COMPANY PROFILE
We submit our brief company profile hoping you understand better our company, And we look forward to taking part in your future projects. Thank you for your kind attention.
68 CONTENTS
1. Present Condition of Company Outline of the Company C.E.O. Message Organization Chart History of the Company Foreign Branch 2. Business Condition Financial Status Contract Awarded Manpower Resources 3. HSE System HSE Policy HSE Organization Chart HSE Certificate 4. QA/QC System QA/QC Policy QA/QC Organization Chart QA/QC Certificate 5. Major Accomplishments Fields of Construction - Semiconductor Plant - Plant - R&D Center / Computing Information Agency - Hotel / Resort / Convention center - Hospital & Health Care Facilities - Apartment/ Residence / Office Building - Mall/ Department Store/ Gym/ Airport - Infrastructure / Transmission Line - Railway Construction - Renewable Energy - Overseas Project 6. Sketch Map of Head Office 1. Present Condition of Company
Outline of the Company
Company DaeMyoung Global Engineering & Construction Co., Ltd. Name
CEO JONG-BO, KIM
Found April 10, 1995
Capital USD 1,875,000.00-
2015 USD 121,275,893.00- Sales Account
Fields M&E Engineering and Construction
Electrical & Mechanical Construction, Information & Telecommunication(IT), Business Fire Fighting System, Civil & Building Works, Wind power generation system
Main Office 10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea
Staff 111 Engineers. 35 Admin./Account, Total 146 qualified staffs
Home Page www.dmgec.com
Contact Tel: +82-2-2182-3902 / Fax: +82-2-2182-3986
Credit A+ : by Korea Ratings Rating A+ : by DNB Korea 1. Present Condition of Company
CEO Message
We will not spare any efforts for being a world wide leading company. We are really appreciating you care and interest about DaeMyoung Global Engineering and Construction Contractor in electrical and Instrument, Fire Fighting facilities, Intelligent telecommunication and information since 1995.
The past 18 years of DayMyoung GEC is the history of challenging and surmounting strong winds of changes by indomitable spirit, which is proven in the fact that DaeMyoung GEC has never gotten any loan through financial institutions through substantial growing.
As one of the leading especial electrical construction contractors, we, DaeMyoung GEC will make continuous efforts and create in one united spirit of all staffs to stand firmly on the basis of accumulated experiences and know-how obtained in the major projects such as Commissioning work for Shuqaiq Steam Power Plant,World Cup Stadium, Samsung R&D center 3,4,5 in Suwon, 7,8 & 9 LCD production line in Tangjung Industrial area, large scale shopping center(E-mart & Home Plus), data center, Sewage treatment system, Transmission line, etc in domestic.
We have opened new market to construct Hynix semiconductor production line in China and convention center, data center, luxury hotel, hospitalized complex, textile factory in Angola, Africa. Also, we become a one of special contractor for electrical contractor to construct chemical plant project in the Qatar and Gas Plant project in the Saudi Arabia. In addition, Brazil, Vietnam, Egypt, Equatorial Guinea, Etc. are undergoing the various project.
DaeMyoung GEC would always be with client on the foundation of trust company to do best for realizing a policy of “ Quality and Client First” company to realize client- centered business.
Thank you C.E.O. JONG-BO, KIM 1. Present Condition of Company
Organization Chart
C.E.O Chairman
Audit & Inspection
Vice Chairman
Overseas Domestic Power Service Administration
Marketing, Estimation Marketing, Estimation Marketing, Estimation Administrator
Construction, Construction, Construction, Accountant Procurement Procurement Procurement
Quality Safety Quality Safety Quality Safety Procurement
Electrical & Mehanical Works, Commissioning, Foreign Branch O&M Service, Plant Simulation, Angola Brazil Vietnam Nigeria Energy Storage System, Reneawable Energy.
