8Th DIS Baltic Arbitration Days 2019

Total Page:16

File Type:pdf, Size:1020Kb

8Th DIS Baltic Arbitration Days 2019 8th DIS BALTIC ARBITRATION DAYS 2019 ARBITRATION IN CONSTRUCTION AND PUBLIC PROCUREMENT DISPUTES/ CURRENT EVENTS REGARDING BREXIT/ EU AND Thursday, 13 – INVESTMENT ARBITRATION Friday, 14 June 2019 FOCUS COUNTRIES: EstoniA, FINLAND, Riga, Latvia RUSSIAN FEDERATION AND UKRAINE VENUE: Stockholm School of Economics in Riga Strelnieku iela 4a, Riga, Latvia CONFERENCE PARTNERS: GOLD SPONSOR: DINNER SPONSOR: AMBER SPONSORS: MEDIA PARTNERS: CIS Arbitration Forum Russia- and CIS-related International Dispute Resolution ERS TN R PA A EDI M OGEMID CONFERENCE PROGRAM, DAY 1 – Thursday, 13 June 2019 RIGA CITY TOUR 10:00 – 13:00 Meeting point: in front of the Stockholm School of Economics in Riga, Strelnieku iela 4A, Riga 14:00 – 15:00 REGISTRATION OPENING HES 15:00 – 15:15 Korinna von Trotha, DIS, Berlin C Chair Day 1: Dr Galina Zukova, Bélot Malan & Associés, Paris, EE Riga Graduate School of Law, Riga P 15:15 – 15:50 Key note speaker: Heidi Merikalla-Teir, Merilampi, Helsinki E S 15:50 – 16:20 COFFEE BREAK Key note speaker: Prof Jörg Risse, Baker & McKenzie, 16:20 – 16:55 Frankfurt am Main YNOT 17:00 CLOSING REMARKS by the Chair KE 17:15 – 18:45 Reception sponsored by Klauberg BALTICS, Alberta street 13 End of Day 1 BUS TRANSFER TO THE DINNER Meeting point: in front of the Stockholm School of Economics in Riga 18:45 – 19:15 Buses leave from the front of the Stockholm School of Economics in Riga at 18:45 and at 19:15 20:00 – 23:00 DINNER Restaurant 36.line, Jurmala BUS TRANSFER BACK TO RIGA 22:30 – 23:00 Return buses leave from the restaurant at 22:30 and at 23:00 – taxis are available CONFERENCE PROGRAM, DAY 2 – Friday, 14 June 2019 Chair Day 2: Theis Klauberg, Klauberg BALTICS, Riga 9:00 – 10:30 PANEL I: Arbitration in Public Procurement Disputes Moderator: Santtu Turunen, The Finland Arbitration Institute, Helsinki Gediminas Dominas, Walless, Vilnius Pontus Ewerlöf, Hannes Snellman, Stockholm Speakers: Dr. Justus Jansen, GSK STOCKMANN, Hamburg Kristiina Rebane, Klauberg BALTICS, Tallinn 10:30 – 11:00 BREAK 11:00 – 12:30 PANEL II: Construction Moderator: Maximilian Bülau, Hengeler Mueller, Frankfurt am Main Christopher Boog, Schellenberg Wittmer, Zurich S Gideon Weinbaum, Epstein Rosenblum Maoz, Tel Aviv L Speakers: Rimma Malinskaya, Bryan Cave Leighton Paisner, Moscow E Uwe Uusitalo, Castrén & Snellman, Helsinki Dr Valentina Wong, Wolf Theiss, Vienna 12:30 to 13:30 LUNCH T PAN T 13:30 – 15:00 PANEL III: Investment Arbitration ER , Squire Patton Boggs, Berlin P Moderator: Dr Eveli Lume Andrei Solin, Shearman & Sterling, Paris EX Diana Tsutieva, Foley Hoag, Washington, D.C. Speakers: Karl Pörnbacher, Hogan Lovells, Munich Olga Hamama, Freshfields Bruckhaus Deringer, Frankfurt am Main Dr Richard Happ, Luther, Hamburg 15:00 – 15:30 COFFEE BREAK 15:30 – 17:00 PANEL IV: BREXIT and Arbitration Moderator: Richard Waugh, Fieldfisher, Birmingham Brandon Malone, Brandon Malone & Company, Edinburgh Gustaf Möller, Krogerus, Helsinki Speakers: Sophie Weber, One Essex Court, London Dr Ilze Dubava, State Chancellery, Riga 17:00 CLOSING REMARKS by the Chair End of Day 2 WALK OR TAKE THE BUS TO THE DINNER 18:30 Meeting point: in front of the Stockholm School of Economics in Riga DINNER 19:00 – 23:00 Riverboat CONFERENCE PROGRAM, DAY 3 – Saturday, 15 June 2019 POST CONFERENCE GET-TOGETHER AT THE JURMALA BEACH RESORT 16:00 Davja iela 67, Jurmala (close to the train station Vaivari, 45 min from Riga Central Station)* *please note that transport will not be provided to the venue SPOUSE’S PROGRAM 10:00 – 18:00 DAY 1 – Thursday, 13 June 2019 Meet in front of the Stockholm School of Economics in Riga, Strelnieku iela 4A, Riga Riga City Tour, Riga Congress Center, Bastion Hill, Riga Cathedral, 10:00 – 13:00 House of the Blackheads Car Tour: Riga Castle, National Library, Daugava River sightseeing, 14:00 – 17:00 Riga Central Market and Gertrudes Street 17:15 – 18:45 Reception sponsored