Draft Updated Integrated Tisza River Basin Management Plan

Total Page:16

File Type:pdf, Size:1020Kb

Draft Updated Integrated Tisza River Basin Management Plan Draft Updated Integrated Tisza River Basin Management Plan Annex 11. List of future infrastructure projects de ame EIA c SEA 4(7) River Main n status status Trans- impact Project Project Project Country purpose ter body WB code WFD WFD Art. Expected boundary deteriora- mentation Exemption tion of wa- Description Start imple- Flood protection de- velopments, elevation Implemen- Flood HUKEHOP-1.4.0- Tivadari bridge and its of dyke heights and Already Hungary Tisza tation of 2017 protec- No No No No HUAEQ054 15-2015-00005 vicinity strengthening of river done project tion sections Removal of summer dikes, land-use Planning Flood HUKEHOP-1.4.0- Floodplain regulation in changes on floodplain; Already In- Hungary Tisza under prep- 2018 protec- No No Yes HUAEQ060 15-2016-00014 the Middle Tisza (VTT) development of flood done tended aration tion reducing channels. Removal of natural Tisza Floodplain Project: and artificial structures Improving the flood con- Implemen- Flood obstructing the course HUKEHOP-1.4.0- Already Already Hungary Tisza veyance capacity be- tation of 2016 protec- of flood on floodplains. No No No HUAEQ060 15-2016-00017 done done tween Szolnok and project tion Floodplain forest regu- Kisköre lations. Rehabilitation of up- stream protection mask, maneuver tower, discharge open- ing and bottom dis- Tur River development - charge; Execution of downstream Negresti- Planning Flood ROFP01.1.1.11.0. beam burst wave and In- RORW1.1.11 Romania Tur Oas locality, including under prep- 2018 protec- No No No No 0.0.0 ballasting the down- tended _B3 tributaries, Satu Mare aration tion stream parament; Re- County placement and rehabil- itation of hydro - elec- tro - mechanical equip- ment; etc. Updated Integrated Tisza River Basin Management Plan 2019 – Annex 11 1 de ame EIA c SEA 4(7) River Main n status status Trans- impact Project Project Project Country purpose ter body WB code WFD WFD Art. Expected boundary deteriora- mentation Exemption tion of wa- Description Start imple- Safety of the Lesu Dam. Protection of the banks for the Iad River, downstream of the Crisul Repede develop- dam. Rehabilitation of ment in order to protect Planning Flood hydromechanical Crisul ROFP01.3.1.44.0. In- RORW3.1.44 Romania against floods of Oradea under prep- 2018 protec- equipment from water No No No No Repede 0.0.0 tended _B3 city and the down- aration tion intake and rehabilita- stream tion for other hydro- mechanical, electrical and automation equip- ment etc. Aggradation dykes on a length of 39.24 km Increase the level of Planning Flood ROFP01.4.1.0.0.0 and aggradation of In- RORW4.1_B Romania Mures flood protection in the under prep- 2018 protec- No No No No .0.0 protection wall on a tended 7 Mures basin river aration tion length of 2.63 km Aggradation dykes on a length of 12.16 km Tar- Increase the level of Planning Flood and aggradation the ROFP01.4.1.96.0. In- RORW4.1.96 Romania nava flood protection in the under prep- 2018 Protec- backwater dykes on No No No No 0.0.0 tended _B7 Mare Mures basin river aration tion the Tiur River and the Veza River Updated Integrated Tisza River Basin Management Plan 2019 – Annex 11 2 Project co-funded by the European Union (ERDF, IPA funds) Partners: General Directorate of Water Management, Hungary | Global Water Partnership Central and Eastern Europe, Slovakia | International Commission for the Protection of the Danube River, Austria | Ministry of Water and Forest, Romania | Ministry of Foreign Affairs and Trade, Hungary | National Administration “Romanian Wa- ters”, Romania | National Institute of Hydrology and Water Management, Romania | Public Water Management Company “Vode Vojvodine”, Serbia | Regional Environmental Center for Central and Eastern Europe, Hungary | The Jaroslav Černi Institute for the Development of Water Resources, Serbia | Water Research Institute, Slovakia | World Wide Fund for Nature Hungary Associated Partners: Interior Ministry, Hungary | Ministry of Agriculture and Environmental Protection Water, Serbia | Secretariat of the Carpathian Convention (SCC), Austria | State Agency of Water Resources of Ukraine | Tisza River Basin Water Resources Directorate, Ukraine .
