Lincoln Gap Wind Farm Local Business Briefing Session
Total Page:16
File Type:pdf, Size:1020Kb
Lincoln Gap Wind Farm Local Business Briefing Session Thursday, 19 April 2018 Introduction Project Overview Project Organisational Chart Stakeholders Nexif Energy Australia Senvion Australia Timeline and Key Milestones Opportunities for Business Supplier engagement process NACAP CPP Questions 2 Project overview • 59 wind-turbines • 10 MW grid scale battery storage • Located approximately 15km to the west of Port Augusta • Connect to a 275kV grid line managed by ElectraNet, running to the south of the project. • Operational in ~ 18 months • Lifetime of at least 25 years. • Will employ around 110 -130 people, and power around 155,000 homes. • Stage 1: • 35 x 3.6M140 Senvion turbines • 126 megawatts generating capacity 3 Project Organisational Chart Nexif Energy Australia Pty Ltd Lincoln Gap Wind Farm Pty Ltd Principal Contractor Senvion Australia Pty Ltd WTG Installation Transportation Balance of Plant (BoP) Contractor Contractor NACAP/CPP TBC TBC 4 Traditional owners – The Barngarla People 5 Stakeholders . Land Owners and Land Managers . Local Community (with special attention to project neighbours, community living along construction routes and special interest groups) . Local Industry (manufacturers and suppliers) . Port Augusta Shire Council . Local State Member: Dan van Holst Pellekaan MP . Local media . Work Safe SA . ICN Gateway . ElectraNet Electricity Distribution . Civil Aviation Authority . Project Contractors and their Subcontractors , Project Consultants . Government Authorities such as Office of Environment & Heritage SA Environmental Protection Agency 6 Nexif Energy • Nexif Energy is an independent “It’s important to us to have power producer (IPP) with power meaningful interaction with plants throughout South East Asia surrounding communities and and Australia to help create as many • Locations opportunities for involvement • Global head office in Singapore and education as possible.” • Australian business run out of Melbourne office • Site office in Port Augusta • Lincoln Gap Wind Farm is a first for Nexif: • First wind farm • First battery • First power plant in Australia • First large-scale power plant 7 Senvion • Senvion is a leading global manufacturer of onshore and offshore wind turbines. With approximately 4,500 employees worldwide, the company makes use of the experience gained from the manufacture and installation of more than 7,500 wind turbines around the world. • Senvion Australia has been delivering wind energy solutions since 2002. Our people have the skills and expertise to safely design, build, operate and maintain wind farms. • The Australian team is also responsible for Senvion's presence in the Asia Pacific region, and has been active in the Japan market since 2003. 8 Senvion – global footprint 9 Footprint in Australia – since 2002 Total fleet 14 wind farms 367 turbines SOUTH AUSTRALIA Over 900 MW operating or under Project Turbines Status construction Coober Pedy (hybrid micro grid) 2 x MM92 Installed 2017 Lincoln Gap Stage 1 35 x 3.6M140 Under construction NSW Project Turbines Status VICTORIA Cullerin 8 x MM82 Installed 7 x MM92 2009 Project Turbines Status Wonthaggi 6 x MM82 Installed 2005 Cape Bridgewater (Portland Stage 2) 29 x MM82 Installed 2008 Cape Nelson (Portland Stage 3) 22 x MM82 Installed 2009 Hepburn 2 x MM82 Installed 2011 Mt Mercer 64 x MM92 Installed 2014 Bald Hills 52 x MM92 Installed 2015 Chepstowe 3 x MM92 Installed 2015 Cape Sir William Grant (Portland Stage 4) 10 x MM82 Installed 2015 13 x MM92 Yaloak South 14 x MM92 Under construction Crowlands 39 x MM92 Under construction Murra Warra Stage 1 61 x 3.7M144 Under construction 10 Senvion Technology - 3.6M140 Strong performance and low noise impact New Electrical • High flexibility to adjust to System future grid requirements Proven • Evolution of proven drive- technology train from MM and 3XM • New aero-acoustic add- Low noise ons Efficient • Highly efficient 68 m blade • Advanced management Advanced and control engineering control features • Operational lifetime of 25 Long life years 11 Key milestones and timeline Milestone Dates ENET Bench Jan – Feb 2018 Access Tracks Feb – July 2018 O&M Facility May – Oct 2018 275kV OHL May – Oct 2018 Wind Turbine Generator (WTG) Installation August 2018 Energisation October 2018 Facility PC June 2019 12 Opportunities for businesses Cleaning and waste removal services Support to Cranage and installation services Fencing and landscaping services Security services Supply of materials for civil works Survey and topographic services Transportation 13 Supplier engagement process • Register supplier details via ICN Gateway • Senvion Supply Chain Management (SCM) to contact supplier about available work packages • The scope of work will depend which process to follow • Smaller work packages, we will gather relevant information through our Supplier Engagement Questionnaire: • Supplier’s capabilities • Quality, safety and environmental compliance • Procedures for management review • ABN details • Larger work packages we require pre-qualification with CM3 Contact: Senvion Australia Supply Chain Management 03 8660 6555 14 LINCOLN GAP WIND FARM LOCAL BUSINESS OPPORTUNITIES Agenda • About Nacap • Local Business Work Packages • Vendor Assessment Qualification • Site Specific Considerations • Contact About Nacap • Leading Australian pipeline and civil construction contractor • Award winning safety systems • All projects delivered on time, within budget • Owned by Quanta Services - global infrastructure contractor & largest in Northern America Local Business Work Packages • Steel fixing • Concrete placement • Concrete pump supply • Cranage supply • Seeding Vendor Assessment Qualification (VAQ) All vendors will be assessed across 4 areas: Area Historical performance, system, process & Safety & Environment accreditation Ability to supply materials/undertake works to Quality required technical standards Ability to meet schedule requirements & HR Production outcomes incl. IR and employment Site Specific Considerations • Experience working on large civil construction projects • Ability to work 11/3 roster including weekends About Consolidated Power Projects • Industry leader in high voltage infrastructure • Design, construct and commission • We constructed the first grid connected wind farm in Australia • Since then we’ve built more than 35 windfarms • 180 employees 21 What we do We partner with Australia’s largest renewable and power transmission utility companies to deliver large scale projects including: Wind Farms Battery Storage Systems Solar Farms and, High Voltage transmission substations 22 Work with us at Lincoln Gap Windfarm Experience in large electrical infrastructure and civil construction environments Work safely in a team Work an 11/3 roster 23 Local Business Work Packages Cleaning and waste removal Cranage and installation services Electrical labour Survey and topographic Light transportation [email protected] 24 Contact Jessica Kenny HR & Logistics Lincoln Gap Wind Farm Nacap [email protected] Questions? © Senvion Australia Pty Ltd All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photography, recording, or any information storage and retrieval system, without permission from Senvion Australia Pty Ltd. .