Form-1 Stone Quarry Ministry of Environment & Forests
Total Page:16
File Type:pdf, Size:1020Kb
APPLICATION FOR ENVIRONMENTAL CLEARANCE Vide para 6 of S. O. 1533 dated 14 September 2006 FORM-1 OF STONE QUARRY Survey No. -40/1/1/A, Area- 1.31 Ha Village- Wagholiwadi, Tehsil- Mohol, Dist-Solapur Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL EXPERT APPRAISAL COMMITTEE (SEAC Maharashtra) * Project Proponent Sitaram Jalindar Lande At post Wagholiwadi, Tehsil- Mohol, Dist-Solapur * EIA Consultant SRUSHTI SEWA Harihar Apartment,Agresen Road, Near Adivasi Bhavan , Giripeth, Nagpur-440010(Maharashtra) Phone : 0712-688545 Email : [email protected] Accredited by NABET: No.- NABET/EIA/127/SA062/0613 Dated 26/06/2013 April-2016 Form-1 REVISED FORM – 1 APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14.09. 2006 (I) Basic Information: S. Item Details No 1. Name of the Project/s : STONE QUARRY 2. S. No. in the schedule : 1 (a) as per S.O.1533dt 14.09.2006 3. Propo sed Capacity / area / length : 1.31 Ha / tonnage to be 2100 Brass/Month Stone handled/command area/lease area/ number of wells to be drilled. 4. New/Expansion/Modernization : Existing lease applied for EC Vide OM No. L - 11011/47/2011-IA.II(M) dated 18.05.12 5. Existing Capacity/Area etc. : 1.31 Ha Existing capacity-2400 Brass/Month Stone 6. Category of project i.e. ‘A’ or ‘B’ : ‘B’ 7. Does it attract the general : No condition? If yes, please specify. 8. Does it attract the specific : No condition? If yes, please specify. 9. Location : Location Map 1 Plot/Survey/Khasra No. : Survey No. 40/1/1/A Village : Wagholiwadi Tehsil : Mohol District : Solapur State : Maharashtra. 10. Nearest Railway station/airport : Mohol Rly station - 8 Km. along with distance in kms. Nearest airport, Solapur - 33 km 11. Nearest Town, city, District : Nearest Town Mohol - 8 Km Headquarters along with distance District headquarter Solapur - 33 km in kms. 12. Village Panchyats, Zilla Parishad, : Wagholiwadi Gram Panchayat. Municipal Corporation, Local Tahsil Mohol body (complete postal address District Solapur with telephone nos. to be given.) Maharastra 13. Name of the applicant : Sitaram Jalindar Lande At post Wagholiwadi, Tehsil- Mohol, Dist-Solapur 14. Registered Address : Sitaram Jalindar Lande At post Wagholiwadi, Tehsil- Mohol, Dist-Solapur 15. Address and correspondence: : Sitaram Jalindar Lande At post Wagholiwadi, Tehsil- Mohol, Dist-Solapur 1 Form-1 S. Item Details No Name : Sitaram Jalindar Lande Designation(Owner/partner/CEO) : Owner Address : Sitaram Jalindar Lande At post Wagholiwadi, Tehsil- Mohol, Dist-Solapur Pin Code : E-mail : [email protected] Telephone : - Fax. No. : 16. Details of Alternative Site : Mining is site specific activity hence no examined, if any location of these alternative sites examined. sites should be shown on a topo sheet. 17 Interlinked Projects : Not Applicable 18. Whether separate application of : Not Applicable interlinked project has been submitted? 19. If yes, date of submission : Not Applicable 20. If no, reason : Not Applicable 1371 Whether the proposal involves : . approval/clearance under: if yes, details of the same and their status to be given. a) The Forest (Conservation) Not applicable Act, 1980 ? b) The wildlife (Protection) Not applicable Act, 1972? c) The C.R.Z Noticefication, Not applicable 1991? 22. Whether there is any : Nil Government Order/ Policy relevant/relating to this site? 23. Forest land involved(hectares) : Nil 24. Whether there is any litigation : No Litigation is involve d pending against the project and /or land in which the project is proposes to be set up? a) Name of the Court b) Case No. c) Order/directions of the Court, if any and its relevance with the proposed project. * Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc. 2 Form-1 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate Information/Checklist Yes/ quantities / rates, wherever Sr. No. confirmation No possible) with source of information data 1.1 Permanent or temporary Yes The existing terrestrial configuration change in land use, land will undergo progressive changes due cover or topography to quarry development, Stone including increase in extraction, creation of haul roads, intensity of land use (with storage dumps, reclamation and respect to local land use rehabilitation during quarrying and plan) decommissioning. 1.2 Clearance of existing land, No There is no vegetation or buildings vegetation and buildings? existing in the area proposed of quarry development. 