Wyndham Vale Railway Station

Total Page:16

File Type:pdf, Size:1020Kb

Wyndham Vale Railway Station Accessibility Wyndham Vale railway station will meet all Disability Discrimination Act 1992 (Cth) requirements and includes: • ramp access to the platforms • anti-slip surfaces, tactile ground surface indicators and hearing loops • crossfalls on platforms to prevent wheeled equipment, such as Station features prams and wheelchairs, from Wyndham Vale railway station rolling towards the platform edge includes: • a dedicated wheelchair accessible • an architect designed station ticket counter building and landscaping • a waiting room with at least two • a bus interchange and taxi rank dedicated seats for passengers with special needs and two • ‘kiss and ride’ dedicated spaces for passengers (pick up/drop off) bays using mobility aids Deer Park – West Werribee Junction • parking spaces for 400 cars, • station lifts with room for two with the ability to build more motorised wheelchairs spaces as demand grows • dedicated car parking for people • two dedicated regional tracks with a disability located close to Wyndham Vale with room for additional tracks for the station entrance. future rail network expansion railway station • bicycle storage cage and How do I get more external hoops information? • CCTV cameras on the platforms, If you would like more information, Regional Rail Link: Deer Park – West station building, forecourts, or would like to provide feedback car park and pedestrian bridge Werribee Junction includes two new on any aspect of the project, • passenger information displays please contact the project team. railway stations in the growing suburbs and clocks on each platform and In person: at the ticket office of Wyndham Vale and Tarneit. Drop in to the Regional Rail Link • sustainability features such as Community Information Hub in Wyndham Vale railway station is solar panels, energy efficient Wyndham Vale. lighting and use of rain water located between Ballan Road and The Hub is open from 10 am to 4 pm, Manor Lakes Boulevard. The platforms • a baby changing facility Monday to Friday, or by appointment. sit in a cutting over two kilometres in • maximised visibility of passengers To make an appointment, call length and up to nine metres deep. for station staff by minimising blind 0407 800 476. spots The pedestrian bridge provides a vital The Hub is located at the project’s • permanent safety fencing along Wyndham Vale site office on the link across the cutting to the railway the length of the railway cutting in corner of Manor Lakes Boulevard station from Academy Way. Wyndham Vale. and Academy Way, Wyndham Vale. Ballarat Rd Station Rd Christies Rd Riding Boundary Rd Middle Rd Mt Derrimut Rd Sunshine Western Hwy Boundary Rd Robinsons Rd Fitzgerald Rd Hopkins Rd Woods Rd Gard Rd Sewells Rd Dohertys Rd Leakes Rd Shanahans Rd Sayers Rd Princes Fwy Tarneit Ballan Road Davis Rd Tarneit Rd Hobbs Rd Derrimut Rd Wyndham Vale Legend New stations Manor Lakes Bvd Heaths Rd NewOld Geelong roads Rd Greens Rd Armstrong Road Deer Park – West Werribee Junction (new track) Wyndham Vale cutting Werribee Black Forest Rd Princes Hwy Footscray – Deer Park (existing track) Ballan Rd West Werribee Junction (new track) Duncans Rd y w Existing stations F s ce Existing rail network Bulban Rd in Pr Geelong Rd More information Website: www.regionalraillink.vic.gov.au If you require Regional Rail Link information in another language, please call us on 9280 0775 to speak to an interpreter. Email: [email protected] Phone: 1800 107 925 If you would like to receive this publication in an alternative format, please telephone the Regional Rail Link Authority on 1800 107 925 or email [email protected]. This document @rrlproject is also available in HTML and/or PDF format on the internet at www.regionalraillink.vic.gov.au. Community Information Hub Manor Lakes Blvd, Wyndham Vale. Open 10am - 4pm Monday to Friday or by appointment on 0407 800 476. Regional Rail Link Regional Rail Link is a major new rail line that will separate regional trains from metropolitan trains – for the first time giving Geelong, Bendigo and Ballarat trains their own dedicated tracks through the metropolitan system from Sunshine to Southern Cross Station. The project is jointly funded by the Australian and Victorian governments, with the Commonwealth contributing $3.225 billion and the Victorian Government contributing $1.582 billion. © Copyright resides with the State of Victoria. No part of this publication may be reproduced by any process except in accordance with the provisions of the Copyright Act 1968 (Cth). Authorised by the Victorian Government, 121 Exhibition Street, Melbourne..