Equatorial Egypt India China guinea
Malaysia Thailand 1. Present Condition of Company
History of the Company
February Creat DaeMyoung Corporation 1995 May Election of CEO : SEO, GI-SUB (Capital ₩350,000,000won) Obtained license Electric Construction 1st Class(Issued #2197)
1996 December Awarded excellent Subcontractor of Samsung Engineering Co., Ltd. April Awarded excellent Subcontractor of Samsung Engineering Co., Ltd. 1997 July Awarded excellent Subcontractor of Samsung Corning Co., Ltd. December Const.Div(sung.gun.hoe) (Capital Increased : ₩450,000,000won)
February ISO 9002 Quality System Certified 1998 April Obtained a specialized license of Fire fighting facility (Issuance NO 97-13/southern Kyonggi-do)
April Awarded excellent Subcontractor for 29th anniversary of Samsung 1999 Engineering Co., Ltd. (The Capital Increased : ₩650,000,000won)
January Moved Head Office : 6FL1Bunji Plaza,Youngtong-dong,Youngtong-gu, Suwon City, Kyonggi-do, 443-813 Korea 2000 March Obtained license, Information & communication business(Issue #10953) November Awarded a superior constructor in chemical & construction business December Awarded excellent Subcontractor of Samsung Electric Co., Ltd.
January Awarded a distinguished service medal for suggesting an improvement strategy to 2001 Samsung Corporation December Awarded a distinguished service medal of Samsung Engineering Co., Ltd.
2002 November Obtained ISO 9001:2000 Quality System Certificate
2004 April Joined “Korean Electric Rail Road Technology Association”
June Signed Contract Talatona Convention Center Project(Luanda, Angola) 2005
January Awarded a distinguished service medal of Samsung Corporation 2006 Awarded excellent constructor of Samsung Electric Co., Ltd. March CEO / Oversea SANG-YEUL LEE Assumption
April Moved Office : 125-8 Yangjae-dong Seocho-gu Seoul, 137-130 Korea 2008 Changed Co.Name : DaeMyoung Global Engineering & Construction November Awarded a testimonial of President
February CEO / Domestic YANG-GI KIM Resignation 2009 July CEO / Domestic HAN-UK KIM Assumption Awarded Accident Prevention Merit of Prime Minister
February Capital increase : \ 1,875,000,000 2010 April Licensed Civil and Architecture Works August Licensed New*Renewable Energy Works
2011 September Yangsan Wind Power station Completion
2012 April ISO 14001 Environmental Management System Certification December Yeongam Wind Power station Completion 2013
January Awarded excellent Subcontractor of Samsung Engineering Co., Ltd. 2016 Awarded excellent Subcontractor of Samsung Corning Co., Ltd. Awarded excellent Subcontractor of Samsung Heavy Industries Co., Ltd. 1. Present Condition of Company
Foregin Branch
CHINA EGYPT VIETNAM
EQUATORIAL GUINEA
BRAZIL MALAYSIA
NIGERIA
THAILAND
INDIA ANGOLA
• VIETNAM • BRAZIL • DaeMyoung GEC Vietnam Co Ltd. • DaeMyoung Brazil Instalacoes Electricals Ltd. •Add : Room 1305, 13th Floor, TTC Tower, No.19 Duy •Add : Rua Das Dunas, nQ 365, District of Tan Street, Dich Vong Hau Ward, Cau Giay District, Ha Noi City, Viet Nam. Cumbuco, City of Caucaia, State of Ceará, Brazil
•INDIA • DaeMyoung Engineering India Private Limited. • NIGERIA •Add : Commercial Shop no. 03.Ramveer Singh • DaeMyoung Engineering Nigeria Private Limited bhati Market. Village - Nangla Charandas Ph-2. Add : 261 A Corporation Drive, Dolphin Estate, Noida, District Gautam Budh Nagar, U.P. Ikoyi, Lagos, Nigeria
• THAILAND • EGYPT • DaeMyoung GEC Co Ltd. • DaeMyoung GEC. •Add : 84/12 Mooball Sriracha Land and House, •Add : 160 AEEN Gate No.4Hadbet EI Ahram. Moo 5, Surasakdi Sub-district, Sriracha District, Floor 5 fl at 4. Egypt Chonburi Thailand
• CHINA EQUATORIAL GUINEA • Sanxi Taming Construction Co.Ltd • DaeMyoung Global Engineering & Construction.
• ANGOLA • MALAYSIA • DaeMyoung GEC – Sucursal De Angola. • DaeMyoung Global Engineering & Construction. 2. Business Condition
Financial Condition
ANNUAL TURNOVER
(US$ Mill.)
200
160
120
80 151 136 134 106 40
0 2013 2014 2015 2016
(US$.)
Current Year Total Assets Sale Assets
2013 33,708,723.00 44,244,444.49 151,282,096.61
2014 39,490,151.76 55,475,686.27 135,995,503.51
2015 49,418,865.71 71,081,534.65 133,587,451.00
2016 50,483,357.46 72,569,607.12 105,619,425.66 2. Business Condition
Contract Awarded
CONTRACT AWARDED (US$ Mill.)
