Planning Application and in the Interests of Amenity, Highway Safety and Protection of Ecological Features

Total Page:16

File Type:pdf, Size:1020Kb

Planning Application and in the Interests of Amenity, Highway Safety and Protection of Ecological Features APPLICATIONS RECOMMENDED FOR DECISION Eastleigh Local Area Committee Tuesday 17 October 2017. Application F/17/81167 Number: Case Officer: Dawn Errington Received Date: Friday 28 July 2017 Site Address: North Stoneham Park, Chestnut Avenue/Stoneham Lane, Eastleigh, SO50 9HT Applicant: Highwood Land LLP Proposal: Erection of 18 dwellings (additional to the 1,100 dwellings granted under outline permission O/15/76023), landscaping, boundary treatments, roads and footways, car parking, drainage and other supporting works and infrastructure for Stage 4 following demolition and site clearance on land previously identified as part of parcel 2B of outline permission ref. O/15/76023 (Application includes an Addendum to the Environmental Impact Assessment). Recommendation: Permit subject to completion of S106 agreement and to the submission of amended plans and details and/or amended conditions to address consultation responses CONDITIONS AND REASONS 1 The development hereby permitted shall be implemented in accordance with the following plans numbered: 14-159-10 Rev B, 14-159-2028 Rev A, 14-159- 2029 Rev A, 14-159-2034, 14-159-2034 Rev A, 14-159-2036, 14-159-2040, 14- 159-2041, 17.003.600, 17.003.605 Rev A, 17.003.610 Rev A, 17.003.620 Rev A, 17.003.630, 17.003.631, 17.003.632 Rev A, 17.003.633 Rev A, 17.003.634 Rev A, 17.003.635 Rev A, DD145D01 Rev B, DD145D04, DD145L31 Rev A, DD145L37 Rev A, DD145L43 Rev A , DD145L48 Reason: For the avoidance of doubt and in the interests of proper planning. 2 The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990. 3 The development shall be implemented in full accordance with the submitted Design Code. Reason: To ensure a comprehensive approach to high quality design across the site. 4 Details of all street furniture for the public areas shall be submitted to and approved in writing by the Local Planning Authority prior to its installation. Reason: In the interests of amenity 5 No development shall start until details and samples of all external facing and roofing materials in respect of buildings within this approved phase of development must be submitted to and approved in writing by the Local Planning Authority before development commences. The development must then accord with these approved details. Reason: To ensure that the external appearance of any building is satisfactory. 6 The details and provisions of the submitted Foul Drainage Strategy and Design Statement Addendum July 2107 and Surface Water Strategy and Design Statement Addendum to the FRA July 2017 shall be fully implemented unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure satisfactory provision of foul and surface water drainage. 7 The details and provisions of the submitted Detailed Landscape Plan and Planting Schedule, Green Infrastructure Strategy, and Landscape and Ecology Management Strategy Revision A shall be fully implemented for this phase of development unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure satisfactory landscape and green infrastructure provisions. 8 The development hereby permitted shall be implemented in accordance with the submitted Reptile Translocation, Mitigation, Management and Monitoring Strategy July 2017, Otter Protection and Enhancement Strategy July 2017, Bat Mitigation, Enhancement and Monitoring Strategy July 2017 and Dormouse Mitigation Strategy July 2017. Reason: To ensure the protection of protected species. 9 The development hereby permitted shall be implemented in accordance with the submitted Arboricultural Impact Assessment and Method Statement July 2017 and in accordance with British Standards Institution Code of Practice for trees in relation to design, demolition and construction - Recommendations British Standard BS 5837:2012. Reason: To protect trees both on and adjacent to the site. 10 The development hereby permitted shall be implemented in accordance with the submitted North Stoneham Park Phase 1 Remediation Strategy July 2017 and shall not be occupied / brought into use until there has been submitted to the LPA verification by competent person that any remediation scheme required has been implemented fully in accordance with the approved details (unless varied with the written permission of the LPA in advance of implementation). Unless agreed in writing with the LPA such verification shall comply with the guidance contained in CLR11 and EA Guidance for the Safe Development of Housing on Land Affected by Contamination - R&D Publication 66: 2008. Typically such a report would comprise: a. A description of the site and its background, and summary of relevant site information, b. a description of the remediation objectives and remedial works carried out c. verification data, including - data (sample locations/analytical results, as built drawings of the implemented scheme ,photographs of the remediation works in progress, etc. d. Certificates demonstrating that imported and / or material left in situ is free from contamination, gas / vapour membranes have been installed correctly Thereafter the scheme shall be monitored and maintained in accordance with the scheme approved. Reason: To minimise the risks of pollution and to ensure the site is satisfactorily de-contaminated. 