Reviving a Reservoir

Total Page:16

File Type:pdf, Size:1020Kb

Reviving a Reservoir September 2018 REVIVING A RESERVOIR PWSA Completes Major Renovation of Lanpher Reservoir IN THIS ISSUE: 1 Reviving a Reservoir 2 RAW Talk 3 PWSA in the Community 6 PWSA in the News 8 Engineering and Construction 10 Performance Metrics 11 Team PWSA 13 Water Wise 14 PWSA Connect Storage in the form of The reservoir was initially taken expects the work to be reservoirs and tanks is the out of service on August 28, completed by the end of 2018. backbone of all major drinking 2017, with urgent repairs to the Improvements to the gatehouse COMING UP: water distribution systems. east cell of the project occurring and the construction of new PWSA’s reservoirs provide from September to November metering and chemical addition backup water supply and 2017. After the east cell was facilities are planned for 2019. 2018 Board Meetings reduce the need for pumping. secured, work commenced on October 26 In addition, the reservoirs a full renewal of the west cell. November 30 are strategically located at a West cell renewal included “A renewed December 14 high elevation to supply the replacing nearly 10 acres of pressure needed to move liner and 10 acres of cover Lanpher Reservoir 20th Anniversary 3 Rivers Wet Weather water throughout the service material. In addition to a new ensures that PWSA Sewer Conference area. liner and cover, a pumping will continue to October 17-18 Last month, PWSA completed and dewatering system was Monroeville Convention Center the final phase of major installed to prevent rainwater provide safe and from pooling on top of the renovations to half of the Carnegie Science Center Lanpher drinking water reservoir cover. Now that reliable water to Stormwater Tabling Event reservoir located in Shaler the west cell has returned to our customers for October 13 Township. The project service, PWSA contractors will November 16 December 15 involved replacing the liner drain the east cell and begin decades to come. I its full renewal as well. Carnegie Science Center and cover of the west cell of applaud our team of See Page 4 for more information this critical treated drinking The entire Lanpher Reservoir water storage facility that renewal project, which PWSA employees Civic Leadership Academy provides water to one-third of includes improvements October 24 and contractors who PWSA Water Treatment PWSA’s customers in northern to the walls surrounding Plant neighborhoods of the City the reservoir, will cost worked together to of Pittsburgh, as well as the approximately $12.5 million. Borough of Millvale and Depending on weather get the job done for Reserve Township. conditions, the Authority our customers,” Executive Director Robert A. Weimar RAW TALK RAW TALK By Executive Director Robert A. Weimar Going above and beyond: The people behind PWSA I cannot say it enough – it is a privilege to work alongside the tireless and dedicated women and men of the Pittsburgh Water and Sewer Authority. These individuals perform often September 2018 Gold Drop thankless tasks in extremely stressful Awardees: situations. They take pride in their work and understand the importance of the essential services we provide our Josh Mincin, Plumber customers. They don’t back down from Water Operations a challenge, and they don’t end a day Brenden Clair, Plumber without getting stuff done! Water Operations We are applauding our employees’ exceptional efforts at this month’s Sharon Gottschalk, Manager Board of Directors meeting. Each Customer Service employee will receive a small but Maureen Lyons, Assistant significant token of appreciation, the Human Resources PGH2O Gold Drop. The PGH2O Gold Drop is a pin in the shape of a water Ana Flores, Engineer II droplet that symbolizes the shining Department of Engineering and Construction example each individual is within the Manda Metzger, Associate Project Manager Authority. It’s important for the public Department of Engineering and Construction to understand that despite challenging circumstances like aging infrastructure Rachel Romano, Manager and extreme weather events, we have Department of Finance a truly special team of Pittsburghers working behind the scenes to make Mora McLaughlin, Communications Associate PWSA the public water, sewer, and Department of Public Affairs stormwater utility that we can all be Jason Fesler, SCADA Technician proud of. Plant Operations These selfless individuals set a high George Watson, SCADA Manager standard and inspire our team to go Plant Operations above and beyond expectations. I look forward to distinguishing more Ruthann Connors, Inventory Control Specialist ll outstanding employees at future Board Central Warehouse meetings. Our customers should be assured that our employees will keep the good work flowing! CURRENTS | September 2018 2 PWSA IN THE COMMUNITY PWSA IN THE Spreading the Word About Stormwater COMMUNITY Community Meeting Kicks-off Four Mile Run Stormwater PWSA engaged with