Technical Memorandum 2.5 Table of Contents 2.5 Environmental Water

Total Page:16

File Type:pdf, Size:1020Kb

Technical Memorandum 2.5 Table of Contents 2.5 Environmental Water Technical Memorandum 2.5 Table of Contents 2.5 Environmental Water Use 2.5.1 Introduction 2.5.2 Water-related Environmental Practices 2.5.2.1 Wyoming State Engineer’s Office Instream Flow Filings 2.5.2.2 U.S. Forest Service Instream Bypasses 2.5.2.3 Minimum Reservoir Releases 2.5.2.4 Water Appropriations for Fish and Wildlife 2.5.3 Environmental Survey 2.5.3.1 Survey Distribution 2.5.3.2 Survey Responses 2.5.4 Cooperative Agreement and Draft Environmental Impact Statement 2.5.4.1 Cooperative Agreement 2.5.4.2 Draft Environmental Impact Statement (DEIS) 2.5.5 Conclusions 2.5.6 References Technical Memorandum 2.5 TC2.5-1 3/24/2005 List of Tables Table 2.5.1. Summary – Wyoming State Engineer’s Office (SEO) instream flow filings in Wyoming’s Platte River Basin Table 2.5.2. Summary – U.S. Forest Service (USFS) instream bypasses Table 2.5.3. Summary – minimum reservoir releases Table 2.5.4. Summary – water appropriations in the Platte River basin for fish and wildlife use Table 2.5.5. Summary – surveyed environmental organizations Technical Memorandum 2.5 TC2.5-2 3/24/2005 List of Figures Figure 2.5.1. Instream flow filing sites – Above Pathfinder Dam subbasin Figure 2.5.2. Instream flow filing sites – Pathfinder to Guernsey subbasin Figure 2.5.3. Instream flow filing sites – Upper Laramie subbasin Figure 2.5.4. Instream bypass sites – Above Pathfinder Dam subbasin Figure 2.5.5. Instream bypass sites – South Platte subbasin Figure 2.5.6. Basin Reservoirs operated to provide minimum or voluntary releases Figure 2.5.7. Fish and wildlife water appropriations Technical Memorandum 2.5 TC2.5-3 3/24/2005 Platte River Basin Water Plan Technical Memorandum 2.5 SUBJECT: Platte River Basin Water Plan Section 2.5 – Environmental Water Use PREPARED BY: Trihydro Corporation DATE: April 1, 2005 PURPOSE: The Platte River Basin Plan is a planning tool developed for the Wyoming Water Development Office. It presents estimated current and estimated future uses of water in Wyoming’s Platte River Basin. The Plan is not used to determine compliance with or administration of state law, federal law, court decrees, interstate compacts, or interstate agreements. 2.5 ENVIRONMENTAL WATER USE 2.5.1 Introduction This technical memorandum describes environmental water use within the Platte River Basin of Wyoming and considers water-related environmental practices in the basin, including Wyoming State Engineer’s Office (SEO) instream flow filings, U.S. Forest Service instream bypasses, and U.S. Bureau of Reclamation (USBR) minimum and voluntary reservoir releases. In addition, this memorandum includes the results of a survey of organizations having an interest in water-related basin environmental issues and a summary of information regarding the Platte River Recovery Implementation Program and Draft Environmental Impact Statement. 2.5.2 Water-related Environmental Practices Environmental water use within the Platte River Basin includes maintenance of minimum stream flow rates and reservoir water levels to protect new and existing fisheries and wildlife habitat. Instream flow filings, instream bypasses, and minimum reservoir releases are three tools used by state and federal agencies to produce and protect fisheries habitat in the Platte River Basin that has been impacted by historical low flow conditions. Due to the non-consumptive nature of environmental water uses, water consumption attributed to environmental use is minimal and is due primarily to evaporative loss. 2.5.2.1 Wyoming State Engineer’s Office Instream Flow Filings In 1986 the Wyoming State Legislature passed House Bill No. 209 leading to the creation of Wyoming Statutes 41-3-1001 through 41-3-1014. These statutes recognize minimum instream flows to establish, maintain, or improve new and existing fisheries as a beneficial use of State Technical Memorandum 2.5 2.5-1 3/7/2005 water. W.S. 41-3-1002(d)(ii) states that any person “may divert and appropriate, as provided by law, instream flow waters for any beneficial use other than for instream flows at the following places: within one (1) mile upstream from any point where the instream flow enters the main stem of the North Platte River.” Establishing instream flow as a beneficial use allows the SEO to grant direct flow and storage water rights to the State of Wyoming solely for the purpose of the creation, enhancement, and protection of fisheries. The Wyoming