<<

Government of Indian Space Program - Highlights

Achievements January 2014 to January 2018

16 February, 2018 Highlights of 4 year Achievements

❖ISRO successfully accomplished 48 missions • 21 Launch Vehicle missions - 16 PSLV, 4 GSLV MkII, 1 GSLV MkIII • 24 missions - 8 Communication; 7 Earth Observation; 6 -2 Imagery Navigation, 1 Space Science, 1 Microsat and CARE (+ a Nanosatellite) • 3 Technology Demonstrators - Successful Technology Demonstrators Re-usable Launch Vehicle (RLV-TD), Scramjet Air-breathing Propulsion Technology & Crew Module Atmospheric Re-entry Experiment  Important achievements: • GSLV with Indigenous CryoStage - 4 successful launches, indigenous capability with 2 Ton class satellite to GTO GSLV-Mk-II • GSLV-Mk-III with Indigenous CryoStage: First Developmental flight successfully conducted on 05 June 2017. Launch of 4 Ton class satellite to GTO. • 202 Foreign from 24 Countries launched by PSLV • Adv. SATCOM - GSAT-6 is providing services through five spot beams using 6 meter dia. antennae GSLV-Mk-III 2 104 Satellites in one Launch

3 Indian Satellites

•CARTOSAT-2S (714 Kg) •2 Nano Satellites (19 Kg)

101 Satellites of 6 Countries

PSLV-C37 February 15, 2017 (GSAT-9)

Conference on “Satellite . India’s gift to the South Asia for the SAARC region and region Space Technology Applications” . Dedicated networks for hosting June 22, 2015 - New Delhi the services by member countries

. Television / Direct-to-Home channels

. VSAT services, e-governance & banking, cellular backhaul, etc.

. Tele-medicine & Tele-education etc.

. Common Network for Disaster Management Support, • 12 Ku Band Transponders Meteorological Data sharing, • - Designed mission life is Connectivity of academic; 12 years scientific and research institutions, etc. Lift-off: 05-05-2017 Successful launch of GSLV MkIII-D1/GSAT-19 Mission

C25 Cryogenic Stage . Enhanced launch capability

. Payloads upto 4-tonnes into Geosynchronous Transfer Orbit (GTO)

. Payloads upto 10- tonnes into Low Earth Orbit (LEO)

. India’s first high Lift-off mass 3136 Kg throughput GSAT-19 communication satellite in Ka x Ku- band

. Private commercial VSAT service requirements Lift-Off: 05-06-2017 Air Breathing Propulsion System – SCRAMJET Engine Technology Demonstrator SCRAMJECT

The August 28 test was the maiden short duration experimental test of ISRO’s Scramjet engine with a hypersonic flight at Mach 6. August 28, 2016 Successful Flight Testing of RLV-TD

. Successfully demonstrated several advanced technologies  Hypersonic aero thermodynamic characterisation of winged body  Autonomous navigation, guidance & control for safe descent  Reusable thermal protection system  Re-entry mission management  Wind tunnel testing (4500 tests) May 23, 2016 Navigation – Indian Constellation (NavIC)

IRNSS-1F IRNSS-1A IRNSS-1C IRNSS-1D IRNSS-1G

55˚ E 111.75˚ E 32.5˚ E 83˚ E 129.5˚E

IRNSS-1B IRNSS-1E Application Sectors

Aviation Railways Roadways • Vehicle tracking application demonstrated. • Application for Fisherman under advanced stage of development. • NavIC certification from IMO under Maritime Navigation Surveys progress. • Development of indigenous Chipset under progress. Potential Fishing Zone & NavIC services for Fishermen

Post Ockhi Alert Message Activities Delivery Chlorophyll using NaVIC Distribution (mg.m-3 ) feedback

Identified User User upload Message decodes message to transmission messages web Server to the through msg ID Parameter retrieval satellite 0.01 0.03 0.20 0.32 1.00 3.16 4.80 • Alert message to fishermen from crossing international boundary Sea Surface Temperature PFZ map

Dissemination

NAVIC Devices demonstrated to Fishermen in Kerala & Tamil Nadu NATIONAL MEET PROJECTS (156) - PROGRESS  125 Projects progressed as per schedule . Methodology Dev., Proof of concept & Pilot studies  120 MoUs are signed with Ministries / Departments / States . Central Ministries / Departments : 72 . State Governments/ Departments: 48  Space Technology Cells / Mechanisms for 20 Ministries / Departments  10,500 Officials Trained from various Ministries / Departments  15 State level meets organized Haryana, Bihar, Uttarakhand, Mizoram, Nagaland, Rajasthan, Punjab, Jharkhand, Meghalaya, Himachal Pradesh, Kerala, Chhattisgarh, Assam, Madhya Pradesh & Tamil Nadu

State meet in Punjab: address by S. PARMINDER Horticulture Management: SINGH DHINDSA Site suitability analysis for Hon’ble Minister planning post-harvest of Finance, infrastructure in major Planning, Finance potato growing areas of Institutions & Bihar Banking and Programme Implementation, Government of 16-Feb-18 Punjab Lithium-ion cell Spinoff ISRO developed Li-ion Ministry of Road Suitable for Electric cell technology Transport & Highways Vehicle applications

50 Ah (Two wheeler demo) 50 Ah (12), 100 Ah (2) 100 Ah ( Feasibility studies)

50 Ah 100 Ah cell evaluation

Electrical Capacity @ 20 0C, 30 0C and 40 0C Capacity at different discharge current Dynamic stress test: 200 Cycles @ 20 0C (80% DoD) 100 Cycles @ 30 0C (80% DoD) Jan 2017 100 Cycles @ 40 0C (80% DoD) Two wheeler ARAI Dynamic stress test profile similar to in-house test Battery voltage : 43.5 V Capacity test: Performance normal Range: 90 km Stress test At Temperature 400C Max Speed: 50 kmph Cell capacity degradation 4.5 % Distance : 300 km Inline with cell characteristics High throughput Satellite for Rural Area

GSLV MKIII: Entering into operational phase 16-Feb-18 12 Launch Opportunity: April - October 2018 Launch Targeted during April 2018

16-Feb-18 13 16-Feb-18 14