Recommended publications
  • Water Developments and Their Impact on Runoff in the Upper Tisa Catchment
    Water developments and their impact on runoff in the Upper Tisa catchment Károly Konecsny The 157 200 km2 large catchment of the River Tisa1 is situated in the eastern part of the Carpathian Basin, also known as the Central Danube Basin. The upper catchment down to the village Záhony is 32 782, that down to Tokaj 49 449 km2 large. The origin of the name Tisa is still unclear, some linguists trace it back to an Indo European root supposed to mean muddy, or silty. In Roman documents the river is mentioned under the names Parsiou, Pthirus, Tigas and Tisianus, while in the mediaeval Latin chronicles in the forms Tisia and Tysia. Keywords: hydrology, Upper Tisa, Carpathian Basin The Upper Tisa and her tributaries in the Ukraine The headwaters of the Tisa are in the Maramuresh Alpine Mountains, the name Tisa is used downstream of the confluence of the Chorna Tisa and Bila Tisa. Of her 962 km total length, the mountain section is only 200 km long. From the confluence of the Chorna Tisa and the Bila Tisa down to the mouth of the Vi§eu the average slope of the valley floor is very steep, 6.33 m/km, between the Vi§eu and the Tereblja 2.28 m/km, flattening down to Tiszabecs to less than l m/km. Over the mountain section the valley is narrow, the river having carved her up to 50 m wide bed between steep banks. The normal depth is a few decimetres. Beyond her emergence into the plains at Hust the Tisa becomes a typically lowland river meandering in a spreading valley.
    [Show full text]
  • Regulamentul Rezervaţiei Naturale „Cursul Inferior Al Râului Tur”
    ANEXĂ REGULAMENTUL ariilor naturale protejate RÂUL TUR - ROSCI0241 Râul Tur, ROSPA0068 Lunca Inferioară a Turului şi Rezervaţia Naturală Râul Tur Art. 1– (1) Prezentul Regulament se referă la trei categorii de arii naturale protejate: a) Rezervaţia naturală Cursul inferior al Râului Tur desemnată la nivel naţional prin Legea 5/2000 privind aprobarea Planului de amenajare a teritoriului naţional - Secţiunea a III-a - zone protejate cu codul 2.680. şi reconfirmată prin Hotărârea Guvernului nr. 2151/2004 privind instituirea regimului de arie naturală protejată pentru noi zone poziţia VII.10 – Râul Tur este arie naturală protejată de interes naţional, corespunzătoare categoriei a IV-a Uniunii Internaţionale pentru Conservarea Naturii b) aria de protecţie specială avifaunistică ROSPA0068 Lunca inferioară a Turului, declarată prin Hotărârea Guvernului nr. 1284/2007 privind declararea ariilor de protecţie specială avifaunistică ca parte integrantă a reţelei ecologice europene Natura 2000 în România, cu modificările şi completările ulterioare. c) situl de importanţă comunitară ROSCI0214 Râul Tur declarat prin Ordinul ministrului mediului şi dezvoltării durabile nr. 1964/2007 privind instituirea regimului de arie naturală protejată a siturilor de importanţă comunitară, ca parte integrantă a reţelei ecologice europene Natura 2000 în România, cu modificările ulterioare. (2) În cuprinsul prezentului regulament, orice referire la ariile naturale protejate menţionate la alin. (1) va fi facută cu denumirea „Arie”, indiferent dacă segmentul pe care se suprapun este total sau parţial. (3) În cuprinsul prezentului regulament, orice referire făcută doar la una dintre categoriile de arii naturale protejate menţionate la alin (1) se consemnează prin menţionarea explicită a acelei categorii. Art. 2 - (1) Scopul declarării rezervaţiei Râul Tur este cel de protecţie şi conservare a habitatelor naturale şi a speciilor autohtone importante sub aspect floristic şi faunistic, precum şi menţinerea diversităţii peisagistice.
