Active Contracts by Type

Active Contracts by Type

Active Professional Services Contracts as of 8/14/2018 Compl. Board Contract Suppl. Contract Final Date Date Number Consultant Phase Contract Amount Description Approved State Pymt Contract PM 07/26/18 RR-18-4379 AMEC Foster Wheeler Environment & Infrastructure, Inc. Design $3,000,000 Reagan Memorial Tollway, Roadway and Bridge Rehabilitation, M.P. 117.8 Award No 06/30/24 M. Faraj (Aurora Toll Plaza) to M.P. 123.4 (IL 59). Phase II Engineering Services. 07/26/18 RR-18-4381 Lochmueller Group, Inc. Design $1,511,894 Reagan Memorial Tollway, Pavement and Structural Preservation and Approved No 07/31/24 M. Faraj Rehabilitation, M.P. 113.3 (Illinois Route 56) to M.P. 117.8 (Aurora Toll Plaza). Phase II Engineering Services. 06/28/18 RR-18-4377 The Roderick Group, Inc. (dba Ardmore Roderick) Inspection $6,500,000 Systemwide, Maintenance Facilities, Construction Management Services Upon Obligated No 12/31/21 W. Doyle Request. On-call and as-needed Construction Management Services. 06/28/18 RR-18-4378 Interra Inc. Inspection $2,500,000 Systemwide, Construction Management Upon Request. On-call and as-needed Award No 12/31/22 J. Kim Construction Management Services. 06/28/18 RR-18-4383 Christopher B. Burke, Engineering, Ltd. Study $5,000,000 Tri-State Tollway, 95th Street to Balmoral Avenue, Planning Studies Upon Obligated No 06/30/25 N. Nutter Request. On-call and as-needed Phase I Engineering Services for Planning Studies and Master Plan Services. 06/28/18 RR-18-9008 Singh & Associates, Inc. Design $2,000,000 Systemwide, Design Upon Request, Non-Roadway. Phase II Engineering Approved No 12/31/25 J. Kim Services. 06/28/18 RR-18-9016 ARCADIS U.S., Inc. Inspection $2,500,000 Systemwide, Construction Management Upon Request, Non-Roadway. On-call Approved No 12/31/22 R. Hanba and as-needed Construction Management Services. 06/28/18 RR-18-9205 Great Arc Technologies, Inc. Design $3,000,000 Infrastructure Management System for 2018/2019/2020/2021 Award No 06/28/23 B. Will 05/24/18 RR-17-4312 TransLand Engineering Group, LLC Inspection $699,800 Reagan Memorial Tollway (I-88), Pavement and Structural Preservation and Obligated No 05/31/21 J. Szabo Rehabilitation, M.P. 123.4 (IL Route 59) to M.P. 126.9 (East of Washington Street). Construction Management Services. 05/24/18 RR-17-4313 Clark Dietz, Inc. Inspection $2,050,967 Reagan Memorial Tollway (I-88), Pavement and Structural Preservation and Obligated No 01/31/21 J. Szabo Rehabilitation, M.P. 126.9 (East of Washington Street) to M.P. 139.1 (York Road). Construction Management Services. 05/24/18 RR-17-4314 Apex Consulting Engineers, LLC Inspection $1,662,049 Tri-State Tollway (I-294), Pavement and Structural Preservation and Obligated No 04/30/21 D. Framarin Rehabilitation, M.P. 40.0 (Balmoral Ave) to M.P. 52.9 (Lake Cook Road). Construction Management Services 05/24/18 I-18-4352 Upchurch Group, Inc., The Design $1,597,911 Reagan Memorial Tollway (I-88), Windsor Road Bridge Widening. Phase II Approved No 12/31/20 M. Faraj Engineering Services 05/24/18 RR-18-4353 Crawford, Murphy & Tilly, Inc. Design $3,000,000 Systemwide, Design Upon Request. On call and as-needed Phase II Obligated No 12/31/26 J. Szabo Engineering Services. 05/24/18 RR-18-4354 2IM Group, LLC Design $8,000,000 Systemwide, Design and Construction Management Services for Landscape Obligated No 07/31/27 M. Faraj Services Upon Request. On call and as-needed Phase II Engineering Services and Construction Management Services 05/24/18 RR-18-4355 EJM Engineering, Inc. / TranSmart Technologies, Inc. Design $3,500,000 Intelligent Transportation Systems (ITS) Services Upon Request. On call and Obligated No 06/30/23 A. Aladham (TM) as-needed Phase II Engineering Services and Construction Management Services 05/24/18 I-18-4356 H.W. Lochner, Inc. Inspection $12,000,000 Tri-State Tollway (I-294), Roadway and Bridge Rehabilitation and Widening, Obligated No 05/31/23 M. Wicks Wolf Road (M.P. 36.2) and the Balmoral Avenue (M.P. 40.0). Construction Management Services 05/24/18 RR-18-4360 Cotter Consulting, Inc. Inspection $3,000,000 Systemwide, Construction Management Upon Request. On call and as-needed Obligated No 05/31/23 M. Lao Construction Management Services. 