Consultation Closed

Total Page:16

File Type:pdf, Size:1020Kb

Consultation Closed NOTE: THIS COPY OF THE QUESTIONNAIRE IS PROVIDED FOR REFERENCE ONLY Central Area Action Plan Issues and Options Consultation Thursday 27 September to Thursday 22 November 2007 Northampton Borough Council is consulting The Central Area Action Plan Issues and on the Issues and Options stage of a Central Options paper and questionnaire can be Area Action Plan. This questionnaire is found in the following locations: designed to assist in commenting on the • Northampton Borough Council website at Issues and Options Discussion paper. We www.northampton.gov.uk are keen to find out the visions and aspirations of our Central Area users. (follow Downloads → Environment → Planning → Development Planning) The Issues and Options paper has been • Local libraries informed by feedback and information • One Stop Shop reception in the Guildhall gathered to date. It sets out the key issues for the central area and options for managing • Northampton Borough Council Cliftonville them and provides a basis for discussion. Reception, Bedford Road This does not mean that proposals are fixed and agreed - this is an early stage of The questionnaire has been designed to consultation. CONSULTATIONallow you to easily provide us with a repsonse. Some key facts have been When complete, the Action Plan will provide highlighted throughout the document. It is the basis for development decisions, by both suggested that you also read the Issues and the public and private sector, within the Options Report which contains all of the centre of Northampton. It will be used by facts. Fill in as much of the questionnaire as West Northamptonshire Development you feel is relevant to you. Please use Corporation (WNDC), as theCLOSED body additional sheets if you require more space to responsible for making decisions on planning make your comments. applications within the Central Area, to guide planning decisions. It will also be used by Northamptonshire County Council, as highway authority, in making decisions about Details of how to return the transportation and public realm matters. questionnaire can be found at The next stage of consultation is preferred the end of the questionnaire. options where specific sites and proposals will be identified and further consultation will take place in winter 2007/08. How to take part in the consultation If you would like a copy of You can provide your feedback on the Issues and Options paper using this questionnaire. this leaflet in Large Print, Your response will be recorded by Braille, Audiotape, or Northampton Borough Council and will contribute to shaping the next stage of translation into another developing the Central Area Action Plan. language please contact 01604 838 907. 1 September 2007 CENTRAL AREA ACTION PLAN – ISSUES AND OPTIONS DISCUSSION PAPER QUESTIONNAIRE Your Details Why do we need your feedback? Feedback is very important to us. It helps to shape and guide our decision-making processes so that we can work together with our customers to deliver effective services. Your response to this questionnaire will feed into the consultation process in developing the Central Area Action Plan. What happens to your feedback? • Northampton Borough Council will record your response to this consultation questionnaire along with your contact details • All representations made in response to this consultation form part of the statutory planning process and will be made available for public viewing. Your response cannot be treated as confidential. The findings from the consultation will be published and reported on (however we will only include your name, street name and town – we will not print your house number, telephone number or email address) • Your details will be added to our database for the Central Area Action Plan and we will keep you informed about the development of this Plan and of further consultation opportunities for this Plan What will we do with your details? The Data Protection Act 1998 requires Northampton Borough Council to notify you that the information you have provided to us will be held in a computer database. Your information will only be used in relation to developing the Central Area Action Plan and consultation activities carried out by, and on behalf of, Northampton Borough Council. Please