County Highway 13 (Ideal Avenue) Phase 2 Pavement and Safety Improvement Project

Total Page:16

File Type:pdf, Size:1020Kb

County Highway 13 (Ideal Avenue) Phase 2 Pavement and Safety Improvement Project County Highway 13 (Ideal Avenue) Phase 2 Pavement and Safety Improvement Project Public Questions/Responses and Comments Date: July 10, 2020 Resident Questions from Survey Q1) Is there any way the roundabout at 40th Street could be pushed to the west so the impact on private property is less? A1) In the time since the informational flyer has been mail, and the design concepts have been posted on the project website, the design team has continued to modify the proposed roundabout at Lake Jane Trail / 40th Street to further reduce impacts to the existing residential properties on the east side of Ideal Avenue. Q2) I would lose a row of trees, don’t see the need for a turn lane unless everything moved west. A2) Turn lanes are being proposed as a safety and operational improvement to Ideal Avenue. Turn lanes are typically installed for streets that serve more than 10 residential homes due to the volume of turning traffic. Turn lanes reduce the risk of rear-end crashes and also prevent unsafe passing of slowing or turning vehicles. Q3) Is it necessary at this time to put in a roundabout at 36th Street? I realize it is intended to accommodate the new housing development but it could be done later, much later when the development occurs and then make the developers pay for that. A3) The proposed improvements are taking into account the increased traffic from the surrounding area over the next 20-years. The Cities of both Lake Elmo and Oakdale will have a cost participation in these proposed improvements. When the new housing development is brought forth to the City of Oakdale, there will be an agreement between the developer and the city that outlines numerous items, including costs and dedication of right-of-way (property) for improvements to Ideal Avenue. Q4) Will the turn lane concept not be lit? A4) It is not Washington County standard practice to add lights to all intersections with turn lanes, but either of the cities may request intersections to be lit with the turn lane concept. County Highway 13 (Ideal Avenue) Phase 2 Page 2 Q5) I do not like roundabouts – if the speed is reduced to 40 mph, turn lanes will work without impeding through traffic. 50 mph speed is too fast and should be reduced to 40 or 35 mph. A5) To reduce impacts to private property and to help encourage reduced travel speeds, the Design Speed was reduced to 40 mph, but this does not guarantee that the posted speed limit will be reduced at the completion of the proposed project. Speed limits are determined by Minnesota state laws and the State Commissioner of Transportation, not by city or county officials. See Open House Boards FAQ for additional information. Q6) Have studies looked at marked crossings for roundabouts? Should there be no marking either way? Is this study possibly because pedestrians feel invincible and just cross thinking the markings will keep them safe? Should we add pedestrian orange flags and flag holders on both sides like they do in some parts of St. Paul? I think a driver coming around a roundabout is less likely to see a pedestrian than a driver making a 90-degree turn Have you considered a tunnel under or bridge over the road? Can you also add a crosswalk to 38th Street? A6) At intersections, pedestrians who are lawfully crossing the roadway have the right-of- way regardless of if crosswalk markings are present. Marked crosswalks are typically used at roundabouts because the crossings are located approximately one car length from the intersection itself, and thus are legally considered a midblock crossing. Crosswalk markings do not themselves provide a safety benefit, but with just one approach lane from each direction the markings do not worsen safety and they do provide a legal benefit. Crosswalk markings can make pedestrian safety much worse when used at uncontrolled crossings across numerous lanes, and especially when there is no median. Orange flags have been tried as a way to improve pedestrian visibility and reduce pedestrian delays in those situations. However, since roundabout crosswalks are only one lane wide and a median refuge is provided, pedestrians can usually complete the crossing with little or no waiting before another vehicle approaches. This is the safest type of gap, when there’s no need to rely on the behavior of any driver. Bridges and tunnels are not cost-feasible for this project, and would require significant city cost participation. Because the 38th Street intersection will involve four lanes to cross, crosswalk markings would be expected to worsen pedestrian safety and therefore will not be installed. Q7) I am not sure about