Recommended publications
  • Historic Heritage Assessment Tarneit Precinct Structure Plan Area 90
    AREA 90HERITAGE ASSESSMENT Historic Heritage Assessment Tarneit Precinct Structure Plan Area 90 Final Report Revised April 2012 Prepared for Growth Areas Authority Context Pty Ltd 2012 Project Team: Annabel Neylon, Senior Heritage Consultant Julia Cusack, Senior Heritage Consultant Jessie Briggs, Project Support Historic Heritage Assessment, Tarneit Precinct Structure Plan 90 Report Register This report register documents the development and issue of the report entitled Heritage Assessment, Tarneit Precinct Structure Plan PSP 90 undertaken by Context Pty Ltd in accordance with our internal quality management system. Project Issue Notes/description Issue date Issued to No.No.No. No.No.No. 1508 1 Draft Report 22/07/2011 Dane Logan 1508 2 Final Report 05/08/2011 Dane Logan 1508 3 Revised Final Report 18/04/2012 Dane Logan Context Pty Ltd 22 Merri Street, Brunswick 3056 Phone 03 9380 6933 Facsimile 03 9380 4066 Email [email protected] www.context-pl.com.au ii CONTENTS CONTENTS III EXECUTIVE SUMMARY V KEY RECOMMENDATIONS VI KEY FINDINGS VII Key findings of Panel Hearing 2009 vii Known Heritage Places viii Key Historic Themes viii Field Survey viii 1 INTRODUCTION 1 1.1 Purpose 1 1.2 Study limitations 1 1.3 The Study Area - Precinct Structure Plan Area 90 (PSP90) 2 1.4 Approach & methodology 3 2 FINDINGS 5 2.1 Previously recorded heritage places and sites 5 3 THEMATIC HISTORY 9 3.1 Truganina & Tarneit - regional context 9 3.2 Truganina 10 3.3 Tarneit 14 4 REVIEW OF SIGNIFICANCE 18 4.1 Basis of Assessment 18 4.2 Establishing threshold
    [Show full text]
  • Werribee, Point Cook & Surrounds
    OFFICIAL VISITOR GUIDE Werribee, Point Cook & Surrounds KIDS ARE FREE! WERRIBEE OPEN RANGE ZOO * An African Adventure Experience an African adventure on over 200 hectares of beautiful natural surrounds. Get on board for a guided safari across the unique open range savannah and spot rhinos, giraffes and zebras! Come face to face with a pride of lions, visit one of the world’s largest gorilla exhibits, see cheeky monkeys at play and discover a family of hippos in their wetland home. Welcome to CONTENTS POINT COOK & SURROUNDS 4 Getting here A region bursting with personality and unique experiences, at the gateway to the famous Great Ocean Road within an 6 Werribee Visitor easy 30-minute drive of Melbourne. Information Centre 8 GetWerribee in the zone We’ll wow you with our world-class attractions – discover 14 On a road to somewhere them clustered in the Werribee Park Precinct and along the Bay West Driving Trail. We’ll intrigue you with pioneering 16 Adventures in aviation aviation history, energise you in natural environments and 18 Nature at her glorious best charm you with our hidden secrets. 22 Delve into the past Relax, settle in and experience it all. 23 Discover arts and soul 26 Come out and play 27 It’s all about you What I enjoy about Werribee“ is the feel of the town. 28 Shop style and substance We can be at Pacific Werribee with all the shops and feel like we’re in a large city, wander into Watton Street for the cafés 30 Food, glorious food and shops and we’re in a country town.