by Klauberg BALTICS, Alberta street 13 DINNER Restaurant 36.line, Jurmala 20:00 – 23:00 Buses leave from the front of the Stockholm School of Economics in Riga at 18:45 and 19:15. Return buses leave the restaurant at 22:30 and at 23:00 – taxis are available 9:00 – 13:00 DAY 2 – Friday, 14 June 2019 9:00 – 10:00 Riga Art Nouveau district and Art Nouveau museum 10:00 – 11:00 Latvian National Museum of Art 11:00 – 12:00 Museum of Decorative Arts and Design 12:00 – 13:00 LUNCH 13:00 – 18:00 Free time DINNER 19:00 – 23:00 Riverboat DAY 3 – Saturday, 15 June 2019 POST CONFERENCE GET-TOGETHER AT THE JURMALA BEACH RESORT Davja iela 67, Jurmala (close to the train station Vaivari, 45 min from 16:00 Riga Central Station)* *please note that transport will not be provided to the venue Date: 13 – 14 June 2019 Stockholm School of Economics in Riga, Venue: Strelnieku iela 4a, Riga LV-1010, Latvia Dispute resolution practitioners, arbitrators, Who should attend: attorneys, academics, students and business executives Language: English Registration fee: Early bird fee received by 15 April 2019: Regular fee received after 15 April 2019: Participant’s fee: EUR 449 + VAT 21% Participant’s fee: EUR 695 + VAT 21% Spouse’s fee: EUR 150 + VAT 21% Spouse’s fee: EUR 150 + VAT 21% Dinner’s fee on Thursday (optional): Dinner’s fee on Thursday (optional): EUR 125 + VAT 21% EUR 125 + VAT 21% Registration fee for conference participants includes: all Conference sessions; Riga City Tour on Thursday; lunches on Thursday and Friday, as well as dinner on Friday, except where indi- cated otherwise. Registration fee for spouses includes: Riga City Tour; Riga Art Tour; lunches on Thursday and Friday, as well as dinner on Friday. State Court judges, as well as lecturers and students from State universities from all countries, participate in sessions for free. Prior registration required. Participation at the dinners is not included to the complimentary ticket and is charged separately for the following fees: 13 June 2019, Restaurant 36.line, Jurmala: EUR 50 Travel stipends available upon request for students from the CIS, Ukraine, Georgia and Turkmenistan. How to register: To register, please fill in the registration form https://goo.gl/forms/hK2JsQsrHqXoCMcx2 (or by visiting our homepage http://www.balticarbitration.com/en/) and notify us by e-mail at [email protected] when the registration form has been completed. Should any questions arise regarding registration, please contact us by e-mail at [email protected]. Cancellation of registration: For cancellations received on or before 14 May 2019, 50% of the participation fee will be refunded. For cancellations received after 14 May 2019, 25% of the participation fee will be refunded. Registration may be transferred to another person if we are informed in writing at [email protected] before the event. The organizers reserve the right to cancel the conference or to change the content and time schedule of the conference program and social events. If the event is cancelled, delegates will receive a full refund. Travel and accommodation: Participants are responsible for all travel arrangements* and hotel bookings. Rooms with preferential rates are available for conference participants and their partners. These will become available upon notifying the respective hotel about your participation in the DIS Baltic Arbitration Days and mentioning the respective promotional code. *AirBaltic and Lufthansa operate direct flights to Riga from all over Europe and from many other destinations. We recommend taking Baltic Taxi or Red Cab from the Airport to Riga City Centre.. Conference participants’ preferential Hotels Promotional code room rates Studio Suite EUR 173 DIS Baltic Arbitration Hotel Bergs***** Apartment Suite EUR 249 http://www.hotelbergs.lv/en/ Days Loft Suite EUR 249 Standard room EUR 42* Twin room EUR 52* Art Hotel Laine *** DIS BALTIC http://www.laine.lv/ *Price offers are valid until 1 May 2019. Afterwards only according to availability Clarion Collection Single room EUR 89 Hotel Valdemars *** Double room EUR 99 DIS BALTIC http://clarion-collection- valdemars.besthotelsriga.com/en/ Standard Single Lielupe Hotel by Semarah**** EUR 93 DIS BALTIC https://lielupe.semarahhotels.com Double Twin Please make reservations directly through hotels’ web-pages. Please note that a VISA is necessary to enter Latvia from many non-EU countries. We will support VISA applications only after receipt of the registration form and payment of the registration fee..