the Improvement Project community at the following meetings: Lawrenceville 9th Ward Block Watch On Monday, September 17th, the boards and discuss elements of the August 21 PWSA provided an overview of project with members of the project Stephen Foster Community Center the Four Mile Run Stormwater team and PWSA staff. Improvement project to introduce The next community meeting is Red Oak and Hayson GI Community proposed concepts for managing Wednesday, November 14th. For more Meeting stormwater, and provide an information please visit the project August 23 opportunity for attendees to share website, www.4mr.org. Banksville Park their ideas and concerns. Four Mile Run has a history of Land Lab Hazelwood: Stormwater flooding and combined sewer Stories overflows. It is home to Schenley August 26 Park and encompasses some Lewis Parklet of Pittsburgh’s most densely populated neighborhoods, Oakland Community Town Hall including Greenfield, Hazelwood, August 27 Oakland, and Squirrel Hill. This Career Center project will capture and route the flow of stormwater through a Senator Jay Costa Public Meetings naturalized surface channel that with PUC and PWSA will generally follow the path of August 28 the historic streams that formed IBEW #5 and Jewish Community Four Mile Run from Panther Center Hollow Lake to the Monongahela River. Panther Hollow Lake will Riverview Park Mairdale Avenue be allowed to discharge to the Project Event Monongahela River instead of the September 8 combined sewer. Riverview Park Redirecting the flow of water through a naturalized surface Uptown Partners Community channel will help prevent Meeting combined sewer overflows and September 12 reduce the intensity of flooding Pittsburgh Association of the Deaf that occurs throughout Four Mile Run. PWSA is also evaluating ALCOSAN Open House the construction of wetlands September 15 and other natural stormwater ALCOSAN treatment systems that will help to control sediment, provide habitat Four Mile Run Stormwater Meeting for wildlife, and filter pollutants September 17 from stormwater before it enters Phipps Conservatory the river. Four Mile Run attendees interact with the project boards. Squirrel Hill Urban Coalition Those attending the meeting had September 20 an opportunity to explore project Jewish Community Center CURRENTS | September 2018 3 PWSA IN THE COMMUNITY Spreading the Word About Stormwater PWSA Participates in 16th Annual ALCOSAN Open House PWSA participated in the Allegheny County Sanitary Authority’s (ALCOSAN) 16th Annual Open House on Saturday, September 15th. This popular event was an opportunity to talk about current stormwater projects. Our giveaway, a native plant kit, provided an ideal opening to engage people in conversations about how our projects are built and why we are using a combination of traditional and nature- based solutions to create safe, flood-prepared neighborhoods. Pittsburgh residents asked questions about the stormwater projects taking place in and around their neighborhoods. Project boards PWSA’s native plant giveaway placed throughout our booth provided basic information about a project’s timeline, design features, and some technical details about the Children learning amount of stormwater managed. about stormwater with PWSA’s interactive Kids of all ages learned about our stormwater models challenges using Legos, sponges, water, and a paint tray. This activity demonstrates how a city can experience stormwater before and after nature-based solutions such as bioswales, rain gardens, vegetation, and trees are added to the landscape. Starting in October, find us at the Carnegie Science Center! Join PWSA at the Carnegie Science Center on Saturday, October 13th from 10:00 a.m. to 3:00 p.m. We will be on site for the next several months to share information about the steps we are taking to manage stormwater throughout Pittsburgh to create safer, healthier, flood-prepared neighborhoods. The tabling activities are a great way to reach a broader audience and it is part of our sponsorship of the H2oh! exhibit. CURRENTS | September 2018 4 PWSA IN THE COMMUNITY PWSA Customer Feedback Going above and beyond to help customers. PWSA is working closely with community groups We received some great feedback from our friends at Lawrenceville United (LU) recently. We visited the community three times over the summer to share our upcoming plans for making our organization work harder for its customers. In a letter to PWSA, LU thanked us by saying we were very generous with our time and addressed every individual resident issue with care. They also appreciated our work with them and the Office of Councilwoman
Recommended publications
  • Restoring the Health of Panther Hollow