    [Show full text]
  • Werribee Township Regional Park
    Werribee Township Regional Park Planning Report - 2018 Werribee Township Regional Park Planning Report - September 2017 Acknowledgements DELWP would like to thank Parks Victoria, Victorian Planning Authority and Melbourne Water for their input into the preparation of this report. Author Sarah Auld, Auld Planning & Projects Editor Vanessa Pearse, Department of Environment, Land, Water and Planning © The State of Victoria Department of Environment, Land, Water and Planning 2018 This work is licensed under a Creative Commons Attribution 4.0 International licence. You are free to re-use the work under that licence, on the condition that you credit the State of Victoria as author. The licence does not apply to any images, photographs or branding, including the Victorian Coat of Arms, the Victorian Government logo and the Department of Environment, Land, Water and Planning (DELWP) logo. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ Disclaimer This publication may be of assistance to you but the State of Victoria and its employees do not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for any error, loss or other consequence which may arise from you relying on any information in this publication. Accessibility If you would like to receive this publication in an alternative format, please telephone the DELWP Customer Service Centre on 136186, email [email protected], or via the National Relay Service on 133 677 www.relayservice.com.au. This document is also available on the internet at www.delwp.vic.gov.au.
    [Show full text]
  • Advisory. Research. Valuations. Projects
    charterkc.com.au ADVISORY. RESEARCH. VALUATIONS. PROJECTS. INTRODUCTION Melbourne continues to emerge as a city of international significance. It was ranked as the world’s most liveable city for seven consecutive years between 2011-2017 and was ranked second in 2018 and 2019. Melbourne contains two universities ranked in the top 100 global universities. Victoria, the second-largest economy in Australia, contracted by -0.5% over FY 19/20 as a result of the COVID-19 pandemic. Over the year to October 2020 the total number of people employed in Victoria fell by 124,600. Broad based industry shutdowns over the August – October period as a result of a second wave of COVID-19 infections caused a further contraction in the Victorian economy. As a result Victoria’s economic recovery is likely to be slower than that of other Australian states. DEMAND CONSIDERATIONS Victoria is the fastest-growing state in Australia and has recorded the highest population growth rate since Q3-2015. The majority of this growth has occurred within metropolitan Melbourne. Victoria in Future 2019 projections forecast that over the 2016 – 2051 period metropolitan Melbourne will house an additional 1.57 million households. Recent population growth across metropolitan Melbourne has been underpinned by high levels of overseas migration. The current border restrictions in place as a result of the COVID-19 pandemic will result in population growth falling below that forecast in the short term. SUPPLY CONSIDERATIONS Melbourne’s housing stock is predominantly represented by detached housing; however, policy aspirations aim to achieve greater levels of higher density dwellings to accommodate future population growth.
    [Show full text]
  • Page 1 E E E E E E E E E E E E E E E E E E E E E E E 711. 4099 452 WER V.2
    e e e ?ltU'B~ 7flA7S'ie e 7flS~'l'BSS ';'1'ie?le e (~ ~ o/ tk ~ B'f/UW4) e ""~ °' ~ 'P~ ~ e 'il!!ekua#t to. th- '?~ Z>~ ol th Seu e e e e e e e e e e e e e 711. e 4099 ~ 199S 452 WER e v.2 e _Management of Project: The overall management of this study was overseen by a Project Steering Group which comprised the following people: • Graham Addison (Chairperson), Manager, Werribee Farm, • Melbourne Water • Hanle Moritz, Operations Engineer, Werribee Farm, Melbourne Water • Andy Puskas, Director Planning and Development, City of Werribee • Tony Murphy, Strategic Planning Group, Maribyrnong Region, Melbourne Water • Gary Pendlebury, Consultant Development Manager, Property Division, Melbourne Water Principal support consultants responsible for advising the Project Steering Group and for the