3 Panther Hollow Lake

Total Page:16

File Type:pdf, Size:1020Kb

3 Panther Hollow Lake 3 Panther Hollow Lake DYNAMIC LAKE CAPACITY A HISTORY OF CHANGE Future Rainwater Connection Realigned Phipps Run PWSA is evaluating active and passive techniques to maximize the Panther Hollow Lake has seen a lot of change over rainwater storage capacity of Panther Hollow Lake. By storing high the years. In fact before industrialization in Pittsburgh, volumes of rainwater and slowly releasing it downstream after a rain there was no lake at all! Our project intends to add new To achieve the project Wetland Edge event, PWSA can further decrease risk for downstream flooding, vibrancy and functionality to a key park landmark. goals, PWSA needs to Constructed Wetland PANTHER HOLLOW BRIDGE basement sewage backups, and combined sewer overflows. Berm Late 1700s increase stormwater storage capacity within Panther Hollow CROSS-SECTION Wet Pond Forebay European-Americans begin to settle in the Pittsburgh area with log cabins built in today’s Schenley Park. Lake. Rock Cascade Source: fatherpitt.wordpress.com Typical lake elevation 1889 Schenley Park is dedicated as a public park. WHY ARE WE DOING IT? Accomodations for Future Amenities Early-1900s Early-1910s ■ To control flows to decrease Path to Junction Hollow N downstream risk of flooding and Lake Loop Trail 250 FEET basement sewage backups New Connection Under the Railroad ■ To improve water quality in the lake SECTION THROUGH THE LAKE INFLOW TREATMENT TRAIN Panther Hollow before the lake was created. Source: Pittsburgh Parks Conservancy THIS PROJECT WILL... ■ Improve trails around the lake and create opportunities for future Mid-1950s amenities as recommended by the Planned drawdown lake elevation in Parks Master Plan advance of a major rain event The cascade and Panther Hollow Lake were ■ Improve habitats, biodiversity, and constructed in the early 1900s. The lake included a boathouse and walking trails. riparian ecology Source: Pittsburgh Parks Conservancy ■ Increase effectiveness of rainwater controls ■ Decrease rainwater in the combined sewer system IMPROVED LAKE FUNCTION IMPROVED HABITATS IMPROVED WATER QUALITY The lake will be deepened and given a A meandering constructed wetland ecosystem The wet pond forebay will capture coarse ■ Enable a new stream through vegetated wetland edge to provide riparian will filter finer sediments and naturally process sediment and woodland debris transported Junction Hollow habitats, improve water quality, and create a pollutants carried from park and neighborhood during storms by Phipps Run and Panther floodable lake edge. The wetland edge of streets and lawns to protect lake water quality. Hollow Run before they enter the lake. This The last substantial modification of the lake the lake allows for the lake to have dynamic Walking paths all around the lake will give park protects the lake from damage and ecological was when it was given a modernist concrete capacity, giving PWSA more control over large users an opportunity to see and learn about disturbance while also making the entire lake edge during the mid-1950s. volumes of rainwater during major rain events. riparian ecology. inflow treatment train simple to maintain. Lake elevation during a major rain event 1999 The Parks Master Plan identifies the lake as a priority for local ecology and stormwater management. revision 20181126-1023.