supply your contact details so that we can contact you again about this consultation. Name: CONSULTATION Address: Postcode: Tel: CLOSED Email: Do your comments represent those of an organisation? Yes No If you answered yes, please state which organisation: There may be future consultations carried out by our Planning Policy team which you may be interested in. If you would like your details to be added to our electronic database to be notified about future consultations and to receive a newsletter to keep you informed about the preparation of the Local Development Framework for Northampton, please tick this box. Please note that you can contact us as at any time to be removed from the database. 2 September 2007 CENTRAL AREA ACTION PLAN – ISSUES AND OPTIONS DISCUSSION PAPER QUESTIONNAIRE Draft Vision for the Central Area up to 2026 The future vision of the town has been drafted. It outlines the key elements that the town should aspire to. The vision is required for the life of the Central Area Action Plan which will be up until 2026. Draft Vision By 2026, the Central Area of Northampton will be a place that: • Encourages and delivers sustainable development • Capitalises on its rich tapestry of architectural heritage, history and natural assets, particularly the River Nene, the Market Square, All Saints Church and Square and 78 Derngate • Maximises the opportunities offered by key retail areas including the Grosvenor Centre, St Giles Street and Abington Street, offering an exceptional shopping experience and choice for the community • Provides a safe, comfortable and appealing environment for people to walk or cycle through with places to stop, relax and interact • Continues to provide and build on a wide range of high-quality attractions and community facilities to serve the needs of residents and visitors such as Royal and Derngate Theatre and Northampton College • Is the location of choice for businesses and investors offering high quality employment opportunities • Provides a vibrant and enterprising environment enjoyed and aspired to by all sectors of the community who live, work and shop in the area, and for its visitors • Is accessible by all means of transport including improved accessibility from Castle Station CONSULTATIONand the provision of an efficient transport interchange Issue 1a: Do you agree with the contents (ideas) contained in the draft vision for Northampton Central Area? Yes No Don’t Know • Are there any other aspirationsCLOSED we should have included and why? Issue 1b: Do you agree with the timescale of the draft vision which is to 2026? Yes No Don’t Know Issue 1c: Does the draft vision include the key elements which will make Northampton’s Central Area a successful and thriving town? Yes No Don’t Know 3 September 2007 CENTRAL AREA ACTION PLAN – ISSUES AND OPTIONS DISCUSSION PAPER QUESTIONNAIRE Draft Spatial Objectives for the Central Area up to 2026 To successfully achieve the vision for the Central Area, the Council needs to identify strategic objectives. These broadly outline how the vision will be achieved. It is important that they are realistic and deliverable. Future policies and plans will be formulated from the strategic objectives. The Council intends to focus on five strategic objectives which are considered to be both achievable and deliverable. Strategic Objectives Strategic Objective 1: Central Area Development and Regeneration To accommodate, in a sustainable manner, high quality new developments which will ensure that the Central Area fulfils its role as a sub-regional centre. Strategic Objective 2: Accessibility and Transport Network To ensure that the Central Area is accessible by all means of transport to secure its economic success and vibrancy. Strategic Objective 3: Public Realm To provide a network of high quality streets and spaces that will encourage people to live, visit and invest in the Central Area. Strategic Objective 4: Community Regeneration To regenerate existing residential and local business communities within the Central Area through initiatives which will create sustainable and enterprising communities. These communities will contribute towards the vitality and prosperity of the town. CONSULTATION Strategic Objective 5: Conservation and built environment To retain and enhance the distinctive local character of the Central Area’s Conservation