San Mariano, Isabela in Restrospect

Total Page:16

File Type:pdf, Size:1020Kb

San Mariano, Isabela in Restrospect Map of the Philippines showing the relative position of San Mariano Map of the Province of Isabela showing the relative position of San Mariano ProfileProfile • Total land Area – considered the largest town in the region with 146,950 has. or 1,469.50 sq. km or about 13.78% of the total land area of Isabela. • Located in the mid-eastern part of the province. • Bounded on North by Municipality of Ilagan; on the East by Municipality of Palanan, on the South by Municipality of San Guillermo and on the West by the Municipality of Benito Soliven. • Comprises of 36 barangays Existing General Land Use Existing Land Use Data Land Use Classification Area (ha) Percent Agricultural 29,264 19.91 Forest 78,451 53.39 Bodies of Water 17,015 11.58 Open Grassland 20,700 14.09 Built up Area 1,268 0.86 Roads 252 0.17 TOTAL 146,950 100 ETHANOLETHANOL PROJECTPROJECT BRIEFBRIEF San Mariano, Isabela • 7,500 hectare sugarcane farm • 125,000 liter a day ethanol distillery • Processing facility is a co-generation project 1. A distillery 2. 8-MW power plant using bagasse as fuel • Joint venture of Different Corporations & Investors. • P 2.0 Billion Project ( P 1.5 Billion – Distillery & P 0.5 – agri- farms) The Approaches: The Benefits: A. Job opportunities B. Additional Income to LGU’s and farmers C. Stimulate local economy D. Turning the idle land to a productive land E. Improved farm to market roads F. Biggest investment after the logging moratorium G. Contribute to the protection of the NSMNP- by providing alternative livelihood ProjectProject Schedule:Schedule: A. Farms - Cutback/transplanting to 70 hectares – Aug. 2008; - Cutback/transplanting to 600-700 hectares – Jan-Feb 2009; - Cutback/transplanting to6,000 hectares – Aug – Sept 2009 B. Processing Plant - Start Construction – 2009 - Start of operation – 2010 The Project is envisioned to generate some 5,000 farms jobs & to stimulate local economy. The Ethanol project is being implemented in close cooperation with the local government units of Isabela..
Recommended publications
  • POPCEN Report No. 3.Pdf
    CITATION: Philippine Statistics Authority, 2015 Census of Population, Report No. 3 – Population, Land Area, and Population Density ISSN 0117-1453 ISSN 0117-1453 REPORT NO. 3 22001155 CCeennssuuss ooff PPooppuullaattiioonn PPooppuullaattiioonn,, LLaanndd AArreeaa,, aanndd PPooppuullaattiioonn DDeennssiittyy Republic of the Philippines Philippine Statistics Authority Quezon City REPUBLIC OF THE PHILIPPINES HIS EXCELLENCY PRESIDENT RODRIGO R. DUTERTE PHILIPPINE STATISTICS AUTHORITY BOARD Honorable Ernesto M. Pernia Chairperson PHILIPPINE STATISTICS AUTHORITY Lisa Grace S. Bersales, Ph.D. National Statistician Josie B. Perez Deputy National Statistician Censuses and Technical Coordination Office Minerva Eloisa P. Esquivias Assistant National Statistician National Censuses Service ISSN 0117-1453 FOREWORD The Philippine Statistics Authority (PSA) conducted the 2015 Census of Population (POPCEN 2015) in August 2015 primarily to update the country’s population and its demographic characteristics, such as the size, composition, and geographic distribution. Report No. 3 – Population, Land Area, and Population Density is among the series of publications that present the results of the POPCEN 2015. This publication provides information on the population size, land area, and population density by region, province, highly urbanized city, and city/municipality based on the data from population census conducted by the PSA in the years 2000, 2010, and 2015; and data on land area by city/municipality as of December 2013 that was provided by the Land Management Bureau (LMB) of the Department of Environment and Natural Resources (DENR). Also presented in this report is the percent change in the population density over the three census years. The population density shows the relationship of the population to the size of land where the population resides.