    [Show full text]
  • Danube Watch the Magazine of T He Danube Rive R / W W W
    DaNube waTcH THE MAGAZINE OF T HE DANUBE RIVE R / W W W. I C P dr .O R G 2 /2007 6 weTlands in the DaNube RIveR basin 10 joint DaNube suRvey 2 lauNcHes The Second Joint Danube Survey sets off this summer to collect and analyse samples from the river to improve water quality data. 18 DaNgeR Heading DowNstreaM The Accident Emergency Warning System provides round-the-clock communication in the event of a major transboundary accident. 3 Letter to readers 9 Cooperation blooms in 15 Cleaning up detergents in 19 The Danube Box gets the Tisza River Basin the basin high marks in schools 4 News & events 9 Conference brings ground- 16 Transboundary cooperation 19 In memoriam 6 A functioning river system: water issues to the surface brings the Sava Commission incorporating wetlands into closer to its goals 20 Recognising efforts to river basin management 10 Million-euro boat protect and restore rivers expedition to test 18 Danger heading down- in the Danube Basin Danube pollution stream: the Accident Emer- gency Warning System in 21 The ICPDR Joint Action 14 Green issues show up action Programme on the red carpet 16 Zagreb, Croatia The first meeting of the 14 sava River basin commis- Dolna Banya, Bulgaria sion puts four countries an international film festi- well on their path towards val is raising the public’s establishing sustainable awareness of ongoing water management. environmental activities by putting conservation 9 issues in the spotlight. Belgrade, Serbia The IWA Regional conference on groundwater Management highlighted current issues facing more than 00 groundwater managers from over 20 countries.
    [Show full text]
  • Tabel Atribute RO 11.05.2015
    Garda Cod / Validare Justificari eliminare (doar la nivel Id trup ID judet / trup Judet Bazinet C1 C2 C3 C4 Forestiera Nivel risc finala de bazinete /trup) 7 AB-7 Cluj AB Molivis AB-7 Total trup 1 0 0 0 galben 9 AB-9 Cluj AB Miras (Cotul) AB-9 Total trup 1 1 0 0 rosu 10 AB-10 Cluj AB Raul Mic AB-10 Total trup 1 0 0 0 galben 12 AB-12 Cluj AB Martinie (Marginea, Tetu) AB-12 Total trup 0 1 0 0 rosu 14 AB-14 Cluj AB Grosesti AB-14 Total trup 0 1 0 0 rosu 15 AB-15 Cluj AB Brustura AB-15 Total trup 1 0 0 0 galben 16 AB-16 Cluj AB Valea Tonii AB-16 Total trup 1 0 0 0 galben 19 AB-19 Cluj AB Chipesa AB-19 Total trup 1 0 0 0 galben 20 AB-20 Cluj AB Garbova AB-20 Total trup 1 0 0 0 galben 26 AB-26 Cluj AB Boz AB-26 Total trup 0 1 0 0 rosu 27 AB-27 Cluj AB Vingard AB-27 Total trup 0 1 0 0 rosu 29 AB-29 Cluj AB Ungurei AB-29 Total trup 0 1 0 0 rosu 30 AB-30 Cluj AB Gardan AB-30 Total trup 0 1 0 0 rosu 31 AB-31 Cluj AB Ohaba (Valea Mare) AB-31 Total trup 0 1 0 0 rosu 38 AB-38 Cluj AB Cenade AB-38 Total trup 0 1 0 0 rosu 39 AB-39 Cluj AB Tarnava (Tarnava Mare) AB-39 Total trup 0 0 0 0 galben 40 AB-40 Cluj AB Lodroman AB-40 Total trup 0 1 0 0 rosu 41 AB-41 Cluj AB Valea Lunga (Tauni) AB-41 Total trup 0 1 0 0 rosu 44 AB-44 Cluj AB Graben AB-44 Total trup 0 1 0 0 rosu 45 AB-45 Cluj AB Spinoasa AB-45 Total trup 1 1 0 1 rosu 46 AB-46 Cluj AB Tatarlaua AB-46 Total trup 1 1 0 1 rosu 48 AB-48 Cluj AB Veseus AB-48 Total trup 1 0 0 0 galben 49 AB-49 Cluj AB Pe Dealul cel mai Departe AB-49 Total trup 1 0 0 0 galben 53 AB-53 Cluj AB Dunarita (Bucerdea) AB-53 Total
    [Show full text]
  • PLANUL DE MANAGEMENT AL RISCULUI LA INUNDAŢII Administraţia Bazinală De Apă Someş - Tisa