11 Before development commences, details of all crime prevention measures in respect of this phase shall be submitted to and approved in writing by the Local Planning Authority. The development of that phase shall not be carried out otherwise than in accordance with the approved details. Reason: In the interest of crime prevention. 12 All works and development hereby approved shall be undertaken in accordance with approved Land South of Chestnut Avenue Stage 1 Construction Environmental Management Plan (CEMP) dated 20.7.17. Reason: to ensure the protection of wildlife and its supporting habitat, avoid deterioration to a Water Framework Directive Waterbody, and secure opportunities for the enhancement of the nature conservation value of the site in line with national planning policy and as identified in the Environmental Impact Assessment (EIA) Addendum accompanying the planning application and in the interests of amenity, highway safety and protection of ecological features. 13 No development shall commence until full details of tree protection fencing have been submitted to and approved in writing by the Local Planning Authority and this shall include a minimum of 15m buffers for all woodland. Work must not commence until a site meeting attended by the Arboricultural Consultant, Site Manager and local planning authority officer has taken place including an inspection and subsequent approval of the tree protection fencing by the Local Planning Authority. Once approved no access by vehicles or placement of chemicals, fuels, soil or other materials shall take place within the fenced area. The tree protection fencing shall be retained in its approved form for the duration of the construction period pf that phase. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality. 14 No development shall take place until a detailed method statement for either the removal or the long-term management/control of any invasive non-native species on the site shall be submitted to and approved in writing by the local planning authority. The method statement shall include proposed measures that will be used to prevent the spread of invasive species during any operations e.g. mowing, strimming or soil movement. It shall also contain measures to ensure that any soils brought to the site are free of the seeds/root/stem of any invasive plant covered under the Wildlife and Countryside Act 1981, as amended. Development shall proceed in accordance with the approved method statement. Reason: To prevent the spread of invasive non-native species. Without it, avoidable damage could be caused to the nature conservation value of the site. 15 Prior to the commencement of development, details of paving and construction within the root zones of retained trees and hedges in accordance with the approved plans and particulars in respect of that phase must be submitted to and approved in writing by the Local Planning Authority. These details shall be in accordance with the British Standards Institution Code of practice for trees in relation to design, demolition and construction - Recommendations British Standard BS 5837:2012. The development of each phase must not be carried out otherwise than in accordance with the approved details. Reason: To conserve the trees adjacent to and within the proposed development 16 Prior to the commencement development, details of a technology and communication strategy for the provision of broadband, fibre optic and audio visual technology within that phase must be submitted to and approved in writing by the Local Planning Authority. The infrastructure must then be provided for use upon first occupation of the buildings hereby permitted within that phase and retained thereafter. Reason: To improve the opportunities to work from home and to reduce the proliferation of individual masts, aerials, satellite dishes and wiring on flatted and commercial blocks in the interests of visual amenity. 17 The roads and footways within each phase must be laid out and made up in accordance with the specification, programme and details for that phase approved and in any event shall be
Recommended publications
  • Hamble-Le- Rice Parish Council AGENDA
