ANSWERED ON:29.11.2005 ALTERNATIVE ROUTE to LEH in J& K Murmu Shri Rupchand;Rawat Shri Bachi Singh

Total Page:16

File Type:pdf, Size:1020Kb

ANSWERED ON:29.11.2005 ALTERNATIVE ROUTE to LEH in J& K Murmu Shri Rupchand;Rawat Shri Bachi Singh GOVERNMENT OF INDIA SHIPPING, ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO:923 ANSWERED ON:29.11.2005 ALTERNATIVE ROUTE TO LEH IN J& K Murmu Shri Rupchand;Rawat Shri Bachi Singh Will the Minister of SHIPPING, ROAD TRANSPORT AND HIGHWAYS be pleased to state: (a) whether the Union Government has decided to build an alternative route from Manali to Leh in Jammu & Kashmir; (b) if so, the details thereof; (c) the length of the new route and its likely cost; (d) the benefits that would accrue after construction of this alternate route; (e) the time by which it is likely to be completed; (f) whether the Srinagar-Leh NH-1A route will be closed after the alternative new route; and (g) if so, the details thereof? Answer THE MINISTER OF STATE IN THE MINISTRY OF SHIPPING, ROAD TRANSPORT AND HIGHWAYS (SHRI K.H. MUNIYAPPA) (a) Yes Sir, the Government has decided to construct an alternate route viz Manali-Darcha-Shinkunla-Padma-Nimu-Leh, Which would pass through the States of Himachal Pradesh and Jammu & Kashmir. (b) The alternate route would starts from Darcha (located at km 144 on Manali −Leh road) and pass through Shinkunla and Padam to join Nimu (on Srinagar −Leh road) including construction of a tunnel by-passing Rohtang pass. (c) Total length of the route via Rohtang tunnel and Darcha-Padam-Nimu road would be 427 km from Manali to Leh and likely cost is Rs. 1355.82 crores. (d) The route would by-pass three high mountain passes on existing route namely Baralacha, Lachungla & Taglangla. This would provide an all weather access to Leh with minimum snow clearance efforts. The alternate route would reduce the distance about 40-45 kms, which will save travel time and operational cost. The route would be away from line of control and hence this is safer route. (e) Target completion date of the road is March 2012 except the tunnel, which will be completed in 2014. (f)&(g) No Sir, Srinagar-Leh route would continue to be used. .
Recommended publications
  • 1 Negi R, Baig S, Chandra A, Verma PK, Naithani HB, Verma R & Kumar A. Checklist of Family Poaceae in Lahaul and Spiti Distr
    1 Negi R, Baig S, Chandra A, Verma PK, Naithani HB, Verma R & Kumar A. Checklist of family Poaceae in Lahaul and Spiti district (Cold Desert), Himachal Pradesh, India. Plant Science Today 2019;6(2):270-274. https://doi.org/10.14719/pst.2019.6.2.500 Supplementary Table 1. List of Poaceae species found in Lahaul-Spiti SUBFAMILY: PANICOIDEAE S.No. SPECIES Annual or OCCURANCE LOCALITY VOUCHER perennial SPECIMEN NO. Tribe- Andropogoneae 1. Arthraxon prionodes (Steud.) Perennial Common Trilokinath BSD 45386 Dandy 2. Bothriochloa ischaemum (L.) Perennial Common Keylong, Gondla, Kailing- DD 85472 Keng ka-Jot 3. B. pertusa (L.) A. Camus Perennial Common Pin Valley BSD100754 4. Chrysopogon gryllus subsp. Perennial Common Madgram DD 85320 echinulatus (Nees) Cope 5. Cymbopogon jwarancusa subsp. Perennial Common Kamri BSD 45377 olivieri (Boiss.) Soenarko 6. Phacelurus speciosus (Steud.) Perennial Common Gondhla, Lahaul, Keylong DD 99908 C.E.Hubb. 7. Saccharum ravennae (L.) L. Perennial Common Trilokinath BSD 45958 Tribe- Paniceae 1. Digitaria ciliaris (Retz.) Koel Annual - Pin Valley C. Sekar (loc. cit.) 2. D. cruciata (Nees) A.Camus Annual Common Pattan Valley DD 172693 3. Echinochloa crus-galli (L.) Annual Rare Keylong DD 85186 P.Beauv. 4. Pennisetum flaccidum Griseb. Perennial Common Sissoo, Sanao, Khote, DD 85530 Gojina, Gondla, Koksar 5. P. glaucum (L.) R.Br. Annual Common Lahaul DD 85417 6. P. lanatum Klotzsch Perennial Common Sissu, Keylong, Khoksar DD 99862 7. P. orientale Rich. Perennial Common Pin Valley BSD 100775 8. Setaria pumila (Poir.) Roem. & Annual Common Pin valley BSD 100763 Schult. 9. S. viridis (L.) P.Beauv. Annual Common Kardang, Baralacha, DD 85415 Gondhla, Keylong SUBFAMILY: POOIDEAE Tribe- Agrostideae 1.