    PLANUL DE MANAGEMENT AL RISCULUI LA INUNDAŢII Administraţia Bazinală de Apă Someş - Tisa Planul de Management al Riscului la Inundaţii Administraţia Bazinală de Apă Someș - Tisa Planul de Management al Riscului la Inundaţii Administraţia Bazinală de Apă Someș - Tisa CUPRINS Abrevieri ................................................................................................................................... 4 Cap. 1: Prezentarea generală a spațiul hidrografic Someș – Tisa ........................................... 8 Cap. 2: Riscul la inundaţii în spațiul hidrografic Someș - Tisa .............................................. 16 2.1. Descrierea lucrărilor existente de protecție împotriva inundațiilor ............................. 16 2.2. Descrierea sistemelor existente de avertizare – alarmare și de răspuns la inundații ........................................................................................ 42 2.3. Istoricul inundațiilor .................................................................................................... 51 2.4. Evenimentele semnificative de inundații ..................................................................... 55 2.5. Zone cu risc potențial semnificativ la inundații ........................................................... 57 2.6. Hărți de hazard și hărți de risc la inundații .................................................................. 60 2.7. Indicatori statistici ....................................................................................................... 64 Cap. 3:
    [Show full text]
  • Satu Mare – Studii Şi Comunicări Seria Ştiinţele Naturii Vol. XIV (2014)
    Satu Mare – Studii şi Comunicări Seria Ştiinţele Naturii Vol. XIV (2014) Colectivul de Redacţie / Editorial Board: Prof. univ. Dr. Leontin Ştefan PÉTERFY (Cluj Napoca) membru corespondent al Academiei Române Conf. Dr. Eszter RUPRECHT (Cluj Napoca) Dr. Dan MUNTEANU (Cluj Napoca) membru corespondent al Academiei Române Prof. univ. Dr. Laszlo RAKOSY (Cluj Napoca) Conf. Dr. Ioan COROIU (Cluj Napoca) Redactor responsabil / Editor-in-Chief: dr. Tamás SIKE tehnoredactare: dr. Tamás SIKE traduceri (ucr.): Svyatoslav VASKO Satu Mare – Studii şi Comunicări Revista Muzeului Judeţean Satu Mare Orice corespondenţă se va adresa: Muzeul Judeţean Satu Mare 440031 Satu Mare B-dul Vasile Lucaciu nr. 21 Tel: +40 261 737526 Fax: +40 261 736761 Acest material este publicat în cadrul proiectului „ BREAKING-THROUG COOLture - European values and common future”, derulat de către Muzeul Judeţean Satu Mare, cu sprijinul financiar al Uniunii Europene prin Programul Hungary-Slovakia-Romania-Ukraine ENPI CBC Programme 2007-2013 © Muzeul Judeţean Satu Mare Publicaţia sau părţi ale acesteia pot fi reproduse numai cu permisiunea autorilor. Editor: Muzeul Judeţean Satu Mare „Conţinutul acestui material nu reprezintă în mod necesar poziţia oficială a Uniunii Europene.” Hungary-Slovakia-Ukraine-Romania ENPI Cross-border Cooperation Programme Joint Technical Secretariat (JTS) VÁTI Nonprofit Kft. Gellérthegy u. 30-32. H-1016 Budapest, HUNGARY http://www.huskroua-cbc.net E-mail: [email protected] ISSN 1582-201X MUZEUL JUDEŢEAN SATU MARE SATU MARE STUDII ŞI COMUNICĂRI SERIA ŞTIINŢELE NATURII XIV 2014 EDITURA MUZEULUI SĂTMĂREAN CUPRINS SZABÓ Anna EVALUAREA HABITATELOR DE INTERES 7 FENESI Annamária COMUNITAR IN ARIILE PROTEJATE DE PE MACALIK Kunigunda RAUL TUR NAGY H.