    [Show full text]
  • Page 1 Subject/Title Res. No. SPONSOR / AUTHOR Date
    Republic of the Philippines PROV1NCE OF 1SABELA Ilagan OFFICE OF THE SANGGUNIANG PANLALAWIGAN RECORD OF PROCEEDINGS OF THE SANGGUNIANG PANLALAWIGAN Series of 2012 Date Subject/Title R es. No. SPONSOR / AUTHOR ADOPTED / ENACTED A RESOLUTION OF CONDOLENCE, EXPRESSING AND CONVEYING THE PROVINCIAL OFFICIALDOM’S DEEPEST SYMPATHIES TO THE BEREAVED FAMILY OF THE LATE HONORABLE LEONCIO K. KIAT, INCUMBENT SANGGUNIANG PANLALAWIGAN 1 UNANIMOUS 01/03/12 MEMBER, PROVINCE OF ISABELA WHO PASSED AWAY ON DECEMBER 29, 2011 WITH SINCERE PRAYERS THAT THE LORD ALMIGHTY GRANT UNTO HIS SOUL ETERNAL PEACE A RESOLUTION STRONGLY AND FAVORABLY ENDORSING TO THE CONGRESS OF THE PHILIPPINES, THE CONVERSION OF THE HON. NAPOLEON M. 2 01/10/12 MUNICIPALITY OF ILAGAN INTO A COMPONENT CITY OF THE HERNANDEZ, JR. PROVINCE OF ISABELA A RESOLUTION STRONGLY SUPPORTING THE PROPOSAL OF THE HONORABLE CONGRESSMAN HERMILANDO I. MANDANAS OF THE PROVINCE OF BATANGAS FOR A FIVE HUNDRED BILLION 3 UNANIMOUS 01/10/12 PESOS (Php500B) INCREASE IN THE INTERNAL REVENUE ALLOTMENT (IRA) FOR LOCAL GOVERNMENT UNITS (LGUs) IN CY 2012 A RESOLUTION DECLARING THE APPROPRIATION ORDINANCE HON. ROLANDO L. NO. 01-2011 DATED APRIL 11, 2011 MUNICIPALITY OF SAN ISIDRO 4 01/10/12 TUGADE OPERATIVE IN ITS ENTIRETY SUBJECT TO SOME CONDITIONS A RESOLUTION DECLARING THE APPROPRIATION ORDINANCE HON. ROLANDO L. NO. 06-2011 DATED APRIL 28, 2011 MUNICIPALITY OF RAMON 5 01/10/12 TUGADE OPERATIVE IN ITS ENTIRETY SUBJECT TO SOME CONDITIONS A RESOLUTION DECLARING THE APPROPRIATION ORDINANCE NO. 2011-02 DATED MARCH 21, 2011 OF THE MUNICIPALITY OF HON. ROLANDO L. 6 01/10/12 SAN AGUSTIN OPERATIVE IN ITS ENTIRETY SUBJECT TO SOME TUGADE CONDITIONS A RESOLUTION DECLARING THE APPROPRIATION ORDINANCE NO.
    [Show full text]
  • Research Note
    Ecosystems & Development Journal 4(2): 54-64 April 2014 ISSN 2012-3612 RESEARCH NOTE Communities’ Perception of a Proposed Mine-Mouth Coal-Fired Power Plant Project in Benito Soliven, Isabela, Philippines Dhino Gegesa, Jennifer Marie Amparo.a, Carla Edith Jimenaa, Maria Emilinda Mendozaa, Emilia Viscoa, Mary Jane Comiab, Jo Anne Franciscob, and Jill Maynelle Rutorb ABSTRACT This study was conducted to determine the communities’ perception of the proposed mine-mouth coal-fired power plant project in the two barangays of Dagupan and Villaluz, in Benito Soliven, Isabela, Philippines. Focus group discussions and key informant interviews were used to gather data from local leaders and representatives from different sectors of the two communities. Participants were asked to answer a questionnaire to determine their socio-demographic characteristics, awareness and perception of the proposed project. Results showed general awareness among the respondents about the coal-fired power plant project, with only 12% of respondents from Dagupan and 9% from Villaluz claiming unawareness. That most respondents were aware of the project can be attributed to the information, education, and communication (IEC) campaign done by the Philippine National Oil Company-Exploration Commission (PNOC-EC). However, majority of respondents (53%) in Dagupan and close to half (44%) in Villaluz perceived that the project will have a negative effect on agriculture in the area. Other sectors that are seen to be negatively affected in both barangays included livelihood/economic at 41% and 40% respectively for Villaluz and Dagupan, social interactions at 44% and 36%, environmental at 47% and 31%, and resettlement at 41% and 36%. Project proponents have to dispel these negative perceptions to fully implement the project.