coordination of the project included: • Roz Hansen, Director, Henshall Hansen Associates • David Hunter, Director, Coomes Consulting Group Pty Ltd • Two volumes of the report: The findings of this project are documented in two reports: (1) The Main Report which addresses the strategic planning considerations relevant to the future development of the site and which includes (in Chapter 5) a summary of more detailed information provided in a number of background reports prepared for the project. The Main Report includes an executive summary and recommendations. (2) A second volume titled "Accompanying Reports", which contains the reports prepared by specialist consultants concerning particular matters which are relevant to the future planning and development
    [Show full text]
  • Wyndham Cycle Strategy – Cyclist Feedback
    Wyndham Cycle Strategy – Cyclist Feedback We have received a great deal of feedback already on cycling within Wyndham. We have considered these items when writing the strategy so far and will include them in an appendix contained in the final version of the Strategy. The appendix list will inform Wyndham City’s future infrastructure planning and capital works budgets, and any advocacy to State and Federal Governments for cycle infrastructure funding. We have included this list so that all involved in the consultation know what other community members have provided as well as what is being considered as input into the strategy. The responses have been grouped under common categories to keep like comments together. Safety/Blackspots Comments include: If it felt safer to ride - the traffic is extremely scary, sometimes. I prefer to have dedicated bicycle only or shared paths for safety reasons and for a relaxed enjoyable ride. I believe more people will be into cycling in Wyndham Vale if such dedicated bike trials exists. Tarneit Rd – at some points the cycle path is in service roads, and cyclists who are travelling straight ahead inexplicably have to give way to motorists who are turning left. Derrimut Rd – crossings at Sayers and Leakes Roads – but I believe these are going to be dealt with by VicRoads Derrimut Rd – Cycle lane on the Eastern side is in one direction only. It’s a busy road so lanes on both sides of the road need to be two way. Also, going under the railway bridge near Princes Hwy – the shared path is almost unusable and frequently covered in glass.
    [Show full text]
  • Local Market Intelligence Residential Market Overview the Grove (Tarneit)
    Local Market Intelligence Residential Market Overview The Grove (Tarneit) Leaders in Property Intelligence. January 2020 charterkc.com.au ADVISORY. RESEARCH. VALUATIONS. PROJECTS. The Melbourne Story Metropolitan Melbourne: Key Considerations INTRODUCTION Education Melbourne continues to emerge as a city of Liveability international significance. It was ranked as 2 Universities in the Top 100 the world’s most liveable city for seven consecutive years between 2011-2017 and Most Liveable Cities Global Universities was ranked second in 2018 and 2019. (University of Melbourne = 32nd (7 Consecutive Times, 2011-2017) There are highly regarded educational and Monash University = 84th) institutions in Melbourne, with two universities ranked in the top 100 global universities. Economic Activity Strong Employment Growth Victoria, the second-largest economy in Australia, recorded strong growth (+3.0% +3.0 % +1.9% growth over FY 18/19) outperforming the +100,000 Jobs wider Australian economy (+1.9% over FY (Victorian Economic (Australian Economic 12 months to November 2019 (Trend) 18/19) Growth 2018-2019) Growth 2018-2019) Melbourne continues to evolve and create opportunities not available elsewhere in Australia. DEMAND CONSIDERATIONS Victoria Population Growth Victoria is the fastest-growing state in Recent Future Population Growth Australia and has recorded the highest 2018 (2016-2051) population growth rate since Q3-2015. The 139,450 New Residents majority of this growth has occurred within +2.2% 1.5% p.a. (86,000 – Overseas Migration, 13,200 - Net Interstate metropolitan Melbourne. Strong population Migration, 40,250 - Natural Increase growth is anticipated to continue into the Australia = + 1.6% p.a. Australia = + 1.6% p.a.