speed being slower in roundabouts? Based on my interactions with other roundabouts already in the area, I feel like people don’t even have to slow down, they just keep going at a pretty fast clip, versus having to slow down to make an actual 90 degree turn with turn lanes. A7) Roundabouts provide physical control of speeds because all drivers must slow down to approximately 25 mph in order to enter the roundabout without losing control of the vehicle. Right turns at a roundabout, though still constrained to this same entry speed, may in fact be faster than right turns at a standard intersection since the right-turning radius at a roundabout is larger. County Highway 13 (Ideal Avenue) Phase 2 Page 3 Q8) Is this project being coordinated with new housing development on 40th Street? A8) Yes, the proposed project is being coordinated with the proposed new development and is taking into account the anticipated increase in traffic from the surrounding area over the next 20-years. Q9) What is the logic in realigning 40th Street to Lake Jane Trail? A9) The realignment of 40th Street to Lake Jane Trail eliminates overlapping left turn movements (northbound left-turn to 40th Street interferes with southbound left-turn to Lake Jane Trail). Eliminating this overlap allows for the left turn hazards to be mitigated with left turn lanes or a roundabout, thus improving roadway safety. Q10) Studies have shown that marking a crossing at an intersection with turn lanes actually decreases safety. Please provide this study. A10) An extensive national study in 2005 of locations where the crosswalk approaches were not controlled by stop signs or traffic signals found that crosswalk markings did not lead to lower pedestrian crash rates. For some types of roads, there was no significant difference in pedestrian crash rates when the crossing was marked, but for higher- volume roads with multiple approach lanes, the pedestrian crash rate for marked crossings was approximately four times higher than crossings that were unmarked. This study can be accessed online at https://www.fhwa.dot.gov/publications/research/safety/04100/04100.pdf. Q11) I don’t see why you could not find a way to continue the left turn lane between Lake Jane Trail and 39th Street so you wouldn’t have to redirect traffic through 38th Street? A11) Left turn lanes are an important safety component to provide a safe area for turning traffic to wait for a gap without being rear-ended by through traffic. 39th Street is too close to the combined 40th Street/Lake Jane Trail intersection to provide dedicated left turn lanes to both streets. A two-way left turn lane would not be suitable for these volumes, and side-by-side left turn lanes would further increase the roadway width in an already constrained area. Q12) Will Lake Elmo be re-building 38th and 39th Street? A12) 38th and 39th Street are owned by the City of Lake Elmo. If you have questions related to these Streets, please reach out to the City of Lake Elmo’s Engineer, Jack Griffin. Q13) Who would maintain the paths? Winter? A13) Maintenance of the paths or trails along Ideal Avenue will be documented by a Maintenance Agreement between the County and the Cities. This agreement is typically executed closer to construction, when the construction plans are further detailed, but is it anticipated that the trail along Ideal Avenue would be owned by the county and maintained by both the county and the cites. Any minor repairs to the trails would be completed by the cities. Any major repairs to the trail will be completed by the county. During winter, if the cities elect to clear snow from the trail, this will be a responsibility of the cities. County Highway 13 (Ideal Avenue) Phase 2 Page 4 Q14) Can the RAB lights be on a motion sensor? A14) We are not aware of any locations where motion-activated streetlights have been tried or the reliability of such technology. Additionally the motion detection zone would need to extend far from the roundabout such that approaching drivers are able to see the central island and reduce their speed prior to reaching the intersection. Therefore, a motion-activated system is not seen as a practical alternative. Q15) We request fire hydrants. Are any other utilities planned? Is curb and gutter decided? A15) Based on public feedback heard during the County Highway 13 Phase 1, curb and gutter is being used to help reduce private property impacts that are associated with grading ditches. Fire hydrants, water main lines, and sanitary sewer lines are owned and operated by Cities. Requests related to these utilities should be sent to the Engineer at either Lake Elmo or Oakdale, depending on which city you reside in. Q16) We moved here two years ago and I get the first notice about the 18th feedback meeting two weeks AFTER it occurred.