Recommended publications
  • Restoring the Health of Panther Hollow
    Restoring the Health of Panther Hollow Kate Evasic, Meliora Design Emily McCoy, RLA, ASLA, Andropogon Associates Project Partners • Pittsburgh Parks Conservancy • Heinz Foundation • Pittsburgh Water and Sewer Authority Design Team • Meliora Design • Andropogon Associates • Rothschild Doyno Collaborative • Cosmos Technologies Project Goals • Understand Panther Hollow hydrology. – Natural and Existing • Develop attainable surface water goals. – Return baseflow to Phipps Run and Panther Hollow Stream. – Mitigate the “flashiness” of runoff during heavy storm events. • Identify range of possible interventions & priority locations for pilot projects. • Design and construct three pilot projects in the watershed. Looking at Panther Hollow • Four Mile Run Sewershed • CMU, Pitt • Oakland, Squirrel Hill Looking at Panther Hollow Water Land People Rothschild Doyno Colaborative Water Original Watershed Monongahela Panther Hollow 4-Mile Run Understanding Historic Conditions • Overlaid watershed with • Overlaid historic streams historic maps. with current topography & aerials. Source: Map of Pittsburgh, J.F. Diffenbacher, Publisher of City Directory, 1885. Provided by the Darlington Library. Defining the Watersheds • Revised watershed boundary based on field notes. ORIGINAL AREA = 780 AC REVISED AREA = 384 AC Original Watershed: Forest • Divided watershed into pre-columbian subbasins. PHIPPS RUN = 67 AC PANTHER HOLLOW STREAM = 300 AC PANTHER HOLLOW LAKE = 17 AC Existing Watershed: Direct Drainage Water from these areas typically makes its way into the
    [Show full text]
  • B-3) RA Ruskin Hall (F-1) SC* Falk School (C-1
    I I I I I I BRACKENR N BAPST . BELLEF I DG PLAZA E CATHO MELWD . Parking Services Office P SP CR RUSKSCHEN LS 127 N. Bellefield Avenue AUL D LLT CHDEVMW I BE T ALKS AR P E E F V WEBSR ARKMAN WF I T E N L VA CR E R D E VENU T CRA A M H A T ULE RUSKN FIFT E ENNYS VENU S O U MUSIC S R RAND LANGY O A T TV W B RA P U S COST A O E P UC S I VE SUTHD L O RY S T . T U O HEN N Y UTD N H SC . Q GEL I T CLAPP U O E M A FRA B T S L T MELLI C S BL O VE L C . H CC T A N R N E CHVRN . BE I AH EBERL E V A AS A WYNUC D I S T. B VENU P I PSCOM R WINTHRO I BLDG5 K L T O M E D G V T P VENU LEF H R I ANTH FRAT Y ALUM A R R FRA T UD SRCC S I E D U S H CRGSQ N R I I V E BELLH T W B T D I OC D F . R IG E T F H THA T I HEINZ G I L M O R E S N F IRVIS E UNIVERS F E L O SOSAM ELOW E A OE OSC D E AA L P LR S T R T A T LRDC VNGRF CATHEDRAL .
    [Show full text]
  • C E E Newsletter
    C E E NEWSLETTER Carnegie Mellon ALSO INSIDE THIS ISSUE CEE’s SUMMER CEE Students 15 Connection 12 Win ASCE With TV’s & Awards ‘The Office’ Al Gore 10 Visits CMU SPRING CEE AlumniSee back cover Events! for details CEE Department Head JIM GARRETT reetings from CEE at Carnegie Mellon! We just completed another excellent academic year, punctuated by an exciting and memorable commencement ceremony. The ceremony featured former Vice President Al Gore, who charged the graduates to lead this country to a more sustainable future and recognized G our department and university as leaders in this mission, and Professor Randy Pausch, who encouraged the graduates to be passionate about how they spend each day. At our CEE graduation ceremony, I was also pleasantly surprised, and touched, to receive a senior class gift from every one of our graduating seniors for use in supporting the Class of 2009. These seniors, a talented group who won many external awards, also clearly demonstrated the community spirit we so often talk about here in CEE. We send our best wishes to all of these graduates as they commence the next phase of their lives. The highlighted theme of this newsletter is environmental sustainability, which we have actively researched and taught courses on since the early 1990’s. One of the most significant contributions to this area has been the Economic Input Output Life-Cycle Assessment (EIO- LCA) tool that has permitted efficient and effective LCA analyses in a large number of domains. This powerful tool, publicly available at www.eiolca.net since 1997, has been very widely used because of its accessibility and flexibility.
    [Show full text]
  • Panther Hollow Surveys What Do You See That Interests You?