Recommended publications
  • (CEF) 2019 TRANSPORT MAP CALL Proposal for the Selection of Projects
    Connecting Europe Facility (CEF) 2019 TRANSPORT MAP CALL Proposal for the selection of projects July 2020 Innovation and Networks Executive Agency THE PROJECT DESCRIPTIONS IN THIS PUBLICATION ARE AS SUPPLIED BY APPLICANTS IN THE TENTEC PROPOSAL SUBMIS- SION SYSTEM. THE INNOVATION AND NETWORKS EXECUTIVE AGENCY CANNOT BE HELD RESPONSIBLE FOR ANY ISSUE ARISING FROM SAID DESCRIPTIONS. The Innovation and Networks Executive Agency is not liable for any consequence from the reuse of this publication. Brussels, Innovation and Networks Executive Agency (INEA), 2020 © European Union, 2020 Reuse is authorised provided the source is acknowledged. Distorting the original meaning or message of this document is not allowed. The reuse policy of European Commission documents is regulated by Decision 2011/833/EU (OJ L 330, 14.12.2011, p. 39). For any use or reproduction of photos and other material that is not under the copyright of the European Union, permission must be sought directly from the copyright holders. PDF ISBN 978-92-9208-086-0 doi:10.2840/16208 EF-02-20-472-EN-N Page 2 / 168 Table of Contents Commonly used abbreviations ......................................................................................................................................................................................................................... 7 Introduction ................................................................................................................................................................................................................................................................
    [Show full text]
  • Rail Baltica
    Rail Baltica Status: In implementation Rail Baltica Published: 21.07.2020. Updated: 17.08.2021. Rail Baltica Global project is an initiative of great significance and added value both in the Baltic Sea region and Europe as a whole. Rail Baltica is an essential part of the European standard 1435 mm gauge Trans - European Transport Network (TEN-T )North Sea - Baltic Corridor – a new electrified high speed double standard gauge railway line equipped with European Railway Traffic Management System ERTMS connecting Tallinn with the Lithuanian - Polish border and further up to Warsaw via a modernized railway line corresponding to the technical requirements of Rail Baltica. It will link Europe’s largest ports of Hamburg, Rotterdam and Antwerp with the Baltics. Rail Baltica - part of TEN-T North Sea-Baltic Corridor Completion of the whole TEN-T network is set for 2030. Rail Baltica as a vital part of it targets completion within the next 2021- 2027 Multiannual Financial Framework. Rail Baltica project the largest infrastructure project in the Baltic region over the last 100 years for both passenger and freight traffic length: 870 km (~265 km in Latvia) max speed: 249 km/h (passenger), 120 km/h (freight) project is implemented in parallel in Estonia, Latvia and Lithuania financed 81-85% by EU, Connecting Europe Facility instrument and co-financed by the Baltic countries History Rail Baltica project is sometimes described as a symbolic return of the Baltic countries into Europe – up until WWII the Baltic countries were already connected to other European capitals by a 1435 mm gauge railway line while since the middle of the 20th century the Baltic countries have been mainly linked to the East-West railway axis using the Russian 1520 mm gauge.