Recommended publications
  • IOWA COUNTY Highway Access for Special Events ORDINANCE
    Ordinance No. 300.05 IOWA COUNTY Highway Access for Special Events ORDINANCE SECTION 1.0: INTRODUCTION 1.1 NAME This Ordinance shall be called the Iowa County Highway Access for Special Events Ordinance. 1.2 INTENT It is the purpose of this Ordinance to regulate the date, time, place, and manner of Special Events occurring on the County Trunk Highway system when the event's impact upon health, safety, sanitary, fire, police, transportation or utility services exceeds those regularly provided to the location of the event. This Ordinance is enacted in order to promote the health, safety, and welfare of the residents and visitors of Iowa County by ensuring that Special Events do not create disturbances, become nuisances, menace or threaten life, threaten health or property, disrupt traffic flow, or damage property. It is not the intent of the County Board enacting this Ordinance to regulate in any manner the content of speech or infringe on the right to assemble; except for regulating the time, place, and manner of assembly. This Ordinance is adopted under the authority of Wisconsin state Statutes 349.185. 1.3 DEFINITIONS A. Extra-ordinary Services means work performed or assistance by any department of county government (Sheriff's office, highway, emergency management, etc.) to provide a service to assist an organizer of a Special Event with the delivery of their event whether required through the permit process or by a voluntary request by the organizer. B. Organizer means the event coordinator, planner, scheduler, corporation, government entity, club, association, or other person(s) who have the responsibility for hosting an event.
    [Show full text]
  • Rice County, Minnesota Highway
    A B C D E F G H I J R 22 WR22 W21 R W21 R WR20 W R20 WR19 Road Name Location Road Name Location Eaton Ave................G4-5, G8, G9, G9-10G9,G8, EatonAve................G4-5, 13000 12000 11000 10000 9000 8000 7000 6000 5000 4000 3000 2000 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 E..............H7-J7 200th St EavesAve...............G3 200th St W.............A7 200th St EbelAve..................G5 201st Ct W.............B7 201stCt EbelWa y.................G3 202ndW............A7 St EbertCt....................G3 Rice County, 204th St E..............G7 204th St EchaCt..................G3 rt 205th St W.............C7 205th St D8-9 D6-7, EchoAve.................D4-5, 1 W.............C7 206th St EchoCt....................D8 1 Edg e brookDr...........G3 3000 E..............F8 208th St 209th St W.............C8 209th St Edward sWa y...........G5 3000 S co tt County Scott I8-J8 E..............I8, 210th St G9 EilerAve...................G6-8, 210th St W.............A8-D8 210th St ElginCt.....................D6 Minnesota ElginTrl....................D8 Porter 02 E..............H8-I8 215th St 04 C8B8, W.............A8, 215th St ElktonTrl..................D8 Creek 218th St W.............A8 218th St ElmCt.......................G6 06 05 04 03 02 06 01 Bridg e waterTowns hip County Wheatland County Porter03 Creek W e bsterTowns hip I8 E..............F8-H8, 220th St D9-10D8,D6, D5-6, D4-5, ElmoreAve...............D2-3, 4000 01 T112NR21W T111NR20W Ditch 14 Ditch 31 W.............B8-C8 220th St ElmorePath..............D6 4000 Delano 1. Ave De 1. cke Ct r 222ndW............D8-E8 St ElmoreTrl.................D6 05 ElmoreWa y..............D6 Highway Map Rice County, W 41stSt 2.
    [Show full text]
  • Improving Bus Service in New York a Thesis Presented to The
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Columbia University Academic Commons Improving Bus Service in New York A Thesis Presented to the Faculty of Architecture and Planning COLUMBIA UNIVERSITY In Partial Fulfillment Of the requirements for the Degree Master of Science in Urban Planning By Charles Romanow May 2018 Abstract New York City’s transportation system is in a state of disarray. City street are clogged with taxi’s and for-hire vehicles, subway platforms are packed with straphangers waiting for delayed trains and buses barely travel faster than pedestrians. The bureaucracy of City and State government in the region causes piecemeal improvements which do not keep up with the state of disrepair. Bus service is particularly poor, moving at rates incomparable with the rest of the country. New York has recently made successful efforts at improving bus speeds, but only so much can be done amidst a city of gridlock. Bus systems around the world faced similar challenges and successfully implemented improvements. A toolbox of near-immediate and long- term options are at New York’s disposal dealing directly with bus service as well indirect causes of poor bus service. The failing subway system has prompted public discussion concerning bus service. A significant cause of poor service in New York is congestion. A number of measures are capable of improving congestion and consequently, bus service. Due to the city’s limited capacity at implementing short-term solutions, the most highly problematic routes should receive priority. Routes with slow speeds, high rates of bunching and high ridership are concentrated in Manhattan and Downtown Brooklyn which also cater to the most subway riders.