    Restoring the Health of Panther Hollow Kate Evasic, Meliora Design Emily McCoy, RLA, ASLA, Andropogon Associates Project Partners • Pittsburgh Parks Conservancy • Heinz Foundation • Pittsburgh Water and Sewer Authority Design Team • Meliora Design • Andropogon Associates • Rothschild Doyno Collaborative • Cosmos Technologies Project Goals • Understand Panther Hollow hydrology. – Natural and Existing • Develop attainable surface water goals. – Return baseflow to Phipps Run and Panther Hollow Stream. – Mitigate the “flashiness” of runoff during heavy storm events. • Identify range of possible interventions & priority locations for pilot projects. • Design and construct three pilot projects in the watershed. Looking at Panther Hollow • Four Mile Run Sewershed • CMU, Pitt • Oakland, Squirrel Hill Looking at Panther Hollow Water Land People Rothschild Doyno Colaborative Water Original Watershed Monongahela Panther Hollow 4-Mile Run Understanding Historic Conditions • Overlaid watershed with • Overlaid historic streams historic maps. with current topography & aerials. Source: Map of Pittsburgh, J.F. Diffenbacher, Publisher of City Directory, 1885. Provided by the Darlington Library. Defining the Watersheds • Revised watershed boundary based on field notes. ORIGINAL AREA = 780 AC REVISED AREA = 384 AC Original Watershed: Forest • Divided watershed into pre-columbian subbasins. PHIPPS RUN = 67 AC PANTHER HOLLOW STREAM = 300 AC PANTHER HOLLOW LAKE = 17 AC Existing Watershed: Direct Drainage Water from these areas typically makes its way into the
    [Show full text]
  • C E E Newsletter
    C E E NEWSLETTER Carnegie Mellon ALSO INSIDE THIS ISSUE CEE’s SUMMER CEE Students 15 Connection 12 Win ASCE With TV’s & Awards ‘The Office’ Al Gore 10 Visits CMU SPRING CEE AlumniSee back cover Events! for details CEE Department Head JIM GARRETT reetings from CEE at Carnegie Mellon! We just completed another excellent academic year, punctuated by an exciting and memorable commencement ceremony. The ceremony featured former Vice President Al Gore, who charged the graduates to lead this country to a more sustainable future and recognized G our department and university as leaders in this mission, and Professor Randy Pausch, who encouraged the graduates to be passionate about how they spend each day. At our CEE graduation ceremony, I was also pleasantly surprised, and touched, to receive a senior class gift from every one of our graduating seniors for use in supporting the Class of 2009. These seniors, a talented group who won many external awards, also clearly demonstrated the community spirit we so often talk about here in CEE. We send our best wishes to all of these graduates as they commence the next phase of their lives. The highlighted theme of this newsletter is environmental sustainability, which we have actively researched and taught courses on since the early 1990’s. One of the most significant contributions to this area has been the Economic Input Output Life-Cycle Assessment (EIO- LCA) tool that has permitted efficient and effective LCA analyses in a large number of domains. This powerful tool, publicly available at www.eiolca.net since 1997, has been very widely used because of its accessibility and flexibility.
    [Show full text]
  • Southwest Regional Office May 27, 2021 Will Pickering Pittsburgh
    Southwest Regional Office May 27, 2021 Will Pickering Pittsburgh Water and Sewer Authority 1200 Penn Avenue Pittsburgh, PA 15222 Email: [email protected] Re: DEP FILE E0205220-031 Technical Deficiency Letter Four Mile Run Stormwater Improvement Project City of Pittsburgh Allegheny County Dear Will Pickering: The Department of Environmental Protection (DEP) has reviewed the above referenced application package and has identified significant technical deficiencies. The attached list specifies the deficiency items. The deficiencies are based on applicable laws and regulations, and the guidance set forth as DEP’s preferred means of satisfying the applicable regulatory requirements. Pursuant to 25 Pa. Code §105.13a of DEP’s Chapter 105 Rules and Regulations you must submit a response fully addressing each of the significant technical deficiencies set forth on the attached list. Please note that this information must be received within sixty (60) calendar days from the date of this letter or DEP may consider the application to be withdrawn by the applicant. You may request a time extension, in writing before the due date to respond to deficiencies beyond the sixty (60) calendar days. Requests for time extensions will be reviewed and considered by DEP. You will be notified of the decision in writing to either grant or deny, including a specific due date to respond if the extension is granted. Time extensions shall be in accordance with 25 Pa. Code §105.13a(b). DEP has developed a standardized review process and processing times for all permits or other authorizations that it issues or grants. Pursuant to its Permit Review Process and Permit Decision Guarantee Policy (021-2100-001), DEP guarantees providing permit decisions within the published time frames, provided applicants submit complete, technically adequate applications that address all applicable regulatory and statutory requirements, in the first submission.
