The Offices at Hingham Shipyard Is a Premier 45,000 Square Foot First

Total Page:16

File Type:pdf, Size:1020Kb

The Offices at Hingham Shipyard Is a Premier 45,000 Square Foot First The modern three-story building on The Launch’s The Offices at Hingham main street features an unparalleled array of Shipyard is a premier 45,000 base amenities: square foot first class office + Fine and casual dining + Movie theatre building in a vibrant 1.2 million + Marina + Grocery stores square foot mixed use center + Specialty retail on lovely Hingham Harbor. + Luxury homes and apartments The inspiring maritime-themed oce building presents tenants with ecient Few office spaces have the modern systems, shared business services, and ample parking. Customizable combination of location, space in a variety of configurations is available from 2,500 to 24,000 square feet. Hingham Shipyard is the vision of Samuels & Associates. It is a waterfront design, accessibility, ocean experience unmatched in New England. Development is complete on a new residential building across from The Oces. Two more residential buildings are in views and convenience of design. Two new restaurants are now open, and Trader Joe’s will open soon. Hingham Shipyard. WINTHROP CAMBRIDGE LOGAN INTERNATIONAL AIRPORT BOSTON Boston Harbor Dorchester Bay Hingham Bay Quincy Bay HULL Neponset River Black Creek William K Webb Park Hingham Harbor Town River QUINCY Bay Weymouth Fore River HINGHAM WEYMOUTH Wompatuck State Park Whitmans BRAINTREE Pond Great Pond Reservoir For more information, visit The Offices at Hingham hinghamlaunch.com/leasing or contact: Shipyard is a live/work/play Tom Kent Sean Lynch Joe Fabiano E x e c u t i v e V i c e P r e s i d e n t Vice President Associate destination rich in history +1 617 531 4224 +1 617 316 6488 +1 617 531 4228 [email protected] [email protected] [email protected] and perfect for business. THE BUILDING BUILDING SIZE 45,000 SF YEAR BUILT 2009 AVAILABLE 3rd floor: 3,769 SF RENT Negotiable Leasing: Owner: TELECOMMUNICATIONS Verizon CEILING HEIGHT 10’ – 11’ PARKING 4.0/1,000 SF One Post Oce Square, Boston, MA 02109 333 Newbury Street, Boston, MA 02115 jll.com/boston samuelsre.com.
Recommended publications
  • Boston Harbor South Watersheds 2004 Assessment Report
    Boston Harbor South Watersheds 2004 Assessment Report June 30, 2004 Prepared for: Massachusetts Executive Office of Environmental Affairs Prepared by: Neponset River Watershed Association University of Massachusetts, Urban Harbors Institute Boston Harbor Association Fore River Watershed Association Weir River Watershed Association Contents How rapidly is open space being lost?.......................................................35 Introduction ix What % of the shoreline is publicly accessible?........................................35 References for Boston Inner Harbor Watershed........................................37 Common Assessment for All Watersheds 1 Does bacterial pollution limit fishing or recreation? ...................................1 Neponset River Watershed 41 Does nutrient pollution pose a threat to aquatic life? ..................................1 Does bacterial pollution limit fishing or recreational use? ......................46 Do dissolved oxygen levels support aquatic life?........................................5 Does nutrient pollution pose a threat to aquatic life or other uses?...........48 Are there other water quality problems? ....................................................6 Do dissolved oxygen (DO) levels support aquatic life? ..........................51 Do water supply or wastewater management impact instream flows?........7 Are there other indicators that limit use of the watershed? .....................53 Roughly what percentage of the watersheds is impervious? .....................8 Do water supply,