Areas and listed buildings. Issue 2a: Do you agree with the draftCLOSED strategic objectives outlined above? Yes No Don’t Know Issue 2b: Are there any other realistic and deliverable strategic objectives which the Council could focus on? 4 September 2007 CENTRAL AREA ACTION PLAN – ISSUES AND OPTIONS DISCUSSION PAPER QUESTIONNAIRE Central Area Development and Regeneration The next questions relate to delivering Strategic Objective 1 - Central Area Development and Regeneration, which is: To accommodate, in a sustainable manner, high quality new developments which will ensure that the Central Area fulfils its role as a sub-regional centre (that is to say a major urban centre within the region). Specific issues and suggested options to deal with the issue are highlighted. Indicate your preferred location by numbering the options (1 = most preferred choice). New Retail Development Issue 3: Where is the best location for
Recommended publications
  • Northampton Bus Interchange – Appraisal Report Northamptonshire Highways June 2011
    Northampton Bus Interchange – Appraisal Report Northamptonshire Highways June 2011 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Date 22/6/11 23/6/11 25/6/11 29/6/11 Prepared by A Hames A Hames A Hames A Hames Signature Checked by M Hammon M Hammon M Hammon M Hammon Signature Authorised by K Gowenlock K Gowenlock K Gowenlock K Gowenlock Signature Project number 10581737 10581737 10581737 10581737 File reference file://ser02cam1uk. file://ser02cam1uk. file://ser02cam1uk. file://ser02cam1u uk.wspgroup.com\ uk.wspgroup.com\ uk.wspgroup.com\ k.uk.wspgroup.co development\Deve development\Devel development\Devel m\development\D lopmentCam2003\ opmentCam2003\1 opmentCam2003\1 evelopmentCam2 10580939Northam 0580939Northampt 0580939Northampt 003\10580939No ptonBusStation\TE onBusStation\TEX onBusStation\TEX rthamptonBusSta XT\REPORTS\WN T\REPORTS\WND T\REPORTS\WND tion\TEXT\REPO DCDraftReport\Fin CDraftReport\Final CDraftReport\Final RTS\WNDCDraft alReport\Northamp Report\Northampto Report\Northampto Report\FinalRepo tonBusInterchange nBusInterchangeM nBusInterchangeM rt\NorthamptonBu MGWSPJune2011 GWSPJune2011A GWSPJune2011A sInterchangeMG AMHv1.doc MHv1.doc MHv2.doc WSPJune2011A MHv3.doc MGWSP Northamptonshire Highways Riverside House Riverside Way Northampton NN1 5NX Tel: +44 (0)1604 654659 Fax: +44 (0)1604 654699 http://www.mgwsp.co.uk May Gurney Ltd, Registered Office: Holland Court, The Close, Norwich, NR1 4DY Registered Number 00873179 England WSP Management Services Limited Registered Office: WSP House, 70 Chancery
    [Show full text]
  • PH Reports 23.4.12
    Council Date: 23 April 2012 Cabinet Member Presentations Report of the Leader of the Council Report of the Cabinet Member for Environment Report of the Cabinet Member for Community Engagement Report of the Cabinet Member for Finance Report of the Cabinet Member for Housing Report of the Cabinet Member for Regeneration, Enterprise & Planning Leader of the Council Northampton Borough Council Date: 23 April 2012 I am pleased to inform everyone that Cllr Bottwood is now doing well having received hospital treatment following his heart attack last month. I am sure all members will join me in wishing him a full and speedy recovery and a quick return to the Guildhall. On 26th March we announced that the Borough Council is working with Local Government Shared Services (LGSS), the organisation set up to share services between Northamptonshire County Council and Cambridgeshire County Council, to explore the potential of joining the partnership. LGSS was set up more than a year ago to provide a wide range of support services for both local authorities. Since the establishment of LGSS, the two founding authorities have saved £11 million and to join the partnership could pave the way for savings for Northampton Borough Council in administration and other back office costs. The Borough Council is at an early stage in negotiations with LGSS and no decision has yet been made over which services could be included in any sharing agreement. LGSS provides a full range of back-office services, including IT, HR, finance, property and asset management and other services. The Northampton Alive Roadshow meetings have started with members of the Cabinet and myself going out and speaking to the public at a series of public meetings.
