Active Contracts by Type
Total Page:16
File Type:pdf, Size:1020Kb
Active Professional Services Contracts as of 8/14/2018 Compl. Board Contract Suppl. Contract Final Date Date Number Consultant Phase Contract Amount Description Approved State Pymt Contract PM 07/26/18 RR-18-4379 AMEC Foster Wheeler Environment & Infrastructure, Inc. Design $3,000,000 Reagan Memorial Tollway, Roadway and Bridge Rehabilitation, M.P. 117.8 Award No 06/30/24 M. Faraj (Aurora Toll Plaza) to M.P. 123.4 (IL 59). Phase II Engineering Services. 07/26/18 RR-18-4381 Lochmueller Group, Inc. Design $1,511,894 Reagan Memorial Tollway, Pavement and Structural Preservation and Approved No 07/31/24 M. Faraj Rehabilitation, M.P. 113.3 (Illinois Route 56) to M.P. 117.8 (Aurora Toll Plaza). Phase II Engineering Services. 06/28/18 RR-18-4377 The Roderick Group, Inc. (dba Ardmore Roderick) Inspection $6,500,000 Systemwide, Maintenance Facilities, Construction Management Services Upon Obligated No 12/31/21 W. Doyle Request. On-call and as-needed Construction Management Services. 06/28/18 RR-18-4378 Interra Inc. Inspection $2,500,000 Systemwide, Construction Management Upon Request. On-call and as-needed Award No 12/31/22 J. Kim Construction Management Services. 06/28/18 RR-18-4383 Christopher B. Burke, Engineering, Ltd. Study $5,000,000 Tri-State Tollway, 95th Street to Balmoral Avenue, Planning Studies Upon Obligated No 06/30/25 N. Nutter Request. On-call and as-needed Phase I Engineering Services for Planning Studies and Master Plan Services. 06/28/18 RR-18-9008 Singh & Associates, Inc. Design $2,000,000 Systemwide, Design Upon Request, Non-Roadway. Phase II Engineering Approved No 12/31/25 J. Kim Services. 06/28/18 RR-18-9016 ARCADIS U.S., Inc. Inspection $2,500,000 Systemwide, Construction Management Upon Request, Non-Roadway. On-call Approved No 12/31/22 R. Hanba and as-needed Construction Management Services. 06/28/18 RR-18-9205 Great Arc Technologies, Inc. Design $3,000,000 Infrastructure Management System for 2018/2019/2020/2021 Award No 06/28/23 B. Will 05/24/18 RR-17-4312 TransLand Engineering Group, LLC Inspection $699,800 Reagan Memorial Tollway (I-88), Pavement and Structural Preservation and Obligated No 05/31/21 J. Szabo Rehabilitation, M.P. 123.4 (IL Route 59) to M.P. 126.9 (East of Washington Street). Construction Management Services. 05/24/18 RR-17-4313 Clark Dietz, Inc. Inspection $2,050,967 Reagan Memorial Tollway (I-88), Pavement and Structural Preservation and Obligated No 01/31/21 J. Szabo Rehabilitation, M.P. 126.9 (East of Washington Street) to M.P. 139.1 (York Road). Construction Management Services. 05/24/18 RR-17-4314 Apex Consulting Engineers, LLC Inspection $1,662,049 Tri-State Tollway (I-294), Pavement and Structural Preservation and Obligated No 04/30/21 D. Framarin Rehabilitation, M.P. 40.0 (Balmoral Ave) to M.P. 52.9 (Lake Cook Road). Construction Management Services 05/24/18 I-18-4352 Upchurch Group, Inc., The Design $1,597,911 Reagan Memorial Tollway (I-88), Windsor Road Bridge Widening. Phase II Approved No 12/31/20 M. Faraj Engineering Services 05/24/18 RR-18-4353 Crawford, Murphy & Tilly, Inc. Design $3,000,000 Systemwide, Design Upon Request. On call and as-needed Phase II Obligated No 12/31/26 J. Szabo Engineering Services. 05/24/18 RR-18-4354 2IM Group, LLC Design $8,000,000 Systemwide, Design and Construction Management Services for Landscape Obligated No 07/31/27 M. Faraj Services Upon Request. On call and as-needed Phase II Engineering Services and Construction Management Services 05/24/18 RR-18-4355 EJM Engineering, Inc. / TranSmart Technologies, Inc. Design $3,500,000 Intelligent Transportation Systems (ITS) Services Upon Request. On call and Obligated No 06/30/23 A. Aladham (TM) as-needed Phase II Engineering Services and Construction Management Services 05/24/18 I-18-4356 H.W. Lochner, Inc. Inspection $12,000,000 Tri-State Tollway (I-294), Roadway and Bridge Rehabilitation and Widening, Obligated No 05/31/23 M. Wicks Wolf Road (M.P. 36.2) and the Balmoral Avenue (M.P. 40.0). Construction Management Services 05/24/18 RR-18-4360 Cotter Consulting, Inc. Inspection $3,000,000 Systemwide, Construction Management Upon Request. On call and as-needed Obligated No 05/31/23 M. Lao Construction Management Services. 