    Panther Hollow Surveys What do you see that interests you? 1. Phipps and Panther Hollow Confluence 2. Panther Hollow Wetland and Streams What do you see that interests you? 3. Panther Hollow Lake 4. Lake Outlet How do you use this space? 1. Phipps and Panther Hollow Confluence 2. Panther Hollow Wetland and Streams How do you use this space? 3. Panther Hollow Lake 4. Lake Outlet What would you like to do here? 1. Phipps and Panther Hollow Confluence 2. Panther Hollow Wetland and Streams What would you like to do here? 3. Panther Hollow Lake 4. Lake Outlet What is missing? 1. Phipps and Panther Hollow Confluence 2. Panther Hollow Wetland and Streams What is missing? 3. Panther Hollow Lake 4. Lake Outlet Junc9on Hollow Surveys 3 4 2 1 2 OUTDOOR CLASSROOM / WETLAND 1 JUNCTION HOLLOW STREAM TRAILHEAD JUNCTION HOLLOW ACTIVITY NODES SEPTEMBER . 06 . 2017 Staon 1: Entrance from Boundary St. How might the entrance at Boundary St. feel How might you connect from surrounding more park-like, more welcoming? neighborhoods to the JuncFon Hollow valley? Staon 2: Old Boundary Street valley What educaonal opportunies do you see for What other improvements could be made Juncon Hollow? to old Boundary Street? Staon 3: Along Junc9on Hollow trail How do you want to interact with water? What forms do you envision for Juncon Hollow’s water? Staon 4: Entrance from The Run What kind of entrance would you like to be How do you currently recreate in JuncFon created for the park? Hollow? Online Survey How do you use Panther Hollow (Schenley Park)? What features of this area do you like? Online Survey What features of this area could be improved? Concept Image Feedback: Lake Inlet Concept Image Feedback: Lake Inlet “I always thought the way the stream entered into the lake was good for contemplation early in the morning, with the fog in the air.” “If you envision a pretty place to congregate, then something akin to the water steps adjacent to PNC Park will do.
    [Show full text]
  • Four Mile Run Stormwater Improvement Project
    Pittsburgh Water & Sewer Authority FOUR MILE RUN STORMWATER IMPROVEMENT PROJECT September 17, 2018 at Phipps Conservatory Robert Weimar, Executive Director, PWSA James J. Stitt, Manager of Sustainability, PWSA Megan Zeigler, Green Infrastructure Project Manager, PWSA PITTSBURGH HAS * * STORMWATER ISSUES * FLOODING BASEMENT BACKUPS * * SEWER OVERFLOWS * EROSION RUNOFF Aerial Image: Google Earth PITTSBURGH HAS STORMWATER ISSUES THE FOUR MILE RUN PROJECT IS A STRATEGY TO MANAGE THEM Aerial Image: Google Earth OUR GOAL: To improve water quality and create safe, flood-prepared neighborhoods that are healthier places to live. Aerial Image: Google Earth OAKLAND SCHENLEY PARK SQUIRREL HILL SOUTH OAKLAND THE RUN WHAT DO THESE GREENFIELD NEIGHBORHOODS HAZELWOOD HAVE IN COMMON? Aerial Image: Google Earth OAKLAND SCHENLEY PARK SQUIRREL HILL SOUTH OAKLAND THE RUN M29 WHAT DO THESE GREENFIELD NEIGHBORHOODS HAZELWOOD HAVE IN COMMON? THEY ALL DRAIN TO Aerial Image: Google Earth CSO M29 Historical Image Files: University of Pittsburgh SHARED HISTORY Stream Junction Hollow Historical Image FIles. University of Pittsburgh SHARED HISTORY Panther Hollow Run Historical Image FIles. University of Pittsburgh SHARED HISTORY Mouth of Little Panther Hollow Historical Image FIles. University of Pittsburgh SHARED HISTORY Pipe Under Junction Hollow Historical Image FIles. University of Pittsburgh SHARED HISTORY Backfilled Trench Historical Image FIles. University of Pittsburgh CONSENT DECREE EARLY GREEN STORMWATER PROJECTS GREEN FIRST PLAN PPC VISION TODAY PUBLIC MEETING
    [Show full text]
  • Southwest Regional Office May 27, 2021 Will Pickering Pittsburgh