    [Show full text]
  • Weir River Area of Critical Environmental Concern Natural Resources Inventory
    Weir River Area of Critical Environmental concern Natural Resources Inventory Massachusetts Executive Office of Environmental Affairs Massachusetts Watershed Initiative Department of Environmental Management Areas of Critical Environmental Concern (ACEC) Program August 2002 Jane Swift, Governor Bob Durand, Secretary, EOEA Peter C. Webber, Commissioner, DEM This document was prepared by Special thanks to Elizabeth Sorensen, Katie Urban Harbors Institute Lund, Jason Burtner, Karl Pastore, Margo University of Massachusetts Boston Clerkin, Straits Pond Watershed Association, 100 Morrissey Boulevard David Roach, Samantha Woods, Sally Avery, J. Boston, MA 02125 Hall, J. Lupos, B. McNamara, Ed Petrilak, and (617) 287.5570 Judith Van Hamm www.uhi.umb.edu Cover photo, Cory Riley Table Of Contents Index of Figures and 10. Land Use 37 Tables ii 11. Open Space and 1. Introduction 1 Recreation 40 12.1 World's End 40 2. Characteristics 12.2 Town of Hull 40 and Designation 5 12.3 Tufts University 41 12.4 Weir River Estuary Park 41 2.1 ACEC Background 5 2.2 Designation of ACEC 5 12. Recreation and Commercial Boating 43 3. Regional History 8 A. Hull 43 3.1 Archaeological Evaluation 7 B. Hingham 43 3.2 Local Industries 7 3.3 Straits Pond 8 13. Future Research 44 3.4 Flood History 9 4. Geology and Soils 11 Literature Cited 45 5. Watershed Appendix A - Natural Heritage Characteristics 12 Endangered Species Program 48 6. Habitats of the ACEC 14 6.1 Estuaries 14 Appendix B - Nomination and 6.2 Tidal Flats 14 Designation of the 6.3 Salt Marsh 14 Weir River ACEC 49 6.4 Shallow Marsh Meadow 15 Appendix C - World’s End Endangered 6.4 Eel Grass Beds 15 Species 58 6.5 Vernal Pools 15 7.
    [Show full text]
  • (Osmerus Mordax) Spawning Habitat in the Weymouth- Fore River
    Massachusetts Division of Marine Fisheries Technical Report TR-5 Rainbow Smelt (Osmerus mordax) Spawning Habitat in the Weymouth- Fore River Bradford C. Chase and Abigail R. Childs Massachusetts Division of Marine Fisheries Department of Fisheries, Wildlife and Environmental Law Enforcement Executive Office of Environmental Affairs Commonwealth of Massachusetts September 2001 Massachusetts Division of Marine Fisheries Technical Report TR-5 Rainbow Smelt (Osmerus mordax) Spawning Habitat in the Weymouth-Fore River Bradford C. Chase and Abigail R. Childs Massachusetts Division of Marine Fisheries Annisquam River Marine Fisheries Station 30 Emerson Ave. Gloucester, MA 01930 September 2001 Massachusetts Division of Marine Fisheries Paul Diodati, Director Department of Fisheries, Wildlife and Environmental Law Enforcement Dave Peters, Commissioner Executive Office of Environmental Affairs Bob Durand, Secretary Commonwealth of Massachusetts Jane Swift, Governor ABSTRACT The spawning habitat of anadromous rainbow smelt in the Weymouth-Fore River, within the cities of Braintree and Weymouth, was monitored during 1988-1990 to document temporal, spatial and biological characteristics of the spawning run. Smelt deposited eggs primarily in the Monatiquot River, upstream of Route 53, over a stretch of river habitat that exceeded 900 m and included over 8,000 m2 of suitable spawning substrate. Minor amounts of egg deposition were found in Smelt Brook, primarily located below the Old Colony railroad embankment where a 6 ft culvert opens to an intertidal channel. The Smelt Brook spawning habitat is degraded by exposure to chronic stormwater inputs, periodic raw sewer discharges and modified stream hydrology. Overall, the entire Weymouth-Fore River system supports one of the larger smelt runs in Massachusetts Bay, with approximately 10,000 m2 of available spawning substrate.
