APPLICATION FOR ENVIRONMENTAL CLEARANCE Vide para 6 of S. O. 1533 dated 14 September 2006

FORM-1

OF STONE QUARRY Survey No. -40/1/1/A, Area- 1.31 Ha Village- Wagholiwadi, Tehsil- Mohol, Dist-

Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL EXPERT APPRAISAL COMMITTEE (SEAC )

* Project Proponent Sitaram Jalindar Lande At post Wagholiwadi, Tehsil- Mohol, Dist-Solapur

* EIA Consultant SRUSHTI SEWA Harihar Apartment,Agresen Road, Near Adivasi Bhavan , Giripeth, Nagpur-440010(Maharashtra) Phone : 0712-688545 Email : [email protected]

Accredited by NABET: No.- NABET/EIA/127/SA062/0613 Dated 26/06/2013

April-2016

Form-1

REVISED FORM – 1

APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14.09. 2006

(I) Basic Information: S. Item Details No 1. Name of the Project/s : STONE QUARRY 2. S. No. in the schedule : 1 (a) as per S.O.1533dt 14.09.2006 3. Propo sed Capacity / area / length : 1.31 Ha / tonnage to be 2100 Brass/Month Stone handled/command area/lease area/ number of wells to be drilled. 4. New/Expansion/Modernization : Existing lease applied for EC Vide OM No. L - 11011/47/2011-IA.II(M) dated 18.05.12 5. Existing Capacity/Area etc. : 1.31 Ha Existing capacity-2400 Brass/Month Stone 6. Category of project i.e. ‘A’ or ‘B’ : ‘B’ 7. Does it attract the general : No condition? If yes, please specify. 8. Does it attract the specific : No condition? If yes, please specify. 9. Location : Location Map 1 Plot/Survey/Khasra No. : Survey No. 40/1/1/A Village : Wagholiwadi Tehsil : Mohol District : Solapur State : Maharashtra. 10. Nearest Railway station/airport : Mohol Rly station - 8 Km. along with distance in kms. Nearest airport, Solapur - 33 km 11. Nearest Town, city, District : Nearest Town Mohol - 8 Km Headquarters along with distance District headquarter Solapur - 33 km in kms. 12. Village Panchyats, Zilla Parishad, : Wagholiwadi Gram Panchayat. Municipal Corporation, Local Tahsil Mohol body (complete postal address District Solapur with telephone nos. to be given.) Maharastra 13. Name of the applicant : Sitaram Jalindar Lande At post Wagholiwadi, Tehsil- Mohol, Dist-Solapur

14. Registered Address : Sitaram Jalindar Lande At post Wagholiwadi, Tehsil- Mohol, Dist-Solapur

15. Address and correspondence: : Sitaram Jalindar Lande At post Wagholiwadi, Tehsil- Mohol, Dist-Solapur

1

Form-1 S. Item Details No Name : Sitaram Jalindar Lande

Designation(Owner/partner/CEO) : Owner Address : Sitaram Jalindar Lande At post Wagholiwadi, Tehsil- Mohol, Dist-Solapur

Pin Code : E-mail : [email protected] Telephone : - Fax. No. : 16. Details of Alternative Site : Mining is site specific activity hence no examined, if any location of these alternative sites examined. sites should be shown on a topo sheet. 17 Interlinked Projects : Not Applicable 18. Whether separate application of : Not Applicable interlinked project has been submitted? 19. If yes, date of submission : Not Applicable 20. If no, reason : Not Applicable 1371 Whether the proposal involves : . approval/clearance under: if yes, details of the same and their status to be given. a) The Forest (Conservation) Not applicable Act, 1980 ? b) The wildlife (Protection) Not applicable Act, 1972? c) The C.R.Z Noticefication, Not applicable 1991? 22. Whether there is any : Nil Government Order/ Policy relevant/relating to this site? 23. Forest land involved(hectares) : Nil 24. Whether there is any litigation : No Litigation is involve d pending against the project and /or land in which the project is proposes to be set up? a) Name of the Court b) Case No. c) Order/directions of the Court, if any and its relevance with the proposed project.

* Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.

2

Form-1 (II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Details thereof (with approximate Information/Checklist Yes/ quantities / rates, wherever Sr. No. confirmation No possible) with source of information data 1.1 Permanent or temporary Yes The existing terrestrial configuration change in land use, land will undergo progressive changes due cover or topography to quarry development, Stone including increase in extraction, creation of haul roads, intensity of land use (with storage dumps, reclamation and respect to local land use rehabilitation during quarrying and plan) decommissioning.

1.2 Clearance of existing land, No There is no vegetation or buildings vegetation and buildings? existing in the area proposed of quarry development. 1.3 Creation of new land uses? Yes Present land use will undergo gradual changes during quarry life d ue to quarry development, basalt extraction, storage, reclamation and rehabilitation. The new land use at the end of quarry life will be as follows.