    [Show full text]
  • Preliminary Results on Environmental Impact Of
    THE HERPETOFAUNA OF THE NATURAL RESERVATION FROM THE INFERIOR COURSE OF THE TUR RIVER AND ITS SURROUNDING AREAS Severus D. COVACIU-MARCOV1, Istvan SAS1, Alfred St. CICORT-LUCACIU2, Horia V. BOGDAN1, Eva H. KOVACS1, Cosmin MAGHIAR1 1University of Oradea, Faculty of Sciences, Departament of Biology, [email protected], [email protected] 2PhD. student, University Babes-Bolyai, Cluj-Napoca, Faculty of Biology and Geology Abstract. In the studied area we encountered 14 species of amphibians (Salamandra salamandra, Triturus vulgaris, Triturus cristatus, Triturus dobrogicus, Bombina bombina, Bombina variegata, Pelobates fuscus, Hyla arborea, Bufo bufo, Bufo viridis, Rana ridibunda, Rana lessonae, Rana dalmatina, Rana arvalis) and 9 species of reptiles (Emys orbicularis, Lacerta agilis, Lacerta viridis, Zootoca vivipara, Anguis fragilis, Natrix natrix, Coronella austriaca, Elaphe longissima and Vipera berus). Hybrids between Triturus cristatus and Triturus dobrogicus, Bombina bombina and Bombina variegata and Rana kl. esculenta are also present in this region. The herpetofauna of this reservation from the inferior course of the Tur River stands out through the glacier relicts that live here, in the woody swamps from the plains (R. arvalis, Z. vivipara and V. berus). Population of Salamandra salamandra and Bombina variegata can be found here at altitudes of no more than 140 m. In this reservation, all the three forms of the Rana green complex that live in Romania are present. The most important sectors of the reservation, from what the herpetofauna is concerned, are the afforested areas. These shelter most of the species and the biggest population of the protected species. The results of our study show the necessity to include into the reservation the forests from Livada.