240
200
160
120 186 80 137 124 115 40
0 2013 2014 2015 2016
(US$.)
Year Total Amount
2013 186,007,483
2014 123,505,710
2015 137,302,829
2016 115,456,512 2. Business Condition
Manpower Resource
PERMANENT STAFFS
(As of Dec, 2016)
23%
Total 146 53%
24%
Project Engineer & Year Adminisration Total Management Supervisor
2013 37 93 38 168
2014 32 83 35 150
2015 35 92 37 164
2016 33 78 35 146
Engineer & Supervisor Administration Project Management 3. HSE System
HSE Policy Healthy, Safety and Environment (HSE) is of top importance DaeMyoung Global E&C to survive and succeed In the construction industry. DaeMyoung Know that our Electrical & Mechanical Works of plants may create hazards to health, safety and environment.
1 HSE is of equal important to other business activate
2 HSE management is line responsibility
3 Every Employee is responsible for HSE
4 No Activity shall be carried out unless considered safe
5 Safeguard the health and safety of all employees
6 Strive to minimize the impact of activities of the environment
7 Maintain good relationship with host communities
8 Strive to enhance security of lie and equipment. 3. HSE System
HSE Organization Chart
CONTRACTOR HSE TEAM
HSE TEAM
PROJECT HSE - Site HSE Support MANAGER - Reporting of Serious Accident to President
HSE SUPERVISOR - Control of HSE Information, Induction and Training - Improvement of Site HSE Condition FIELD HSE - Lead of Accident & Incident CONTROLLER Investigation - Reporting of Serious Accident to Head Office 3. HSE System
HSE Certificate-ISO 14001 3. HSE System
HSE Certificate-KOSHA 18001 4. QA/QC System
QA/QC Policy DaeMyoung GEC shall carry out all project execution activities to the highest quality standards as set out in our corporate Quality Management System (QMS). DaeMyoung’s QMS, implemented in full accordance with the International Standard of ISO 9001, provides essential support and guidance for each of us in our quest for quality performance.
•Full compliance with ISO 9001 including provision of necessary 1 resources to ensure
•Set clearly defined quality objectives, plans and targets that are 2 regularly audited and reviewed by senior management
•Communicate the company quality ethos to all employees and 3 our supply chain
•Ensure quality standards are operated at the highest level 4 across all our projects
•Ensure new and existing employees have the skills, training and 5 capability to meet the needs and expectations of our project
•Establish clear procedures for working with all project Clients so 6 as to create long term relationships 4. QA/QC System
QA/QC Organization Chart
CONTRACTOR CONTRACTOR QA/QC TEAM
HEAD OFFICE QA/QC TEAM
SITE (DMGEC) PROJECT QA/QC MANAGER
QUALITY PLANNING INSPECTION NDT
- Training & Education - Receiving Inspection - PWHT - Document & Data Control - Test Equipment Control - NDE - Quality Record Control - ITP Control - RT, UT, MT, PT - FCN Follow-up - Inspection Notification - PMI, Ferrite Check - Welder Qualification Control - Hydro Test Control - RT Film control 4. QA/QC System
QA/QC Certificate 5. Major Accomplishments
◈ Fields of Construction
PLANT OVERSEAS PROJECT (Electrical and I&C Works,Mechanical,Piping,Storage Tank)