    [Show full text]
  • Westinghouse Memorial City of Pittsburgh Historic Landmark Nomination
    “Untitled Photograph,” Carnegie Mellon University Architecture Archives. Westinghouse Memorial City of Pittsburgh Historic Landmark Nomination Prepared by Preservation Pittsburgh 412.256.8755 1501 Reedsdale St., Suite 5003 October, 2018. Pittsbu rgh, PA 15233 www.preservationpgh.org HISTORIC REVIEW COMMISSION Division of Development Administration and Review City of Pittsburgh, Department of City Planning 200 Ross Street, Third Floor Pittsburgh, Pennsylvania 15219 INDIVIDUAL PROPERTY HISTORIC NOMINATION FORM Fee Schedule HRC Staff Use Only Please make check payable to Treasurer, City of Pittsburgh Date Received: .................................................. Individual Landmark Nomination: $100.00 Parcel No.: ........................................................ District Nomination: $250.00 Ward: ................................................................ Zoning Classification: ....................................... 1. HISTORIC NAME OF PROPERTY: Bldg. Inspector: ................................................. Council District: ................................................ Westinghouse Memorial 2. CURRENT NAME OF PROPERTY: Westinghouse Memorial 3. LOCATION a. Street: W Circuit Rd. b. City, State, Zip Code: , Pittsburgh, Pa. 15217 c. Neighborhood: Schenley Park 4. OWNERSHIP d. Owner(s): City of Pittsburgh e. Street: 414 Grant St. f. City, State, Zip Code: Pittsburgh, Pa. 15219 Phone: (412) 255-2626 5. CLASSIFICATION AND USE – Check all that apply Type Ownership Current Use: Structure Private – home Memorial District Private
    [Show full text]
  • PHLF News Publication
    Protecting the Places that Make Pittsburgh Home Pittsburgh History & Landmarks Foundation Nonprofit Org. 1 Station Square, Suite 450 U. S. Postage Pittsburgh, PA 15219-1134 PAID www.phlf.org Pittsburgh, PA Address Service Requested Permit No. 598 PHLF News Published for the members of the Pittsburgh History & Landmarks Foundation No. 162 March 2002 In this issue: 6 Awards in 2001 10 Richard King Mellon Foundation Gives Major Grant to Landmarks’ Historic Rural Preservation Program 16 Remembering Frank Furness 19 Solidity & Diversity: Ocean Grove, New Jersey More on Bridges Bridges, roads, and buildings were ablaze in light in 1929, when Pittsburgh joined cities across the nation in celebrating the Pittsburgh’s Bridges: fiftieth anniversary of the lightbulb. Architecture & Engineering Walter C. Kidney to Landmarks to pay for the lighting of The following excerpt from a recent Duquesne Light Funds the Roberto Clemente Bridge. The grant review in The Journal of the Society may also be used for certain mainte- for Industrial Archaeology might nance costs so taxpayers will not have to encourage you to buy Walter Bridge Lighting bear all future maintenance costs. Kidney’s book on bridges if you We have appointed a Design Advisory have not already done so (see page 9 Committee, headed by our chairman In the summer, the Roberto Clemente Bridge will be lighted, thanks to a generous for book order information): grant from Duquesne Light Company and the cooperative efforts of Landmarks, Philip Hallen, that will work in cooperation with the Urban Design For his book, Kidney was able to the Riverlife Task Force, Councilman Sala Udin, and many interested parties.