    Hamble-le- Rice Parish Council Memorial Hall, High Street, Hamble-le-Rice, Southampton SO31 4JE 02380453422 [email protected] A meeting of the Parish Council will be held on Monday 13 March 2017 at Roy Underdown Pavilion, Baron Road, Hamble-le-Rice at 7.00pm. AGENDA 1. Apologies for absence 2. Declaration of interest and approved dispensations 3. To approve minutes of the Full Council Meeting 27th February 2017 4. Public session Community and Partnership 5. Presentation on the new Community facility at the former Barclays Bank by Matt Blyth, Eastleigh Borough Council. 6. Planning applications F/17/79951 Single storey rear extension, first floor terrace, raised patio to rear DEL and alterations to elevation 14 Oakwood Way, Hamble-Le-Rice, Southampton, SO31 4HJ F/17/80052 Two storey side extension, single storey rear extension, conversion DEL of roof space to provide habitable accommodation and alterations to fenestration 2 Emmons Close, Hamble-Le-Rice, Southampton, SO31 4QF C/17/80102 Erection of 1.5m high wall to site entrance DEL 16 Crowsport, Hamble-Le-Rice, Southampton, SO31 4HG T/17/80104 Fell 1no. Beech, 1no. Holm Oak and 1no. Lawson Cypress to rear DEL 6 Copse Lane, Hamble-Le-Rice, Southampton, SO31 4QH 7. Playing Pitch strategy – Response Finance 8. Audit report(s) – reports attached 9. Annual review of Financial Regulations – report attached 10. Refunds policy - verbal report 11. Member training – verbal update 12. Budget monitoring – report attached Update reports on: 13. 26/52/16 Coronation Parade Improvements 14. 52/2/15 Hamble Lifeboat toilets 15. 477/111/16 CPF Storage Building Project 16.
    [Show full text]
  • Saxon Charters and Landscape Evolution in the South-Central Hampshire Basin
    ProcHampsh Field Club ArchaeolSoc 50, 1994, 103-25 SAXON CHARTERS AND LANDSCAPE EVOLUTION IN THE SOUTH-CENTRAL HAMPSHIRE BASIN By CHRISTOPHER K CURRIE ABSTRACT THE CHARTER EVIDENCE Landscape study of the South Central Hampshire Basin north of Methodology Southampton has identified evidence for organised land use, based on diverse agricultural, pastoral and woodland land uses in the The methods used to eludicate the bounds of the Saxon period. Combined study of the topographic, cartographiccharter s discussed below are based on a long­ and charter evidence has revealed that the basis for settlement standing knowledge of the areas under patterns had largely developed by the tenth century. Highly consideration. This was combined with organised common pasturing is identified within gated areas as topographical information given on the earliest being the origin of English commons in the later historic period.Ordnanc e Survey map (one inch, 1810 edition, Evidence for possible river engineering is discussed. sheet XI), particularly with regard to the parish Charter evidence suggests that this developed landscape, boundaries shown thereon. In some cases this was underwent reorganisation in the Late Saxon period, with ecclesiastical bodies at Winchester being the major beneficiaries.supporte d by knowledge of earlier documents. It Although dealing with a small geographical area, this study is accepted that much of the boundaries of these raises implications for the nation-wide study of the origin of estates will be conjectural. Where the boundary land-use traditions and settlement in England. appears to follow close to the earliest known parish boundary, it has been assumed this is the course of die charter bounds, unless there is good INTRODUCTION reason to think otherwise.
    [Show full text]
  • OV5 Iustory of R
    OV5 iUSTORY OF r StettetyA, & 'Ditfnict Aocal Society PREFACE This paper has been written with the intention of setting down basic facts in the history of Eastleigh as they are known, and of drawing attention to the vast amount of detail still needing to be discovered and recorded. The very name of Eastleigh has its history and, together with all the other place-names in our modem Borough, a long one, with variations in spelling, popularity and expanse of land indicated by the name. Research already carried out by members of the Eastleigh and District Local History Society has been published in a series of Occasional and Special Papers. Reference to these and other publications is made in the text so that more detailed information may be obtained when needed. The reader is encouraged to set himself in the right mood by making sure that he knows the history of his own patch. Who built the house? Why was it so designed? What materials were used and where did they come from? Why was the road so named? What is the nature of the garden soil and how was it composed? Find out the answers to these and other questions and, above all, remember that today’s events are tomorrow’s history. This may inspire you to seek further information or advice and, possibly, to meet others with similar aims. Local History Societies exist for this purpose; they welcome visitors and new members. The Eastleigh and District Local History Society meets on the fourth Thursday of the month, the Botley and Curdridge Society on the last Friday of the month, and the West End Society on the first Wednesday of the month, except in July and August when outside visits are usually organised.