Plantation in the open space. 1.4 Pre-construction No Not Required investigations e.g. bore holes, soil testing? 1.5 Construction works? No - 1.6 Demolition works No No demolition work is involved in the proposed mining lease area. 1.7 Temporary sites used for No - construction works or housing of construction workers? 1.8 Above ground buildings, Yes Surface infrastructures like mine office structures or earthworks & stores, first aid station, etc. including linear structures, cut and fill or excavations 1.9 Underground works No Not Applicable including mining or tunneling? 1.10 Reclamation works? Ye s Reclamation plan will be prepared and approved from competent authority before closer of mine.

3

Form-1 Details thereof (with approximate Information/Checklist Yes/ quantities / rates, wherever Sr. No. confirmation No possible) with source of information data 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and Yes The quarrying will be carried out by manufacturing processes? opencast method. 1.14 Facilities for storage of No Extracted Mineral dispatched directly, goods or materials? transit storage at site.

1.15 Facilities for treatment or Yes Solid Waste: OB which is ve ry scanty disposal of solid waste or when encounter is stored within lease liquid effluents? boundary along the periphery with garland drain Liquid Effluent : There is no effluent generation. The quarry dose not intercepts the water table. Only rain water is accumulated in the pit during monsoon whi ch is used for plantation & dust suppression etc. 1.16 Facilities for long term No Not Applicable housing of operational workers?

1.17 New road, rail or sea traffic No • Existing road network is adequate during construction or for transportation of produced operation? material. • No transportation by Sea. 1.18 New road, rail, air No • Road : Not applicable waterborne or other transport infrastructure • Rail link : Not required including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No Not applicable existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No Not Applicable transmission lines or pipelines?

1.1371 Impoundment, damming, No No crossing of natural drainage. culverting, realignment or other changes to the hydrology of water courses or aquifers? 1.22 Stream crossings? No Not Applicable 1.23 Abstraction or transfers of No Not Applicable 4

Form-1 Details thereof (with approximate Information/Checklist Yes/ quantities / rates, wherever Sr. No. confirmation No possible) with source of information data water from ground or surface waters? 1.24 Changes in water bodies or No No seasonal streams passing through the land surface affecting the ML area. drainage or run-off? 1.25 Transport of personnel or Yes As far as possible, local people from materials for construction, surrounding villages will be engaged. operation or The transportation of personnel and decommissioning? construction materials by road. Existing road network is adequate. 1.26 Long term dismantling or Yes Quarry will be systematically closed as decommissioning or per decommissioning pl an, which is restoration works? prepared a few years prior to mine closure. 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area Yes Quarry employees except the local in either temporarily or employees. permanently? 1.29 Introduction of alien No Not Applicable species? 1.30 Loss of native species or No No ecological losses genetic diversity? 1.31 Any other actions? No Not Applicable

5

Form-1 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non - renewable or in short supply)

Details thereof (with approximate quantities / rates, wherever Information/Checklist S. No. Yes/No possible) with source of confirmation information data

2.1 Land especially undeveloped No Private Land or agricultural land (ha) 2.2 Water (expected source & Yes Dust suppression: 10 KLPD competing users) unit: KLD plantation : 0.5 KLPD Drinking Purpose : 0.25 KLPD Source : Dugwell/tubewell or pit water 2.3 Minerals (MT) No Not Applicable 2.4 Construction material – Stone, No Not required aggregates, and/soil (expected source – MT) 2.5 Forests and timber (source – No Not Required. MT) 2.6 Energy including electricity and Yes Electricity Source: Nearby HT fuel (source, competing users) Power Line of Maharashtra State Unit: fuel (MT), energy (MW) Power Distribution Company. 2.7 Any other natural resources No Not Applicable (use appropriate standard units)

3. Use storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details thereof (with approximate Information/Checklist quantities/rates, wherever S. No. Yes/No confirmation possible) with source of information data 3.1 Use of substances or No Not Applicable materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No Not Applicable disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people Yes About 09 persons benefited by the e.g. by changing living way of regular employment and conditions? some person also get indirect employment 3.4 Vulnerable groups of people No Site is 2.0 km away from Hospital, 6

Form-1 Details thereof (with approximate Information/Checklist quantities/rates, wherever S. No. Yes/No confirmation possible) with source of information data who could be affected by the School and Villages project e.g. hospital patients, children, the elderly etc. 3.5 Any other causes No Nil

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Details thereof (with approximate Information/Checklist quantities / rates, wherever S. No. Yes/No confirmation possible) with source of information data 4.1 Soil, overburden or mine No No top Soil, overburden negligible wastes and meager. 4.2 Municipal waste (domestic and Yes Approx 0.02 m 3/day domestic waste or commercial wastes) only 4.3 Hazardous wastes (as per No Nil Hazardous Waste Management Rules) 4.4 Other industrial process No Not Applicable wastes 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge No Not Applicable from effluent treatment 4.7 Construction or demolition No Nil wastes 4.8 Redundant machinery or Yes Only at mine closure stage. equipment 4.9 Contaminated soils or other No Not Applicable materials 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approximate Information/Checklist quantities/rates, wherever S. No. Yes/No confirmation possible) with source of information data 5.1 Emissions from combustion of Yes From operation of diesel driven fossil fuels from stationary or machinery, trucks/tractors etc. mobile sources 5.2 Emissions from production Yes The production process involves processes excavation which generate s dust. 7