    [Show full text]
  • Environment and Natural Resources Office Accomplishment Updates
    EEnvironment and NNatural RResources OOffice AAccomplishment UUpdates From January 2, 2014 to February 21, 2014 ENVIRONMENT AND NATURAL RESOURCES OFFICE ACCOMPLISHMENT UPDATES FOREST MANAGEMENT AND CONSERVATION A. Forest Protection and Law Enforcement With the continuing efforts of the Provincial Government through the leadership of Hon. Faustino G. Dy III as Chairman of the Isabela Environment Protection - Task Force (ISEP-TF), the alarming dilemma on economic salvation and environmental imbalance is address to ensure protection, conservation, wise utilization and development of the remaining resources through the issuance and enforcement of Executive Order No 03 series of 2014 that strengthened the ISEP-TF. In this initiative of the Provincial Government prior to the issuance of Executive Order No. 23 of the President of the Philippines, it complements the national government thru the DENR in the strict implementation and enforcement of forestry, mining and environmental laws, rules and regulations within the province which brought about the apprehension and confiscation of common hardwood and narra species, respectively all done during the conduct of surveillance and foot patrolling activities in the different areas covered by the established Monitoring Checkpoints strategically based within the province, namely: Marana 1st and Abuan River, Cab. 10 both in the City of Ilagan, District 2 in Benito Soliven, San Pablo in Cauayan City and San Isidro in Jones, to wit: Table 1: Shows the Confiscated Forest Products NO. OF VOLUME DATE SPECIES DIMENSION REMARKS PIECES (CU.M.) Abandoned at CHW Feb. 9, Eight Assorted 723 bd. ft. Abuan River, Lumber and 2014 (8) Sizes 1.70 cu. m. Cab. 10, City of Flitches Ilagan B.
    [Show full text]
  • Provincial Government of Isabela
    ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬ Provincial Government of Isabela ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬ CSC Publication Code : 20180601-22-14 CSC Website Posting Date : 01-June-2018 Position Title : CHIEF OF HOSPITAL I Annual Salary : 879,588.00 Salary/Job Grade : SG-24/1 Job Qualification Standards/Requirements: Education : Doctor of Medicine Training : 8 hours of relevant training Experience : 2 years of relevant experiences Eligibility : RA 1080 Number of Vacancy/ies : Five (5) 1 . Plantilla Item No. : 42.1.1 CSC Posting ID : ExMan8370 Place of Assignment : Cauayan District Hospital Regional Location : CAGAYAN VALLEY Other Requirements : none 2 . Plantilla Item No. : 42.12.1 CSC Posting ID : ExMan8372 Place of Assignment : Palanan Station Hospital Regional Location : CAGAYAN VALLEY Other Requirements : none 3 . Plantilla Item No. : 42.2.1 CSC Posting ID : ExMan8368 Place of Assignment : Manuel A. Roxas District Hospital Regional Location : CAGAYAN VALLEY Other Requirements : none 4 . Plantilla Item No. : 42.6.1 CSC Posting ID : ExMan8369 Place of Assignment : Echague District Hospital Regional Location : CAGAYAN VALLEY Other Requirements : none 5 . Plantilla Item No. : 42.9.1 CSC Posting ID : ExMan8371 Place of Assignment : San Mariano Medicare Community Hospital Regional Location : CAGAYAN VALLEY Other Requirements : none ------------------------------------------------------------------------------------------------------------------------------------------------------ CSC Publication Code : 20180601-22-14
    [Show full text]
  • Philippine Crocodile Crocodylus Mindorensis Merlijn Van Weerd