    [Show full text]
  • Transport Statement and Travel Plan
    Transport Statement Extension of Lings Primary School Hayeswood Road Northampton For Northampton Schools Ltd Report Reference: 4875R010A TS Date: October 2012 BCALCONSULTING. Orient House, Church Way, Wellingborough, Northamptonshire, NN8 4HJ Telephone: 01933 440024 Fax: 01933 440041 E-mail: [email protected] Web: www.bcal.co.uk 4875R010A Transport Statement Extension of Lings Primary School, Northampton October 2012 REVISION RECORD Report Ref: 4875R010 TS Rev Description Date Originator Checked - Planning March 2013 AN PK Existing and proposed number of car A March 2013 AN PK parking spaces amended. Disclaimers This report has been prepared for the sole use of the named client and, consequently, is confidential to the client and his professional advisors. The Contracts (Rights of Third Parties) Act 1999 does not apply, nothing in this report confers or purports to confer on any third party any benefit or right. No responsibility whatsoever is accepted to any other person than the named client and, consequently, the contents of this report should not be relied upon by third parties for the whole or any part of its contents. This report is made on behalf of BCAL, no individual is personally liable, and by receiving this report and acting upon it, the client - or any third party relying on it - accepts that no individual is personally liable in contract, tort, or breach of statutory duty (including negligence). O:\\projects\4800\4875\Technical\Reports\4875R010 - Lings Primary School\4875R010A TS.pdf 1 4875R010A Transport Statement Extension
    [Show full text]
  • Masterplan and Project Proposals
    NORTHAMPTON CENTRAL AREA , DESIGN, DEVELOPMENT AND MOVEMENT FRAMEWORK Masterplan and project proposals Other sites 5.5 In addition to the above, the masterplan indicates potential commercial developments Summary at the Northern Gateway/Campbell Street (Site 13, 10,200m2 at 3 storeys), residential 5.7 This section of the report has set out a proposal led developments at the St Edmunds Hospital for a masterplan and key developments for site and along Bedford Road (site 14 - the the Central Area of Northampton. This is the development shown would provide some result of the identification of the Vision and key 620 two bed and 114 one bed apartments drivers of development and the appraisal of the at 4 storeys) and leisure and residential potential areas of change and investment within developments at various sites along the the Central Area. The key development projects Waterside. There is also the potential for the will deliver the required step change in the development of a healthcare campus at the range of services, accommodation, destinations, General Hospital, subject to the investment and infrastructure and employment in the development proposals of the NHS Trust. town centre. Summary of outputs 5.8 In the next two sections of the report we set out the complementary strategies for transportation 5.6 The total projected outputs of the projects listed and movement and the public realm. above are summarised in the table below. This relates to new build space only and does not take account of refurbishment or conversion. The amount of floorspace shown exceeds short term requirements but is designed to meet long term growth objectives.
    [Show full text]
  • Northampton Local Plan
    CASTELLO FORTIOR CONCORDIA NORTHAMPTON BOROUGH COUNCIL NORTHAMPTON LOCAL PLAN 1993-2006 ADOPTED JUNE 1997 WRITTEN STATEMENT Indicating Saved Policies as amended by the Secretary of State for Communities and Local Government September 2007 David Moir Director of Environment Services June 1997 FOREWORD Northampton is rapidly developing town - fortunate in having within its boundary a blend of old and new. It combines a historic town centre, former village communities, modern housing areas and a diverse range of employers with parks and open spaces which extend right into the heart of the town. It is an environment of which we are proud. Almost thirty years ago Northampton was designated a new town and under the auspices of the Development Corporation, Northampton expanded significantly through the implementation of the Northampton Master Plan. The momentum of growth remains, but it is important to ensure that future development adds to the quality of the environment in Northampton. The adopted Local Plan forms the basis for all decisions relating to land use within the Borough. It reflects many comments and representations made during its preparation as well as taking on board the recommendations of a Planning Inspector appointed by the Department of Environment following a Public Inquiry into remaining objections. The Plan aims to guide the further expansion of Northampton. It seeks to conserve important open spaces, encourage a balanced mix of residential, business and leisure development and promote good sustainable transport initiatives. In essence it seeks to produce an environment which enhances Northampton for the benefit of all. In conclusion, I wish to pay tribute to the late Councillor Roger Alder who steered the Plan through the majority of its stages as chair of the Planning Committee.