    [Show full text]
  • Public Transport
    Travel Destinations and Operators Operator contacts Route Operator Destinations Monday – Saturday Sunday Bus operators Daytime Evening Daytime Bluestar Quay Connect Bluestar Central Station, WestQuay, Town Quay 30 mins 30 mins 30 mins 01202 338421 Six dials 1 Bluestar City Centre, Bassett, Chandlers Ford, Otterbourne, Winchester 15 mins 60 mins 30 mins www.bluestarbus.co.uk B1 Xelabus Bitterne, Sholing, Bitterne 3 per day off peak (Mon, Weds, Fri) City Red and First Solent Premier National Oceanography Centre, Town Quay, City Centre, Central 0333 014 3480 Inn U1 Uni-link 7/10 mins 20 mins 15 mins Station, Inner Avenue, Portswood, University, Swaythling, Airport www.cityredbus.co.uk Night service. Leisure World, West Quay, Civic Centre, London Road, 60 mins U1N Uni-link Royal South Hants Hospital, Portswood, Highfield Interchange, (Friday and Saturday nights) Salisbury Reds Airport, Eastleigh 01202 338420 City Centre, Inner Avenue, Portswood, Highfield, Bassett, W1 Wheelers 30/60 mins www.salisburyreds.co.uk W North Baddesley, Romsey I N T O N ST City Centre, Inner Avenue, Portswood, Swaythling, North Stoneham, 2 Bluestar 15 mins 60 mins 30 mins Eastleigh, Bishopstoke, Fair Oak Uni-link 2 First City Red City Centre, Central Station, Shirley, Millbrook 8/10 mins 20 mins 15 mins 023 8059 5974 www.unilinkbus.co.uk B2 Xelabus Bitterne, Midanbury, Bitterne 3 per day off peak (Mon, Weds, Fri) U2 Uni-link City Centre, Avenue Campus, University, Bassett Green, Crematorium 10 mins 20 mins 20 mins Wheelers Travel 023 8047 1800 3 Bluestar City Centre,
    [Show full text]
  • Weekly List of Planning Consultations 15.04.2021
    CONSERVATION CASES PROCESSED BY THE GARDENS TRUST 15.04.2021 This is a list of all the conservation consultations that The Gardens Trust has logged as receiving over the past week, consisting mainly, but not entirely, of planning applications. Cases in England are prefixed by ‘E’ and cases in Wales with ‘W’. When assessing this list to see which cases CGTs may wish to engage with, it should be remembered that the GT will only be looking at a very small minority. SITE COUNTY SENT BY REFERENCE GT REF DATE GR PROPOSAL RESPONSE RECEIVED AD BY E ENGLAND Frenchay Park Avon South P21/02403/F E21/0077 15/04/2021 N PLANNING APPLICATION 07/05/2021 Gloucestershi https://developments.so Erection of a detached outbuilding with re uthglos.gov.uk/online- raised decking area. Installation of a applications/ free standing swimming pool. (retrospective) Frenchay Park House Old Frenchay Hospital Beckspool Road Frenchay South Gloucestershire BS16 1YB MISCELLANEOUS [email protected] Mentmore Towers Buckinghams Buckinghams 21/01212/APP E21/0038 09/04/2021 II* PLANNING APPLICATION 30/04/2021 hire hire https://publicaccess.buck Variation of Condition 3 of planning permission 16/03473/APP (No scc.gov.uk/online- alterations other than those expressly applications/ authorised by this permission) - To allow the insertion of a glazed door in the north west elevation of the approved house. The Forge Stag Hill Mentmore Buckinghamshire LU7 0QG BUILDING ALTERATION [email protected] k Stowe Buckinghams Buckinghams 21/01284/APP E21/0069
    [Show full text]
  • 3C: Itchen Valley