    [Show full text]
  • La Crosse County Highway Department Policies and Procedures Manual
    HIGHWAY DEPARTMENT Policies and Procedures Manual La Crosse County, Wisconsin March 2021 Highway Department Policies and Procedures Manual La Crosse County, Wisconsin Approved by the La Crosse County Highway Department and the Public Works & Infrastructure Committee ------ March 8, 2021 Disclaimer This manual was prepared to summarize the policies and procedures of the La Crosse County Highway Department. It is intended to be a living document that conveys the Highway Department procedures that relate to or directly impact the County Highway system. Most sections in this manual reference specific laws, rules, and regulations including, but not limited to, the Wisconsin State Statutes and the La Crosse County Code of Ordinances. This manual is not intended to be a substitute for the specific laws and regulations contained in those or any other documents. The La Crosse County Highway Department and Public Works & Infrastructure Committee reserves the right to review and revise the policies and procedures in this manual. At a minimum, this document will be reviewed on an annual basis (March of each year) and will be updated accordingly to reflect changes to ordinances, State Statutes, State Administrative Code, and other relevant rules and regulations. The Highway Department and Public Works & Infrastructure Committee also reserves the right to make decisions on a case-by-case basis regarding issues that are not contained in this manual. Prepared by La Crosse County Highway Department Policies and Procedures Manual Table of Contents 3.4.4 Removal of Noncompliant Structures ...................................... 8 3.5 Right-of-Way Encroachments ............................. 10 3.5.1 Plantings, Crops, and Other Vegetation ...............................
    [Show full text]
  • Trains Stop (Local Mosholu Pkwy Norwood Times
    ORCHARD Wakefield PELHAM BEACH Wakefield BAY 241 St PARK WESTCHESTER 2 EASTCHESTER THE BRONX Nereid Av Eastchester 2•5 Dyre Av Riverdale 5 Woodlawn 233 St 2•5 Baychester New York City Subway Av CO-OP 225 St 5 CITY with airport and railroad connections 2•5 Van Cortlandt Park 219 St BAYCHESTER 242 St VAN Woodlawn 2•5 THE Key 1 CORTLANDT 4 RIVERDALE PARK Gun Hill Rd Gun Hill Rd CITY The subway operates 24 hours a Local service only Williams BRONX ISLAND Bridge 2•5 5 day, but not all lines operate at all Rush hour line All trains stop (local Mosholu Pkwy Norwood times. Call our Travel Information extension and express service) 238 St 4 205 St Center at 511 for more information 1 D Pelham Bay Park in English or Spanish (24 hours) or KINGSBRIDGE Burke Av 6 ask an agent for help in all other 2•5 231 St Bedford Pk Blvd Bedford Pk Blvd languages (6AM to 10PM). Accessible Station 1 Buhre Av station Spuyten Lehman College B•D Name Allerton Av 6 • Free subway transfer Duyvil Marble 4 Pelham Pkwy A B Marble Hill 2•5 Hill 225 St Botanical Garden 5 Bus or AIRTRAIN Free out-of-system 1 Kingsbridge Rd Middletown Rd to airport subway transfer visit www.mta.info (excluding single-ride Kingsbridge Rd B•D 6 Police 4 Pelham Pkwy Morris Park ticket) 2•5 5 Full time service Fordham Rd Part time service Bus to airport INWOOD 215 St B•D Fordham Westchester Sq Terminal HILL PARK Fordham Rd 1 FORDHAM BRONX Bronx Park East Tremont Av To show service more clearly, geography 4 West FarmsZOO Sq East 6 on this map has been modified.
    [Show full text]
  • KENDALL COUNTY Ordinance No
    KENDALL COUNTY Ordinance No. JO-LO, An Ordinance for the Establishment of Altered Speed Zone on Jughandle Road WHEREAS, pursuant to 625 ILCS 5/11-604, the Kendall County Board has been granted authority to establish altered speed limits on all county highways, township roads and district roads as defined in the Illinois Highway Code, except those under the jurisdiction of the Illinois Department of Transportation or of the Illinois State Toll Highway Authority; and WHEREAS, an engineering and traffic investigation, performed by the Kendall County Highway Department or its agent(s) upon the respective streets or highways listed in the schedule contained herein, has determined that an altered speed zone(s). is appropriate for the listed streets or highways maintained by Kendall County Highway Department or others; and WHEREAS, the Kendall County Board has determined that the statutory maximum vehicular speed limits established by Section 11-601 of the Illinois Vehicle Code are greater or less than that considered reasonable and proper on the street or highway listed in the following schedule; THEREFORE, BE IT ORDAINED, that the County Board of Kendall County hereby declares that the reasonable and proper, absolute maximum speed limits for the respective streets or highways listed in the following schedule shall be as stated therein; AND BE IT FURTHER ORDAINED, that this ordinance shall take effect immediately after the erection of signs giving notice of the maximum speed limits. SCHEDULE OF ALTERED SPEED ZONES Street or Highway Exact Limits of Zone(s) Maximum Speed Limit Jughandle Road Bell Road to U.S. Route 52 40MPH I, Debbie Gillette, County Clerk in and for said County, in the State aforesaid, and keeper of the records and files thereof, as provided by statute, do hereby certify the foregoing to be a true, perfect and complete copy of an ordinance adopted by the Kendw County Board, at its regularly scheduled meeting in Yorkville, Illinois, on the¥ day of · UN , A.D., 2020.
