PORTLAND PUBLIC SCHOOLS AND PORTLAND PARKS & RECREATION Grant Upper Field Improvements
Design Advisory Group October 8, 2020 AGENDA
Introductions 0:05
Design Update 0:45
Collaborative Agreement 0:05
Schedule 0:05
Public Comments 0:10 Introductions Design Updates SOCCER FIELD
NEW SOCCER FIELD STRIPING
210’ X 300’
BASEBALL GAME FIELD
SOCCER 210'x300'
4' SWING GATE SOFTBALL GAME FIELD BUILDING
4' SWING GATE
12' SLIDING GATE 18" RETAINING WALL PROPOSED BULLPEN 60'x14' batting cage
LAWN
0' 15' 30' 60' SCOREBOARD
1 EXISTING BASEBALL SCOREBOARD
2 NEW SOFTBALL SCOREBOARD
3 NEW OR RELOCATED DAKTRONICSBASEBALL SCOREBOARD MS-3918 PRODUCT SPECIFICATIONS BASEBALL GAME FIELD
SOCCER 3 BALL 210'x300' STRIKE OUTBALL STRIKE HOMEOUT H E GUEST 2 HOME H E GUEST
4' SWING GATE INNING Included SOFTBALL GAME FIELD Caption Panel BUILDING PERIOD
4' SWING GATE
This outdoor LED multisport scoreboard displays period time to 99:59, HOME and GUEST scores to 99, INNING to nine and 12' SLIDING GATE includes indicators for BALL, STRIKE, OUT, H (hit) and E (error) in baseball mode. Scoreboard also includes a changeable 18" RETAINING WALL PERIOD caption panel. When period time is less than one minute, the scoreboard displays time to 1/10 of a second. Scoreboard shown with optional striping and amber PanaView® digits. PROPOSED BULLPEN 60'x14' batting cage 1 DIMENSIONS UNCRATED WEIGHT POWER (120 VAC)* 5'-0" H x 10'-0" W x 8" D Red/Amber Digits 130 Watts, 1.1 Amp LAWN 115 lb (52 kg) (1.52 m, 3.05 m, 203 mm) White Digits 270 Watts, 2.3 Amps
*Scoreboard requires a dedicated circuit. Models with 240 VAC power at half the indicated amperage are also offered (International Use On
DIGITS & INDICATORS DISPLAY COLOR 0' 15' 30' 60' • All digits are 18" (457 mm) high. All indicators are 2" Choose from 150+ colors (from Martin Senour® paint book (51 mm) in diameter. at no additional cost. BULLPEN SOCCER 210'x300'
4' SWING GATE SOFTBALL GAME FIELD BUILDING
4' SWING GATE
12' SLIDING GATE 18" RETAINING WALL PROPOSED BULLPEN 60'x14' batting cage
LAWN FIELD ACCESS
EXISTING SWING GATES
EXISTING ROLLING GATE BASEBALL GAME FIELD
SOCCER 210'x300'
4' SWING GATE SOFTBALL GAME FIELD BUILDING
PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF 4' SWING GATE SPORTSFIELD SPECIALTIES INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF SPORTSFIELD SPECIALTIES INC. IS PROHIBITED. 12' SLIDING GATE 18" RETAINING WALL PROPOSED BULLPEN 60'x14' batting cage
LAWN
0' 15' 30' 60' LANDSCAPE MITIGATION
BASEBALL GAME FIELD
SOCCER 210'x300'
4' SWING GATE SOFTBALL GAME FIELD BUILDING
4' SWING GATE
12' SLIDING GATE 18" RETAINING WALL PROPOSED BULLPEN 60'x14' batting cage
LAWN
0' 15' 30' 60' PA SYSTEM
BASEBALL GAME FIELD
SOCCER 210'x300'
4' SWING GATE SOFTBALL GAME FIELD BUILDING
4' SWING GATE
12' SLIDING GATE 18" RETAINING WALL PROPOSED BULLPEN 60'x14' batting cage
LAWN
0' 15' 30' 60' PRESS BOX SOCCER 210'x300'
4' SWING GATE SOFTBALL GAME FIELD BUILDING
4' SWING GATE
12' SLIDING GATE 18" RETAINING WALL PROPOSED BULLPEN 60'x14' batting cage
LAWN PRESS BOX
“Fencing Without Boundaries” PORTABLE FENCING Product Description
SportaFence™ is the “ONLY” professional grade portable fencing system on the market! A revolutionary new design that allows softball and baseball outfield fences to be easily moved from field to field. It can be used also for special events, crowd control, etc. BASEBALL GAME FIELD Staffing Solutions
With the wheeled SportaFence™ system, an entire SOCCER 210'x300'field can be ready for play in one hour. This high quality fencing enhances player safety and adds excitement to the game.