    3C: ITCHEN VALLEY Valley floor in downland setting between Itchen Abbas and Ovington. Permanent pasture, numerous small woods and scattered individual trees, few hedges. Ovington – Clear chalk streams, oftenValley floor– Lower reaches urban There are numerous historic mills wooded banks. edge, pony paddocks and wooded and bridges – along the Itchen. (from ridge backdrop at Bishopstoke. SDILCA) Cheriton – canalised section of theItchen Valley Country park; sluice as Playing fields with poplar windbreaks Itchen on the left. part of restored water meadows. in Lower Itchen Valley. Hampshire County 1 Status: FINAL May 2012 Integrated Character Assessment Itchen Valley Hampshire County 2 Status: FINAL May 2012 Integrated Character Assessment Itchen Valley 1.0 Location and Boundaries 1.1 This character area includes the river valley floor and its sides which make up the visual envelope of the valley. The valley tops are defined approximately where there is a break/slackening in slope angle. The southern boundary is formed at the County/Southampton unitary edge. The upper most reaches of the valley follow three spring fed tributaries/headwaters, which join close to New Arlesford namely the Candover stream to the north, River Arle to the east and Cheriton stream to the south. 1.2 Component County Landscape Types Open Downs, Downland Mosaic Large Scale, Downland Mosaic Small Scale, River Valley Floor, Lowland Mosaic Medium Scale, Lowland Mosaic Small Scale, Lowland Mosaic Heath Associated, Settlement. 1.3 Composition of Borough/District LCAs: Winchester CC Eastleigh BC Upper Itchen Valley Broom Hill Farmland and Woodland Lower Itchen Valley Upper Itchen Valley Floodplain Lower Itchen Valley Floodplain Eastleigh Airport Itchen Valley Sports Pitches The extent of the valley sides is comparable with the two Itchen valley character areas in the Winchester assessment.
    [Show full text]
  • Line Guide Elegant Facade Has Grade II Listed Building Status
    Stations along the route Now a Grade II listed The original Southern Railway built a wonderful Art Deco Now Grade II listed, the main Eastleigh Station the south coast port night and day, every day, for weeks on b u i l d i n g , R o m s e y style south-side entrance. Parts of the original building still building is set well back from the opened in 1841 named end. Station* opened in platforms because it was intended remain, as does a redundant 1930’s signal box at the west ‘Bishopstoke Junction’. Shawford is now a busy commuter station but is also an T h e o r i g i n a l G r e a t 1847, and is a twin of to place two additional tracks end of the station. In 1889 it became access point for walkers visiting Shawford Down. W e s t e r n R a i l w a y ’ s Micheldever station. through the station. However the ‘ B i s h o p s t o k e a n d terminus station called The booking hall once had a huge notice board showing The station had a small goods yard that closed to railway The famous children’s extra lines never appeared! Eastleigh’ and in 1923 ‘Salisbury (Fisherton)’ passengers the position of all the ships in the docks, and had use in 1960, but the site remained the location of a civil author, the Reverend The construction of a large, ramped i t b e c a m e s i m p l y was built by Isambard the wording ‘The Gateway of the World’ proudly mounted engineering contractor’s yard for many years.