    [Show full text]
  • BOHA Water Resources Scoping Report
    BOSTON HARBOR ISLANDS – A NATIONAL PARK AREA, MASSACHUSETTS WATER RESOURCES SCOPING REPORT Mark D. Flora Technical Report NPS/NRWRD/NRTR-2002/300 United States Department of the Interior • National Park Service The National Park Service Water Resources Division is responsible for providing water resources management policy and guidelines, planning, technical assistance, training, and operational support to units of the national park system. Program areas include water rights, water resources planning, regulatory guidance and review, hydrology, water quality, watershed management, watershed studies, and aquatic ecology. Technical Reports The National Park Service disseminates the results of biological, physical, and social research through the Natural Resources Technical Report Series. Natural resources inventories and monitoring activities, scientific literature reviews, bibliographies, and proceedings of technical workshops and conferences are also disseminated through this series. Mention of trade names or commercial products does not constitute endorsement or recommendation for use by the National Park Service. Copies of this report are available from the following: National Park Service (970) 225-3500 Water Resources Division 1201 Oak Ridge Drive, Suite 250 Fort Collins, CO 80525 National Park Service (303) 969-2130 Technical Information Center Denver Service Center P.O. Box 25287 Denver, CO 80225-0287 ii BOSTON HARBOR ISLANDS – A NATIONAL PARK AREA MASSACHUSETTS WATER RESOURCES SCOPING REPORT Mark D. Flora1 Technical Report NPS/NRWRD/NRTR-2002/300 December, 2002 1Chief, Planning & Evaluation Branch, Water Resources Division, National Park Service, U.S. Department of the Interior, Denver, Colorado This report was accepted and the recommendations endorsed by unanimous vote of the Boston Harbor Islands Partnership on December 17, 2002.
    [Show full text]
  • Quincy Bay: Background Analysis
    State Water Survey Division SURFACE WATER SECTION AT THE Illinois Department of UNIVERSITY OF ILLINOIS Energy and Natural Resources Miscellaneous Publication 69 QUINCY BAY: BACKGROUND ANALYSIS AND A PROPOSED PLAN OF ACTION by J. Rodger Adams Champaign, Illinois October 1982 Quincy Bay: Background Analysis and a Proposed Plan of Action Introduction Quincy Bay is a complex backwater along the Mississippi River adjacent to the City of Quincy, Illinois. Hunting, fishing, and boating are common in the bay. Sediment accumulation in Quincy Bay has been a concern for many years. The change in water flow patterns and sediment deposition following the opening of a small boat access channel in the late 1960's has increased the concern. Local citizens have requested corrective action since 1975. This report presents a summary of existing data, some of which has been provided by a citizens group. The available information is not adequate to determine the best means of alleviating the sedimentation problem. Thus, this report outlines a proposal to conduct a complete study of the hydraulics and sedimentation of Quincy Bay. This study would produce recommendations to alleviate the sedimentation problem. Description of Quincy Bay On most maps (USGS, 1971; Corps of Engineers, 1978) Quincy Bay is a 3-mile long by 400 to 2000 ft wide body of water extending north along the bluff line in Illinois from mile 327 above Cairo, Illinois on the Upper Mississippi River. The City of Quincy is located near the bay outlet. An associated complex of interconnected channels and small bays lies to the west of Quincy Bay proper.