    [Show full text]
  • Jfk Tearsheet Map 17X11 4-16F
    V Va n John F. Kennedy International Airport A a Ai n W Legend ir rT W Tr y N ra yc ai ck n MMTATA NNYCYC TBusransit Bus in k E John F. Kennedy International Airport T x To E o xp J w MTA NYC Transit Subway Blvd a p M TA NYC Transit Subway ay J aw am wy Express Bus to Manhattan ma y Express Buses to Manhattan ai 1 JFK Plaza c 1 5 i Fairfield Inn and LaGuardia Airport a 5 and LaGuardia Airport Rock c 0 Hotel Fairfield Inn 0 a EXITEXIT 20 20 by Marriott G S G S by Marriott S u Rental Car, Hotel t u Rental Car, Hotel St t JFK Inn R y a Hampton JFK Inn y Hampton Rockawayockawa Blvdy and Cargo Area Shuttles t R and Cargo Area Shuttles at Courtyard R d Courtyard d Rockaway Blvd i InnInn to HolidayHoliday Inn Inn Express Express v v B Rockaway Blvd l B i byby Marriott Marriott l r Eastern Rd Taxi Pick Up Area on B r e Taxi Pick Up Area B N 1 e 130 St w n BestBest B s s w 3 vvee DaysDays Inn Inn lvd r A r e 0 St A WesternWestern e Airport Plazas - 55 e e r Hotels 1133 HiltonInternational New York r ComfortComfor Innt Inn & &Suites Suites m m B Food, gas, truck parking r r B 254 255 JFKJFK Hotel Hotel vee l 256 AAv a a l v t F F v d Parking iit d P u 257 Hotels EXIT 2 CrowneDoubletree Plaza nd Nassau Expwy Four oondu Kiss & Fly Pointsoiintsn CC Hiltonton tthh P Parking Soouu PA Medical AMBAM CargoB Cargo Bldgs Bldgs Garden Inn S Gardenrdenen InnInnn 262262 N.
    [Show full text]
  • Highway Commissioner Oneida County
    HIGHWAY COMMISSIONER ONEIDA COUNTY Oneida County in Rhinelander, Wisconsin is accepting applications for the position of Highway Commissioner. This position plans and directs work of the County Highway Department requiring independent judgment and thorough knowledge of all factors affecting road construction and maintenance including short and long term planning. This is a full-time position with a 2021 annual salary of $76,913 to $87,901 based on prior experience and qualifications; excellent fringe benefit package included. Qualified candidate must possess the following: Associate Degree in Business Management, Engineering, or related field; minimum of five years’ experience in progressively responsible administrative and supervisory duties within a road construction/maintenance environment or business; any combination of education and experience that provides the equivalent knowledge, skills and abilities will be considered. Successful candidates should possess knowledge and experience in highway and bridge construction, maintenance procedures and long-range construction planning; knowledge of budgetary planning, computers and personnel management strongly preferred. Applicants will be required to undergo an oral interview, and must have the ability to pass a pre-employment drug screen, background check and skills evaluation. Full job description and required Oneida County application are available at www.co.oneida.wi.us. Completed application along with cover letter, resume, transcripts, certificates of training and letters of recommendation should be submitted to [email protected] or mailed to Oneida County LRES, P.O. Box 400, Rhinelander, WI 54501. Deadline to apply is Tuesday, January 19, 2021 at 4:30 p.m. EOE/AA Oneida County Job Description Job Title: Highway Commissioner Class Title: Highway Commissioner Department: Highway Reports To: Public Works Committee FLSA Status: Exempt-Exec.