    [Show full text]
  • Sheraden Park Master Plan Community Event #1 Recap Ce1 Responses: Station 1: Welcome Materials
    SHERADEN PARK MASTER PLAN COMMUNITY EVENT #1 RECAP CE1 RESPONSES: STATION 1: WELCOME MATERIALS: -MASTER PLAN LOGO BOARD -TEAM INTRODUCTION BOARD -SIGN IN SHEETS -EXIT SURVEY -EVENT DATE MAGNETS -STATION MAPS CE1 RESPONSES: SIGN IN SHEET CE1 RESPONSES: EXIT SURVEY CE1 RESPONSES: CE1 RESPONSES: STATION 2: PARK UNDERSTANDING & ANALYSIS MATERIALS: -EXISTING PARK PLAN -STEEP SLOPES -SOILS -GEOLOGY -SEWERSHEDS & WATERSHEDS -HYDROLOGY -PARK EXPANSION OPPORTUNITIES -EXISTING CONDITIONS PHOTOS -HISTORICAL IMAGERY -AMENITY PROXIMITY -INFRASTRUCTURE & HABITAT RESTORATION CE1 RESPONSES: STATION 3: INTERACTIVE MAPPING ACTIVITIES MATERIALS: -MAP YOUR ROUTE -UNLAWFUL BEHAVIOR -PARK & NEIGHBORHOOD CIRCULATION CE1 RESPONSES: STATION 4: VISUAL PREFERENCE PHOTOS & VALUES QUESTIONS MATERIALS: -PRECEDENT IMAGERY CARDS HIGHLIGHTING PARK CHARACTER -PARK VALUES QUESTION CARDS -PLASTER REFERENCE MODEL CE1 RESPONSES: VISUAL PREFERENCE PHOTOS NUMBER OF LIKES 16 0 0 0 2 0 0 2 2 2 3 0 CE1 RESPONSES: VISUAL PREFERENCE PHOTOS NUMBER OF LIKES 5 2 2 0 0 1 4 0 0 1 1 0 CE1 RESPONSES: VISUAL PREFERENCE PHOTOS NUMBER OF LIKES 0 2 1 0 1 6 0 3 1 0 0 6 CE1 RESPONSES: VISUAL PREFERENCE PHOTOS NUMBER OF LIKES 2 0 7 2 3 2 0 3 5 2 4 5 CE1 RESPONSES: VISUAL PREFERENCE PHOTOS NUMBER OF LIKES 0 1 2 2 2 1 2 3 0 2 1 2 CE1 RESPONSES: VISUAL PREFERENCE PHOTOS NUMBER OF LIKES 0 2 0 0 1 4 5 2 1 0 2 2 CE1 RESPONSES: VISUAL PREFERENCE PHOTOS NUMBER OF LIKES 2 1 0 0 1 0 0 0 3 0 11 1 CE1 RESPONSES: VISUAL PREFERENCE PHOTOS NUMBER OF LIKES 0 15 1 2 1 1 1 2 0 7 2 4 CE1 RESPONSES: VISUAL PREFERENCE
    [Show full text]
  • Pittsburgh Regional Parks Master Plan Is Estimated to Cost $113.5 Million of Public and Private Funds
    PITTSBURGH’S REGIONAL PARKS MASTER PLAN A New Ethic of Stewardship "The beauty of the park . should be the beauty of the fields, the meadow, the prairie, of the green pastures, and the still waters. What we want to gain is tran- quility and rest to the mind . A great object of all that is done in a park, of all the art of the park, is to influence the mind of men through their imagination." Frederick Law Olmsted (Public Parks and the Enlargement of Towns, 1870) PITTSBURGH’S REGIONAL PARKS MASTER PLAN A New Ethic of Stewardship PREPARED FOR: CITY OF PITTSBURGH - DEPARTMENT OF CITY PLANNING PITTSBURGH PARKS CONSERVANCY PREPARED BY: LAQUATRA BONCI ASSOCIATES / MICHAEL A. STERN BIOHABITATS,INC. TAI +LEE ARCHITECTS LANDSCAPES • LA • PLANNING • HP EARTHWARE / LANDBASE SYSTEMS Acknowledgements The Pittsburgh Regional Parks Master City of Pittsburgh Consultants Plan relied heavily on Task Force Eloise Hirsh, Director LaQuatra Bonci Associates and members from Frick, Highland, Department of City Planning Michael A. Stern, Landscape Riverview and Schenley Parks. They (1994 - 2000) Architects and Lead Consultants were from every walk of life, were full Susan Golomb, Director LANDSCAPES•LA•Planning•HP, of passion for and knowledge about Department of City Planning with Barry Hannegan, PHLF and their parks, and contributed many vol- (current, 2000 - ) Eliza Brown, Historic Preservation unteer hours and invaluable ideas to Duane Ashley, Director Biohabitats, Inc., Ecology this document. These same Task Force Department of Parks and Recreation Tai + Lee Architects, Architecture members will help guide and imple- Guy Costa, Director Earthware / Landbase Systems, ment the Plan for years to follow.