    [Show full text]
  • Sub- State Site Biodiversity Strategy and Action Plan (Lahaul & Spiti and Kinnaur)
    FOR OFFICIAL USE ONLY SUB- STATE SITE BIODIVERSITY STRATEGY AND ACTION PLAN (LAHAUL & SPITI AND KINNAUR) MAY-2002 SUBMITTED TO: TPCG (NBSAP), MINISTRY OF ENVIRONMENT & FOREST,GOI, NEW DELHI, TRIBAL DEVELOPMENT DEPARTMENT, H.P. SECRETARIAT, SHIMLA-2 & STATE COUNCIL FOR SCIENCE TECHNOLOGY AND ENVIRONMENT, 34 SDA COMPLEX, KASUMPTI, SHIMLA –9 CONTENTS S. No. Chapter Pages 1. Introduction 1-6 2. Profile of Area 7-16 3. Current Range and Status of Biodiversity 17-35 4. Statement of the problems relating to 36-38 biodiversity 5. Major Actors and their current roles relevant 39-40 to biodiversity 6. Ongoing biodiversity- related initiatives 41-46 (including assessment of their efficacy) 7. Gap Analysis 47-48 8. Major strategies to fill these gaps and to 49-51 enhance/strengthen ongoing measures 9. Required actions to fill gaps, and 52-61 enhance/strengthen ongoing measures 10. Proposed Projects for Implementation of 62-74 Action Plan 11. Comprehensive Note 75-81 12. Public Hearing 82-86 13. Synthesis of the Issues/problems 87-96 14. Bibliography 97-99 Annexures CHAPTER- 1 INTRODUCTION Biodiversity or Biological Diversity is the variability within and between all microorganisms, plants and animals and the ecological system, which they inhabit. It starts with genes and manifests itself as organisms, populations, species and communities, which give life to ecosystems, landscapes and ultimately the biosphere (Swaminathan, 1997). India in general and Himalayas in particular are the reservoir of genetic wealth ranging from tropical, sub-tropical, sub temperate including dry temperate and cold desert culminating into alpine (both dry and moist) flora and fauna.
    [Show full text]
  • Lok Mitra Kendras (Lmks)
    DistrictName BlockName Panchayat Village VLEName LMKAddress ContactNo Name Name Chamba Bharmour BHARMOUR bharmour MADHU BHARMOUR 8894680673 SHARMA Chamba Bharmour CHANHOTA CHANHOTA Rajinder Kumar CHANHOTA 9805445333 Chamba Bharmour GAROLA GAROLA MEENA KUMARI GAROLA 8894523608 Chamba Bharmour GHARED Ghared madan lal Ghared 8894523719 Chamba Bharmour GREEMA FANAR KULDEEP SINGH GREEMA 9816485211 Chamba Bharmour HOLI BANOON PINU RAM BANOON 9816638266 Chamba Bharmour LAMU LAMU ANIL KUMAR LAMU 8894491997 Chamba Bharmour POOLAN SIRDI MED SINGH POOLAN 9816923781 Chamba Bharmour SACHUIN BARI VANDANA SACHUIN 9805235660 Chamba Bhattiyat NULL Chowari SANJAY Chowari 9418019666 KAUSHAL Chamba Bhattiyat NULL DEEPAK RAJ Village Kathlage 9882275806 PO Dalhausie Tehsil Dalhausie Distt Chamba Chamba Bhattiyat AWHAN Hunera Sanjeet Kumar AWHAN 9816779541 Sharma Chamba Bhattiyat BALANA BALANA RAM PRASHAD 9805369340 Chamba Bhattiyat BALERA Kutt Reena BALERA 9318853080 Chamba Bhattiyat BANET gaherna neelam kumari BANET 9459062405 Chamba Bhattiyat BANIKHET BANIKHET NITIN PAL BANIKET 9418085850 Chamba Bhattiyat BATHRI BATHRI Parveen Kumar BATHRI 9418324149 Chamba Bhattiyat BINNA chhardhani jeewan kumar BINNA 9418611493 Chamba Bhattiyat CHUHAN Garh (Bassa) Ravinder Singh CHUHAN 9418411276 Chamba Bhattiyat GAHAR GAHAR SHASHI GAHAR 9816430100 CHAMBIAL Chamba Bhattiyat GHATASANI GHATASANI SHEETAL GHATASANI 9418045327 Chamba Bhattiyat GOLA gola santosh GOLA 9625924200 Chamba Bhattiyat JIYUNTA kunha kewal krishan JIYUNTA 9418309900 Chamba Bhattiyat JOLNA Jolna Meena
