To & Botanical Garden

West

Don Valley Pkwy

Sunnybrook Park

E

Eglinton Ave. E.

Eglinton Ave. E.

Sutherland Dr. Sutherland Bayview Ave. Bayview

Beltline Trail Linkwood Lane Park Davisville Ave.

East Don River

Millwood Rd.

Mt. Pleasant E.T. Seton Redway Rd. Cemetery Park Moore Ave.

Bayview Ave.

Yonge St.

Beltline Trail Taylor Massey Creek Mt. Pleasant Rd. Pleasant Mt.

Taylor Creek Trail Don Valley Pkwy O’Connor Dr.

Pottery Rd. Cosburn Ave.

Roxborough Dr.

Todmorden Mills Mortimer Ave.

Crescent Rd. y w k P

Mt. Pleasant Rd. Pleasant Mt. y ilkma e South Dr. M n’s L l n. l

a

V Craigleigh n

o

Gardens D

Broadview Ave. Park Rd.

Rosedale Valley Rd. F Bayview Ave. Bayview Danforth Ave.

Bloor St. W. G Bloor St. E.

Queen’s Wellesley St. E. Park Wellesley St. E. Riverdale Amelia St. Park East Riverdale Winchester St. Farm D Langley Ave.

Carlton St. Greenwood Ave. Greenwood

Gerrard St. E. Gerrard St. E.

Dundas St. E.

River St. River Parliament St. Parliament

Sherbourne St. Sherbourne Dundas St. E. Woodbine Ave. Woodbine

Shuter St.

Broadview Ave. Broadview

Yonge St. Yonge Bayview Ave. Bayview Queen St. E.

Queen St. W. Woodbine

Knox Ave. Knox Park Sarah Ashbridge Ave. Ashbridge Sarah Northern Dancer Blvd. Dancer Northern A Eastern Ave. Corktown B Common King St. W. Front St. E. Don Woodbine Landing Lake Shore Blvd. E. Beach Mill St. Distillery Front St. W. C District Entertainment Gardiner Expy District

Queens Quay E. Port

Lands Cherry St. Cherry

Cherry 0 0.5 1 km Beach

A From to Evergreen Brick Works (Approx. 5.5 km) - via Lower Don Trail, Pottery Rd., Bayview Ave. Lower Don Trail Trail Entry Point 1 hr 20 mins 25 mins B From to Evergreen Brick Works (Approx. 10 km) - via Lake Shore Blvd. E., Lower Don Trail, Pottery Rd., Bayview Ave. Suggested Routes 50 mins C From Union Station to Evergreen Brick Works (Approx. 6 km) - via Front St. E., Sherbourne St., Wellesley St. E., Bayview Ave. Trail Entry Point (Stairs) 1 hr 15 mins 40 mins Steep slope D From West to Evergreen Brick Works (Approx. 4 km) - via Lower Don Trail, Pottery Rd., Bayview Ave. Accessible Trail Entry Point 40 mins 15 mins Duane Linklater Sculptures E From south to Evergreen Brick Works (Approx. 8 km) - via multi surface trail, Bayview Ave. (Don River Valley Park Art Program) 35 mins F From Duane Linklater Sculptures to Evergreen Brick Works (Approx. 2.5 km) - via Lower Don Trail, Pottery Rd., Bayview Ave. Evergreen Brickworks 30 mins 10 mins G From Bloor Station to Evergreen Brick Works (Approx. 6.5 km) - via Bloor St. W., Parliament St., Amelia St., Lower Don Trail (550 Bayview Ave.) 1 hr. 30 mins 60 mins