    [Show full text]
  • A World-Class Airport Rail Link
    A world-class Airport Rail Link AirRail Melbourne has developed a proposal to accelerate the delivery of a world-class, fast, reliable and competitive Airport Rail Link Victorians can be proud of. Unlocks opportunities for either: Legend • High speed rail to Sydney Airport Rail Link • Northern rail connections to Metro Tunnel • Seymour and Shepparton • Suburban rail loop City Loop MARL Station Surface section MELBOURNE AIRPORT Tunnel section Existing track Integrated underground Airport Station M80 TO FROM SUNBURY M2 AND BENDIGO For Geelong, Wyndham 27km of new, Vale and the west: M80 dedicated tracks Unlocks more frequent, electrified services and Seamless connections via Victoria’s busiest high speed rail transport hub, Southern Cross Station TO FROM MELTON BALLARAT AND Relieves WYNDHAM VALE GEELONG congestion on M1, M2 and M80 SUNSHINE STATION ‘SUPERHUB’ New Metro Tunnel M2 AirRail Melbourne investment in revitalising from south east will enable Sunshine Station precinct interchange at Sunshine Sunshine Express Link Dedicated track SOUTHERN CROSS for Airport trains, STATION Geelong and TO/FROM CITY LOOP Victoria’s regions M1 TRAM, UBER, TAXI, BUS M1 TO FROM SOUTH EAST With Melbourne’s growth far outpacing all Australian cities, a multi-billion dollar investment needs to go beyond funnelling tourists to and from the airport. It needs to grasp this unique opportunity to provide capacity for the extra public transport services Victoria needs. Integrating our regions and growth areas with Melbourne and the Airport Bringing together an unrivalled team of Melbourne Airport, Southern Cross Station, Metro Trains Australia and fund manager IFM Investors, our proposed partnership with government would enable a $15 billion investment in Victoria’s rail network.
    [Show full text]
  • Land Assessment
    LAND ASSESSMENT. SOURCE - GAA Wyndham West Development Contributions Plan (DCP) Land Assessment Ballan Road Precinct Structure Plan (PSP) No. 40 Black Forest Road North PSP No. 42.1 Black Forest Road South PSP No. 42.2 Alfred Road PSP No. 43 Westbrook PSP No. 92 Prepared For Growth Areas Authority (GAA) Date of Valuation - 22 April 2013 CONTENTS. Executive Summary. ................................................................................................................... 1 1. Property Details. ................................................................................................................ 4 2. Scope of the Development. ............................................................................................. 14 3. Valuation Rationale. ........................................................................................................ 16 4. Valuation and Valuation Compliance Statement. ............................................................ 17 5. Assumptions / Qualifications. .......................................................................................... 18 WYNDHAM WEST PSP’S DCP LAND ASSESSMENTS PAGE 1 EXECUTIVE SUMMARY. Wyndham West PSP’s DCP Land Assessments. INSTRUCTIONS. Client Instructions. Growth Areas Authority Level 29 35 Collins Street MELBOURNE VIC 3000 (Mr. Tim Peggie, Manager Structure Planning) Refer to Assumptions / Qualifications - Terms of Reference. Refer to Assumptions / Qualifications - Definition of Market Value. Purpose. To assess the fair market value of the land within
    [Show full text]
  • Cut the Crush on Geelong Trains !
    CUT THE CRUSH ON GEELONG TRAINS ! August 2017 Within two years of opening, the Traffic congestion in Regional Rail Link has become a victim Melbourne’s west will become even worse than of its own success. Geelong trains are it is now unless extra rail ever more crowded! capacity is provided. The West Gate Tunnel Massive growth in commuting from the will not provide a magic Geelong solution to traffic Region and Wyndham is still to congestion and will come. Services tailored for the needs of impose new tolls on regional and suburban passengers many trips. Extra rail capacity is vital. must be planned for and locked in. The Victorian and Commonwealth Government spent $4.2 billion building the Regional Rail Link so that trains from Geelong and other regional cities could run to Southern Cross without being delayed by suburban trains. No sooner was it finished than the RRL effectively became a suburban line itself, serving the mushrooming suburbs in Wyndham, with new stations at Tarneit and Wyndham Vale. More new suburban stations are planned. Instead of speeding Geelong line services, V/Line's VLocity trains now make additional stops and are often crammed with both regional and suburban passengers. Geelong line users depend on the railway for access to jobs, health and educational services, and much else. They need their railway fixed — and both short term and longer term solutions are needed. Q: What can be done in the short term? A: The current timetables provide good frequency for Geelong travellers, with a This new V/Line train on average every 12 minutes in the peak period.