    [Show full text]
  • History : Project Deepak
    HISTORY : PROJECT DEEPAK 1. Raising & Early History. Project Deepak was raised in May 1961 with Col S N Punjh as Chief Engineer, primarily for the construction of Hindustan-Tibet (H-T) Road. The H-T Road is one of the most difficult roads ever to have been constructed in India. The 76 Km long Pooh-Kaurik sector of H-T Road passes through considerable lengths of sheer vertical hard rock stretches and huge bouldery strata embedded in sand and non-cohesive material, which is inherently unstable. The sector runs along the River Satluj crossing it at several locations. The road runs at altitudes between 1600 to 3600 meters. On the whole, the terrain and climatic conditions are very uncongenial. Many valuable lives were lost during the construction of this road. Thus, this work is a testimony to the sheer grit, determination and perseverance shown by PROJECT DEEPAK right from its early days. The subsequent major events in the history of Project Deepak include:- (a) In 1965, construction of the 122 Km long Road Dhami-Basantpur-Kiongal and 107 Km long stretch of Road Keylong-Sarchu (part of the Manali-Leh road) was entrusted to PROJECT DEEPAK. (b) In December 1966, following disbandment of Project Chetak, all roads of Uttaranchal were taken over by PROJECT DEEPAK. Thus, the 300 Km long Road Rishikesh –Joshimath-Mana, 63 Km long road Road Joshimath-Malari and 260 Km long Road Tanakpur-Askote-Tawaghat came under PROJECT DEEPAK. (c) The early seventies saw Project Deepak spreading its light (Deepak Jyoti) in the states of Rajasthan and even Punjab.
    [Show full text]
  • Details of Visas Granted by India
    DETAILS OF VISAS GRANTED BY INDIA I. e-VISA 1 Eligibility e-Visa is granted to a foreigner whose sole objective of visiting India is recreation, sight seeing, casual visit to meet friends or relatives, attending a short term yoga programme, medical treatment including treatment under Indian systems of medicine and business purpose and no other purpose/ activity. This facility shall not be available if the person or either of his / her parents or grand parents (paternal or maternal) was born in, or was permanently resident in Pakistan. e-Visa facility shall not be available to holders of Diplomatic/Official passports, UNLP (UN Passport) holders and international travel document holders e.g. INTERPOL officials. List of countries whose nationals are presently eligible for e-visa is given in Appendix I. 2 Procedure for applying for e-Visa The foreign national may fill in the application online on the website https://indianvisaonline.gov.in/visa/tvoa.html . The applicant can apply 120 days in advance prior to expected date of arrival in India. 3 Sub-categories of e-Visa There are three sub-categories of e-Visa i.e. (a) e-Tourist Visa : For recreation, sightseeing, casual visit to meet friends or relatives, and attending a short term yoga programme, (b)e- Business Visa : For all activities permitted under normal Business Visa and (c) e-Medical Visa : For medical treatment, including treatment under Indian systems of medicine. A foreign national will also be permitted to club these activities provided he/she had clearly indicated the same in the application form along with requisite documents.