    Southwest Regional Office May 27, 2021 Will Pickering Pittsburgh Water and Sewer Authority 1200 Penn Avenue Pittsburgh, PA 15222 Email: [email protected] Re: DEP FILE E0205220-031 Technical Deficiency Letter Four Mile Run Stormwater Improvement Project City of Pittsburgh Allegheny County Dear Will Pickering: The Department of Environmental Protection (DEP) has reviewed the above referenced application package and has identified significant technical deficiencies. The attached list specifies the deficiency items. The deficiencies are based on applicable laws and regulations, and the guidance set forth as DEP’s preferred means of satisfying the applicable regulatory requirements. Pursuant to 25 Pa. Code §105.13a of DEP’s Chapter 105 Rules and Regulations you must submit a response fully addressing each of the significant technical deficiencies set forth on the attached list. Please note that this information must be received within sixty (60) calendar days from the date of this letter or DEP may consider the application to be withdrawn by the applicant. You may request a time extension, in writing before the due date to respond to deficiencies beyond the sixty (60) calendar days. Requests for time extensions will be reviewed and considered by DEP. You will be notified of the decision in writing to either grant or deny, including a specific due date to respond if the extension is granted. Time extensions shall be in accordance with 25 Pa. Code §105.13a(b). DEP has developed a standardized review process and processing times for all permits or other authorizations that it issues or grants. Pursuant to its Permit Review Process and Permit Decision Guarantee Policy (021-2100-001), DEP guarantees providing permit decisions within the published time frames, provided applicants submit complete, technically adequate applications that address all applicable regulatory and statutory requirements, in the first submission.
    [Show full text]
  • Jonathan Kline Education 2007 Master of Fine Arts, The
    Jonathan Kline Education 2007 Master of Fine Arts, The Pennsylvania State University, Graduate Fellow 1998 Bachelor of Architecture, Carnegie Mellon University, with University Honors Academic Appointments 2015 – Present Carnegie Mellon University – School of Architecture, Associate Studio Professor 2014 – 2015 Carnegie Mellon University – School of Architecture, Adjunct Professor 2002 – 2014 Carnegie Mellon University – School of Architecture, Adjunct Assistant Professor 2007 Carnegie Mellon University – Remaking Cities Institute, Research Fellow 2006 – 2007 The Pennsylvania State University – School of Visual Arts, Instructor and Graduate Fellow 2004 Carnegie Mellon University – STUDIO for Creative Inquiry, Associate Fellow – Planning Coordinator, 3 Rivers 2nd Nature Professional Practice 2007 – current Studio for Spatial Practice Principal 2002 – 2007 Independent Consultant Urban Design, Community Workshops, Architectural Rendering 1998 – 2002 Urban Design Associates, Pittsburgh Assistant Design Team Leader, Architectural Intern Scholarship/Publications /Lectures [selected] 2016 POWER: Organizing Around Transit Equity in Place and in Motion – Panelist at Pittsburgh Community Reinvestment Group Annual Community Summit, May 18, 2016, Pittsburgh, PA 2015 Evolution of Pittsburgh’s Urban Form- Growth, Decline and Reinvention – Lecture at La Salle University School of Architecture, Barcelona. February 11, 2015, Barcelona, Spain 2008 The Urban Laboratory Pedagogy – board exhibition at The Oxford Conference 2008 – 50 Years On – Ressetting the
    [Show full text]
  • Sbu . Pennsyl Vania Minutes
    THE BOARD OF PUBLIC EDUCA TION OF THE SCHOOL DIflRTC7- OF P'SBU.PENNSYL VANIA MINUTES Meeting of: February 21, 2001 Call of the Meeting: Regular Meeting Members Present: Mr. Brentley, Mrs. Fink, Mrs. Harris, Mr. Isler, Mrs. Neiser (via telephone), Mrs. Schmidt, Mr. Taylor, Mrs. Wood, Mr. Matthews. Present 9. Members Absent: Absent 0. The following matters were received and acted upon. Actions taken are recorded following the reports. Note: Mrs. Neiser's telephone connection was lost at the time of the Human Resources Committee Report and for the remainder of the meeting. THE BOARD OF PUBLIC EDUCATION PITTSBURGH, PENNSYLVANIA 15213 Administration Building 341 South Bellefield Avenue February 21,2001 AGENDA Presentation of Books Bruce Campbell, Esq. Approval of the Minutes of the Meeting of January 24,2001 Roll Call Announcement of Executive Sessions COMMITTEE REPORTS 1. Committee on Student Services Roll Call 2. Committee on Operations Roll Call HUMAN RESOURCES REPORT 3. Human Resources Repoxt of