Infrastructure / Transmission SEMICONDUCTOR Plant Line
R&D CENTER / Computing & HOTEL / RESORT / Information Agency Convention center
Hospital & Health Care APARTMENT/ RESIDENCE / Facilities Office Building
MALL/ Department Store/ RAILWAY CONSTRUCTION GYM/ Airport
RENEWABLE ENERGY Commissioning,O&M,ESS 3. Major Accomplishments
◈ Overseas Project
Talatona Convention Compound, ANGOLA
Talatona Exhibition Center, ANGOLA SOYO LNG TANK Const. Pjt, ANGOLA
PERIOD CLIENT PROJECT DESCRIPTION
07.11 ~ 09.12 Sigma Group Omega Compound Building in Angola
09.10 ~ 11.07 NIEC Talatona Exhibition Center Project in Angola
10.06 ~ 10.11 Samsung Heavy Industries SEC-VC Factory Project in Vietnam
10.11 ~ 11.02 Samsung Heavy Industries TSE Air Conditioner Line in Thailand
11.08 ~ 11.12 MS-Autotech MS-Autotech Piracicaba Plant in Brazil
11.11 ~ 12.06 Sigma Group New Omega Compound Building A & B in Angola
12.02 ~ 13.08 Ssangyong E&C Mongomo Leader’s Club in Equatorial Guinea
12.10 ~ 13.02 DABO DABO Industry Project in Brazil
12.11 ~ 13.05 Unisinos HT MICRON Project in Brazil
13.01 ~ 13.07 Samsung Electronics SEV 4th Component Project in Vietnam
13.01 ~ 14.09 Samsung Engineering Textile PH-2 Project in Angola
13.03 ~ 14.12 POSCO CSP Steel Plant PKG-1, 2 in Brazil 3. Major Accomplishments
◈ Overseas Project
Botswana’s Morupule “A” 33MW x 4Unit Coal Fired Power Plant
SHUQAIQ Steam 700MW x 4Unit Power Plant Project,KSA
PERIOD CLIENT PROJECT DESCRIPTION
13.05 ~ 15.10 Samsung Engineering Textile PH-3 Project in Angola
13.07 ~ 14.06 Ssangyong E&C Mongomo Residence (EMORA) in Equatorial Guinea
13.07 ~ 14.02 Samsung C&T SEVT Yenbin Wiress Complex in Vietnam
13.07 ~ 14.10 Samsung C&T SEDA-P(M) Utility & 69Kv in Brazil
13.09 ~ 14.01 Samsung Everland SDIV2 Pack Factory (Package3) in Vietnam
13.10 ~ 14.03 Samsung C&T Noida Dynamic Center in India
13.10 ~ 14.07 Samsung C&T SEEG VD Complex in Egypt
14.01 ~ 14.08 GS Engineering LGEEG New Factory in Egypt
14.02 ~ 14.07 Samsung Engineering SEMV Project (Zone A) in Egypt
14.03 ~ 14.08 Ssangyong E&C EGMOA Security Control Center in Equatorial Guinea
14.03 ~ 14.08 Ssangyong E&C Mongomo’s Residence Papal in Equatorial Guinea
14.03 ~ 14.08 Ssangyong E&C Mongomo’s Capilla Privada in Equatorial Guinea Botswana’s Morupule A 33MW x 4Unit Coal Fired Power 16.04 ~ 17.01 Doosan Heavy I&C Plant Simulator&Tranining Service KSA’s Shuqaiq 700MW x 4Unit Steam Power Plant O&M 16.08 ~ 17.11 Hyundai Heavy Industries Service 3. Major Accomplishments
◈ Overseas Project
Khatoum 80MW x 4Unit North Power Station, Sudan
Rabigh 670MW x 4Uint Power Plant Project, KSA 3. Major Accomplishments
◈ Overseas Project
CSP STEEL PLANT PKG-1,2 BRAZIL
DABO INDUSTRY PROJECT, BRAZIL HT MICRON PROJECT, BRAZIL 3. Major Accomplishments
◈ Overseas Project
MS-AUTOTECH PIRACICABA PLANT, BRAJIL TSE AIR CONDITIONER LINE, THAILAND
SEC-VC FACTORY PROJECT, VIETNAM SEV 4TH COMPONENT, VIETNAM 3. Major Accomplishments
◈ Overseas Project
HYNIX CHINA 300MM FAB LINE 2 SANGHAI, CHINA
NOIDA DYNAMIC CENTER, INDIA
SAMSUNG ELECTRONIC Semiconductor Factory, HUNGARY 3. Major Accomplishments
◈ Plant
온양 V-PJT 신축공사현장 Samsung SDI OLED Samsung Corning KC09~12 Project
Plant of C-6 Line in CHUNAN Branch of SAMSUNG ELECTRONICS