    [Show full text]
  • CAMDEN COUNTY HIGHWAY CIRCULATION ~E: PLAN ,$!;
    CAMDEN COUNTY HIGHWAY CIRCULATION ~e: PLAN ,$!;, .. '\, ,, \ ,, ,, I , I i, • , I I I , , , Wf\TEAFOAD J , J~ , • , I , IJ , I , • , &a , , Delaware Valley ,) , Regional Planning , , \ Commission ~~~ \ Bi>~""<WIIZI'Ir:[I~~IIIIIJMI'I',",I!IiSIIIIJtIIO: December, 1991 CAMDEN COUNTY IDGHWAY CIRCULATION PLAN FINAL DOCUMENT DELAWARE VALLEY REGIONAL PLANNING COMMISSION DECEMBER 1997 CAMDEN COUNTY BOARD OF CHOSEN FREEHOLDERS Jeffrey L. Nash, Freeholder Director Annette Castiglione-Degan, Freeholder Deputy Director Scott M. Goldberg, Freeholder, Department of Public Works (Divisions of Engineering and Planning) Riletta Cream Edward T. McDonnell Bernard A. Platt Frank Spencer CAMDEN COUNTY PLANNING BOARD Jeffrey L. Nash, Freeholder Director Scott M. Goldberg, Freeholder Frank Spencer, Freeholder Barry Malesich, Board Chairperson Carole Miller, Board Vice-Chairperson Robert E. Kelly, P.E., County Engineer Thomas Quackenbush William J. Controvich William J. Snyder Margaret A. Young Joseph Forte George Jones Michael Brennan, Esquire, Board Solicitor CAMDEN COUNTY DEPARTMENT OF PUBLIC WORKS: Dominic J. Vesper, Jr., Director George C. Fallon, Supervisor of Roads DIVISION OF ENGINEERING: Robert E. Kelly, P.E., County Engineer DIVISION OF PLANNING: J. Douglas Griffith, P.P., AICP, Planning Director Thomas B. Chamberlin, Supervising Planner Land Development and Review Gail Elbert, Supervising Planner Ronald Jernegan, Data Processing Technician Louise M. Sawchuk, Principal Clerk Typist DELAWARE V ALLEY REGIONAL PLANNING COMMISSION Publication Abstract
    [Show full text]
  • Little Hills Expressway & Mel Wetter Roundabout
    Little Hills Expressway & Mel Wetter Roundabout Sponsor Saint Charles Project No. RB18-000008 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $2,000,000 $500,000 $500,000 $1,000,000 Project Description The Mel Wetter and MO 370 Interchange Study has identified the intersection of Mel Wetter Parkway and Little Hills Expressway to have significant traffic delays and experiencing an increase traffic volume due to new developments. A recent traffic impact study prepared for the Villages of Provence, a new residential development on Mel Wetter Parkway south of MO-370, forecasts increasing traffic volumes that will warrant intersection improvements at Mel Wetter Parkway and Little Hills Expressway. Multiple conceptual layouts were developed during the Mel Wetter and MO 370 Interchange Study with County and MoDOT participation. After a detail evaluation, Alternative A with a roundabout at Mel Wetter Parkway and Little Hills Expressway was the preferred alternative. Summary of Alternative A: Expand the MO-370 interchange at Route 94 to include access to Mel Wetter Parkway through the addition of a collector distributor (C-D) road system; redesign the intersection at Mel Wetter Parkway and Little Hills Expressway with a roundabout; new signalized intersection on Mel Wetter Parkway with the south C-D road. The City of Saint Charles is requested County funds for the design and construction of the roundabout at Mel Wetter Parkway and Little Hill Expressway. The roundabout will be constructed within existing City Right-of-Way. The roundabout will be designed and constructed to accommodate future MO 370 ramps and connection to the north collector distributor C-D road.