    [Show full text]
  • 2 Bus Time Schedule & Line Route
    2 bus time schedule & line map 2 Eastleigh View In Website Mode The 2 bus line (Eastleigh) has 4 routes. For regular weekdays, their operation hours are: (1) Eastleigh: 7:50 AM - 8:50 PM (2) Eastleigh: 11:02 PM (3) Fair Oak: 12:30 AM - 11:20 PM (4) Southampton City Centre: 4:56 AM - 10:09 PM Use the Moovit App to ƒnd the closest 2 bus station near you and ƒnd out when is the next 2 bus arriving. Direction: Eastleigh 2 bus Time Schedule 37 stops Eastleigh Route Timetable: VIEW LINE SCHEDULE Sunday 11:45 PM Monday 7:50 AM - 8:50 PM Bargate, Southampton City Centre 6 Hanover Buildings, Southampton Tuesday 7:50 AM - 8:50 PM Above Bar, Southampton City Centre Wednesday 7:50 AM - 8:50 PM 93 Above Bar Street, Southampton Thursday 7:50 AM - 8:50 PM Cenotaph, Southampton City Centre Friday 7:50 AM - 8:50 PM Above Bar Street, Southampton Saturday 7:50 PM - 8:50 PM Giddy Bridge, Bedford Place 41 London Road, Southampton Law Courts, Bedford Place 2 bus Info Archers Road, Banister Park Direction: Eastleigh Stops: 37 Stag Gates, Banister Park Trip Duration: 34 min 144 Lodge Road, Southampton Line Summary: Bargate, Southampton City Centre, Above Bar, Southampton City Centre, Cenotaph, Cedar Road, Portswood Southampton City Centre, Giddy Bridge, Bedford 98-100 Lodge Road, Southampton Place, Law Courts, Bedford Place, Archers Road, Banister Park, Stag Gates, Banister Park, Cedar Spring Crescent, Portswood Road, Portswood, Spring Crescent, Portswood, 51 Portswood Road, Southampton Waitrose, Portswood, Portswood Broadway, Portswood, Sainsbury, Portswood,
    [Show full text]
  • History of Glen Eyre House, Bassett and Glen Eyre Hall of Residence, University of Southampton
    History of Glen Eyre House, Bassett and Glen Eyre Hall of Residence, University of Southampton Introduction The history of large houses in and around Southampton is well covered in a range of books and articles in the local press written by Southampton’s best known local historian Elsie M. Sandell born in 1891 and who died in 1974. She inherited her love of Southampton from her father George W. Sandell who was born in 1853 on the Isle of Wight and died in 1945. However both she and Jessica Vale in her informative article entitled “The Country Houses of Southampton”, published in 1983, make no substantial reference to Glen Eyre House. Nothing appears to have been written about the family who built the house, how it came into the hands of the University or its inception as a hall of residence for students. As a contribution to the history of the City and University this article attempts to fill that void. Miss Sandell’s father was a successful ship broker and according to the 1901 Census, when he and his family were living at Highclere, No.63, Portswood Road, also a shipping agent and merchant and Consul for Finland and Norway. The house still exists. He received an education at the School of Art opened in 1855 and housed in what was originally the Savings Bank, in Havelock Road. The bank was built in 1860, almost over the railway tunnel and close to the 1896 building of King Edward VI Grammar School. Both buildings were badly bombed but survived into the post- War period.
    [Show full text]
  • South Stoneham South Stoneham Bishops Stoneham
    South Stoneham South Stoneham Bishops Stoneham 1.0 PARISH South Stoneham 2.0 HUNDRED Mainsbridge 3.0 NGR 443990 115420 (parish church) 4.0 GEOLOGY Valley Gravel; Alluvium in Itchen Valley. Much of the former parish is Bracklesham Beds with pockets of Plateau Gravel. 5.0 SITE CONTEXT (Map 2) 5.1 The parish is now divided between West End CP, Hedge End CP, Southampton St Nicholas and Eastleigh. The church and manor house site is within the bounds of Southampton but much of the former South Stoneham parish is in Eastleigh District including the tithing of Eastleigh itself. It is therefore very relevant to this survey area. 5.2 South Stoneham House is at c. 8m AOD and the Church of St Mary, 100m to the south-east, just a little lower. Both stand above two large ponds that can probably be equated with the two fisheries mentioned in the Domesday survey (paragraph 14.1). These are fed by The Monks Brook (east) and the Itchen Navigation passes just to the south (c. 4m AOD). South Stoneham House is now a part of the Southampton University campus which includes an adjoining tower block and accommodation units. To the east and west are C20 housing estates. Areas of woodland are still intact (south-east) and the fisheries, part of the Monks Brook and the banks of the Itchen Navigation provide public open space. 6.0 PLAN TYPE & DESCRIPTION (Maps 3, 4 and 5) Church and manor house 6.1 South Stoneham House was built 1705, probably on the traditional site of the manor house.