    [Show full text]
  • UNESCO and Greenways by Bike. Trip Ideas for Independent Travellers
    UNESCO and greenways by bike. Trip ideas for independent travellers www.greenwaysheritage.org DISCLAIMER: “The content of this document represents the views of the author only and it is his/her sole responsibility: it cannot be considered to reflect the views of the Executive Agency of Small and Medium-sized Enterprises or any other body of the European Union. The European Commission and the Agency do not accept any responsibility for the use that may be made of the information it contains” This document is part of the Greenways Heritage project, co-funded by the EU COSME programme. Presented in a basic working edition, in PDF format, the document has been prepared by the project partner responsible for the deliverable for the purpose of communicating the project results to a broader audience. Your efforts to ensure the maximum dissemination of the document are therefore greatly appreciated. Copyright: This document may be freely distributed and its contents reprinted, provided no fee is charged and the source is correctly attributed to the Greenways Heritage project. Acronym GREENWAYS HERITAGE. Title: Development and promotion of a transnational cultural tourism product linked to greenways and UNESCO cultural sites. Action Title: "SUPPORTING THE PROMOTION AND DEVELOPMENT OF TRANSNATIONAL THEMATIC TOURISM PRODUCTS LINKED TO CULTURAL AND CREATIVE INDUSTRIES" COSME Work Programme [2017] Lead partner/coordinator: European Greenways Association (EGWA) [email protected] www.aevv-egwa.org Partners: Fundación de los Ferrocarriles Españoles (Spain) Università degli Studi di Milano (Italy) Latvijas Zalo Celu Asociacija (Latvia) Provincie Antwerp (Belgium) Turismo Vivencial (Spain) Stad Mechelen (Belgium) Comunidade Intermunicipal do AVE (Portugal) www.greenwaysheritage.org Greenways and UNESCO Heritage in Europe: The high potential of their joint promotion.
    [Show full text]
  • RB RAIL AS Rail Baltica Project the TRANS-NATIONAL GATEWAY CONNECTING the BALTICS and EUROPE
    RB RAIL AS Rail Baltica Project THE TRANS-NATIONAL GATEWAY CONNECTING THE BALTICS AND EUROPE www.railbaltica.org RB RAIL AS- Rail Baltica Project THE TRANS-NATIONAL GATEWAY CONNECTING THE BALTICS AND EUROPE Rail Baltica is a much needed European gate railway and an economic corridor of high importance to the European Union. RESEARCH BY Joseph Philips 2 [ MAY 2020 ] BUSINESS EXCELLENCE BUSINESS EXCELLENCE [ MAY 2020 ] 3 RB RAIL AS - RAIL BALTICA PROJECT ail Baltica is a much needed European estimated total cost is EUR 5.8 billion and of gate railway and an economic corridor this, the EU is expected to contribute around R of high importance to the European 85% (or EUR 4.6 billion). The remaining EUR 1.2 Union. When completed in 2026, it will billion will be provided by the Baltic countries’ pass through Estonia, Latvia and Lithuania, national budgets. Construction began in 2019 connecting Finland in the north with the rest and EUR 800 million has already been made of Europe in a way that it has never been available to ensure that the project runs possible before: for the first time, all the according to its schedule. largest Baltic cities, seaports and airports will To formalize the arrangement, a joint be connected through a continuous rail link. venture (“RB Rail AS”) exists between the This is what the European Union calls ‘a three Baltic States, which each holds a third European value-added project’ meaning of the shares in the venture. This is not just that it ticks boxes in areas like removing a a commercial partnership however: All three transportation bottleneck, bridges a missing countries stand to become more integrated link, utilizes innovation and digitalization, in a number of ways when the project is promotes the EU single market and equal delivered - through connecting regions, competition, reduces CO2 emissions and fostering business relations, technological above all, increases the safety of EU citizens.