    Philippine Crocodile Crocodylus mindorensis Merlijn van Weerd Centre of Environmental Science, Leiden University, Abel Tasmanstraat 5bis, Utrecht 3531 GR, Netherlands ([email protected]) Common Names: Philippine crocodile (English), buwaya 2009 IUCN Red List: CR (Critically Endangered. Criteria (general Philippines), bukarot (northern Luzon) A1c. Observed decline in extent of occurrence >80% in 3 generations. C2a. Less than 250 adults in the wild, populations highly fragmented and declining; IUCN 2009) (last assessed Range: Philippines in 1996). Taxonomic Status The Philippine crocodile was described in 1935 by Karl Schmidt on the basis of a type specimen and three paratypes from the island of Mindoro (Schmidt 1935, 1938). Schmidt also described the closely related New Guinea freshwater crocodile (Crocodylus novaeguineae) in 1928 and later made a comparison of morphological differences between C. mindorensis, C. novaeguineae and C. porosus, maintaining C. mindorensis as a separate species (1956). However the Philippine crocodile has long been treated as C. novaeguineae mindorensis, a sub-species of the New Guinea crocodile, by other authorities. Hall (1989) provided new evidence of the distinctness of the Philippine crocodile and nowadays C. mindorensis is generally treated as a full species endemic to the Philippines. Figure 1. Distribution of Crocodylus mindorensis. Figure 2. Juvenile C. mindorensis in Dunoy Lake, in Northern Sierra Madre National Park, northern Luzon. Photograph: Merlijn van Weerd. Conservation Overview CITES: Appendix I Ecology and Natural History CSG Action Plan: The Philippine crocodile is a relatively small freshwater Availability of recent survey data: Adequate crocodile. Although much is still unknown, studies at two Need for wild population recovery: Highest captive breeding facilities [Palawan Wildlife Rescue and Potential for sustainable management: Low Conservation Centre (PWRCC), Palawan Island (Ortega Van Weerd, M.
    [Show full text]
  • Mobility and Sedentarization Among the Philippine Agta
    SENRI ETHNOLOGICAL STUDIES 95: 119 –150 ©2017 Sedentarization among Nomadic Peoples in Asia and Africa Edited by Kazunobu Ikeya Mobility and Sedentarization among the Philippine Agta Tessa Minter Leiden University ABSTRACT This article provides an ethnography of Agta mobility, based on fieldwork in the northern Philippines conducted over the past decade. The Agta are a population of about 10,000 people, living in small settlements distributed along the coasts and in the mountainous interior of northeastern Luzon. They follow a hunting-fishing and gathering lifestyle, which includes a relatively mobile settlement pattern. First, this article aims to document Agta mobility by exploring its drivers and by showing how it is both facilitated and limited by kinship relations. How mobility varies regionally and seasonally will also be discussed. Second, the article focuses on Agta mobility in relation to Philippine development policies. This includes a discussion of past and recent efforts at sedentarization, as well as the government’s misconceptions of Agta mobility in relation to the ongoing ancestral land titling processes. Finally, the article explores the ongoing and future developments likely to influence Agta mobility. These concern Agta parents’ recent emphasis on enrolling their children in formal education and the approval of a road construction project that will traverse Agta living areas and the associated claims on coastal land by politically influential outsiders. An underlying question of this article is how anthropological knowledge on mobility could contribute to improving policy. INTRODUCTION Nomadism and sedentarization have long since raised the interest of policy makers, development practitioners and academics. Discussions have, however, focused mostly on pastoralist herders in arid and semi-arid regions of Eurasia and Africa (Khazanov and Wink 2001).