Product Features4' SWING GATE SOFTBALL GAME FIELD Heavy-duty portableBUILDING chainlink fence panels: 5ft H x 10ft 4' SWING GATE L / Weight: 175 lbs. (also available in 6’H x 10’L).
12' SLIDING GATE Constructed of durable galvanized steel with 8-gauge coated chainlink18" RETAINING fence material. WALL PROPOSED BULLPEN 60'x14' batting cage Connectors secure panels together to form one LAWN continuous fence. Legs collapse for easy storage.
References 0' 15' 30' 60' ASA Official Portable Fence NCAA Women’s Fast- BACKSTOP/NETTING Backstop/Netting Option B
Semi-Permanent (sleeved) Netting for Soccer 20' height
Traditional 30' tall Chainlink Backstop to match baseball. 20' tall 30 ht. netting chainlink backstop
CAMERON McCARTHY KEY MAP LANDSCAPE ARCHITECTURE & PLANNING
BACKSTOP/NETTING ALTERNATE A Backstop/Netting Option A
post netting
CAMERON KEY MAP McCARTHY LANDSCAPE ARCHITECTURE & PLANNING BACKSTOP/NETTING ALTERNATE B Backstop/Netting Option C
post netting
CAMERON McCARTHY KEY MAP LANDSCAPE ARCHITECTURE & PLANNING Collaboration Agreement Next Steps SCHEDULE
Grant Upper Field Improvements | 3008801 Updated September 25, 2020
2020 2021 2022 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 19 26
General Schedule Fall Term 2020 Spring Term 2021 Fall Term 2021
Milestones DD 75CD CD SC
Construction Administration (3 Design Development (9 weeks) Construction Documents (8 weeks) Bidding/Permitting (16 weeks) Phase months) Land Use (19 Weeks)
KOff DD1 DD2 PT CD 1 PT PPS/Design Team Meetings Key Milestones CD 2
DAG 3 Public Process Meetings DAG 1 TH 1 DAG 2 TH 2 Land Use Process Design Advisory Group 2 Conditional Use (12 weeks) October 8, 2020
100%Milestones DesignPublic PPS/Design Development Team Meetings Jurisdiction October 23, 2020 October 23 August 25 August 26 Feb 9 October 13 100% Design DAG 1 Kick off CD 1 Pre App ConditionalDevelopment Use HearingConference January 28, 2020 September 30 September 15 March 16 March 5 Town Hall 1 DD 1 CD 2 January 28 75% Conditional Use DesignConstruction October Advisory 6 October 6 GroupMarch 30 Page Hearing3 February 16, 2020 Documents DAG 2 DD 2 Turn February 11 March 26 October 27 October 30 Appeal period 75%100% ConstructionTown Hall 2 Page Turn Documentsends March 5, 2021 Construction Documents January 28 Conditional Use 100%September, ConstructionHearing Documents March 26, 2021 Note: All dates are approximate and subject to change 2021 Substantial Feb 16 SubstantialCompletion DAG 3 Completion September 2021 Thank you.