    [Show full text]
  • Book 5 Implementation Plan Update 2020
    Photo: Lithuanian Railways Infrastructure jj Book 5 Implementation Plan update 2020 1 Version Control Version number Chapter changed Changes Version for publication (12/10/2020) 2 Table of contents 1.Introduction ......................................................................................................................................... 5 2. Corridor Description ............................................................................................................................ 6 2.1 Key Parameters of Corridor Lines ............................................................................................... 14 2.2 Corridor Terminals ...................................................................................................................... 22 2.3 Bottlenecks .................................................................................................................................. 23 2.4 RFC Governance .......................................................................................................................... 23 3. Transport Market Study .................................................................................................................... 24 3.1 Introduction ................................................................................................................................ 24 3.2 Catchment area of the North Sea-Baltic Rail Freight Corridor.................................................... 25 3.3 Corridor alignment: existing alignment and planned and proposed
    [Show full text]
  • Rail Baltica Final Report Executive Summary
    Transportation May 2011 Rail Baltica Final Report Executive Summary Prepared by: ............................................................. Checked by: ........................................................................ P Constable A Kakulis Deputy Project Manager Local Project Coordinator Approved by: ............................................................. M Elton Project Manager Rail Baltica Final Report Rev No Comments Checked by Approved Date by 1 Final Report v2 AK PC 31/05/11 Saxon House, 27 Duke Street, Chelmsford, Essex, CM1 1HT Telephone: 01245 771200 Website: http://www.aecom.com Job No Reference Date Created May 2011 This document has been prepared by AECOM Limited for the sole use of our client (the “Client”) and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM Limited and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM Limited, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM Limited. c:\backup\my documents\documents\aecom\aecom lv\projects\rail baltica\project administration\final report\submittal v2\executive summary\rail_baltica_final_report_executive_summary_31_05_11 final v2.doc Table of Contents 1.0 INTRODUCTION ..................................................................................................................................................
    [Show full text]
  • Ministry of Transport Republic of Latvia Mobility Plan and Action Program for Riga and Pieriga SEA Report
    Ministry of Transport Republic of Latvia Mobility Plan and Action Program for Riga and Pieriga SEA Report Mobility Plan Riga and Pieriga Tornu iela 4, III C, office no. 203 Riga, LV-1050 Latvia Phone: +371 7 223 144 Fax: +371 7 223 830 INDEX P. ABBREVIATIONS EXECUTIVE SUMMARY 1. INTRODUCTION 1 1.1. Framework 1 1.2. Project background 1 1.3. Objectives of the RPMP 2 1.4. Strategic Environmental Assessment 3 1.5. SEA Scoping 5 1.6. Consultation meetings 5 1.7. Relation SEA and RPMP 6 1.8. Contents of the report 6 2. LEGISLATIVE FRAMEWORK 7 2.1. SEA Directive 7 2.2. Other EU regulations 8 2.3. Other international conventions 11 2.4. Latvian regulations 11 2.4.1. SEA regulations 11 2.4.2. Other relevant Latvian regulations 14 2.4.3. Latvian transport development policy documents 16 3. THE CURRENT STATE OF THE ENVIRONMENT IN RIGA AND PIERIGA 17 3.1. Introduction 17 3.2. About Riga and Pieriga 17 3.3. Climate, air, water, soil and the landscape 18 3.3.1. Climate 18 3.3.2. Air 19 3.3.3. Noise 25 3.3.4. Water 30 3.3.5. Landscape and soil 30 3.4. Flora and fauna 31 3.4.1. Biological diversity 31 3.4.2. Special protected areas 31 3.5. Cultural heritage 32 4. ANALYSIS OF CURRENT MOBILITY IN RIGA AND PIERIGA 33 4.1. The study area 33 4.2. Socio-economic characteristics 35 4.3. The policy framework 37 4.4.