PERIOD CLIENT PROJECT DESCRIPTION 03.10 ~ 05.03 Samsung C&T Samsung Corning KC09~12 Project 05.05 ~ 07.03 Samsung Engineering Samsung SDI OLED Project 04.11 ~ 06.12 Samsung C&T Samsung Corning KC17~20 Project 06.06 ~ 07.05 Samsung Engineering Samsung SDI, PDP #4 Line Project 07.12 ~ 08.12 Samsung Engineering Samsung Corning 5~8 Line Project 08.01 ~ 09.08 Samsung C&T SEC, LCD Line Expansion Project 08.06 ~ 09.12 Samsung C&T Samsung Corning 2nd R-Project 09.05 ~ 11.12 Samsung Engineering A1 PH3 Expansion Project 09.02 ~ 10.10 Hyundai E&C (Qatar) Qafco-5 Project (Ammonia & Urea Plant) 09.04 ~ 11.09 Chinheung Korea Flour Mills Dangjin Plant 09.05 ~ 09.10 NIEC (Angola) Soyo LNG Tank Project 09.11 ~ 11.10 Samsung C&T Tangjeong LCD Valley 2nd Project 10.03 ~ 12.03 Hyundai E&C (Saudi) KARAN Gas Facilities Project 13.02 ~ 14.12 POSCO E&C CSP Steel Plant Complex Phase1 3. Major Accomplishments
◈ Plant
QAFCO-5 Ammonia & Urea Plant Project, QATAR
KARAN Gas Facilities Project in Saudi Arabia
Korea Flour Mills Dangjin Plant Rehabilitation of Textile Plant at SATEC(Phase-3) 3. Major Accomplishments
◈ Infrastructure / Transmission Line
Street Lighting
Industrial Road
PERIOD CLIENT PROJECT DESCRIPTION
04.02 ~ 04.11 Samsung SDI W.W.T Asan lnd. Area.
04.03 ~ 04.11 SEC W.W.T Chonan Ind Area 3rd Block
04.07 ~ 05.07 SEC W.W.T Giheung Green Project.
04.11 ~ 08.01 SEC 154KV T/L Pyongtaek lnd Area
05.03 ~ 06.03 SEC 154KV T/L & Duct Bank for H1 Project
05.04 ~ 05.08 SEC 154KV T/L & Duct Bank for H1 Project
05.10 ~ 06.09 SEC W.W.T Whasung H2 Project
12.02 ~ 17.01 Ministry of Infra & Trans. Yongsan-Jangheung Road Construction Project
13.11 ~ 15.12 Ministry of Infra & Trans. National Road Ulsan-Pohang Electrical Works Project 3. Major Accomplishments
◈ Infrastructure / Transmission Line
Underground Piping Work
Tangjeong Techno Complex Wastewater Treatment facility
1ST Stage of Semicon. Green Project 3. Major Accomplishments
◈ Infrastructure / Transmission Line
154KV Power Transmission Line (PYEONNGTAEK – ASAN)
154KV Power Transmission Line(GIHEUNG)
Telecommunication Facility 3. Major Accomplishments
◈ Semiconductor Plant
Onyang V-Project Hynix Semi-conductor Project in China
Samsung Electronics T7 2nd Project Samsung Electronics Giheung S-Project
PERIOD CLIENT PROJECT DESCRIPTION 97.09 ~ 99.06 Samsung Electronics SFC ECH Project 00.03 ~ 01.08 Samsung Electronics TBGA MICRO CS Project 03.06 ~ 04.02 Samsung C&T Pyeongtaek K-2 Project 04.01 ~ 04.12 Samsung C&T Samsung Electronics Asan T-7 Project 04.06 ~ 05.04 Samsung C&T Giheung S-Project Expansion Project 04.12 ~ 05.06 Samsung C&T Onyang V-Project 05.04 ~ 06.05 Samsung C&T Hwaseong 15 Line Project 05.04 ~ 06.05 Samsung C&T Samsung Electronics Asan T7 2nd Project 06.12 ~ 07.06 Hyundai E&C Hynix Semi-conductor Project in China 07.04 ~ 08.06 Hyundai E&C Cheongju Hynix Semi-conductor A - Project 07.06 ~ 07.10 Hyundai E&C Hynix Semi-conductor NBE - Project 07.10 ~ 07.11 Hyundai E&C Icheon Hynix Semi-conductor M10X Project 07.12 ~ 08.05 Samsung C&T Tangjeong T8-2 Project 3. Major Accomplishments
◈ Semiconductor Plant
Cheongju Hynix Semiconductor Factory Kiheung Branch Semiconductor Factory