the Superintendent of Schools Roll Call LEVYING OF TAX 4. Affirmation and Restatement of Real Property Tax Levy for 2001 Roll Call FINANCIAL MATTERS 5. Transfer of Funds - 2000 General Fund Budget NEW BUSINESS Roll Cd(s) 431 We are an equal rights and opportunity school district. EXECUTIVE SESSIONS Legislative Meeting of February 21, 2001 In addition to executive sessions announced at the legislative meeting of January 24, 2001, the Board met in executive session on February 13, February 20 and immediately before this legislative meeting to discuss various matters, specifically, reorganization, transfers, promotions, reclassifications, disciplinary matters, residency waivers, and positions opened and closed.
    [Show full text]
  • JUNCTION HOLLOW PROJECT: Executive Summary
    JUNCTION HOLLOW PROJECT: IMPROVING BICYCLIST/PEDESTRIAN SAFETY ON NEVILLE & BOUNDARY STREETS Report of: Neville/Boundary Working Group Oakland Green Team OPDC Bike Pittsburgh June, 2017 Executive Summary This report makes a case for connecting the Junction Hollow trail along Neville Street to North Oakland. Neville Street is a major bicycling corridor, providing the most direct access from Shadyside, the eastern section of Oakland, and Squirrel Hill to the popular riverfront trail system, as well as being a highly trafficked route for people driving to Central Oakland. This creates daily conflict, and occasional injury, and is generally a hazardous situation. The recent completion of Carnegie Mellon University’s (CMU) South Neville Parking Lot opened up a huge opportunity to extend the existing Junction Hollow Trail (JHT) into the heart of Oakland. Currently, access to the trail is hidden at the end of Boundary Street. When CMU built the parking lot, they reserved space for a trail between the lot and rail road tracks. Connecting this partially built trail along railroad grade to the existing JHT would eliminate the need for bikes and cars to “share the road” within a dangerous section of the corridor. Extending the trail is an opportunity for a public-private partnership that will greatly improve its access, utility, and safety. Between the railroad tracks and Fifth Avenue, we present an option for improving conditions for cyclists and pedestrians along city-owned streets. This completes the connection to North Oakland, Shadyside, and the city’s bicycle lane and trail network. This report summarizes current conditions and construction (Section 2 and 3), and proposes a strategy for improving the cyclist/pedestrian infrastructure (Section 4).
    [Show full text]
  • The Bellefield Boiler Plant Louis M
    THE BELLEFIELD BOILER PLANT LOUIS M. SUSANY, Manager A Review of the Origin, Expansion, and Modernization of the Plant and the Growth of the Steam Load it Serves The Bellefield Boiler Plant is a Long-Time Member of NDHA. Origin and Early History: 1904-1932 The original Carnegie Library and Music Hall, built in The boiler planr was completed in 1907, and occupies 1893-1895, was heated by a small boiler plant located with­ a site on the western side of Junction Hollow. It is of steel in the original building. In 1900, a large sum of money frame construction, with brick exterior walls. The original was donated by Mr. Andrew Carnegie for the purpose of structure, which remained unchanged until the current ex­ greatly expanding the facilities of the Carnegie Library pansion in 1965-66, is approximately 150 ft long by 65 ft Building. The new consrruction enlarged the Library, added wide, with a height of 70 ft from grade ro eave. the foyer t0 the Music Hall, and expanded the facilities tO A siding from the adjacent Baltimore & Ohio Railroad, include the Museum, Art Galleries, and the large Hall of which runs through the Hollow, serves the boiler plant. Architecture and Sculpture. (Fig. 1). Coal is delivered via a siding inro the south end of the This huge educational and cultural complex of libraries, building, where railroad car platform scales weigh in the music hall, museum, and art gaUeries occupies land donated coal, which is dumped direct from rhe cars into a receiving by the Ciry of Pirrsburgh, and extends for 440 ft along hopper.