Water Development Commission (WWDC) has filed 93 applications with the SEO on behalf of the State for minimum instream flow rights state-wide. At the time of this writing, 34 instream flow water rights have been permitted. An instream flow water right is established through a process involving the Wyoming Game and Fish Department (WGF), the Wyoming Water Development Commission (WWDC), and the Wyoming State Engineer’s Office (SEO). WGF is responsible for initial identification of stream segments that need minimum instream flow protection. These stream segments may be presented annually by the WGF to the WWDC. The WWDC is required to file applications with the SEO for instream flow appropriation in stream segments recommended by the WGF. The WWDC is also responsible for evaluating the feasibility of each WGF request for instream flow protection and whether storage is needed to provide the discharge recommended by the WGF. The WWDC provides its findings regarding the feasibility of the appropriation of water for instream flow in a report to the SEO. The SEO is responsible for reviewing the application and feasibility report and either permitting the instream flow water right requested by the WWDC or rejecting the application. The SEO may not issue an instream flow permit when the instream flow right would be included as part of the consumptive share of water allocated to Wyoming in an interstate decree or compact. In addition, the amount of water appropriated under an instream flow right may not result in more water leaving the state than would otherwise be allocated for downstream uses outside Wyoming. As part of the instream flow permitting process, the SEO conducts a public hearing to present information regarding the instream flow application and to receive public comment. A 30-day comment period is normally allowed. If the SEO approves the instream flow permit application, the SEO may place a condition on the permit requiring review of continuation of the permit. Instream flows permitted by the SEO are water rights held in the name of the State of Wyoming. Instream flow rights are administered similarly to other surface water rights granted by the SEO. After senior upstream water rights are satisfied, remaining stream flow is protected for instream purposes when water is available under an instream flow permit. Assuming natural flow is sufficient and senior upstream water rights are met, instream flows are typically satisfied. It is the responsibility of the Wyoming Game and Fish Department (WGF) to recognize when a permitted minimum instream flow is not achieved due to diversions by appropriators with junior water rights. In this event, WGF reports the need for regulation for the benefit of the instream flow water right to the WWDC, who in turn requests (calls for) regulation by the SEO. The SEO will Technical Memorandum 2.5 2.5-2 3/7/2005 then evaluate whether the call for regulation is valid and, if so, will administer the water rights to provide the permitted instream flow. The recommended instream flow may, in some instances, vary by time and season of the year, based on studies completed by the WGF. The basis for recommended minimum flows is described in WGF reports that are attached to instream flow applications that are submitted to the WWDC by WGF. Currently, 12 instream flow filings for stream reaches located within the Platte River Basin have been submitted to the SEO. Information regarding these 12 filings is summarized in Table 2.5.1, and the locations of these 12 stream reaches are shown on Figures 2.5.1, 2.5.2, and 2.5.3. To date, none of the 12 Platte River Basin instream flow application filings have been permitted by the SEO. Technical Memorandum 2.5 2.5-3 3/7/2005 Table 2.5.1 Summary - Wyoming State Engineer's Office (SEO) instream flow filings in Wyoming's Platte River Basin Point of beginning Stream Minimum of minimum Point of ending of reach flow (cubic instream flow minimum instream Hearing length feet per (Section, Township, flow (Section, No. Stream segment held (miles) second) Range) Township, Range) South Fork of the Grand 1 Encampment River yes 13.60 54 10-12-84 13-14-84 2 North Platte River yes 16.00 163 23-12-80 26-14-81 3 Sweetwater River yes 10.20 16-80 17-28-98 34-29-97 4 Lake Creek yes 5.80 0.5 33-14-78 11-13-79 5 Horse Creek yes 0.10 0.2 16-14-79 16-14-79 6 Nugget Gulch Branch yes 0.10 0.2 14-14-79 14-14-79 7 Beaver Creek yes 1.90 0.35 14-14-79 22-14-79 8 Camp Creek yes 1.20 0.2 13-14-79 19-14-78 9 Douglas Creek yes 22.30 5.5 9-14-79 6-13-80 10 Wagonhound Creek no 8.50 