    [Show full text]
  • The Provincial Government of Isabela Under the Excellent Leadership of Gov. Faustino “Bojie” G. Dy III and Vice-Governor Antonio “Tony Pet” T
    Republic of the Philippines PROVINCE OF ISABELA ILAGAN PROVINCIAL HEALTH OFFICE FARMERS CONGRESS cum MEDICAL/DENTAL MISSION Date: April 27, 2017 Venue: Cordon, Isabela The Provincial Government of Isabela under the excellent leadership of Gov. Faustino “Bojie” G. Dy III and Vice-Governor Antonio “Tony Pet” T. Albano spearheaded ”FARMERS CONGRESS-RELOADED” cum Medical/Dental Mission intended for the people of Isabela last April 27,2017 at Cordon,Isabela. In keeping with its mission of providing the best quality of life to every Isabeleño thru various programs, projects and innovations addressed specifically to the marginalized citizenry of the province most particularly our farmers. As a proof of its success, the table below reflects the number of recipients from the health services nobly provided: Municipality Health Services Provided Medical Dental BRO-LUSOG Sta. Maria 630 34 250 Benito Soliven 836 121 125 The Provincial Governor Faustino The Provincial Vice Governor G. Dy III, gives a warm message to Antonio “Tony Pet” T. Albano , also people of Cordon. shares a motivating message to everyone IPHO-024-0 The c ommunity of Cordon gather around the town whie waiting for the activity to begin. Outpouring of patients while the health team from IPHO and GFNDY attend to their health concerns The people of Cordon while waiting to avail of the Medical/Dental Services that the province delivered to their place. IPHO-024-0 IPHO Nurses and GFND Nurses with the help of some RHU staff attend to patients for consultation. The Provincial Dentists lead the team in providing Oral Health care The Provincial Nutritionist-Dietician facilitates the distribution of seedlings for identified parents thru the BNS with a help from the Department of Agriculture.
    [Show full text]
  • Republic of the Philippines Province of Isabela City of Ilagan OFFICE of the PROVINCIAL HEALTH OFFICER
    Republic of the Philippines Province of Isabela City of Ilagan OFFICE OF THE PROVINCIAL HEALTH OFFICER May 16, 2016 Angadanan RHU May 16, 2016 Angadanan RHU The technical team conducts a random TCL check The MHO of Angadanan highlights the importance of organizing the HPN and Diabetic Club for the non -communicable program as well as presenting possible activities to support a Healthy lifestyle for everyone in Angadanan. The Nurse IV from PHO provides insights regarding program management to attain better health outcomes . May 17, 2016 San Isidro, Isabela The TB Raider presents the TB program implementation of San Isidro. The PHN of San Isidro gives an overall report of program implementation May 20, 2016 City of Ilagan Health Office I DMO IV from DOH-RO II helps the PHNs and Midwives in identifying their strength, weakness, opportunities and threats The Midwife of Barangay Baculud/Centro presents her accomplishment for calendar year 2015 Technical team from the Provincial Health Office assists the PHNs and midwives in the data presentation analysis May 23, 2016 Echague, Isabela The RHU staff of Echague strikes a pose with he technical team after the PIR RHU Accomplishments by means of picture presentation by the TB aider. May 24, 2016 San Agustin, Isabela The Nurse supervisor of San Agustin presents the over-all accomplishment of the RHU The RHU staff critically studies their loopholes in the implementation of their health programs. Everybody enjoys a fun moment of posing after the PIR Republic of the Philippines Province of Isabela City of Ilagan OFFICE OF THE PROVINCIAL HEALTH OFFICER ILAGAN CHO II PROGRAM IMPLEMENTATION REVIEW Program Implementation Review is one of the strategies of IPHO in order to determine status of the different health programs in terms of management and achieving national standards.
    [Show full text]
  • The Official Newsletter of Isabela II Electric Cooperative Inc
    The Official Newsletter of Isabela II Electric Cooperative January - March Issue no. 3 What’s inside ISD revives school symposia Page 2 by: Pinky Ann C. Lucas ISELCO II joins “Isang Bayan, After a few years of its non-ex- their applications for power con- Isang Bayanihan” challenge istence, the school symposium has nection in the near future, hence, Page 3 again emerged as part of the regu- they are being made aware of in- Key officers and employees lar activities of the Institutional Ser- formation relative to the operation attend 3-day consultative vices Department (ISD). The activity and programs of our distribution meeting intends to educate the youth on utility. Page 4 various information on electricity The team composes of the MSD EC Regional Presidents that generally affect them as young Chief Ma. Luisa Z. Demetria, Mem- reactivates PHILAECIA consumers. The Cooperative is not bership Education Development Page 4 discounting the fact that most of and Coop Promotion Section Head ISELCO II social responsibility these students, if not all, shall file turn to page 3 and civil concern Page 5 NELECA SPORTSFEST 2013 ISELCO II energizes ISELCO II CHAMPIONS - Earned not Given far-flung sitios & barangays by: Jessa I. Que Page 8 he Northeast Cagelco I. The event ferent participating Unbundled power rate TLuzon Electric was participated by coops. Other coops schedule for the month Cooperatives’ Asso- CAGELCO I, CAGELCO have their respective of December 2013 ciation (NELECA) con- II, IFELCO, KAELCO, IS- assignments. During Page 9 ducted a sports festival ELCO I and ISELCO II. the opening program, ISELCO II conducts work on August 23-24, 2013 participants paraded attitude seminar for employees t was bright and held at the Cagayan together with athletes clear day perfect Sports Complex, Tu- I with the torch relay Page 10 for sports.