    [Show full text]
  • Table of Contents
    Table of Contents Acknowledgements Recommendations Oakland Strategic Visioning Process 1 i Past Planning Efforts ii The Future of Oakland: A Community Investment Strategy Summary of Issues 7 Urban Design Analysis 12 i Existing Conditions ii Institutional Master Plans iii Other Master Plans and Studies iv Concurrences, Conflicts, and Gaps v Areas of Opportunity Transportation Analysis 47 i Transportation Issues ii Transportation Guiding Principles iii Transportation Alternatives Benchmarking Summary 67 i Lessons from Benchmarking Trips ii Conclusions from Quantitative Benchmarking Recommended Projects 77 Introduction a Create a Sense of Place in Oakland b Make it Easier to Get Into and Around In Oakland c Stimulate Neighborhood Revitalization d Foster Technology Development Project Charts The Future of Oakland Acknowledgements Mayor Oakland Task Force Member Organizations Tom Murphy Carlow College Carnegie Mellon University Pittsburgh City Council Carnegie Museums of Pittsburgh Gene Ricciardi President Carnegie Library of Pittsburgh Barbara Burns Children's Hospital Twanda Carlisle City of Pittsburgh Jim Ferlo Magee Womens Hospital Alan Hertzberg Oakland Business Improvement District Jim Motznik Oakland Community Council Bob O'Connor Oakland Planning and Development Corporation Bill Peduto Oakland Transportation Management Sala Udin Association Phipps Conservatory and Botanical Gardens Pittsburgh Board of Public Education Pittsburgh Parks Conservancy Pittsburgh Playhouse of Point Park College Port Authority of Allegheny County Public
    [Show full text]
  • Alternate Routes for Getting Around on Foot and Bike Without the Bridge
    Non-profit Organization U. S. Postage 5344 Second Avenue PAID Pittsburgh, PA Pittsburgh, PA 15207 Permit No. 5333 Serving the communities of Greenfield • Hazelwood • Lincoln Place • Hays • New Homestead Volume 3, No. 3 PUBLISHED BY HAZELWOOD INITIATIVE, INC. 5344 SECOND AVENUE, PITTSBURGH, PA 15207 March 2015 Road is a single lane road. Because of its People are definitely nervous about what width (similar to the historical use of Sec- will happen and Patrick was honest that ond Ave), people have been using it as two Public Works, the Police and the Construc- lanes. Greenfield Road is a park road. I am tion Company cannot predict people’s be- excited to slow traffic down to keep it safe havior. We are not going to know what the for the public that will flow along its edges. problem areas are until we see how many Returning the bridge to park use enhances people are using alternatives. I believe it our neighborhood and allows better access was important that future funds will be used by foot, car, and bike. But for 18 months- to keep the detours and traffic under analy- it doesn’t matter what Greenfield Road or sis while the construction proceeds. This Editorial: From Point A to Point B - Schenley park roads look like. What are we is vital to address issues as they arise. The going to do about traffic control? posted detours are suggestions, but local The Greenfield Bridge Meeting People worried about the Swinburne Greenfield residents will each have to come Bridge and interaction onto Greenfield Av- up with their own commuting and transpor- to Patrick Hassett, Assistant Director for By Annie Quinn enue.
    [Show full text]