    [Show full text]
  • Hingham Bay Racing 2021 Wednesday Night Racing
    Hingham Bay Racing 2021 Wednesday Night Racing Fran Davis Spring Series | Sullivan Summer Series | Flashlight Fall Series SAILING INSTRUCTIONS Hingham Bay Racing, Inc. (HBR), the Organizing Authority of HBR Wednesday Night Racing (WNR), will host three series of races throughout the racing season. These races will be governed by the Mass Bay Sailing Association (MBSA) General Sailing Instructions (GSI), except as amended by these Event Sailing Instructions (ESI). Eligibility: Open to all HBR Fleet Members with a valid 2021 New England ORR-Ez certificate. HBR Fleet Membership information is available at www.hinghambayracing.org/membership New England ORR-Ez Certificates are available at www.regattaman.com/certificate_page.php Entry: Registration: All Fleet Members are required to register for each WNR Series (Spring / Summer / Fall) online at www.regattaman.com prior to the commencement of the series. Check-in: Each week, prior to the first warning signal, registered boats must check-in online, or verbally, with the Race Committee (RC) boat. At check-in, skippers must declare to the RC their boat name and their intention to sail under their Racing Rating (Flying Spinnaker) or Cruising Rating (Flying Jib & Main Only). This declaration cannot be altered after the first warning signal. Fee: Each WNR series event fee is included with Fleet Members HBR Season Pass. Notice to Competitors & Signals Made Ashore: Notices will be made via email to Fleet Members at their registered email address and/or announced via VHF channel 68. Please monitor your VHF as courses will be announced over the radio as well as posted on the RC boat.
    [Show full text]
  • Ocm17241103-1896.Pdf (5.445Mb)
    rH*« »oo«i->t>fa •« A »iri or ok. w Digitized by tine Internet Arciiive in 2011 witii funding from Boston Library Consortium IVIember Libraries littp://www.arcliive.org/details/annualreportofbo1896boar : PUBLIC DOCUMENT .... .... No. 11. ANNUAL REPORT Board of Harboe and Land Commissioners Foe the Yeab 1896. BOSTON WRIGHT & POTTER PRINTING CO., STATE PRINTERS, 18 Post Office Square. 1897. ,: ,: /\ I'l C0mm0ixixr^aIt{? of P^assar^s^tts* REPORT To the Honorable the Senate and House of Representatives of the Common- wealth of Massachusetts. The Board of Harbor and Land Commissioners, pursuant to the provisions of law, respectfully submits its annual re- port for the year 1896, covering a period of twelve months, from Nov. 30, 1895. Hearings. The Board has held one hundred and sixty-six formal ses- sions during the year, at which one hundred and eighty-three hearings were given. One hundred and twenty-one petitions were received for licenses to build and maintain structures, and for privileges in tide waters, great ponds and the Con- necticut River ; of these, one hundred and fifteen were granted, four withdrawn and two denied. On June 5, 1896, a hearing was given at Buzzards Bay on the petition of the town of Wareham that the boundary line on tide water between the towns of Wareham and Bourne at the highway bridge across Cohasset Narrows, as defined by the Board under chapter 196 of the Acts of 1881, be marked on said bridge. On June 20, 1896, a hearing was given in Nantucket on the petition of the local board of health for license to fill a dock.
    [Show full text]
  • Massachusetts Coastal Waters
    CIRCULATION AND CONTAMINANT TRANSPORT IN MASSACHUSETTS COASTAL WATERS: A SUMMARY OF ACHIEVEMENTS AND FUTURE PLANS work conducted under a JOINT FUNDING AGREEMENT between THE MASSACHUSETTS WATER RESOURCES AUTHORITY and THE UNITED STATES DEPARTMENT OF INTERIOR U. S. GEOLOGICAL SURVEY By M.H. Bothner, M. Buchholtz ten Brink, Bradford Butman, H. J. Knebel, F.T. Manheim, and R. P. Signell U.S. Geological Survey, Woods Hole, MA U.S. Geological Survey Open File Report # 94-649 TABLE OF CONTENTS Executive Summary ............................................ 3 Summary of USGS Program Components: Long-term Current Observations. ............................ 9 Geochemical Studies ..................................... 13 Sea-floor Mapping ....................................... 18 Circulation Modeling .................................... 23 Contaminated-Sediment Database ........................... 27 References cited in this summary ................................ 35 Publications resulting from the MWRA-USGS Joint Funding Agreement and related USGS programs in Boston Harbor and Massachusetts Bay 1989-1994 .................. 36 This report has not been reviewed for conformity with USGS editorial standards. Any use of trade, product, or firm names is for descriptive purposes only and does not imply endorsement by the U.S. Government. EXECUTIVE SUMMARY The USGS is developing a conceptual model for the transport and accumulation of sediments and associated contaminants in the Massachusetts Bays. Our approach is multidisciplinary. Each of five discipline