1.2-545 31-19-79 6-19-79 Pathfinder to Guernsey subbasin 11 Deer Creek yes 5.00 10-30 11-31-77 T110A-32-77 Upper Laramie subbasin 12 Laramie River yes 3.94 50-100 26-13-77 10-13-77 Source: Wyoming State Engineer's Office, February 17, 2005 e-mail Technical Memorandum 2.5 2.5-4 3/7/2005 Sublette Natrona Fremont Sweetwater River Albany Rawlins Carbon Legend Instream Flow Segments County Boundaries Wagonhound Creek ** NOTE: Nugget Gulch Branch, Horse Creek and Camp Creek segments are too small to be seen at this scale Saratoga Grand Encampment South Fork Grand Encampment River Beaver Creek Lake Creek Douglas Creek North Platte River Figure 2.5.1 Instream Flow Filing Sites Above Pathfinder Dam Subbasin 7 3.5 0 7 Miles Platte River Basin Water Plan Carbon Legend Albany Instream Flow Segments Laramie County Boundaries Laramie River I.F.
Recommended publications
  • Seminoe Reservoir Inflow
    Annual Operating Plans Table of Contents Preface ..................................................................................... 5 Introduction ............................................................................. 5 System Planning and Control ................................................ 7 System Operations Water Year 2018 ................................... 10 Seminoe Reservoir Inflow ........................................................................... 10 Seminoe Reservoir Storage and Releases .............................................. 10 Kortes Reservoir Storage and Releases .................................................. 12 Gains to the North Platte River from Kortes Dam to Pathfinder Dam .................................................................................................... 13 Pathfinder Reservoir Storage and Releases ........................................... 14 Alcova and Gray Reef Reservoirs Storage and Releases .................... 17 Gains to the North Platte River from Alcova Dam to Glendo Reservoir ........................................................................................... 18 Glendo Reservoir Storage and Releases ................................................. 18 Gains to the North Platte River from Glendo Dam to Guernsey Reservoir ........................................................................................... 21 Guernsey Reservoir Storage and Releases ............................................ 22 Precipitation Summary for Water Year 2018 ..........................................
    [Show full text]
  • North Platte Project, Wyoming and Nevraska
    North Platte Project Robert Autobee Bureau of Reclamation 1996 Table of Contents The North Platte Project ........................................................2 Project Location.........................................................2 Historic Setting .........................................................4 Project Authorization.....................................................7 Construction History .....................................................8 Post-Construction History................................................20 Settlement of Project ....................................................26 Uses of Project Water ...................................................30 Conclusion............................................................32 Suggested Readings ...........................................................32 About the Author .............................................................32 Bibliography ................................................................33 Manuscript and Archival Collections .......................................33 Government Documents .................................................33 Articles...............................................................33 Newspapers ...........................................................34 Books ................................................................34 Other Sources..........................................................35 Index ......................................................................36 1 The North Platte Project
    [Show full text]
  • Full Historic Context Study