    [Show full text]
  • ANSWERED ON:11.03.2016 Road Conectivity in Ladakh Region Chhewang Shri Thupstan
    GOVERNMENT OF INDIA DEFENCE LOK SABHA UNSTARRED QUESTION NO:2439 ANSWERED ON:11.03.2016 Road Conectivity in Ladakh Region Chhewang Shri Thupstan Will the Minister of DEFENCE be pleased to state: (a) whether Ladakh region of the Jammu and Kashmir State remains isolated approximately for six months during winter due to the absence of road connectivity having a direct impact on our defence preparedness; (b) whether the Ministry is considering construction of roads to provide round the year connectivity to Ladakh; (c) if so, the details of the road project under construction and those proposed to be taken up along with the details of funds allocated to each of these projects; (d) the expected time frame for completion of each of these projects and the amount spent on them upto the current financial year; (e) the current status of construction of yemo-padum-darcha road and the expected time frame for its completion; and (f) whether the Ministry proposes to set up a special task force of the BRO for expediting progress of this important road project and if so, the details thereof? Answer MINISTER OF DEFENCE (SHRI MANOHAR PARRIKAR) (a) Yes, Madam. Due to heavy snow fall during winter season, the roads leading to Ladakh region remain closed for 5-6 months every year. (b) Yes, Madam. (c) & (d): The present status of projects under construction are as under: Name of road Length (in km) Estimated cost (Rs in crores) Amount spent (Rs in Crores) Expected time frame for completion Srinagar − Kargil −Leh 418 1092.31 956.99 2019 Manali −Sarchu-Upsi-Leh 472 1055.92 713.54 2020 Moreover, to negotiate the passes and to provide all weather road connectivity in the Ladakh region, in addition to the roads mentioned in table above, Rohtang tunnel on road Manali-Sarchu−Leh of length measuring 8.802km is under construction with date of completion as August 2019 and Approval in Principle to carry out feasibility study of Baralachla tunnel, Tanglangla tunnel on road Manali-Sarchu−Leh and Shinkula tunnel on Nimmu-Padam−Darcha has been accorded.
    [Show full text]
  • Mass Movement Events in the Himalaya: the Impact of Landslides on Ladakh, India
    Mass movement events in the Himalaya: The impact of landslides on Ladakh, India. Sian Hodgkins Geology for Global Development 1 | P a g e This report was commissioned for charitable purposes, by Geology for Global Development. The report is intended to provide a useful compilation of literature, media and statistics relating to hazardous mass movements for charities, local authorities or students working in Ladakh or other mountainous regions. No responsibility can be accepted for any errors, mistakes or inaccuracies, but we would be happy to correct any errors brought to our attention in a second edition. Licencing and attribution The content on this report is licensed under the Creative Commons Attribution 3.0 licence (CC BY). This means that: Copyright on any article is retained by the author(s) for the post. The name of a post author is specified in the by-line. Any third party can use the article freely as long as its original authors and citation details are identified. This includes a link to the post if used in an online publication, or citing www.gfgd.org for print materials, together with the author’s name. Note that this licence applies to the text in this report. While some images are licensed under Creative Commons, others have been reproduced with permission from the author. Please check the original source for information on how they are licensed before using them. To summarise, this licence means anyone is free to Share (to copy, distribute and transmit the work) and to Remix (to adapt the work), under the following conditions: Attribution.
    [Show full text]
  • Upper Darcha Valley, Goat Peak
    AAC Publications Upper Darcha Valley, Goat Peak (6,080m GPS); Para Handy Ridge India, Himachal Pradesh In 2012 the Scottish Zanskar Expedition attempted a couple of unclimbed 6,000m peaks in the Namkha Tokpo (AAJ 2013). One succumbed, but the other (G22) showed an unexpected lack of consideration. However, a potential route up the south face was spotted, and in June 2013 much of the same team (Rob Adams, Bob Hamilton, Steve Kennedy, Andy Nisbet, and I) returned to attempt an ascent from the Himachal Pradesh (as opposed to Zanskar) side of the range. We went a little earlier in the year for improved snow conditions, and spent June 12–July 1 at or above base camp. The approach included a three-day walk from Zanskar Sumdo, where we watched a new track being bulldozed over the Shingo La. Heading north up the Darcha-Mayar valley, we hung a right at Kuddu and continued for a couple of days up a valley that was used for grazing but apparently had seen no other mountaineers. It hadn’t seen many cartographers either: We established base camp at the foot of an unclimbed, unnamed 6,000m peak that was not marked on one of our maps, despite being only a day's walk from a well-used trekking route. A reconnaissance of the southern side of G22 showed it to be an undertaking that would require a few days. Then it started to snow. Weather systems that caused havoc in Uttarakhand also made it possible for us to build rather large snowmen at base camp.