05/24/18 RR-18-9013 R.M. Chin & Associates, Inc. Inspection $2,500,000 Systemwide, Construction Management Upon Request, Non-Roadway. On call Obligated No 12/31/21 C. Tibbs and as-needed Construction Management Services. Tuesday, August 14, 2018 Powered by Catapult Page 1 of 9 Active Professional Services Contracts as of 8/14/2018 Compl. Board Contract Suppl. Contract Final Date Date Number Consultant Phase Contract Amount Description Approved State Pymt Contract PM 05/24/18 RR-18-9015 Kristine Fallon Associates, Inc. Project / $6,385,827 Document and Process Control Management Services. Obligated No 06/30/25 S. Qureshi Program Management 04/26/18 RR-16-4275 Thomas Engineering Group, LLC Inspection $7,001,012 Edens Spur (I-94) , Tri-State Tollway (I-294), Roadway and Bridge Approved No 12/31/22 D. Framarin Reconstruction, M.P. 25.2 (Tri-State Tollway) to M.P. 30.0 (Edens Expressway). Construction Management Services. 04/26/18 I-18-4357 Gonzalez Companies, LLC / JA Watts, Inc. (TM) Inspection $5,000,000 Tri-State Tollway, Construction Management Upon Request. On call and as- Approved No 12/31/22 C. Tibbs needed Construction Management Services. 02/22/18 RR-17-4295 Chastain & Associates LLC Inspection $10,800,000 Veterans Memorial Tollway, Roadway and Bridge Rehabilitation, I-55 (M.P. Obligated No 10/31/21 J. Noe 12.3) to Army Trail Road (M.P. 29.8). Construction Management Services. 02/22/18 I-17-4680 BLA, Inc. (dba Bollinger, Lach & Associates., Inc.) Inspection $6,523,000 Elgin O’Hare Western Access, IL 390 from IL 83 to York Road. Construction Obligated No 06/30/22 H. Garrett Management Services. 02/22/18 RR-16-9196 Quantum Spatial Inc Design $1,500,000 Aerial Mapping Services Upon Request - Systemwide. Aerial Mapping Obligated No 02/28/23 G. Meyer Services. 01/25/18 RR-16-4281 GSG Consultants, Inc. Inspection $1,647,571 Tri-State Tollway, 159th Street Bridge Reconstruction, M.P. 6.3. Construction Obligated No 03/31/21 A. Pebler Management Services. 12/21/17 RR-16-4282 Collins Engineers, Inc. Inspection $3,820,587 Tri-State Tollway (I-94), Pavement and Structural Preservation and Obligated No 08/31/21 T. Coleman Rehabilitation, M.P. 0.5 (Russell Road) to M.P. 25.2 (Lake Cook Road). Construction Management Services. 12/21/17 RR-17-4292 DAMA Consultants, Inc. Inspection $734,460 Systemwide, Veterans Memorial Tollway, Pavement Preservation. Construction Obligated No 11/30/20 J. Noe Management Services. 12/21/17 RR-17-4313 Bloom Companies, LLC Design $1,498,250 Reagan Memorial Tollway, Pavement and Structural Preservation and Obligated No 12/31/24 M. Brink Rehabilitation, M.P. 126.9 (East of Washington Street) to M.P. 139.1 (York Road). Phase II Engineering Services 11/29/17 I-17-4093 HNTB Corporation Project / $119,834,000 PMO Contract. Program Management Office and Technical/ Administrative Obligated No 12/31/27 P. Foernssler Program Services Management 11/29/17 I-17-4093 HNTB Corporation Project / $70,600,000 Program Management Core Services (Lump Sum) Obligated No 12/31/27 P. Foernssler Program Management 11/29/17 RR-16-4253 DB Sterlin Consultants, Inc. Inspection $4,872,025 Reagan Memorial Tollway, Roadway and Bridge Rehabilitation, IL 251 (M.P. Obligated No 04/30/21 L. Thompson 76.1) to Annie Glidden Road (M.P. 91.4). Construction Management Services. 11/29/17 RR-16-4254 Burns & McDonnell Engineering Co., Inc. / d'Escoto, Inc. Inspection $8,599,530 Reagan Memorial Tollway, Roadway and Bridge Rehabilitation, Annie Glidden Obligated No 09/30/21 L. Thompson Road (M.P. 91.4) to IL 56 (M.P. 113.3). Construction Management Services. 11/29/17 I-17-4302 V3 Companies of Illinois, Ltd./Michael Baker International, Design $6,000,000 Tri-State Tollway, Roadway Reconstruction and Bridge Rehabilitation, Wolf Obligated No 11/29/27 M. Wicks Inc. Road (M.P. 36.2) to O'Hare Oasis (M.P. 37.8). Phase II Engineering Services. 11/29/17 I-17-4307 Delta Engineering Group, LLC Design $2,115,673 Tri-State Tollway, Advanced ITS Assets Relocation, 95th Street (M.P. 17.8) to Obligated No 11/15/27 E. Morgan Balmoral Avenue (M.P. 40.0). Phase II Engineering Services. 11/29/17 RR-17-4312 Fuhrmann Engineering, Inc. Design $915,000 Reagan Memorial Tollway, Pavement and Structural Preservation and Obligated No 09/28/23 M. Brink Rehabilitation, M.P. 123.4 (IL Route 59) to M.P. 126.9 (East of Washington Street). Phase II Engineering Services. 11/29/17 RR-17-4314 Harry O. Hefter - Associates, Inc. Design $2,515,679 Tri-State Tollway, Pavement and Structural Preservation and Rehabilitation, Obligated No 06/30/24 D. Kapadia M.P. 40.0 (Balmoral Ave) to M.P. 52.9 (Lake Cook Road). Phase II Engineering Services. Tuesday, August 14, 2018 Powered by Catapult Page 2 of 9 Active Professional Services Contracts as of 8/14/2018 Compl. Board Contract Suppl. Contract Final Date Date Number Consultant Phase Contract Amount Description Approved State Pymt Contract PM 11/29/17 I-17-4326 Omega & Associates, Inc. Project / $107,913,681 Owner's (Tollway) Rep., Construction Corridor Management, & Construction Obligated No 12/31/27 L.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us