    [Show full text]
  • UIC Enews Online Version by Clicking on a Link Enabling Them To
    Nr 200 - 15 September 2010 Nr 200 of UIC e-News Long live UIC e-News: the newsletter dedicated to its 200 members and 2000 readers hits its 200th issue! UIC is pleased to send you herewith the 200th issue of its in-house electronic newsletter UIC e-News, released each week – and sometimes more frequently at busier periods in the railway calendar – to over 2000 contacts across the world including rail company and business unit leaders and institutional partners. I can but delight in the ongoing development of this efficient, fast and cost-effective source of information and its ever-expanding readership. Though not totally comprehensive given the broad range of activities carried out or coordinated by UIC, the UIC e-News electronic newsletter helps turn the spotlight on the main areas of cooperation, project progress and the results achieved, not to mention the staff who are lifeblood of the association. Over 1500 articles have been released to date on one or another of these aspects. For our members the newsletter is also a means for them to communicate their most important achievements to the international railway community as a whole. Each and every one of the team at UIC tasked with producing this newsletter, in close collaboration with the technical experts, joins me in thanking you for your loyalty, and we hope you enjoy reading this 200th issue. Jean-Pierre Loubinoux, UIC Director General 1 Nr 200 of UIC e-News UIC e-News – your opinion matters to us! In January 2010, the cover design of UIC e-News was adapted to incorporate UIC’s new visual identity and since April, a series of improvements has been made, making it possible for readers to consult the UIC eNews online version by clicking on a link enabling them to: Navigate more easily with “clickable” links Zoom in on photos and illustrations Have a consistently updated version of the newsletter (taking into account any errors without the newsletter being sent back to you) Other advantages and functions of this online version will be available shortly (in particular a clickable contents page).
    [Show full text]
  • Bread Baking Workshop and Country Life in the Country House “Caunites”
    GENERAL INFO: Package Type: Day tour Season: January - December For whom: for individual (min. 2pers.) or groups (min 8. - max.15) Package includes: bread baking workshop + lunch Duration of the package (excl.transportation): 2.5 h Type of transport: Public transport (train) or tourist bus Distance from Riga: 40km VIDEO: http://galerija.celotajs.lv/lv_LV/f/Events/2017/170413_JPN_FAM/Japani/11_Japani_dazi_video (several clips in JPN language) Bread baking workshop and country life in the country house “Caunites” Bread baking is one of the most honoured traditional skills in Latvia as bread has always been one of the most important staple foods for Latvians. “Caunites” is a country house that keeps Latvian traditions and shows them to visitors. The hosts master many of traditional skills in handicraft, music, making food, and they offer specialised excursion and workshop programs to groups and individuals. The house is designed and decorated in traditional Latvian style and carries authentic ambience while having modern facilities. Bread baking is the most popular programme. Under guidance of the hostess, visitors bake their own loaf of sweet-and-sour bread in a wood-fired bread oven. Traditionally in Latvian families, it was one of the main duties of the mistress of the house, to bake a week’s supply of bread for the whole family every Saturday morning. Everyone was proud of her own best recipe and passed it down to her daughters and granddaughters through generations. There are many traditional beliefs, sayings and riddles linked with bread in Latvian folklore. Today, there is great interest in old recipes, bread baking methods and use of ecological ingredients as many families go for healthy lifestyle.
    [Show full text]
  • Strategy Meeting for PO3 a More Connected Europe by Enhancing Mobility and Regional ICT Connectivity
    Strategy meeting for PO2 and PO3 13.03.2020. Riga AGENDA 1. ICT infrastructure 2. Mobility 3. Connectivity 2 PO2 investment Railway EMMISIONS MOBILITY Multimodal Bicycle Public transport centres TEN-T NETWORK CONNECTIVITY Roads PO3 investment PO3 digitalisation as enabler Investment interventions Digitalisation (PO3) Next generation network in rural areas Broadband ViaBaltica 5G Last mile connections Rail Baltica electronic communications Environmental actions, multimodality (PO2) Railway electification Rolling stock P&R Environmentally friendly public transport Transport infrastructure (PO3) Railway State main and regional roads Riga city as TEN-T urban node Sea ports Connecting National centres/ Regional centres 4 AGENDA 1. ICT infrastructure 2. Mobility 3. Connectivity 5 Synergy or dependency? Electronic communication infrastructure serves as an enabler for development of digital transformation and lifestyle 6 Emphasis for next planning period: Connectivity targets set by EU by 2025: • all schools, transport hubs and main providers of public services as well as digitally intensive enterprises should have access to internet connections with download/upload speeds of 1 Gbps; • all households should have access to networks offering a download speed of at least 100 Mbps, which can be upgraded to 1 Gigabit; • all urban areas as well as major roads and railways should have uninterrupted 5G wireless broadband coverage; Reducing digital divide between urban and rural areas; Development of neutral 5G infrastructure Cybersecurity 7 DESI index – one of priorities in National development plan for 2021- 2027 National development plan for 2021-2027 sets out the target to step up from 17-th place to 13-th place in DESI index rankings. National broadband plan for 2021 – 2027 will cover the Connectivity indicator of the DESI index Action «Technological environment and services» National broadband • [294] Broadband electronic plan communications infrastructure in line with EU connectivity objectives.