Tangjung T-7 TFT/LCD Factory Clean Room Icheon Hynix Semiconductor Factory
PERIOD CLIENT PROJECT DESCRIPTION 11.10 ~ 12.09 Samsung C&T Hwasung 16Line FAB Project 11.11 ~ 13.12 Samsung C&T SR Retrofit Project 13.05 ~ 14.10 Samsung Engineering Tangjeong OLED Retrofit Project 13.05 ~ 14.01 Samsung C&T Hwasung S3-A Project 13.08 ~ 14.10 Samsung C&T Hwasung S3 New Line Project 13.11 ~ 14.12 Samsung Engineering S3 Water Purification Project 14.02 ~ 14.10 Samsung Engineering 5Line Retrofit Project of Hwasung 16 Line 13.10 ~ 15.08 Samsung C&T SR Project FAB Phase 2 3. Major Accomplishments
◈ R&D Center / Computing & Information Agency
L-T Gwacheon SDS Research Institute Samsung Electronics SCM, in Korea
Mutamba R&D Building, in Angola Hwasung NRD Research Institute Samsung Electronics R3 Project
PERIOD CLIENT PROJECT DESCRIPTION
00.03 ~ 03.03 Samsung Electronics SEC, IT R&D Center Project
01.03 ~ 03.11 Samsung Electronics SEC, SCM R&D Center Project
02.11 ~ 04.02 Samsung Electronics Korea Information/Telecom. Univ. Project
03.12 ~ 06.04 Samsung Electronics SEC, R3/R4 Project Project
05.06 ~ 06.11 Samsung Electronics Hwasung NRD R&D Center Project
Samsung Heavy 06.11 ~ 08.01 SEC, Software R&D Center Project Industries
07.05 ~ 09.12 NIEC Research & Production Building, Angola
Samsung Heavy 09.02 ~ 10.05 Techwin Pankyo R&D Center Project Industries
09.06 ~ 10.01 Hyundai E&C Songdo Yonsei Univ. Campus Step-1 Project
11.05 ~ 13.05 Samsung C&T SEC, R5 Project 3. Major Accomplishments
◈ R&D Center / Computing & Information Agency
SAMSUNG ELECTRONIC Computer Science Center
PERIOD CLIENT PROJECT DESCRIPTION
11.11 ~ 13.05 Samsung Heavy Industry UT Infra Composition Project 13.01 ~ 13.05 Samsung SDS Daedeok Center Retrofit Project Electronics in Suwon Medical Research Bldg 13.05 ~ 13.11 Samsung SDI Renovation Project
14.04 ~ 14.12 Samsung Engineering A3-Ph1 Control Construction A&B Project
14.05 ~ 14.08 Samsung SDS Multi-Campus Retrofit Ph2 Project 3. Major Accomplishments
◈ R&D Center / Computing & Information Agency
SAMSUNG SDI OLED
Samsung Electronics R5 Project 3. Major Accomplishments
◈ Hotel / Resort / Convention center
Intercontinental Hotel, ANGOLA
Convention Center, ANGOLA Yeosu Ocean Resort
PERIOD CLIENT PROJECT DESCRIPTION
Samsung Heavy 04.04 ~ 05.12 Geoje VIP Villa Project Industries
05.07 ~ 06.08 NIEC (Angola) Talatona Convention Center, Angola
07.04 ~ 08.09 SUNWON Const. Yeosu Ocean Resort Project
07.07 ~ 08.11 NIEC (Angola) Talatona Convention Hotel, Angola
08.02 ~ 10.05 NIEC (Angola) Intercontinental Hotel & Casino, Angola
08.04 ~ 08.12 STX Const. STX Mungyeong Resort
12.12 ~ 13.07 Samsung C&T Shilla Hotel Seoul Renovation 3. Major Accomplishments
◈ Hotel / Resort / Convention center
Talatona Convention Hotel, ANGOLA
STX Mungyeong Resort
Geoje Hotel 3. Major Accomplishments
◈ Hospital & Health Care Facilities
GANGBUK SAMSUNG Hospital
SUNGKYUNKWAN UNIV. Medical LAB
PERIOD CLIENT PROJECT DESCRIPTION
Samsung Heavy 00.01 ~ 00.12 SAMSUNG 1ST Hospital Project Industries Samsung Heavy 01.05 ~ 05.01 SAMSUNG Hospital Remodeling Project Industries
06.04 ~ 06.06 MYGIN Co. Myjin Healthcare Center Remodeling Project