    [Show full text]
  • Analysis of the Tisza River Basin 2007 Initial Step Toward the Tisza River Basin Management Plan – 2009
    4 Analysis of the Tisza River Basin 2007 Initial step toward the Tisza River Basin Management Plan – 2009 ///////////////////////////////////////////////////////////////// ///////////// ///////// / ìÍ ‡ªÌ‡ //// Ro mâ nia // // Sl ov en sk o // // M a g /// ì͇ªÌ‡ / y ///// /// a ///// R r //// om o //// â rs /// n z /// i á //// a g /// /// // / /// // // /// / /// S S // l r /// o b /// v // e ij /// a //// n / /// s // //// k // /// o / // // // / / // / / // / // /// / / // // /// M /// ///// //// ///// a /// ///// g //// ////// y ////// /////// a /////////////////// r o r s z á g / / / / S r b i j a / / / / / / / / / / / / / / / / / / / / / / // // // // // // // // // /// /// /// //// //// ///// ///////////////////////////////// //////////////////////////////// //////// 6 This document has been produced with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect the official opinion of the European Union. IMPRINT Published by: ICPDR – International Commission for the Protection of the Danube River © ICPDR 2008 Contact ICPDR Secretariat Vienna International Centre / D0412 P.O. Box 500 / 1400 Vienna / Austria T: +43 (1) 26060-5738 / F: +43 (1) 26060-5895 [email protected] / www.icpdr.org V 7 ACKNOWLEDGEMENTS Many people contributed to the successful preparation of this report, in particular: The chairman of the ICPDR Tisza Group Mr Joachim D’Eugenio The ICPDR Tisza Group experts and observers from the five Tisza countries contributed comprehensive data and text as well as comments
    [Show full text]
  • Appeal Hungary Emergency Flood Relief
    150 route de Ferney, P.O. Box 2100 1211 Geneva 2, Switzerland Appeal Tel: 41 22 791 6033 Fax: 41 22 791 6506 e-mail: [email protected] Coordinating Office Hungary Emergency Flood Relief – EUHU-11 Appeal Target: US$ 365,225 Balance Requested from ACT Network: US$ 225,225 Geneva, 21 March 2001 Dear Colleagues, Three countries in Europe have been affected by the overflowing of the river Tisza. Hungarian, Romanian and Ukrainian populations living close to the Tisza were forced to leave their homes and seek shelter either within their own regions or in neighboring countries. Compared to the magnitude of the disaster, the initial response by the Hungarian Government appears unable to meet the immediate needs of the affected and displaced population who are left without minimum living conditions. ACT member Hungarian Interchurch Aid/HIA is already assisting the most vulnerable families affected by the floods in Ukraine. They also seek to continue supporting the population of Eastern Hungary that fled the flood sites to seek shelter in other parts of the country. In the first phase of their proposed program, HIA is proposing to provide the humanitarian aid in the following manner: § Distribution of drinking water and food § Distribution of clothes and blankets § Distribution of hygiene items § Psycho-social assistance At a later stage, HIA will assist the most affected with shelter/rehabilitation activities. ACT member Hungarian Baptist Aid (HBAid) is currently preparing a project proposal, therefore this appeal will be revised shortly to include their proposal. ACT is a worldwide network of churches and related agencies meeting human need through coordinated emergency response.
    [Show full text]
  • Danube Watch 4/1999
    WELCOME • NO.4/1999 DANUBE WATCH Editorial CONTENTS This issue of the Danube Watch concentrates on two demonstration CLEAN TECHNOLOGIES projects of the Strategic Action 3 Industrial Pollution should be dammed Plan Implementation Programme for the Danube Basin that were funded by the EC-Phare Multi- beneficiary Programme for the DRAVA-MURA Environment. These demonstration 5 The European River Lifeline needs Protection projects relate to improved environmental practices and clean technologies in Industry on one hand and on wetland restoration SMALL SCALE WETLANDS and 8 Saving Natural Paradises in Europe improved wetland management in some of the very valuable remaining wetlands in the Danube Basin on the other hand. SMALL SCALE WETLANDS What may even be of more interest is that this issue of the Danube 9 Examples for Restoration Projects Watch introduces two new initiatives. On is a special “corner” for children and one is the initiative “Artists for the Danube“. WETLAND The children of today are the 10 Wetland Management goes beyond Borders decision-makers of the future. If today children are well educated TEUN BOTTERWEG, about the importance of the TEAM LEADER, environment and nature then there EVENT DANUBE PROGRAMME is a good chance that they will 12 Artist for the Danube COORDINATION UNIT, apply that knowledge in their E-MAIL: future decision-making. For this TEUN.BOTTERWEG@ reason at the Danube PCU we were UNVIENNA.ORG thinking about producing a special TEENS CORNER children’s page. In this edition of 15 Aquarius, the Water Teen from the Danube the Danube Watch the result is launched! We do hope that children will be as exited about this idea as we are, and that teachers of schools will use this page in their environmental educational work and in English language lessons.
