ANSWERED ON:29.11.2005 ALTERNATIVE ROUTE to LEH in J& K Murmu Shri Rupchand;Rawat Shri Bachi Singh

ANSWERED ON:29.11.2005 ALTERNATIVE ROUTE to LEH in J& K Murmu Shri Rupchand;Rawat Shri Bachi Singh

GOVERNMENT OF INDIA SHIPPING, ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO:923 ANSWERED ON:29.11.2005 ALTERNATIVE ROUTE TO LEH IN J& K Murmu Shri Rupchand;Rawat Shri Bachi Singh Will the Minister of SHIPPING, ROAD TRANSPORT AND HIGHWAYS be pleased to state: (a) whether the Union Government has decided to build an alternative route from Manali to Leh in Jammu & Kashmir; (b) if so, the details thereof; (c) the length of the new route and its likely cost; (d) the benefits that would accrue after construction of this alternate route; (e) the time by which it is likely to be completed; (f) whether the Srinagar-Leh NH-1A route will be closed after the alternative new route; and (g) if so, the details thereof? Answer THE MINISTER OF STATE IN THE MINISTRY OF SHIPPING, ROAD TRANSPORT AND HIGHWAYS (SHRI K.H. MUNIYAPPA) (a) Yes Sir, the Government has decided to construct an alternate route viz Manali-Darcha-Shinkunla-Padma-Nimu-Leh, Which would pass through the States of Himachal Pradesh and Jammu & Kashmir. (b) The alternate route would starts from Darcha (located at km 144 on Manali −Leh road) and pass through Shinkunla and Padam to join Nimu (on Srinagar −Leh road) including construction of a tunnel by-passing Rohtang pass. (c) Total length of the route via Rohtang tunnel and Darcha-Padam-Nimu road would be 427 km from Manali to Leh and likely cost is Rs. 1355.82 crores. (d) The route would by-pass three high mountain passes on existing route namely Baralacha, Lachungla & Taglangla. This would provide an all weather access to Leh with minimum snow clearance efforts. The alternate route would reduce the distance about 40-45 kms, which will save travel time and operational cost. The route would be away from line of control and hence this is safer route. (e) Target completion date of the road is March 2012 except the tunnel, which will be completed in 2014. (f)&(g) No Sir, Srinagar-Leh route would continue to be used. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us