    Wyoming Will Be Your New Home . Ranching, Farming, and Homesteading in Wyoming, 1860 –1960 Michael Cassity PREPARED FOR THE WYOMING S TAT E HISTORIC PRESERVATION OFFICE PLANNING AND HISTORIC CONTEXT DEVELOPMENT PROGRAM WYOMING S TAT E PARKS & C U LT U R A L RESOURCES Wyoming Will Be Your New Home . Wyoming Will Be Your New Home . Ranching, Farming, and Homesteading in Wyoming, 1860 –1960 Michael Cassity PREPARED FOR THE WYOMING STATE HISTORIC PRESERVATION OFFICE PLANNING AND HISTORIC CONTEXT DEVELOPMENT PROGRAM WYOMING STATE PARKS & CULTURAL RESOURCES Copyright © 2011 by the Wyoming State Historic Preservation Office, Wyoming State Parks and Cultural Resources, Cheyenne, Wyoming. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise—except as permitted under Section 107 or 108 of the United States Copyright Act— without the prior written permission of the Wyoming State Historic Preservation Office. Printed in the United States of America. Permission to use images and material is gratefully acknowledged from the following institutions and repositories. They and others cited in the text have contributed significantly to this work and those contributions are appreciated. Images and text used in this document remain the property of the owners and may not be further reproduced or published without the express consent of the owners: American Heritage Center, University of Wyoming; Bridger–Teton
    [Show full text]
  • A. Platte River System Environmental Baseline
    1 Biological Opinion on the Platte River Recovery Implementation Program June 16, 2006 2 Table of Contents TABLE OF CONTENTS ............................................................................................................................................2 LIST OF TABLES.......................................................................................................................................................5 LIST OF FIGURES.....................................................................................................................................................7 LIST OF APPENDICES...........................................................................................................................................10 I. INTRODUCTION.................................................................................................................................................11 II. CONSULTATION HISTORY ............................................................................................................................13 A. DEVELOPMENT OF A BASIN-WIDE RECOVERY PROGRAM ...................................................................................17 B. DETERMINATIONS OF EFFECTS FROM THE FEDERAL ACTION ..............................................................................20 III. SCOPE OF THE BIOLOGICAL OPINION...................................................................................................24 A. PROGRAM EFFECTS ON THREATENED OR ENDANGERED SPECIES.......................................................................24
    [Show full text]
  • Facilities in the North Platte River Drainage Basin Above and Including Guernsey Dam and the Four Inland Lakes Near Scottsbluff, Nebraska
    PREFACE This report documents the operation of all Bureau of Reclamation (Reclamation) facilities in the North Platte River Drainage Basin above and including Guernsey Dam and the four Inland Lakes near Scottsbluff, Nebraska. This area of the North Platte River Drainage Basin is simply referred to in this report as the Basin. References to average in this document will refer to the average of the historical record for the years 1981-2010, except for water year 2012 information which uses the years 1982-2011. In each coming year this period will be advanced by one year to maintain a running 30-year average. INTRODUCTION The System of dams, reservoirs, and powerplants on the North Platte River (referred to as the "System" in this text) is monitored and in most cases operated and managed from the Wyoming Area Office in Mills, Wyoming. The operation and management of the System is aided by the use of a Programmable Master Supervisory Control, computerized accounting processes, an extensive network of Hydromet stations, control crest measurement weirs at gaging stations, SNOw TELemetry (SNOTEL) stations, and a snowmelt runoff forecasting procedure used by the Water Management Branch. The System consists of a number of individual water resource projects that were planned and constructed by Reclamation. The individual projects and features are operated as an integrated system to achieve efficiencies that increase multipurpose benefits. The drainage basin which affects the System covers an area from northern Colorado to southeastern Wyoming, encompassing 16,224 square miles. Storage reservoirs in the System include four off stream reservoirs known as the Inland Lakes in western Nebraska as shown in Figure 21.