    [Show full text]
  • A Sociolinguistic Survey of Lahul Valley, Himachal Pradesh
    DigitalResources Electronic Survey Report 2019-006 A Sociolinguistic Survey of Lahul Valley, Himachal Pradesh Brad Chamberlain and Wendy Chamberlain A Sociolinguistic Survey of Lahul Valley, Himachal Pradesh Brad Chamberlain and Wendy Chamberlain SIL International® 2019 SIL Electronic Survey Report 2019-006, August 2019 © 2019 SIL International® All rights reserved Data and materials collected by researchers in an era before documentation of permission was standardized may be included in this publication. SIL makes diligent efforts to identify and acknowledge sources and to obtain appropriate permissions wherever possible, acting in good faith and on the best information available at the time of publication. Abstract The main purpose of this survey of the Lahul Valley of Himachal Pradesh was to determine the best language varieties for communicating with the Lahuli people. The survey was conducted in June, July, and August of 1996. The survey was divided into three studies: a language and dialect area study; a language use, attitudes, and vitality study; and a bilingualism study. Wordlists were collected for the Pattani language, which is the largest language group in Lahul. Recorded Text Testing was used. Oral questionnaires were the means to study language use, attitudes and vitality. Self-reported levels of bilingualism in Hindi were assessed through questionnaires, informal interviews, and observation. In addition, a test based on the Recorded Text Testing procedure was used to see if minority language groups of Lahul could understand the most widely spoken Lahuli language, Pattani. Although Lahul Valley is home to only 20,000 residents, there are seven mother tongue languages: Pattani, Gahri, Tinani, Bhoti, Lohari, Chinali and Pangi.
    [Show full text]
  • Preliminary Data on the High Himalayan Crystallines Along the Padum-Darcha Traverse (South-Eastern Zanskar, India)
    RENDJCONT! DELLA SOCIETA ITALlANA DJ MINERAl-OGJA E PETROLOGIA, 1987. Vol. 42, pp. 9H02 Preliminary data on the High Himalayan Crystallines along the Padum-Darcha Traverse (South-Eastern Zanskar, India) UGO POGNANTE Dipartimento di Sdenze della Terra, Via Valperga Caluw 37, 10125 Torina GIUSEPPE GENOVESE Viale Roma 50, 10078 Venaria Reale, Torino BRUNO LoMBARDO Centm di Studio sui Problemi cIcll'OrogellO delle Alpi Occidentali, C.N.R., Via kcademia delle Scierue 5, lOU3 Torino PIERGIORGIO ROSSEITI Dipartimento di Georisorse e Territorio, Politecnico di Torino, Corso Duca degli Abruzzi 24, 10129 Torino ABSTRACT. _ Preliminary study of the High Himalayan di rocre crostali. 11 HHC e stato teltonicamente sovra· CrystaHines (HHCj in SE Zanskar has shown the ex­ scorso da metasedimenti di basso grado (meugrovacche istence of an early high temperature event of hypothetical dello Shingo La) e dalle sequence merasedimentarie di Late Proterowic age associated with migmatization and gudo molto basso della Zona Tibetana. to production of leucocratic granitoids; this event is Parole chiave: mctamorfismo, migmatiti, Icucograniti, followed by a lower pressure high/medium temperature sovrascorrimenti, Himalaya. metamorphism of Himalayan age. During Miocene times the HHC have been intruded by the Gumbutanjon leucogranite which, like other Himalayan leucogranites, derives by partial melting of crustal rocks and post-dates the main Himalayan metamorphism. The HHC are over­ Introduction thTUSt by a sequence of low grade metasediments (Shingo La metagraywackes) and are in tectonic contact with the This work deals with a preliminary study very low grade metasediments of the Tibetan Zone. carried out during summer 1985 in south­ Key words: metamorphism, migmathe, leucogranite, eastern Zanskar (Fig.