    [Show full text]
  • Tarneit Precinct Structure Plan Area 91 Growth Areas Authority Document Prepared By
    Desktop Environmental, Report ref: Hydrological and 220829 17 August 2011 Geotechnical Study Revision 2 Tarneit Precinct Structure Plan Area 91 Growth Areas Authority Document prepared by: Aurecon Australia Pty Limited Level 12 60 Albert Road South Melbourne Victoria 3205 Australia T: +61 3 8683 1333 F: +61 3 8683 1444 E: [email protected] W: aurecongroup.com Document control Document ID: 20111708_GAA_PSP_91_Desktop_Study_Rev_02 Final.doc Rev No Date Revision details Typist Author Verifier Approver 0 14 July 2011 Internal Review GB GB TM 1 28 July 2011 Draft Copy to Client GB GB NP JM 2 17 August 2011 Final Issue Copy GB GB NP JM A person using Aurecon documents or data accepts the risk of: a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard copy version. b) Using the documents or data for any purpose not agreed to in writing by Aurecon. Desktop Environmental, Hydrological and Geotechnical Study Tarneit Precinct Structure Plan Area 91 Contents Executive summary 1 1. Introduction 1 1.1 Background 1 1.2 Objectives 1 1.3 Scope of works 1 1.3.1 Desktop review 1 1.3.2 Site inspection 2 1.3.3 Reporting 2 1.4 Legislative requirements and relevant assessment guidelines 2 1.5 Limitations 3 2. Site Description 4 2.1 Location and description 4 2.2 Site features 6 2.3 Surrounding land use 6 2.4 Proposed land use 6 2.5 Topography 6 2.6 Geology 6 2.7 Soil characteristics 6 2.8 Acid sulphate soils 7 2.9 Historical mining activity 7 2.10 Expected geological conditions 7 2.11 Key geotechnical constraints 8 2.12 Hydrology and hydrogeology 8 2.12.1 General assessment 8 2.12.2 Surface water assessment 9 2.12.3 Groundwater assessment 9 2.12.4 Groundwater resources and usage 10 2.13 Wetlands 12 2.13.1 General 12 2.13.2 Relevant legislation 12 2.13.3 Wetland ecological vegetation classes 12 2.13.4 Conservation significance of wetland EVCs 13 2.13.5 Key ecological areas for wetlands 14 2.13.6 Potential for identifying additional wetland areas 14 2.13.7 Conclusions of wetlands review 14 3.
    [Show full text]
  • 945 Bus Time Schedule & Line Route
    945 bus time schedule & line map 945 Wyndham Vale View In Website Mode The 945 bus line Wyndham Vale has one route. For regular weekdays, their operation hours are: (1) Wyndham Vale: 5:00 AM - 5:30 AM Use the Moovit App to ƒnd the closest 945 bus station near you and ƒnd out when is the next 945 bus arriving. Direction: Wyndham Vale 945 bus Time Schedule 25 stops Wyndham Vale Route Timetable: VIEW LINE SCHEDULE Sunday 5:00 AM - 5:30 AM Monday Not Operational Melbourne Town Hall/Collins St (Melbourne City) 190 Collins Street, Melbourne Tuesday Not Operational Scots' Church/Russell St (Melbourne City) Wednesday Not Operational 81 Russell Street, Melbourne Thursday Not Operational Melbourne Central/Lonsdale St (Melbourne City) Friday Not Operational 253 Lonsdale Street, Melbourne Saturday 4:30 AM Elizabeth St/Lonsdale St (Melbourne City) 361 Lonsdale Street, Melbourne Little Collins St/Queen St (Melbourne City) 122 Queen Street, Melbourne 945 bus Info Direction: Wyndham Vale Spencer St/Flinders St (Melbourne City) Stops: 25 605 Flinders Street, Southbank Trip Duration: 85 min Line Summary: Melbourne Town Hall/Collins St Francis St/Williamstown Rd (Yarraville) (Melbourne City), Scots' Church/Russell St 348 Williamstown Road, South Kingsville (Melbourne City), Melbourne Central/Lonsdale St (Melbourne City), Elizabeth St/Lonsdale St Somerville Rd/Williamstown Rd (Yarraville) (Melbourne City), Little Collins St/Queen St 193 Williamstown Road, Kingsville (Melbourne City), Spencer St/Flinders St (Melbourne City), Francis St/Williamstown Rd (Yarraville),
    [Show full text]