    [Show full text]
  • Northampton Town Transport Strategy
    Northamptonshire Transportation Plan FitNorthamptonshire for Purpose Transportation Plan Fit for Purpose Northampton Town Transport Strategy Northampton Town Transport Strategy Fit for Purpose January 2013 1 Northampton Town Transport Strategy (Blank Page) 2 Northampton Town Transport Strategy Northampton Town Transport Strategy Contacts and Further Information This is Northamptonshire County Council’s Northampton Town Transport Strategy. It sets out the overarching vision for transport in Northampton and sets out our strategy to achieve it. This strategy is one of a series of thematic daughter documents to the Northamptonshire Transportation Plan that was adopted in April 2012. Consultation on the first batch of the town transport strategies, including this Northampton Town Transport Strategy, took place between 24th September and 2nd November 2012. A summary of the consultation responses can be found on our website at: http://www.northamptonshire.gov.uk/en/councilservices/Transport/TP/Pages/NTP-Town- Transport-Strategies.aspx If you have any problems accessing Northamptonshire County Council’s website or do not have access to the internet, please contact us using the details below. This strategy was approved and adopted by Northamptonshire County Council’s Cabinet in December 2012. This strategy together with the other Batch 1 daughter documents and the Northamptonshire Transportation Plan itself can be viewed on the County Council’s website at: http://www.northamptonshire.gov.uk/en/councilservices/Transport/TP/pages/northamptonshire- transportation-plan.aspx Should you have any queries regarding this strategy, please contact the Transport Planning Team. Transport Planning Northamptonshire County Council County Hall Northampton NN1 1ED Email: [email protected] 3 Northampton Town Transport Strategy (Blank Page) 4 Northampton Town Transport Strategy Contents Chapter Theme & Content Page No.
    [Show full text]
  • Northampton Borough Council
    NORTHAMPTON BOROUGH COUNCIL COUNCIL Monday, 23 April 2012 YOU ARE SUMMONED TO ATTEND A MEETING OF NORTHAMPTON BOROUGH COUNCIL, WHICH WILL BE HELD AT THE GUILDHALL NORTHAMPTON ON MONDAY, 23 APRIL 2012 AT SIX THIRTY O’CLOCK IN THE EVENING WHEN THE FOLLOWING BUSINESS IS PROPOSED TO BE TRANSACTED:- 1. DECLARATIONS OF INTEREST 2. MINUTES. To approve the minutes of the proceedings of the Meetings of the Council held on 29 February and 12 March 2012. 3. APOLOGIES. 4. MAYOR'S ANNOUNCEMENTS. 5. PUBLIC COMMENTS AND PETITIONS 6. MEMBER AND PUBLIC QUESTION TIME Questions and the responses are attached. 7. CABINET MEMBER PRESENTATIONS (Copy herewith) 8. OPPOSITION GROUP BUSINESS Councillor Mason to make a statement on “NBC Sheltered Housing”. 9. CENTRAL AREA ACTION PLAN- SUBMISSION DOCUMENT Report of Chief Executive (copy herewith) 10. NOTICES OF MOTION (i) Councillor Wire DL to move and Councillor Eales to second: “Labour introduced the St Crispins Street Fair in the early nineties with the assistance of both the showmen and dedicated and enthusiastic officers of the Council. It brought pleasure to thousands of local residents, children and visitors to the Town. It became one of the biggest Fairs in the Country and it has been sadly missed. The previous Tory administration presided over its demise by scrapping the event. Council calls on the Administration to reintroduce the St Crispins Street Fair and having lost so many events over the last eight years bringing the event back will reinvigorate the Town Centre. It will also be in line with the Councils ‘Love Northampton’, introducing the street fair would be a good start.” (ii) Councillor Palethorpe to move and Councillor Gowen to second: This Council is concerned that the Conservative Administration appears to be reneging on a promise by them to ‘hold a series of public meetings’ made at the last Council full meeting on 12th March 2012.