    [Show full text]
  • Rail Baltica Implementation in Latvia October 2017 2
    Rail Baltica Implementation in Latvia October 2017 2 Agnis Driksna Director, Development and Cooperation Department Agnis Driksna works in EDZL from 2016 From 2014 Rail Baltica project manager at the Ministry of Transport of the Republic of Latvia Establishment of Rail Baltica joint venture RB Rail CEF 1 and CEF 2 applications, Grant agreement Strategic planning and cooperation 2 DEVELOPMENT OF THE PROJECT IMPLEMENTATION Inter-beneficiary Two CEF Grant Agreement signed Intergovernmental Global project CBA Agreements signed Contracting Scheme Agreement signed completed CEF3 signature pending Agreement signed 2015/2016/2017 2016 2017 2017 CEF 1 & CEF 2 financing: ̴ € 765 million Who is who? Project implementers PROJECT IMPLEMENTERS Beneficiaries Rail Baltic Estonia OU Estonian Technical Estonia’s Ministry of Regulatory Authority Economic Affairs and Main coordinator Communications RB Rail Eiropas Dzelzceļa līnijas SIA Latvia’s Ministry of Transport Rail Baltica statyba UAB Lithuania’s Ministry of Lietuvos geležinkeliai JSC Transport and Communications. Implementing Bodies RAIL BALTICA FINANCIAL FLOW Financing flow (CEF) European Union/INEA State co-financing RB Rail AS Latvia (Beneficiary) Estonia (Beneficiary) Lithuania (Beneficiary) LV budget EE budget LT budget Eiropas dzelzceļa līnijas RB Estonia Geležinkeliai/RB Statyba (Implementing body) (Implementing body) (Implementing body) Contractor Contractor Contractor Contractor What does EDZL do OUR ROLE 100% state owned company Shareholder in joint venture «RB Rail» Implementation of Rail Baltica project (33,33%) at national level Operating basis: Operating basis: Decree of the Cabinet of Ministers Nr.431 on CEF 1 and CEF 2 Grant Agreements establishment of EDZL Delegation agreement with the Ministry of Transport RB Rail Shareholders' agreement Contracting Scheme Articles of association and national legislation Articles of association and national legislation OBJECTIVE Professionally implement Rail Baltica project in Latvia according to Global project standards and ensure integration in EU railway network.
    [Show full text]
  • Network Statement 2022 2
    2022 NETWORK STATEMENT of the Public-Use Railway Infrastructure of the State Joint Stock Company “Latvijas dzelzceļš” Approved with decision No.VL-2/5 of the of the Management Board of 11 January 2021 Valid from 12 December 2021 VERSION CONTROL Version Date Section Description of changes 1.0 11.01.2021. - Initial version In accordance with LRN 22.01.2021. letter Nr.L-6.3.1/14-2021 the following amendments have been made: 5.2.11., 5.3.(4), 1.1 22.01.2021. Section 5.2.11. expressed in new edition; 5.3.(5)(c), 5.3.(5)(f). Section 5.3.(4) expressed in new edition; Sections 5.3. (5)(c) and 5.3. (5)(f) expressed in new edition. In accordance with VDA 12.02.2021. letter Nr.2-1-16 the following amendments have been made: Section 5.4. expressed in new edition; 5.4. 5.5., 5.6.3., 1.2. 9.04.2021. Section 5.5. expressed in new edition; 7.3.11 Section 5.6.3. expressed in new edition; New section 7.3.11. In accordance with LRN 08.04.2021. letter Nr.L-6.3.1/63-2021 the following amendments have been made: Section 4.2.1.(7) expressed in new edition; 4.2.1.(7), 4.2.2.(3), 1.3. 14.04.2021. 4.2.3.(3), 5.2.11., Section 4.2.2.(3) expressed in new edition; 5.3.(4), 5.3.(5)(c). Section 4.2.3.(3) expressed in new edition; Section 5.2.11.
    [Show full text]