    [Show full text]
  • Village and Townwise Primary Census Abstract, Lahul & Spiti, Part -XII- a & B, Series-3 , Himachal Pradesh
    CENSUS OF INDIA 2001 SERIES-03 HIMACHAL PRADESH - - DISTRICT CENSUS HANDBOOK Part - A & B LAHUL & SPITI DISTRICT VILLAGE & TOWN DIRECTORY -¢- VILLAGE AND TOWNWISE PRIMARY CENSUS ABSTRACT - - c>-I) Cl7j ~-:!~ PfOl'l f ORlfNTrD Directorate of Census qperatlons, Himachal Pradesh Data Product Code 02-012-2001 - Cen-Book (E) en) '. \ '" I I 8 \ A , .., ' _0". .... _·_._ .-l'. ..... _",' .'.. r-. ' ~ _.r' ... / ., ...... ....:, \.. ..I' '( ' ~. ",,'" \ ......2r ,..... :1 ..... .,.. ,,' <"' ." ., .. -'.. G) '. .::0 i'" ( '" .», \ '-f () i o \ . '). J .' r' r ') »­ ro \ .~.J :r: r ).... - c o " r o -+ '" (. ••J' "if) ::' .; ;<; ::I: ,. i » 1"'1 o .,., N » > o " \....... o .... c: » l :;u I -I I'TI :;u VI I. 1 I z ,.' \ ..... .lr-.. .J '-J , ..1 .A. .. -../ .,.,... ..":. (- ! ;,... -;0 _ ",.. \ I .- ........ ',! / .i '..,., (.... '"" I .-......... _. ..,' 0 I ..... , - ",.. .".' ; .4 V) -I r :::u , ......j - () ::r:: ". ."'. ...... ...... J_. / -I ~ > r n ::c ~ x )::0- 1'; I > ~ ~ r :v C '1j I N t;1 r ./ ::0 I ....... _.. , \ ......\. c; > .1 "'. i » 0 \.' . 1'>i Z t:r:I ' ....... .. ~'. ..,. ... -- .'" .-~ .. UJ I )..... , -...l 0 ::r:: I '.. , 0 ' V) -y 1, .... / i....... ........ ," ....... , ._ ........ j).. "U , -I \ ,.' t3 " ..... _.,. "'l. .,.' :;;> I \ I J Kee Monastery ~ ee Monastery of Spiti-sub division of Lahul & Spiti district attracts one's ~yes due to its spectacular landscape in the cold desert of the Western Himalayan region consisting of a large irregular heap of low rooms and narrow corridors, inter-connected by dark passages and stairs. The cluster of mud packed houses that crown the top offers a wonderful view of the valley both up and down. The Kee Monastery is the largest in Spiti, and is situated at a height of 4,116 Mtrs.
    [Show full text]
  • Dialect Intelligibility Between Ladakhi and the Bhoti Varieties of Lahul Valley
    DigitalResources Electronic Survey Report 2019-007 Dialect Intelligibility between Ladakhi and the Bhoti Varieties of Lahul Valley Brad Chamberlain Dialect Intelligibility between Ladakhi and the Bhoti Varieties of Lahul Valley Brad Chamberlain SIL International® 2019 SIL Electronic Survey Reports 2019-007, September 2019 © 2019 SIL International® All rights reserved. Data and materials collected by researchers in an era before documentation of permission was standardized may be included in this publication. SIL makes diligent efforts to identify and acknowledge sources and to obtain appropriate permissions wherever possible, acting in good faith and on the best information available at the time of publication. ii Abstract This dialect intelligibility study among the Bhoti varieties of Lahul Valley (Himachal Pradesh) and Ladakhi from Leh, Ladakh (Jammu and Kashmir) was undertaken by the Indian Institute for Cross Cultural Communication (IICCC). The survey was conducted in July and August 1997 and follows on data gathered during the Lahul Valley survey the previous year (Chamberlain and Chamberlain 2019). The survey found that the Stod Bhoti variety is the best understood and most widely accepted language variety throughout Lahul Valley. (This survey report written some time ago deserves to be made available even at this late date. Conditions were such that it was not published when originally written. The reader is cautioned that more recent research may be available. Historical data is quite valuable as it provides a basis for a longitudinal analysis and helps us understand both the trajectory and pace of change as compared with more recent studies.—Editor) Contents Abstract 1. Introduction 1.1 Purpose 1.2 Goals 1.3 Methods 2.
    [Show full text]