    [Show full text]
  • January/February 1957
    Copied from an original at The History Center. www.TheHistoryCenterOnline.com 2013:023 Copied from an original at The History Center. www.TheHistoryCenterOnline.com 2013:023 Copied from an original at The History Center. www.TheHistoryCenterOnline.com 2013:023 Published t fomers a d o promote F . by the Lut/"ends and7en dship and G in Foundry ~ °r:: vance the ?Od Will With . ach in e Co Jn fe rest of its Jfs cus. LINE~~ .......... ~ ............ o~ ~v:· ~:· :"':P:a~n~y..: · :::::~: L:u~fk~~· P:r:od:u~c~.. ts~~ Sales and Service Offices of the LUFKIN FOUNDRY & J,BNUflRY • FEBRUARY. 1957 MACHINE COMPANY BAKERSFIELD. CALIFORNIA Volume 32 Number 1 2608 Pine St.; Phone Fflirview 7-8564 • Carl Frazer CASPER. WYOMING ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• P. 0. Box 1849. Phone 3-4670 Robert Bowcutt, Tom Berge CORPUS CHRISTI. TEXRS 1201 Wilson Bldg. ROCKY MOUNTAIN DIVISION ISSUE Phone TUiip 3-1881 fohn Swanson DALLAS. TExas COLORflDO'S MOUNTflIN MflJESTY­ 814 Vaughn Bldg. · Phone Riverside 8-5127 Dick Bellew and Bob flrrendale ..... 4- 7 A. £ . Ca raway-R. C. Thompson fim C. Roe DENVER. COLORADO 1423 Mile High Center NEW TRAILER SHOP IS COMPLETED ..... .. ... .. 8-11 Phone Alpine 5-1616 R. S. Miller EDMONTON. ALBERTA, CANADA LUFKIN INSTflLLflTIONS . ... .. .... .. ...... ... 12-13 Lufkin Machine Co., Ltd . 9950 Sixty-Fifth Ave., Phone 3-3111 Ja ck Gissler, Jack Leary, L. fl. Ruzicki EFFINGHAM. ILLINOIS CASPER'S TRflILS OF flDVENTURE­ 210 W. Jefferson St., Phone 667-W P. 0 . Box n Dolores B. Jeffords . ' .. ... ..... .. ' ' . 14-1 7 Lewis W. Breeden, Ben C. Sargent, Jr. EL DORADO. ARICANSAS f. R. Wilson Bldq.
    [Show full text]
  • Case Studies of Potential Facility-Scale and Utility-Scale Non-Hydro Renewable Energy Projects Across Reclamation S
    Placement for optional Case Studies of Potential Facility-Scale and Utility-Scale Non-Hydro Renewable Energy Projects across Reclamation S. Haase, K. Burman, D. Dahle, D. Heimiller, A. Jimenez, J. Melius, B. Stoltenberg, and O. VanGeet Produced under direction of Bureau of Reclamation by the National Renewable Energy Laboratory (NREL) under Interagency Agreement IAG-11-1816 and Task No WFJ2.1000. NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory Technical Report 15013 Denver West Parkway TP-7A30-57123 Golden, CO 80401 May 2013 303-275-3000 • www.nrel.gov Contract No. DE-AC36-08GO28308 Case Studies of Potential Facility-Scale and Utility-Scale Non-Hydro Renewable Energy Projects across Reclamation S. Haase, K. Burman, D. Dahle, D. Heimiller, J. Melius, T. Jimenez, B. Stoltenberg, and O. VanGeet Prepared under Task No. WFJ2.1000 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory Technical Report 15013 Denver West Parkway TP-7A30-57123 Golden, CO 80401 May 2013 303-275-3000 • www.nrel.gov Contract No. DE-AC36-08GO28308 NOTICE This manuscript has been authored by employees of the Alliance for Sustainable Energy, LLC (“Alliance”) under Contract No. DE-AC36-08GO28308 with the U.S. Department of Energy (“DOE”). This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights.
    [Show full text]
  • Downtown Casper and Five Nightly JUNE PRCA Rodeo Performances
    and the work we do, please contact John Giantonio For more information on the Casper Sports Alliance at 307-234-5362 Natrona County and the people of Wyoming by hosting creating sports The Casper Sports Alliance serves Bear Bait 8 State Games The Cowboy or [email protected] The Cowboy State Games Casper Area Convention & Visitors Bureau Visit Casper Office Pre-Sorted 139 West139 West 2nd 2nd Street, Street, Suite 1B Standard Casper, WY 82601 U.S. POSTAGE Suite 1B PAID Casper, WY 82601 Casper, WY Foss Motors 3X3 Permit No. 165 Basketball Tournament VisitCasper.com facebook.com/phbcasper facebook.com/cowboystategames facebook.com/caspersportsalliance Wyoming High School State Championships In Casper? Stop by our Visitor Center in the National Historic Trails Interpretive Center at 1501 North Poplar Street. Three Crowns Golf Club Set against a dramatic backdrop of the Casper Mountains is a one of a kind Golf experience... You’ll enjoy: Award Winning Robert Trent Jones II 18-Hole Golf Course Indoor and Outdoor Special Events Tournaments • Weddings “The Grille” Restaurant Serving Delicious, Fresh Food Daily Open to the Public 1601 King Boulevard Casper, WY 82604 www.threecrownsgolfclub.com Photo by: Southern Native Photography 307.472.7696 WELCOME TO CASPER We’re just going to come right out and say it: we’re so glad you’re considering Casper. And while you’re here, we’ll let you in on a little secret: there’s no where in the world quite like it. Nowhere else perfectly combines small-town charms and big-city vibes or outdoor opportunities with an urban vibrancy like Casper.