Form-1 Details thereof (with approximate Information/Checklist quantities/rates, wherever S. No. Yes/No confirmation possible) with source of information data Adequate measures will be adopted for its control. 5.3 Emissions from materials Yes Dust emissions during loading and handling including storage or unloading, storage and transport transportation of mineral. 5.4 Emissions from construction Yes Dust and vehicular emissions activities including plant and equipment 5.5 Dust or odours from handling Yes Only fugitive dust of materials including construction materials, sewage and waste 5.6 Emissions from incineration of No Not Applicable waste 5.7 Emissions from burning of No Not Applicable waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No Not Applicable sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approximate Information/Checklist quantities/rates, wherever S. No. Yes/No confirmation possible) with source of information data 6.1 From operation of equipment Yes Operation of trucks will generate e.g. engines, ventilation plant, noise. Adequate precautions will be crushers taken to minimize the noise at source. 6.2 From Industrial or similar No Not Applicable processes 6.3 From construction or No Not Applicable demolition 6.4 From blasting or piling No Not Applicable 6.5 From construction or Yes Plying of trucks. operational traffic 6.6 From lighting or cooling No Not Applicable systems 6.7 From any other sources No Not Applicable

8

Form-1 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, ground water, coastal waters or the sea:

Details thereof (with approximate Information/Checklist quantities/rates, wherever S. No. Yes/No confirmation possible) with source of information data 7.1 From handling, storage, use or No Not Applicable spillage of hazardous materials 7.2 From discharge of sewage or Yes Excess Quarry water (if other effluents to water or the encountered) during monsoon to be land (expected mode and released into natural drain after place of discharge) treatment

7.3 By deposition of pollutants No Not Applicable emitted to air into the land or into water 7.4 From any other sources No Not Applicable 7.5 Is there a risk of long term No Not Applicable build up of pollutants in the environment from these sources?

8. Risks of accidents during construction or operation of the Project, which could affect human health or the environment Details thereof (with S. Information/Checklist approximate quantities/rates, Yes/No No. confirmation wherever possible) with source of information data 8.1 From explosions, spillages, Yes Accident due to human error may fires etc from storage, occur some times while operating handling, use or production of the machinery. hazardous substances 8.2 From any other causes No Not applicable. 8.3 Could the project be affected No The area is not prone to any by natural disasters causing natural disaster. environmental damage (e.g. floods, earthquake, landslides, cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

Details thereof (with approximate S. Information/Checklist quantities/rates, wherever Yes/No No. confirmation possible) with source of information data 9.1 Lead to development of Yes The produced material shall be supporting, facilities, ancillary used for the infrastructure development stimulated by the developmental projects of the 9

Form-1 Details thereof (with approximate S. Information/Checklist quantities/rates, wherever Yes/No No. confirmation possible) with source of information data project which could have impact region. on the environment e.g.: • Supporting infrastructure (roads, power supply, waste or wastewater treatment, etc. • Housing development • Extractive industries • Supply industries • Other 9.2 Lead to after use of the site, Yes Depending on Reclamation Plan which could have impact on the environment 9.3 Set a precedent for later Yes Depending on Reclamation Plan developements 9.4 Have cumulative effects due to Yes There are other quarry projects proximity to other existing or located within 10 km radius. planned projects with similar effects

10

Form-1 (III) Environmental Sensitivity

Aerial distance (within 15 S. Area Name/Identity km) Proposed project location No. boundary 1 Areas protected under No Not Applicable international conventions, national or local legislation for their ecological, landscape, cultural or other related value.

2 Areas which are important No Not Applicable or sensitive for ecological reasons – Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, No Not Applicable important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or No Not Applicable underground waters

5 State, National boundaries No Not Applicable

6 Routes or facilities used by No Not Applicable the public for access to recreation or other tourist, pilgrim areas

7 Defense installations No Not Applicable

8 Densely populated or built- No Not Applicable up area 9 Areas occupied by No Not Applicable sensitive man-made land uses (hospital, schools, places of worship, community facilities) 10 Areas containing No Not Applicable important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

11

Form-1 11 Areas already subjected to No Not Applicable pollution or environmental damage. (Those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural NO Not Applicable hazard which could cause the project to present environmental problems (earthquake, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) "I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.

Date: Place:

(Project Proponent/ Authorized Signatory) NOTE:

1. The projects involving clearance under Coastal Regulation Zone Notification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendations of the State Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z Notification, 1991 for the activities to be located in the CRZ. 2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-a-vis the project location and the recommendations or comments of the Chief Wildlife Warden'thereon (at the stage of EC)."

3. All correspondence with the Ministry of Environment & Forests including submission "of application for TOR/Environmental Clearance, subsequent clarifications, as may be required from time to time, participation in the EAC Meeting on behalf of the p/oject proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project."

12

Form-1 (IV) Proposed Terms of Reference for EIA studies.

It is requested to consider this minor mineral extraction project in B2 category as per the provisions of EIA notification 2006.

13

Form-1

MAP 1: LOCATION MAP

Location of Stone Quarry

14