    [Show full text]
  • Quincy Homestead NHL Nomination
    NATIONAL HISTORIC LANDMARK NOMINATION NPS Form 10-900 USDI/NPS NRHP Registration Form (Rev. 8-86) OMB No. 1024-0018 QUINCY HOMESTEAD Page 1 United States Department of the Interior, National Park Service National Register of Historic Places Registration Form 1. NAME OF PROPERTY Historic Name: Quincy Homestead Other Name/Site Number: Dorothy Quincy House 2. LOCATION Street & Number: 34 Butler Road Not for publication: City/Town: Quincy Vicinity: State: Massachusetts County: Norfolk Code: 025 Zip Code: 02169-2212 3. CLASSIFICATION Ownership of Property Category of Property Private: Building(s): X Public-Local: District: Public-State: X Site: Public-Federal: Structure: Object: Number of Resources within Property Contributing Noncontributing 1 1 buildings sites structures objects 1 1 Total Number of Contributing Resources Previously Listed in the National Register: 1 Name of Related Multiple Property Listing: Quincy Multiple Resource Area (1991) NPS Form 10-900 USDI/NPS NRHP Registration Form (Rev. 8-86) OMB No. 1024-0018 QUINCY HOMESTEAD Page 2 United States Department of the Interior, National Park Service National Register of Historic Places Registration Form 4. STATE/FEDERAL AGENCY CERTIFICATION As the designated authority under the National Historic Preservation Act of 1966, as amended, I hereby certify that this ____ nomination ____ request for determination of eligibility meets the documentation standards for registering properties in the National Register of Historic Places and meets the procedural and professional requirements set forth in 36 CFR Part 60. In my opinion, the property ____ meets ____ does not meet the National Register Criteria. Signature of Certifying Official Date State or Federal Agency and Bureau In my opinion, the property ____ meets ____ does not meet the National Register criteria.
    [Show full text]
  • Annual Report of the Board of Harbor
    Nil ill U I I III iii!!ili!!iill!IIHIIililllll!!il!IJilti! I !in liiiliy I; ' ini!H!;ihiitiii;iituii!iiiiii!'iii(rii i!ii: . s-i i ji n ijl! ii!IHi!iiii!llliilliilJiiillillllll!ill!!tlliiiii!iii!ii)iliiiiiiitilitiit i r n COLLECTiON m 1 2 isso 'niyersity of Massachusetts Deposifory Copy : PUBLIC DOCUMENT .... .... No. U. ANNUAL EEPOKT Board of Harbor and Land Commissioners For the Year 189 7. BOSTON WRIGHT & POTTER PRINTING CO., STATE PRINTERS, 18 Post Office Square. 1898. Digitized by the Internet Archive in 2011 with funding from Boston Library Consortium IVIember Libraries http://www.archive.org/details/annualreportofbo1897boar Commonlwalt^ ai P^assat^usftts. REPORT. To the Honorable the Seriate and House of Representatives of the Common- wealth of Massachusetts. The Board of Harbor and Land Commissioners, pursuant to the provisions of law, respectfully submits its annual re- port for the year 1897, covering a period of twelve months, from Nov. 30, 1896. Every year brings an access of business of a character which needs the personal attention of the commissioners. Every new subject matter over which the Board is given jurisdiction, or with reference to which an examination and report is required, brings with it a multitude of lesser re- quirements, such as the visitation of localities, conferences with individuals, examination of documents and answers to inquiries from others, which take up time. In systematizing the business of the office, the Board has found it convenient to have a return day, on which parties petitioning may come in and be heard, either in person, or, as often happens, by counsel, whereby the hearings are now and again extended by continuances, in which questions of law and fact are presented and argued, and have to be finally determined by the Board.