    [Show full text]
  • WIRP01807 DIP.Pdf
    YOUR WATER BY EDWIN W. BURRITT STATE ENGINEER Cheyenne,Wyo. Wyoming Reclamation As~ociat:ion, Casper,Wyoming April 2- 3, 1936 ELWOOD MEAD BORN JANUARY 16, 1858 DIED JANUARY 26, 1936 HE WAS INTERESTED IN WYOMING'S WATERS DURING TENURE OF OFFICE AS STATE ENGINEER OF WYOMING, 1666-1699 . TI-lE REASON FOR St;MINOI; I .-;..·'' • -·. , PATHFINDER ······. .·· ·. SPILLS! - • .. .; --· w . ,_ :... .~.., . 'C • -= ,- ·- . ·---- -~-p. .. The C( ·.!l;)il.A.ti on of this r::::_p~~rt has ~·;f ;Gn uade possi ~~l l( , du .. ;; t ...'l t.hc, cuc,pGrat,lon a:nd assi :3t::tnc~.:: c·f c1tany pe· ~, pl:..: ~nd I r.:·ish tc ~~x11r8SS ..a::t ap1;-recL1tion tu the f,Jl­ J.or.ring: Hun . Leslie A. ,idller - Gcver11(1r ~1f Wyo.J.ing . Wil.l U. 1vk:tz - q'J PA A.duinistratur fnr V~y o.u ing. Senior Hydraulic ~~ngJ.neer, U.SeG.E1. Fult"Jn D. 3ell:L·ry - AusistJ.nt. State Engine(:n·, \Vy C; ,.1Jng • .l!.:ar.l Lloyd - Clvil &.ginec.:r, Che;:ro.n:ne, Wy(;.i;ling. Charlt::s B. Sta.ff:)rd - Dopt. C~>.i1 . ;1erc e & Industry, Wy Cl.:,ing. J~)lm E. Dunkin - DraftscoH:in, Chcy.::nna, Nyo.:dng. (Th0 {{a tar Conaervat1on ProJ act su11ervised by Lae). Edwin w. · Burritt State Eri~ineer Cht::yennc:, Wy ..1 ••d.ng ,11hrch 50, 19:56 ---~---- ....., __ Paee Yo ur ~:r at e r , by Edwin W. Bur ritt , Sta t e Engi neer • •. • . • l - 9 SUliPLET 7SFT I r rigation - 2epr int ed from "WyoE1 in.::; St a tisti cs '.' .
    [Show full text]
  • Summary of North Platte River and Laramie River Court Decrees Interstate Streams Division, Wyoming State Engineer’S Office Date Completed: December 1, 2004
    Summary of North Platte River and Laramie River Court Decrees Interstate Streams Division, Wyoming State Engineer’s Office Date Completed: December 1, 2004 1. North Platte River. During the mid-1930s the state of Nebraska filed an action against the states of Colorado and Wyoming in the U.S. Supreme Court over the flows of the North Platte River. In 1945 the Court handed down a decree equitably apportioning the waters of the North Platte among the states. The decree included the following provisions: (a) Exclusive of the Kendrick Project and Seminoe Reservoir, the State of Wyoming is enjoined from diverting water from the North Platte River above the Guernsey Reservoir and from the North Platte River and its tributaries above Pathfinder Dam, for the irrigation of more than a total 168,000 acres of land during any one irrigation season. (b) Exclusive of the Kendrick Project and Seminoe Reservoir, the State of Wyoming is enjoined from storing more than 18,000 acre-feet of water from the North Platte River and its tributaries above the Pathfinder Reservoir for irrigation purposes during any one year. (c) The storage rights of the Pathfinder, Guernsey, Seminoe, and Alcova reservoirs are junior to 1165 second-feet of rights for the irrigation of land in Western Nebraska, and the State of Wyoming is enjoined from storing or permitting the storage of water in these reservoir otherwise than in accordance with the rule of priority. (d) The natural flow of the North Platte River in the section of the river between the Guernsey Dam and Tri-State Dam, or approximately the Wyoming-Nebraska state line, between May 1 and September 30 of each year, is apportioned 25% to Wyoming and 75% to Nebraska.
