This document has been produced for the specific purpose of providing an infrastructure needs assessment to inform East Riding of Yorkshire Council's emerging Local Plan as well as other plans, policies and proposals Contact Details For further information please contact: James Durham Senior Planning Officer Forward Planning, Room FS32, County Hall, East Riding of Yorkshire Council Beverley, HU17 9BA E-mail:
[email protected] Tel: 01482 391750 Or Caroline Grant Senior Planning Officer Forward Planning, Room FS32, County Hall, East Riding of Yorkshire Council Beverley, HU17 9BA E-mail:
[email protected] Tel: 01482 391737 EAST RIDING OF YORKS HIRE INFRASTRUCTURE STUDY UPDATE 2013 ©2013. East Riding of Yorkshire Council. All rights reserved. No part of this publication may be reproduced in any form or by any means without the prior permission of the East Riding of Yorkshire Council CONTENTS Key findings and recommendations 1 Introduction 18 Flood Defence and Drainage 21 Electricity transmission and distribution network 43 Gas transmission and distribution network 52 Sewage and wastewater treatment 54 Water supply and distribution network 59 Health services 61 NHS GP services 62 NHS Dental services 65 Pharmacy services 67 Hospital services 68 Primary and secondary school education 69 Sports and leisure 81 Highway junctions studies 90 Corridor public transport improvements 94 List of appendices 96 KEY FINDINGS & RECOMMENDATIONS East Riding of Yorkshire Council (the Council) has completed an Infrastructure Study Update 2013. Together with the Infrastructure Study 2011 - 2026, it provides a detailed evidence base to support the production of the Council’s Local Plan, and in particular the Strategy and Allocations Documents.