    [Show full text]
  • TMDL Report for Boston Harbor, Weymouth-Weir, and Mystic
    Final Pathogen TMDL for the Boston Harbor, Weymouth-Weir, and Mystic Watersheds October 2018 (Control Number CN 157.1) Boston Harbor Watershed Prepared as a cooperative effort by: Massachusetts DEP USEPA New England Region 1 1 Winter Street 1 Congress Street, Suite 1100 Boston, Massachusetts 02108 Boston, Massachusetts 02114 ENSR International (now AECOM) 2 Technology Park Drive, Westford, MA 01886 NOTICE OF AVAILABILITY Limited copies of this report are available at no cost by written request to: Massachusetts Department of Environmental Protection (MassDEP) Division of Watershed Management 8 New Bond Street Worcester, Massachusetts 01606 This report is also available on MassDEP’s web page http://www.mass.gov/eea/agencies/massdep/water/watersheds/total-maximum-daily-loads- tmdls.html. A complete list of reports published since 1963 is updated annually and printed in July. This list, titled “Publications of the Massachusetts Division of Watershed Management (DWM) – Watershed Planning Program, 1963-(current year)”, is also available by contacting Robin Murphy at [email protected] or by writing to the DWM at the address above. DISCLAIMER References to trade names, commercial products, manufacturers, or distributors in this report constituted neither endorsement nor recommendations by the Division of Watershed Management for use. Acknowledgement This report was developed by ENSR through a partnership with Resource Triangle Institute (RTI) contracting with the United States Environmental Protection Agency (EPA) and the Massachusetts Department of Environmental Protection Agency under the National Watershed Protection Program. The report follows the same format and methodology for previously approved bacteria TMDLs (Charles, Cape Cod, Buzzards Bay, North Coastal, and South Coastal).
    [Show full text]
  • “Natural” Gas Compressor Station in Weymouth, Massachusetts
    A Comprehensive Assessment of the Potential Human Health Impacts of a Proposed “Natural” Gas Compressor Station in Weymouth, Massachusetts Released September 24, 2019 A report by: Regina LaRocque, M.D., M.P.H. Board Member, Greater Boston Physicians for Social Responsibility Associate Professor of Medicine, Massachusetts General Hospital/Harvard Medical School Brita Lundberg, M.D. Board Member, Greater Boston Physicians for Social Responsibility Member, Massachusetts Medical Society Environmental and Occupational Health Committee Zoe Petropoulos, PhD candidate Boston University School of Public Health on behalf of Greater Boston Physicians for Social Responsibility Contact: Anna Baker, M.P.H. Executive Director, Greater Boston Physicians for Social Responsibility [email protected] (617) 868-3003 Regina LaRocque, M.D., M.P.H. Board, Greater Boston Physicians for Social Responsibility (617) 519-6705 1" " EXECUTIVE SUMMARY Greater Boston Physicians for Social Responsibility (GB PSR) is a non-profit organization of physicians, health professionals and public health experts. In this report, we provide a quantitative and qualitative assessment of the human health impacts of a proposed 7,700-horsepower natural gas compressor station that Spectra Energy proposes to build in Weymouth, Massachusetts. This report focuses on three areas of concern that were inadequately assessed by the Commonwealth’s Health Impact Assessment (HIA) and by the Massachusetts Department of Environmental Protection (MassDEP) permitting process: I.! Health Concerns Related to Existing Soil and Groundwater Contamination at the Proposed Site Spectra Energy’s soil and groundwater testing at the proposed site demonstrates high levels of heavy metal contamination, particularly arsenic. Exposure to these heavy metals is associated with cancer, cardiovascular disease, diabetes, and impaired neurologic development.
    [Show full text]