05/24/18 RR-18-9013 R.M. Chin & Associates, Inc. Inspection $2,500,000 Systemwide, Construction Management Upon Request, Non-Roadway. On call Obligated No 12/31/21 C. Tibbs and as-needed Construction Management Services. Tuesday, August 14, 2018 Powered by Catapult Page 1 of 9 Active Professional Services Contracts as of 8/14/2018 Compl. Board Contract Suppl. Contract Final Date Date Number Consultant Phase Contract Amount Description Approved State Pymt Contract PM 05/24/18 RR-18-9015 Kristine Fallon Associates, Inc. Project / $6,385,827 Document and Process Control Management Services. Obligated No 06/30/25 S. Qureshi Program Management 04/26/18 RR-16-4275 Thomas Engineering Group, LLC Inspection $7,001,012 Edens Spur (I-94) , Tri-State Tollway (I-294), Roadway and Bridge Approved No 12/31/22 D. Framarin Reconstruction, M.P. 25.2 (Tri-State Tollway) to M.P. 30.0 (Edens Expressway). Construction Management Services. 04/26/18 I-18-4357 Gonzalez Companies, LLC / JA Watts, Inc. (TM) Inspection $5,000,000 Tri-State Tollway, Construction Management Upon Request. On call and as- Approved No 12/31/22 C. Tibbs needed Construction Management Services. 02/22/18 RR-17-4295 Chastain & Associates LLC Inspection $10,800,000 Veterans Memorial Tollway, Roadway and Bridge Rehabilitation, I-55 (M.P. Obligated No 10/31/21 J. Noe 12.3) to Army Trail Road (M.P. 29.8). Construction Management Services. 02/22/18 I-17-4680 BLA, Inc. (dba Bollinger, Lach & Associates., Inc.) Inspection $6,523,000 Elgin O’Hare Western Access, IL 390 from IL 83 to York Road. Construction Obligated No 06/30/22 H. Garrett Management Services. 02/22/18 RR-16-9196 Quantum Spatial Inc Design $1,500,000 Aerial Mapping Services Upon Request - Systemwide. Aerial Mapping Obligated No 02/28/23 G. Meyer Services. 01/25/18 RR-16-4281 GSG Consultants, Inc. Inspection $1,647,571 Tri-State Tollway, 159th Street Bridge Reconstruction, M.P. 6.3. Construction Obligated No 03/31/21 A. Pebler Management Services. 12/21/17 RR-16-4282 Collins Engineers, Inc. Inspection $3,820,587 Tri-State Tollway (I-94), Pavement and Structural Preservation and Obligated No 08/31/21 T. Coleman Rehabilitation, M.P. 0.5 (Russell Road) to M.P. 25.2 (Lake Cook Road). Construction Management Services. 12/21/17 RR-17-4292 DAMA Consultants, Inc. Inspection $734,460 Systemwide, Veterans Memorial Tollway, Pavement Preservation. Construction Obligated No 11/30/20 J. Noe Management Services. 12/21/17 RR-17-4313 Bloom Companies, LLC Design $1,498,250 Reagan Memorial Tollway, Pavement and Structural Preservation and Obligated No 12/31/24 M. Brink Rehabilitation, M.P. 126.9 (East of Washington Street) to M.P. 139.1 (York Road). Phase II Engineering Services 11/29/17 I-17-4093 HNTB Corporation Project / $119,834,000 PMO Contract. Program Management Office and Technical/ Administrative Obligated No 12/31/27 P. Foernssler Program Services Management 11/29/17 I-17-4093 HNTB Corporation Project / $70,600,000 Program Management Core Services (Lump Sum) Obligated No 12/31/27 P. Foernssler Program Management 11/29/17 RR-16-4253 DB Sterlin Consultants, Inc. Inspection $4,872,025 Reagan Memorial Tollway, Roadway and Bridge Rehabilitation, IL 251 (M.P. Obligated No 04/30/21 L. Thompson 76.1) to Annie Glidden Road (M.P. 91.4). Construction Management Services. 11/29/17 RR-16-4254 Burns & McDonnell Engineering Co., Inc. / d'Escoto, Inc. Inspection $8,599,530 Reagan Memorial Tollway, Roadway and Bridge Rehabilitation, Annie Glidden Obligated No 09/30/21 L. Thompson Road (M.P. 91.4) to IL 56 (M.P. 113.3). Construction Management Services. 11/29/17 I-17-4302 V3 Companies of Illinois, Ltd./Michael Baker International, Design $6,000,000 Tri-State Tollway, Roadway Reconstruction and Bridge Rehabilitation, Wolf Obligated No 11/29/27 M. Wicks Inc. Road (M.P. 36.2) to O'Hare Oasis (M.P. 37.8). Phase II Engineering Services. 11/29/17 I-17-4307 Delta Engineering Group, LLC Design $2,115,673 Tri-State Tollway, Advanced ITS Assets Relocation, 95th Street (M.P. 17.8) to Obligated No 11/15/27 E. Morgan Balmoral Avenue (M.P. 40.0). Phase II Engineering Services. 11/29/17 RR-17-4312 Fuhrmann Engineering, Inc. Design $915,000 Reagan Memorial Tollway, Pavement and Structural Preservation and Obligated No 09/28/23 M. Brink Rehabilitation, M.P. 123.4 (IL Route 59) to M.P. 126.9 (East of Washington Street). Phase II Engineering Services. 11/29/17 RR-17-4314 Harry O. Hefter - Associates, Inc. Design $2,515,679 Tri-State Tollway, Pavement and Structural Preservation and Rehabilitation, Obligated No 06/30/24 D. Kapadia M.P. 40.0 (Balmoral Ave) to M.P. 52.9 (Lake Cook Road). Phase II Engineering Services. Tuesday, August 14, 2018 Powered by Catapult Page 2 of 9 Active Professional Services Contracts as of 8/14/2018 Compl. Board Contract Suppl. Contract Final Date Date Number Consultant Phase Contract Amount Description Approved State Pymt Contract PM 11/29/17 I-17-4326 Omega & Associates, Inc. Project / $107,913,681 Owner's (Tollway) Rep., Construction Corridor Management, & Construction Obligated No 12/31/27 L.