    [Show full text]
  • Ozaukee County Highway Department 410 South Spring Street P.O
    Ozaukee County Highway Department 410 South Spring Street P.O. Box 994 Port Washington, Wisconsin 53074-0994 Robert Dreblow – Highway Commissioner Phone 262-238-8331 Fax 262-238-8343 2005 REPORT OF THE HIGHWAY COMMISSIONER To the Honorable Board of Supervisors Ozaukee County, Wisconsin The annual report of the County Highway Commissioner for the year 2005, as required by Section 83.01(7) of the Wisconsin Statutes, is presented for your consideration. This report includes an itemized statement of expenditures for 2005, including County Highway Maintenance, Building Outlay, New Equipment and Highway Construction Projects. A complete inventory of equipment, materials and a detailed accounting of all expenditures are available as a separate document. Highway Department Mission Statement The Ozaukee County Highway Department seeks to provide and maintain the highest quality transportation system possible, one that balances the desires of County taxpayers for safety, speed and efficiency, and to provide for it in a fiscally responsible manner. The Ozaukee County Highway Department is fully equipped to provide complete maintenance and construction services for the transportation system in Ozaukee County. Working under contract to the State of Wisconsin Department of Transportation, services are provided to maintain 27 miles of Interstate Highway and 64 miles of State Trunk Highways running through the County. The Highway Department also is responsible for maintaining 152 miles of County Trunk Highways, and through intergovernmental agreements, provides service to Townships, maintaining 204 of the 266 total miles of Town Roads in the County. Construction activities in 2005 included several notable projects. The significant State project principally completed in 2005 was the reconstruction of a portion of STH 33 in the Village of Saukville, including replacement of the Milwaukee River crossing with a new four-lane, post tensioned structure.
    [Show full text]
  • Decatur County Highway Standards
    TABLE OF CONTENTS PREFACE SECTION 1: DEFINITIONS SECTION 2: UTILITY CONSTRUCTION PERMITS AND STANDARDS 2.1 APPLICABILITY 2.2 GENERAL 2.3 DESIGN DRAWINGS 2.4 STANDARDS FOR UTILITY PLACEMENT AND CONSTRUCTION 2.5 ABOVE GROUND UTILITIES 2.6 RESTORATION REQUIREMENTS 2.7 PUBLIC SAFETY TABLE OF 2.7.1 PRECONSTRUCTION CONFERENCE CONTENTS SECTION 3: APPROACH PERMITS & STANDARDS (DRIVEWAYS & ROAD APPROACHES) 3.1 APPLICABILITY 3.2 GENERAL 3.3 STANDARDS 3.4 RESTORATION REQUIREMENTS 3.5 PENALTY SECTION 4: STANDARDS FOR NEW ROAD CONSTRUCTION 4.1 GENERAL REQUIREMENTS 4.2 ROADWAY CLASSIFICATION 4.3 RIGHT-OF-WAY REQUIREMENTS 4.4 DESIGN CRITERIA 4.5 TRAFFIC STUDY 4.6 DRAINAGE 4.7 SIGNAGE 4.8 GUARDRAIL OR BARRIER PAGE 1 PREPARED BY: HOWARD J. BARTH & ASSOCIATES 4.9 CLEARING AND GRUBBING 4.10 SUBGRADE 4.11 COMPACTED AGGREGATE BASE 4.12 HOT ASPHALT MATERIALS 4.13 ACCEPTANCE OF ROADS 4.14 REQUIRED SUBMITTALS – SPECIFICATIONS FOR DRAWINGS REQUIRED INSPECTION & INFORMATION CHECKLIST SECTION 5: MAILBOXES & NEWSPAPER DELIVERY BOXES 5.1 APPLICABILITY 5.2 STANDARDS 5.3 LOCATIONS 5.4 REMOVAL & LIABILITY SECTION 6: MISCELLANEOUS FIGURES FIGURE 6.1 - TYPICAL COMPLIANCE LETTER FROM HIGHWAY SUPERINTENTANT FILED WITH THE AREA PLAN DIRECTOR. TABLE OF FIGURE 6.2 - TYPCAL HIGHWAY CUT LETTER FROM APPLICANT CONTENTS TO BE FILED WITH HIGHWAY DEPARTMENT PAGE 2 PREPARED BY: HOWARD J. BARTH & ASSOCIATES PREFACE It is the purpose of this manual to identify and define standards for construction of new roads proposed for dedication to and maintenance by Decatur County. Also included in this manual are construction standards for new or existing private road and driveway approaches, which enter upon or already exist within right of ways owned by Decatur County or onto roads maintained by Decatur County, but not within dedicated rights of way, and for the construction and maintenance of utilities within County owned rights of ways or other roadways maintained by Decatur County but not necessarily within dedicated rights of way.
    [Show full text]