    [Show full text]
  • Moving Forward WWF International Danube-Carpathian Programme
    Moving forward WWF International Danube-Carpathian Programme A look back at 2006–07 © WWF-Canon Vorauer / Anton Moving forward Significant changes continued to The WWF Danube-Carpathian Our work continued to be guided by the sweep the Danube-Carpathian re- Programme focused its efforts last 5-year Strategy (2005–10) that was gion last year, presenting new chal- year on restructuring and developing its developed with and is supported by the lenges but also many opportunities operations in order to better meet the 3 WWF stakeholders that are active for conservation and sustainable challenges and grasp the opportunities in the Danube-Carpathian region. The development in the region. Most for conservation in the region. Two new Programme Implementation Agree- significantly, Romania and Bulgaria legal entities were created to support ment signed by all parties represents a joined the European Union, taking the staff and projects in Romania and truly integrated network response to the on innovative legislation, e.g. on wa- Bulgaria, and operational systems were urgent threats facing this region and the ter and river basin management as overhauled to ensure that these offices opportunities it offers to ensure that at well as nature conservation, but are fully integrated into the programme. least one sizable corner of Europe can also potentially destructive policies We also significantlyexpanded our remain wild. on transportation and development. public outreach and fundraising, led by our first campaigns in Romania The following report, which follows the and Bulgaria. structure and targets of our 00 Strat- egy, summarises our work, achievements At the same time, we continued our and challenges over the past financial strong conservation work.
    [Show full text]
  • The Status of Danube Beluga Sturgeon (Huso Huso): Past, Present and Future
    INNSENDTE ARTIKLER The status of Danube beluga sturgeon (Huso huso): Past, present and future Av Carolyn M. Rosten, Dalia Onara, Kate Hawley and Radu Suciu Carolyn M. Rosten1 is a researcher with the Norwegian Institute for Water Research (NIVA), Pirsenteret, Havnegate 9, 7462 Trondheim, Norway. Dalia Onara is a scientific researcher with the Danube Delta National Institute (DDNI), Sturgeon Research Group, 165 Babadag Street, RO-8800, Tulcea, Romania. Kate L. Hawley is a research assistant with NIVA. Radu Suciu is leader of the Sturgeon Research group at the DDNI and CITES Scientific Authority for Acipenseriformes of Romania. Status for Donau beluga drett og utsettelse av stør er også trådt i stør (Huso huso): kraft for å bedre fiskebestanden i områ­ Fortid, nåtid og fremtid det. En av de største utfordringene ligger Støren i Donau er i stadig tilbakegang, og i forebyggingen av illegalt fiske, gitt den langsiktige forandringer i populasjons­ gode markedsverdien på stør, og forval­ størrelse og struktur av størarter er blitt tingsprogrammet utarbeider stadige nye observert. I dette manuskriptet er beluga strategier for å håndtere utfordringene. stør (Huso huso) brukt som en flaggskips­ Som et ledd av dette ble Danube Sturgeon art for en casestudie av stør i Donau. Den Task Force (DSTF) opprettet i 2012 for å rumenske regjeringen brukte i 2006 doku­ ta denne utfordringen i årene som mentasjonen fra disse kritiske forandrin­ kommer. gene til å tvinge igjennom midlertidige fiskestanse på størarter, samt imple­ Summary mentere regionale overvåkingsstrategier. Sturgeons of the Danube River are in Overvåkingsprogrammet for juvenil stør decline. Long term changes in both som ble implementer på grunnlag av population size and structure of sturgeon dette har samlet ny og vital data på antall species have been observed.
    [Show full text]