    [Show full text]
  • Pdf | 308.16 Kb
    2. Damaged Infrastructure and Agriculture (Tab D) Total Estimated Cost of Damages PhP 411,239,802 Infrastructure PhP 29,213,821.00 Roads & Bridges 24,800,000.00 Transmission Lines 4,413,821.00 Agriculture 382,025,981.00 Crops 61,403,111.00 HVCC 5,060,950.00 Fisheries 313,871,920.00 Facilities 1,690,000.00 No report of damage on school buildings and health facilities as of this time. D. Emergency Incidents Monitored 1. Region II a) On or about 10:00 AM, 08 May 2009, one (1) ferry boat owned by Brgy Captain Nicanor Taguba of Gagabutan, Rizal, bound to Cambabangan, Rizal, Cagayan, to attend patronal fiesta with twelve (12) passengers on board, capsized while crossing the Matalad River. Nine (9) passengers survived while three (3) are still missing identified as Carmen Acasio Anguluan (48 yrs /old), Vladimir Acasio Anguluan (7 yrs /old) and Mac Dave Talay Calibuso (5 yrs/old), all from Gagabutan East Rizal, Cagayan. The 501st Infantry Division (ID) headed by Col. Remegio de Vera, PNP personnel and some volunteers from Rizal, Cagayan conducted search and rescue operations. b) In Nueva Vizcaya, 31 barangays were flooded: Solano (16), Bagabag (5), Bayombong (4), Bambang (4), in Dupax del Norte (1) and in Dupax del Sur (1). c) Barangays San Pedro and Manglad in Maddela, Quirino were isolated due to flooding. e) The low-lying areas of Brgys Mabini and Batal in Santiago City, 2 barangays in Dupax del Norte and 4 barangays in Bambang were rendered underwater with 20 families evacuated at Bgy Mabasa Elementary School.
    [Show full text]
  • DATE of REGISTRATION Isabela II Electric Cooperative (ISELCO II) Was Organized and Registered As a Non-Stock, Non-Profit Electri
    DATE OF REGISTRATION Isabela II Electric Cooperative (ISELCO II) was organized and registered as a non-stock, non-profit electric cooperative with the National Electrification Administration (NEA) on February 25, 1978. Its organization was mandated by Republic Act No. 6038 which was enacted on August 4, 1969 and later amended by Presidential Decree No. 269 (PD 269), also known as the National Electrification ,Administration Charter, promulgated on August 6, 1973. On June 22, 2007, ISELCO II also registered with the Cooperative Development Authority (CDA) by virtue of Republic Act No. 6938 (Cooperative Code) and Republic Act No. 6939 (Cooperative Development Authority Charter). OPERATIONAL MILESTONE ISELCO II officially started its operation with the purchase and take-over of the operations of the now defunct Ilagan Electric Plant on December 1, 1978. By December 12, 1982 eighteen out of twenty two municipalities were energized namely: Ilagan, San Pablo, Cabagan, Sta. Maria, Delfin Albano, Naguilian, Aurora, Roxas, Gamu, Mallig, Tumauini, Benito Soliven, San Mariano, Quirino, Sto.Tomas, San Manuel, Quezon and Burgos. The four coastal municipalities of Palanan, Dinapigue, Divilacan and Maconacon remained unenergized for a long time because they are inaccessible and isolated from the rest of the coverage area by the Sierra Madre Mountain ranges. Palanan was energized on June 20, 1993 through a generator set installed by the National Power Corporation-Small Power Utilities Group (NPC- SPUG) while Divilacan, Maconacon and Dinapigue were energized through solar home systems. Dinapigue is now included in the franchise area of AURELCO. SERVICE AREA ISELCO II is one of the two electric cooperatives providing electric service to the province of Isabela.
    [Show full text]