    [Show full text]
  • Large Dams.Pdf
    THE HISTORY OF LARGE FEDERAL DAMS: PLANNING, DESIGN, AND CONSTRUCTION IN THE ERA OF BIG DAMS David P. Billington Donald C. Jackson Martin V. Melosi U.S. Department of the Interior Bureau of Reclamation Denver Colorado 2005 INTRODUCTION The history of federal involvement in dam construction goes back at least to the 1820s, when the U.S. Army Corps of Engineers built wing dams to improve navigation on the Ohio River. The work expanded after the Civil War, when Congress authorized the Corps to build storage dams on the upper Mississippi River and regulatory dams to aid navigation on the Ohio River. In 1902, when Congress established the Bureau of Reclamation (then called the “Reclamation Service”), the role of the federal government increased dramati- cally. Subsequently, large Bureau of Reclamation dams dotted the Western land- scape. Together, Reclamation and the Corps have built the vast majority of ma- jor federal dams in the United States. These dams serve a wide variety of pur- poses. Historically, Bureau of Reclamation dams primarily served water storage and delivery requirements, while U.S. Army Corps of Engineers dams supported QDYLJDWLRQDQGÀRRGFRQWURO)RUERWKDJHQFLHVK\GURSRZHUSURGXFWLRQKDVEH- come an important secondary function. This history explores the story of federal contributions to dam planning, design, and construction by carefully selecting those dams and river systems that seem particularly critical to the story. Written by three distinguished historians, the history will interest engineers, historians, cultural resource planners, water re- source planners and others interested in the challenges facing dam builders. At the same time, the history also addresses some of the negative environmental consequences of dam-building, a series of problems that today both Reclamation and the U.S.
    [Show full text]
  • The History of Large Federal Dams: Planning, Design, and Construction in the Era of Big Dams
    THE HISTORY OF LARGE FEDERAL DAMS: PLANNING, DESIGN, AND CONSTRUCTION IN THE ERA OF BIG DAMS David P. Billington Donald C. Jackson Martin V. Melosi U.S. Department of the Interior Bureau of Reclamation Denver Colorado 2005 INTRODUCTION The history of federal involvement in dam construction goes back at least to the 1820s, when the U.S. Army Corps of Engineers built wing dams to improve navigation on the Ohio River. The work expanded after the Civil War, when Congress authorized the Corps to build storage dams on the upper Mississippi River and regulatory dams to aid navigation on the Ohio River. In 1902, when Congress established the Bureau of Reclamation (then called the “Reclamation Service”), the role of the federal government increased dramati- cally. Subsequently, large Bureau of Reclamation dams dotted the Western land- scape. Together, Reclamation and the Corps have built the vast majority of ma- jor federal dams in the United States. These dams serve a wide variety of pur- poses. Historically, Bureau of Reclamation dams primarily served water storage and delivery requirements, while U.S. Army Corps of Engineers dams supported QDYLJDWLRQDQGÀRRGFRQWURO)RUERWKDJHQFLHVK\GURSRZHUSURGXFWLRQKDVEH- come an important secondary function. This history explores the story of federal contributions to dam planning, design, and construction by carefully selecting those dams and river systems that seem particularly critical to the story. Written by three distinguished historians, the history will interest engineers, historians, cultural resource planners, water re- source planners and others interested in the challenges facing dam builders. At the same time, the history also addresses some of the negative environmental consequences of dam-building, a series of problems that today both Reclamation and the U.S.
    [Show full text]