Federal Register/Vol. 76, No. 43/Friday, March 4, 2011/Notices
Total Page:16
File Type:pdf, Size:1020Kb
12212 Federal Register / Vol. 76, No. 43 / Friday, March 4, 2011 / Notices Charting Forum to be held from April 26 Council on Environmental Quality District Department of Transportation, through April 28, 2011, from 8:30 a.m. Regulations (40 CFR parts 1500–1508); Planning, Policy, and Sustainability to 5 p.m. at Advanced Management and the FHWA Environmental Impact Administration, 2000 14th Street, Technology, Inc. (AMTI), 1515 Wilson and Related Procedures (23 CFR part NW., 7th Floor, Washington, DC Boulevard, Arlington VA 22209. 771). 20009. The Instrument Procedures Group National Capital Planning Commission FOR FURTHER INFORMATION CONTACT: agenda will include briefings and Library, 401 9th Street, NW., North Federal Highway Administration, discussions on recommendations Lobby, Suite 500, Washington, DC District of Columbia Division: Mr. regarding pilot procedures for 20004. Michael Hicks, Environmental/Urban instrument flight, as well as criteria, Martin Luther King, Jr. Memorial Engineer, 1990 K Street, NW., Suite 510, design, and developmental policy for Library, 901 G Street, NW., Washington, DC 20006–1103, (202) 219– instrument approach and departure Washington, DC 20001. 3536; or District Department of procedures. Cleveland Park Branch Library, 3310 Transportation: Austina Casey, Project The Charting Group agenda will Connecticut Avenue, NW., Manager, Planning, Policy and include briefings and discussions on Washington, DC 20008. Sustainability Administration, 2000 recommendations regarding Mount Pleasant Library, 3162 Mt. 14th Street, NW., 7th Floor, aeronautical charting specifications, Pleasant Street, NW., Washington, DC Washington, DC 20009, (202) 671–2740. flight information products, as well as 20010. new aeronautical charting and air traffic SUPPLEMENTARY INFORMATION: The Issued: February 28, 2011. proposed action evaluated in the control initiatives. Attendance is open Joseph C. Lawson, to the interested public, but will be Environmental Assessment (EA) includes construction of a multi-use Division Administrator, Federal Highway limited to the space available. Administration, District of Columbia Division. The public must make arrangements trail facility within the 0.7 mile [FR Doc. 2011–4822 Filed 3–3–11; 8:45 am] by April 8, 2011, to present oral barricaded portion of Klingle Road BILLING CODE 4910–22–P statements at the meeting. The public between Porter Street, NW., and may present written statements and/or Cortland Place, NW.; including the restoration of Klingle Creek. new agenda items to the committee by DEPARTMENT OF TRANSPORTATION providing a copy to the person listed in Four Klingle Valley Trail alternatives, the FOR FURTHER INFORMATION CONTACT including the No Action Alternative, Federal Motor Carrier Safety section not later than April 8, 2011. two options for the Restoration of Administration Public statements will only be Klingle Creek, and three options for considered if time permits. Access to Rock Creek Trail are analyzed [Docket No. FMCSA–2011–0059] Issued in Washington, DC, on February 28, in detail in the EA to meet the project Agency Information Collection 2011. purpose and need. Two options for Activities: Proposed Collection; John A. Moore, lighting were also evaluated. Following Comment Request; Generic Clearance the public comment period, DDOT Co-Chair, Aeronautical Charting Forum. for the Collection of Qualitative identified Alternative 2, 10-Foot Multi- Feedback on Agency Service Delivery [FR Doc. 2011–4958 Filed 3–3–11; 8:45 am] Use Trail (Permeable), as the Preferred BILLING CODE 4910–13–P Alternative. Furthermore the following AGENCY: Federal Motor Carrier Safety options were identified as the preferred Administration (FMCSA), DOT. FEDERAL HIGHWAY options: Klingle Creek Restoration ACTION: Notice of the Office of ADMINISTRATION Option B—Full Stream Channel and Management and Budget (OMB) review Bank Stabilization; access to Rock Creek of information collection and [FHWA–DC–EA–2010–01–F] Trail Option C Modified, and Lighting solicitation of public comment. Option B—Pole Lighting. Notice of Availability of the Finding of The FHWA has determined that the SUMMARY: In compliance with the No Significant Impact for the Klingle Preferred Alternative and options will Paperwork Reduction Act of 1995, this Valley Trail not have a significant impact on the notice announces that the Information Collection Request (ICR) abstracted AGENCIES: Federal Highway natural, human or built environment. Administration, District of Columbia This Finding of No Significant Impact below will be submitted to the OMB for Division; and District Department of (FONSI) is based on the findings of the review. The ICR describes the nature of Transportation; in cooperation with the proposed project’s Final EA, and the information collection and its National Park Service. comments submitted during preparation expected burden. A Federal Register notice with a 60-day comment period ACTION: Notice of availability of the of the EA. The Final EA has been evaluated by the FHWA and determined soliciting public comments on the Finding of No Significant Impact for the following information collection was Klingle Valley Trail Project. to adequately discuss the need, environmental issues, and impacts of published on December 22, 2010 (75 FR SUMMARY: The U.S. Federal Highway the proposed project and appropriate 80542). Administration (FHWA) and the District mitigation measures. It provides DATES: Please send your comments by Department of Transportation (DDOT) sufficient evidence and analysis for April 4, 2011. OMB must receive your as lead agencies, and in cooperation determining that an environmental comments by this date in order to act with the National Park Service (NPS), impact statement is not required. quickly on the ICR. announce the availability of the Finding Electronic and Hard Copy Access: An FOR FURTHER INFORMATION CONTACT: Mr. of No Significant Impact (FONSI) for the electronic copy of this document may be Brian Ronk, Program Manager, FMCSA, Klingle Valley Trail Project, pursuant to downloaded from the Project Web Site: Office of Enforcement and Program the requirements of the National http://www.klingletrail.com. Hard Delivery, Outreach Division/MC–ESO. Environmental Policy Act of 1969 copies of the EA may also be viewed at Telephone (202) 366–1072; or e-mail (NEPA), 42 U.S.C. 4321–4347; the the following locations: [email protected]. Department of VerDate Mar<15>2010 19:16 Mar 03, 2011 Jkt 223001 PO 00000 Frm 00200 Fmt 4703 Sfmt 4703 E:\FR\FM\04MRN1.SGM 04MRN1 jlentini on DSKJ8SOYB1PROD with NOTICES.