    [Show full text]
  • Go South Coast SOUTHAMPTON
    Go South Coast SOUTHAMPTON - EASTLEIGH - FAIR OAK Bluestar 2 via Portswood - Swaythling - Bishopstoke Sunday 5th September 2021 (Southampton Marathon) Ref.No.: MF21 Service No 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Houndwell Park (Debenhams)0820 0915 0945 1020 1050 1120 1150 1220 1250 Southampton (Hanover Buildings) 1320 1350 1420 1450 1520 1550 1620 1650 Portswood Broadway 0830 0927 0957 1032 1105 1135 1205 1235 1305 1335 1405 1435 1505 1535 1605 1635 1705 Swaythling (McDonalds) 0835 0933 1003 1038 1111 1141 1211 1241 1311 1341 1411 1441 1511 1541 1611 1641 1711 North Stoneham (Robin Square)0841 0939 1009 1044 1119 1149 1219 1249 1319 1349 1419 1449 1519 1549 1619 1649 1719 Nightingale Bridge 0843 0941 1011 1046 1121 1151 1221 1251 1321 1351 1421 1451 1521 1551 1621 1651 1721 Eastleigh Bus Station 0850 0949 1019 1054 1129 1159 1229 1259 1329 1359 1429 1459 1529 1559 1629 1659 1729 Eastleigh Bus Station 0851 0951 1021 1056 1132 1202 1232 1302 1332 1402 1432 1502 1532 1602 1632 1702 1732 Barton Park 0853 0953 1023 1058 1134 1204 1234 1304 1334 1404 1434 1504 1534 1604 1634 1704 1734 Bishopstoke (Spring Lane) 0855 0955 1025 1100 1137 1207 1237 1307 1337 1407 1437 1507 1537 1607 1637 1707 1737 Stoke Park Road/Drake Road 0858 0958 1028 1103 1140 1210 1240 1310 1340 1410 1440 1510 1540 1610 1640 1710 1740 Fair Oak Road (Welcome Inn)0903 1003 1033 1108 1145 1215 1245 1315 1345 1415 1445 1515 1545 1615 1645 1715 1745 Fair Oak (New Clock Inn) 0905 1005 1035 1110 1147 1217 1247 1317 1347 1417 1447 1517 1547 1617 1647 1717 1747 Sandy Lane/Victena Road
    [Show full text]
  • X21 Bus Time Schedule & Line Route
    X21 bus time schedule & line map X21 Southampton - Chilworth Science Park View In Website Mode The X21 bus line (Southampton - Chilworth Science Park) has 2 routes. For regular weekdays, their operation hours are: (1) Chilworth Old Village: 7:00 AM - 9:00 AM (2) Southampton City Centre: 4:10 PM - 6:10 PM Use the Moovit App to ƒnd the closest X21 bus station near you and ƒnd out when is the next X21 bus arriving. Direction: Chilworth Old Village X21 bus Time Schedule 32 stops Chilworth Old Village Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 7:00 AM - 9:00 AM Vincent's Walk, Southampton City Centre Vincents Walk, Southampton Tuesday 7:00 AM - 9:00 AM Above Bar, Southampton City Centre Wednesday 7:00 AM - 9:00 AM 99 Above Bar Street, Southampton Thursday 7:00 AM - 9:00 AM Cenotaph, Southampton City Centre Friday 7:00 AM - 9:00 AM Above Bar Street, Southampton Saturday Not Operational Giddy Bridge, Bedford Place 41 London Road, Southampton Law Courts, Bedford Place X21 bus Info Archers Road, Banister Park Direction: Chilworth Old Village Stops: 32 Cedar Road, Portswood Trip Duration: 33 min 98-100 Lodge Road, Southampton Line Summary: Vincent's Walk, Southampton City Centre, Above Bar, Southampton City Centre, Spring Crescent, Portswood Cenotaph, Southampton City Centre, Giddy Bridge, 51 Portswood Road, Southampton Bedford Place, Law Courts, Bedford Place, Archers Road, Banister Park, Cedar Road, Portswood, Spring Waitrose, Portswood Crescent, Portswood, Waitrose, Portswood, 121-131 Portswood Road, Southampton Portswood
    [Show full text]