dec 2012 Client: ADGAS Marin Anker ( D.M.A ) palace and Recovery PROJET NAME- AILL RUASE port , Air Diver DCN OFFSCHORE Diving Construction job 15 Apr 2012 – ( ABU DABHI) Container Block placing , Aggregate, Manual Frame, Client: Brouge 02 July 2012 Hydraulic Frame, Inspection Reliance petroleum PROJET NAME – INDIA Offshore Air Diver DSV Offshore Construction job (Jamnagar) PAWAN Pipe line repairing, mud lifting and 14-Dec-2011 SUTH air lifting also fitting clamp inside 15-Mar- 2012 Gujarat, INDIA. Mechanical joint. Reliance petroleum PROJET NAME –INDIA Offshore DSV Offshore Construction job (Jamnagar) PAWAN Pipe line repairing, mud lifting and 18 -Sep- Air Diver SUTH air lifting also fitting clamp inside 08-Nov-02-011 Gujarat, INDIA. Mechanical joint. Offshore Construction job Reliance petroleum MGR on jacket and Riser , DSV Pipeline Installation of permanent oil (Jamnagar) 10-may- PAWAN boom. Free span inspection. Air Diver 05 -Jun-2011 SUTH Relocation of Anodes for riser clamp Gujarat, INDIA. installation and obstruction removal, Under water cutting with Broco Offshore Construction job Reliance petroleum MGR on jacket and Riser , DSV Pipeline Installation of permanent oil (Jamnagar) 25 Feb- PAWAN boom. Free span inspection. Air Diver 28-Apr-2011 SUTH Relocation of Anodes for riser clamp Gujarat, INDIA. installation and obstruction removal, Under water cutting with Broco Trinity trade PROJET NAME – RASEL FANE port , international (Qatar) Construction job Air Diver 15 Nov 2010 - CB 03 Construction of quay wall and brake water. Client: Qatar Petrol. Sea bed leveling. Block placing(using 02-Feb-2011 hydraulic frame) and taking measurements PROJET NAME – RASEL FANE port , Trinity trade Construction job Mad lifting and cleaning bottom. Open 04-Jul-2010 international (Qatar) CB 07 Air Diver Geotextile and stitching the Geotextile and 14-Aug-2010 Client: Qatar Petrol. put stone. PROJET NAME – RASEL FANE port , Trinity trade Construction job 03-May-2010 international (Qatar) CB 03 Air Diver Mad lifting and cleaning bottom. Open 03- Jun-2010 Date reviewed 05.11.2013 Client: Qatar Petrol. Geotextile and stitching the Geotextile and put stone. PROJET NAME – RASEL FANE port Trinity trade Construction job international (Qatar) Construction of quay wall and Sea bad 02-Apr-2010 CB 03 Air Diver leveling. Block placing and taking 02-May-2010 Client: Qatar Petrol. measurements . Cleaning and stone removed From Block Offshore Construction job Reliance petroleum MGR on jacket and Riser , DSV Pipeline Installation of permanent oil (Jamnagar) 08-Jan- PAWAN boom. Free span inspection. Air Diver SUTH Relocation of Anodes for riser clamp 20-Feb-2010 Gujarat, INDIA. installation and obstruction removal, Under water cutting with Broco Offshore Construction job Reliance petroleum MGR on jacket and Riser , DSV Pipeline Installation of permanent oil (Jamnagar) 02-Nov-2009 PAWAN boom. Free span inspection. Air Diver 10-Dec-2009 SUTH Relocation of Anodes for riser clamp Gujarat, INDIA. installation and obstruction removal, Under water cutting with Broco Archirodon PROJET NAME – khlefa port ( ABU DABHI) Lesvos- 01-Sept-09 Construction job Air Diver XI Block placing , screeding and Inspection 03-Oct-09 Client: ADPC Archirodon PROJET NAME – khlefa port ( ABU DABHI) Lesvos- 01-Jun-09 Construction job Air Diver Client: ADPC XI Block placing , Agrport placing and Inspection 01-Sept-09 PROJET NAME – khlefa port , Archirodon Construction job 01-Jan-09 Construction of quay wall and brake water. ( ABU DABHI) Akamas Air Diver 01-Mar-09 Client: ADPC Sea bad leveling. Block placing and taking measurements. PROJET NAME – khlefa port , Archirodon Construction job 25-Nov08 Construction of quay wall and brake water. ( ABU DABHI) Akamas Air Diver 31-Dec-08 Client: ADPC Sea bad leveling. Block placing and taking measurements. PROJET NAME – BOMBAY HIGH offshore Dolphin offshore Offshore Construction job (INDIA) Pipe line repairing, mud lifting and 05-Sep-08 seamak Air Diver Client: ONGC air lifting also fitting clamp inside 04-Nov-08 Mechanical joint. PROJET NAME – BOMBAY HIGH offshore Dolphin offshore Offshore Construction job (INDIA) Sea gull - Relocation of Anodes for riser clamp 17-Apr-08 Air Diver Client: ONGC 1 installation and obstruction removal ,MGR 13-May-08 on jacket and Riser ,Barge Bumper Boat Landing Riser Protector (BBBLRP) Dolphin offshore PROJET NAME – BOMBAY HIGH offshore , (INDIA) Offshore Construction job Sea gull - Under water cutting with Broco ,MGR on 15-Feb-08 Air Diver 1 jacket and Riser .Barge Bumper Boat 20-Mar-08 Landing Riser Protector (BBBLRP) , Client: ONGC Relocation of Anodes for riser clamp Date reviewed 05.11.2013 installation and obstruction removal, PROJET NAME – BOMBAY HIGH offshore Dolphin offshore Offshore Construction job (INDIA) Sea gull - MGR on jacket and Riser ,Barge Bumper 25-Dec-07 Air Diver 1 Boat Landing Riser Protector (BBBLRP) , 20-Jan-08 Relocation of Anodes for riser clamp Client: ONGC installation and obstruction removal RIL/Underwater Offshore Construction job Ocean Sub Sea hose and floating hose Oct 2006 (INDIA) Diver Ruby change Tanker mooring demooring and SBM Dec 2006 maintenance as per schedule Offshore Construction job RIL/Underwater SBM maintenance carried out Ocean Feb 2006 (INDIA) Sub Sea hose and floating hose change Diver Ruby Apr 2006 Tanker mooring demooring and SBM maintenance as per schedule RIL/Underwater Offshore Construction job Ocean Nov 2005 (INDIA) Subsea hose changing &pile chain inspection &SBMDiver Ruby Dec 2005 maintenance carried out RIL/Underwater Offshore Construction job Ocean Jul 2005 (INDIA) Diving on SBM during low& high tied hose Diver Ruby Sept 2005 configuration carried out Offshore Construction job RIL/Underwater Ocean Mar 2005 (INDIA) Subsea hose changing & pile Diver Ruby May 2005 chain inspection &SBM maintenance carried out Date reviewed 05.11.2013 Certification – Ashish Dahiya IMCA Dive Tick et Class II Commercial Diver Dive Medical (exp 16.JUN.2014) First Aid (exp. 25.06.2016) Date reviewed 05.11.2013 .