    [Show full text]
  • A Character Assessment & Tall Buildings Strategy for Northampton's Central Area
    A Character Assessment & Tall Buildings Strategy for Northampton’s Central Area Produced for Northampton Borough Council Final Report June 200 Character Assessment & Tall Buildings Strategy for Northampton’s Central Area CONTENTS PAGE PRELUDE Page No. Page No. This Character Assessment and Tall Building Strategy document has been prepared on behalf of Northampton Prelude 1 0 Character Area Assessments Borough Council by _space. Character Area - Brewery District 58 This document acknowledges the importance of character and local distinctiveness, by analysing the built Character Assessment 2 Character Area 2 - Avon 68 environment within Northampton’s central area in order to designate distinct character areas Character Area 3 - Cliftonville 78 Character Area 4 - Spring Boroughs 88 The findings of the Character Area Assessment provides a sound platform to develop a strategy and or 5 stage review process 6 Character Area 5 - Castle Station 98 planning policy tool for Northampton Borough Council to appropriately deal with planning applications for ‘tall Character Area 6 - Grafton Street 08 buildings’ in order to protect and enhance the historic skyline of Northampton. Section.1: Macro Analysis 8 Character Area 7 - Upper Mounts 8 Character Area 8 - St. Johns 28 Character Area 9 - Historic Core 38 This document is made up of 3 sections which chronologically inform one another: Analysis Methodology 9 Character Area 0 - Greyfriars 48 1) Baseline Analysis 14 Layers of Analysis 10 Northampton Generic Design Principles 158 Examines Northampton’s central area using a macro analysis Do’s & Don’ts Layer - Lynchian Analysis 2 to help provide a robust evidence base for section.2 and 3 of Layer 2 - Natural Topography 4 Layer 3 - Urban Structure 6 Section.3 Tall Buildings Strategy this document.
    [Show full text]
  • Joint Core Strategy Local Plan (Part 1)
    West Northamptonshire Joint Core Strategy Local Plan (Part 1) Adopted - December 2014 West Northamptonshire Joint Core Strategy Local Plan (Part 1) Adopted DEC 2014 1.0 Foreword The importance of "Strategic Planning" which shapes and makes the places in which people live, work and play cannot be overstated. The alternative would, in all likelihood, result in an uncoordinated approach through speculative developer-led planning and related applications. This West Northamptonshire Joint Core Strategy Local Plan is a key document in ensuring places are shaped and made in a way which meets the needs of the people of today whilst ensuring the needs of future generations are safeguarded. This Local Plan forms Part 1 of the suite of Local Plans in West Northamptonshire that will, together, guide the evolution of Northampton, Daventry and South Northamptonshire in the years that lie ahead. It provides a long-term vision for the area with an overall framework in which more detailed plans will be drawn up and decisions made. It contains a broad planning strategy aimed at meeting that vision, and contains core strategic policies, which the Partner Councils - Daventry District, Northampton Borough, South Northamptonshire and Northamptonshire County Councils - believe will provide sound guidance in the years ahead. This Joint Core Strategy provides a strategic framework to guide the preparation of Part 2 Local Plans which will provide more detailed planning policies and site allocations for each of the partner Borough and District Councils. The whole community has had a real opportunity to positively and collectively influence and improve the way we do things in the future - in the way we use land, we build, and how we shape our environment.
    [Show full text]
  • Appendix 2 GF Capital Monitoring
    Appendix 2 NB Capital Monitoring Capital GF Budget Forecasts 2016/17 December 2016 Head Scheme Original Approved Latest YTD Actual Committed Forecast Year Expected Foecast Summarised Scheme Description of Code Budget Changes In Year Approved Budget Expenditure Expenditure End Spend Carry Forward Under/Overspend Transaction Service £000's £000's £000's £000's £000's £000's £000's £000's Description BA236 Car Park Lifts 250 0 250 0 0 250 0 0 BA383 Cinepod - Royal & Derngate Theatre 0 566 566 0 0 566 0 0 BA674 Operational Buildings - Enhancements 250 166 416 39 339 416 0 0 BA675 Commercial Landlord Responsibilities 120 292 412 65 5 412 0 0 BA889 Mayorhold Car Park - Drainage Works 07777007700 Glenn Miller 620 1,101 1,721 104 344 1,721 0 0 BA197 Delapre Abbey Restoration Minor Projects 00 000000 BA211 Extension of Duston Cemetery 00 034000 St Johns MSCP Storage Facilities Upgrade & BA214 Construction 00 000000 BA215 Moulton Athletic Track 0 631 631 526 464 631 0 0 BA221 Vulcan Works 3,940 (210) 3,730 65 5 850 2,880 0 BA223 Eastfield Park Additional Play Equipment 0 47 47 45 2 45 0 (2) BA224 Delapre Abbey and Parklands Infrastructure 100 197 297 18 11 297 0 0 BA226 Purchase of National Grid Land 0 1,500 1,500 0 0 1,500 0 0 BA227 Duston Arts Project 40 1 41 25 14 41 0 0 BA229 Weston Favell Improvement Project 0 33 33 9 0 24 0 (9) Underspend to due Scope of Works being reduced Budget carried forward to next financial year as works will only commence BA243 Lodge Farm Community Centre 0 53 53 0 1 1 52 0 sometime in February 2017.