    [Show full text]
  • Download the Park
    4 3 1 2 7 6 5 It’s nearly impossible to mark all of the entrances to Schenley Park. There is parking along most of the roads in this park. The most people are at the Schenley Oval area. If you explore just a little bit, you should be able to easily avoid other people. 1. Anderson Playground resources/points of interest: steps down to Panther Hollow Lake, trail under road past pool and up to veteran’s pavilion Connects to: Panther Hollow, Phipps, Bridle Trail, Parking: 2 hr parking in Anderson Playground google map link: https://goo.gl/maps/SmVreXSYVaoNtQ766 2. Bartlett Shelter resources/points of interest: Pavilion Connects to: Upper and lower Panther Hollow Trails, Hollow Run Trail, Steve Faloon Trail, Serpentine Dr Parking: Street Parking google map link: https://goo.gl/maps/Xd7K9uPvd7QYfmGBA 3. Westinghouse memorial fountain resources/points of interest: Westinghouse memorial, CMU, Flagstaff Hill Connects to: Phipps Run Trail, Steve Faloon Trail, Westinghouse Trail Parking: Street Parking google map link: https://goo.gl/maps/duJwe2cwVPqBrqpr5 4. Schenley Plaza resources/points of interest: Schenley Plaza, Carnegie Library, Pitt, Mary Schenley Fountain Connects to: Flagstaff Hill, Phipps Parking: Parallel and Head-in street parking google map link: https://goo.gl/maps/ng9BqcgtMi9S6FTD8 5. Junction Hollow (The Run) resources/points of interest: Ball Fields, Junction Hollow Trail Connects to: Boundary St., Panther Hollow Parking: Parking Lot google map link: https://goo.gl/maps/9YiYXupqTSsffLrR6 6. Prospect Hill resources/points of interest: Prospect Shelter, Lightly wooded grassy space Connects to: Parking: Street Parking google map link: https://goo.gl/maps/xGgWuAPAbxstwBbH8 7.
    [Show full text]
  • 200802281208430.Pitt Is It 2008.Pdf
    2008 Who are the key people I should know in the Chemistry Department? The Chemistry Department is a big place, but there are also people you will or should get to know in the Department early on. The Graduate Admissions Committee makes decisions on the applications submitted for graduate study in the Chemistry Department. The current committee reviewing applications for Fall 2006 include: Scott Nelson, Chair Peter Siska David Earl Stephen Weber Joe Grabowski Craig Wilcox Nathaniel Rosi The Graduate Student Advising Committee (aka GSAC, pronounced gee-sack) advises graduate students until they pass the preliminary exam - i.e., pass four core courses with a B average. GSAC will meet with new students to advise them when they register in August. The current GSAC includes: Toby Chapman, Chair Stéphane Petoud Lillian Chong Sunil Saxena Kazunori Koide Arguably, the most important person for any graduate student is the Chemistry Graduate Administrator, Fran Nagy. Ask any graduate student. When you need to drop-add courses, go see Fran. When you’re not sure if you have enough credits, go see Fran. If you need a course list for registration, go see Fran. If you need a graduation card, go see Fran. (Get the picture?) When you arrive at the Department, ready to “go to work,” you will want to meet the Department’s Payroll Coordinator, Toni Weber. Remember that to complete your payroll paperwork you will need a passport or two forms of ID (including one picture ID) such as driver’s license, birth certificate, or voter’s registration card. You will also need a Social Security Card.