1.3 Creation of new land uses? Yes Present land use will undergo gradual changes during quarry life d ue to quarry development, basalt extraction, storage, reclamation and rehabilitation. The new land use at the end of quarry life will be as follows. Plantation in the open space. 1.4 Pre-construction No Not Required investigations e.g. bore holes, soil testing? 1.5 Construction works? No - 1.6 Demolition works No No demolition work is involved in the proposed mining lease area. 1.7 Temporary sites used for No - construction works or housing of construction workers? 1.8 Above ground buildings, Yes Surface infrastructures like mine office structures or earthworks & stores, first aid station, etc. including linear structures, cut and fill or excavations 1.9 Underground works No Not Applicable including mining or tunneling? 1.10 Reclamation works? Ye s Reclamation plan will be prepared and approved from competent authority before closer of mine. 3 Form-1 Details thereof (with approximate Information/Checklist Yes/ quantities / rates, wherever Sr. No. confirmation No possible) with source of information data 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and Yes The quarrying will be carried out by manufacturing processes? opencast method. 1.14 Facilities for storage of No Extracted Mineral dispatched directly, goods or materials? transit storage at site. 1.15 Facilities for treatment or Yes Solid Waste: OB which is ve ry scanty disposal of solid waste or when encounter is stored within lease liquid effluents? boundary along the periphery with garland drain Liquid Effluent : There is no effluent generation. The quarry dose not intercepts the water table. Only rain water is accumulated in the pit during monsoon whi ch is used for plantation & dust suppression etc. 1.16 Facilities for long term No Not Applicable housing of operational workers? 1.17 New road, rail or sea traffic No • Existing road network is adequate during construction or for transportation of produced operation? material. • No transportation by Sea. 1.18 New road, rail, air No • Road : Not applicable waterborne or other transport infrastructure • Rail link : Not required including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No Not applicable existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No Not Applicable transmission lines or pipelines? 1.1371 Impoundment, damming, No No crossing of natural drainage. culverting, realignment or other changes to the hydrology of water courses or aquifers? 1.22 Stream crossings? No Not Applicable 1.23 Abstraction or transfers of No Not Applicable 4 Form-1 Details thereof (with approximate Information/Checklist Yes/ quantities / rates, wherever Sr. No. confirmation No possible) with source of information data water from ground or surface waters? 1.24 Changes in water bodies or No No seasonal streams passing through the land surface affecting the ML area. drainage or run-off? 1.25 Transport of personnel or Yes As far as possible, local people from materials for construction, surrounding villages will be engaged. operation or The transportation of personnel and decommissioning? construction materials by road. Existing road network is adequate. 1.26 Long term dismantling or Yes Quarry will be systematically closed as decommissioning or per decommissioning pl an, which is restoration works? prepared a few years prior to mine closure. 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area Yes Quarry employees except the local in either temporarily or employees. permanently? 1.29 Introduction of alien No Not Applicable species? 1.30 Loss of native species or No No ecological losses genetic diversity? 1.31 Any other actions? No Not Applicable 5 Form-1 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non - renewable or in short supply) Details thereof (with approximate quantities / rates, wherever Information/Checklist S. No. Yes/No possible) with source of confirmation information data 2.1 Land especially undeveloped No Private Land or agricultural land (ha) 2.2 Water (expected source & Yes Dust suppression: 10 KLPD competing users) unit: KLD plantation : 0.5 KLPD Drinking Purpose : 0.25 KLPD Source : Dugwell/tubewell or pit water 2.3 Minerals (MT) No Not Applicable 2.4 Construction material – Stone, No Not required aggregates, and/soil (expected source – MT) 2.5 Forests and timber (source – No Not Required.