    [Show full text]
  • Sustainable Northamptonshire Economic Action Plan (SNEAP) Progress and Next Steps December 2010
    Sustainable Northamptonshire Economic Action Plan (SNEAP) Progress and Next Steps December 2010 www.letyourselfgrow.com 3 Progress and Next Steps – December 2010 Contents C Summary Contents SNEAP: Summary 3 Corby East Midlands International Swimming Pool SNEAP: Building the Brand 41 Executive Summary 3 SNEAP: Enterprise and Innovation 52 Developing ownership of the SNEAP 7 1.0 Introduction 8 SNEAP: Employment Land and Premises 64 2.0 Background 8 SNEAP: Education and Skills 79 3.0 Wider Strategic Context 9 SNEAP: Town Centre Regeneration 87 4.0 Economic Changes since 2008 – Implications for SNEAP 11 5.0 Delivering the SNEAP 13 SNEAP: Transportation 104 1. Employment Land and Premises 15 2. Education and Skills 16 3. Enterprise and Innovation 17 4. Transportation 18 5. Town Centre Regeneration 19 6. Building the Brand 20 6.0 Next stages of development 21 Appendices 22 Appendix 1 - Background Analysis 23 Appendix 2 - Transformational Actions 25 Cover Image: iCon Centre for Sustainable Construction, Daventry www.letyourselfgrow.com 4 Executive Summary Executive Summary 5 ‘Transformational actions and interventions are required over Becketts Park Marina, Northampton and above “business as usual” to meet the challenges of future growth.’ Executive Summary Progress and Next Steps – December 2010 Progress and Next Steps – December 2010 Over the next 10 to 20 years Frameworks, a jobs trajectory for North desires, productivity (measured by Northamptonshire will and West Northamptonshire, and should Gross Value Added) would continue continue to grow, whether identify the interventions necessary and to fall behind UK and regional the frameworks required to deliver that averages. through natural changes to jobs growth.
    [Show full text]
  • Executive NORTHAMPTON CASTLE STATION AREA: SITE
    Executive Item No 18th July 2005 Portfolio: NORTHAMPTON CASTLE Directorate: Living STATION AREA: Author/Contact Officer: SITE DEVELOPMENT PRINCIPLES Noreen Banks Senior Planning Officer Tel: (01604) 837835 Purpose of Report The purpose of this report is to seek Committee endorsement on the principles of development opportunities and regeneration for Northampton Castle Station and its surrounding areas. These principles have been outlined in the interim statement attached to this Committee report . Recommendation(s) It is recommended that; • the contents of the interim statement attached be agreed and • the statement be submitted as part of the consultants brief to prepare a feasibility study and masterplan for the area Summary and Links to Corporate Plan The interim statement establishes the principles of development options which is envisaged to secure the sustainable redevelopment and regeneration of the site. It is anticipated that the principles and options, once translated into a masterplan, could significantly improve the physical characteristics of Northampton Station, meet current and future passenger demand, achieve a sustainable multi-modal network, and contribute towards the housing and employment requirements set out in Regional Spatial Strategy 8 and the Milton Keynes South Midlands South Regional Strategy. The Corporate Plan refers to the fact that Northampton is one of the areas chosen by the Government to deliver economic, social and housing growth under the Sustainable Communities Plan. The redevelopment of the Station and surrounding areas gives the Borough Council an opportunity to play a strong and influential role in securing the best outcome for the area and the town as a whole. The whole project has, to date, involved partnership working and communication between the Borough Council , County Council, the West Northamptonshire Development Corporation, Network Rail and Invest Northamptonshire.
    [Show full text]