    [Show full text]
  • Remaking Hazelwood, Remaking Pittsburgh: a Background Study
    Remaking Hazelwood, i Remaking Pittsburgh a background study ii iii Remaking Hazelwood, Remaking Pittsburgh was prepared by For more information, please contact: Research Associates Elise Gatti and Kim Kinder, under the direction of Luis Rico-Gutierrez, Director of the Remaking Luis Rico-Gutierrez Cities Institute. Director, Remaking Cities Institute/ Associate Dean, College of Fine Arts The RCI would like to thank the Heinz Endowments for their Carnegie Mellon, School of Architecture generous financial support. Additional appreciation is owed College of Fine Arts 201 to Bob Gradeck, Director of Community Projects, Carnegie Pittsburgh, PA Mellon Center for Economic Development and Jim Richter, 15213-3890 USA Executive Director, Hazelwood Initiative, Inc. [p]: 001 (412) 412-268-2349 [e]: [email protected] [w]: http://www.arc.cmu.edu/cmu/rci Copyright © August 2007 Carnegie Mellon School of Architecture [CONTENts] 1 Introduction: Remaking Hazelwood RCI and the Urban Lab: Community-University Collaboration iv 5 Pittsburgh, Pennsylvania The Hard Facts ... and the Reasons for Hope 13 Project Stakeholders Owners, Institutions, Community Organizations, and Research Groups 31 Pittsburgh Socio-Geography Regional Context and Development History 41 Hazelwood: Current Conditions Site Overview and Community Context 59 Hazelwood Planning Initiatives Recent Plans and Future Developments 71 Sustainable Development Initiatives Sustainable Development and Eco-Urban Planning [CONTENts] 87 Neighborhood Energy Generation Local and Renewable Urban Energy
    [Show full text]
  • Technical Report August 2015
    HOW OUR REGION CAN WORK TOGETHER FOR CLEAN WATER Technical Report August 2015 Technical Report 1.0 Introduction ……………………………………………………………………...1-1 2.0 Source Control Practices Section Summary ........................................................................................................ 2-1 2.1 Green Stormwater Infrastructure ....................................................................... 2-2 2.1.1 Benefits of Green Stormwater Infrastructure .......................................... 2-2 2.1.2 National and Regional Perspectives on Controlling CSOs through Green Stormwater Infrastructure ................................................................................ 2-4 2.1.3 Current Green Stormwater Infrastructure in the Pittsburgh Region ..... 2-9 2.2 Inflow and Infiltration (I/I) Source Reduction ................................................... 2-11 2.2.1 What is Inflow and Infiltration Source Reduction? ................................ 2-11 2.2.2 Benefits of I/I Reduction .......................................................................... 2-12 2.2.3 National and Regional Perspectives on I/I Reduction ............................ 2-12 2.3 Source Control in Municipal Feasibility Studies ............................................... 2-16 3.0 Regional Source Control Analysis Section Summary ........................................................................................................ 3-1 3.1 Source Control Performance and Costs ............................................................... 3-3 3.1.1
    [Show full text]
  • Appendix E-7 – Municipality and Stakeholder Outreach
    Appendix E-7 – Municipality and Stakeholder Outreach G-1 –Municipality/Stakeholder Suggested Green Stormwater Infrastructure Project Sites G-2 – Summaries of Meetings with Municipalities and Stakeholders G-3 – Green Stormwater Infrastructure Reports Developed by Municipalities and Stakeholders Appendix E-7-1 Municipality/Stakeholder Suggested Green Stormwater Infrastructure Project Sites Project Municipality/Authority/ Stakeholder Suggested Project Location ID 1 Braddock Community Plaza at former UPMC hospital site 2 Braddock Braddock Ave at the intersections of 4th, 5th and 6th Streets Future Redevelopment at Braddock Ave and Quarry St (site of former 3 Braddock bakery) 4 Braddock Vacant Lots 5 PWSA - Hazelwood 4800 Block of 2nd Ave 6 PWSA - Hazelwood Hazelwood Carnegie Library Second Avenue and Tecumseh 7 PWSA - Hazelwood ALMONO Development Business District - along Forbes Avenue business district (between 8 PWSA - Squirrel Hill Murray Ave and Shady Ave) 9 PWSA - Squirrel Hill Near O'Connor's Corner (Murray Ave and Phillips Ave) 10 PWSA - Squirrel Hill Squirrel Hill Post Office 11 PWSA - Southside S. 21st Street from Southside Park to the riverfront trail 12 PWSA - Saw Mill Run Watershed Projects TBD 13 Project 15206 - Morningside Heth's Run, Chislett St & Vetter St 14 PWSA - Beechview Broadway Ave Streetscape 15 PWSA - Carrick Brownsville Road Streetscape Smallman Street - Road reconfiguration and resurfacing between 16th 16 PWSA - Strip District and 21st streets 17 PWSA - Chateau Beaver Ave - Road reconfiguration 18 PWSA - Lawrenceville
    [Show full text]