Samsung Heavy 06.10 ~ 07.04 SAMSUNG Hospital HyoSukdong Project Industries Samsung Heavy 08.05 ~ 09.09 Bundang Heritage Health Care Facilities Project Industries 3. Major Accomplishments
◈ Hospital & Health Care Facilities
Medical Research SAMSUNG JEIL Hospital
Bundang Heritage Health Care Facilities
37 3. Major Accomplishments
◈ Apartment / Residence / Office Building
HYUNDAI SUNGWOO PH-1 Apartment SAMSUNG CORP. RAEMIAN Apartment
SH Chunwang Apartment LOTTE CASTLE Premier Apartment
PERIOD CLIENT PROJECT DESCRIPTION
Samsung Heavy 99. 12~ 02.05 Seocho-dong , Samsung Chere Vill Apartment building Industries Samsung Heavy 00.03 ~ 03.02 Dogokdong, Tower Palace Mixed-use Apartment building Industries
00.11 ~ 02.12 Samsung C&T Mabukri, Samsung Remian Apartment building
04.11 ~ 07.09 Lotte E&C Lotte Castle PremierApartment building
07.01 ~ 09.02 Samsung C&T Uiwang, Samsung Remian Apartment building
08.11 ~ 11.08 SH Chunwang, Apartment building
09.03 ~ 10.11 Hanil Junghak District-2 Urban Improvement Project
Samsung Heavy 09.07 ~ 11.04 Seocho-dong 1327-1 Office Building Industries
09.08 ~ 11.10 Samsung C&T Bon-dong, Apartment building
11.07 ~ 13.10 Asia trust Heungduck IT Valley
38 3. Major Accomplishments
◈ Apartment / Residence / Office Building
Heungduck IT Valley Seocho-dong 1327-1 Office Building
PERIOD CLIENT PROJECT DESCRIPTION
12.02 ~ 14.04 Korea Land & Housing Chungbuk Innovation City B-1 Block I&C Project
12.02 ~ 14.05 Korea Land & Housing Goyang Wonheung A2 Block Project
12.06 ~ 13.12 Posco E&C Sejong city Posco the # Central City
12.09 ~ 14.05 Samsund SDI Samsung Seocheon Leadership Center Project
14.10 ~ 16.06 Hyundai Engineering Daegu Seocheon Block Housing Project 3. Major Accomplishments
◈ Apartment / Residence / Office Building
Sejong city Posco the # Central City
Samsung Seocheon Leadership Center Project
Dogok-dong Tower Palace II Complex Residential Building 3. Major Accomplishments
◈ Mall /Department store /Gym / Airport
E-MART Mall, BUPYEONG MEGA MART Mall, Dongrae-gu
HOME PLUS Mall, UJUNGBU CGV COMPLEX Mall at YONGSAN KTX STATION
PERIOD CLIENT PROJECT DESCRIPTION
99.09 ~ 02.03 Suwon city World Cup Stadium, Suwon Korea
00.02 ~ 00.11 Samsung Heavy Industries Home Plus, Changwon Mall
00.09 ~ 02.08 Samsung Heavy Industries MEGAMART Dongrae Mall
01.04 ~ 01.11 SINSEGAE CONST. E-Mart, Pyongtaek Mall
02.05 ~ 03.03 Samsung Heavy Industries Home Plus, Sangdong Mall
03.03 ~ 04.04 Samsung Heavy Industries Home Plus, Gumchun Mall
04.03 ~ 04.10 SHINSEGAE CONST. E-Mart Walgae Mall
06.04 ~ 06.08 SHINSEGAE CONST. SINSEGAE Department Store, Gwangju
07.03 ~ 08.12 SHINSEGAE CONST. E-Mart, Dongtan Mall
08.12 ~ 09.05 HanmiParsons Home Plus, Songtan Mall
11.09 ~ 12.10 Samsung Heavy Industries MEGAMART Gimhae Mall
12.03 ~ 12.09 Hyundai Amco Home Plus, Suwon Homaesil Mall
14.03 ~ 17.09 Korea Airports Corporation Gimpo Airport Renovation Electrical Work 3. Major Accomplishments
◈ Mall /Department store /Gym / Airport
SUWON World Cup Stadium
GIMPO AIRPORT RENOVATION ELECTRICAL WORK 3. Major Accomplishments
◈ Railway Construction
Cheongla Rolling Stock Depot Instrument Works
Signal Electrical works for Pyongnae Rolling Stock Depot Goyang Rolling Stock Depot Tramways Construction
PERIOD CLIENT PROJECT DESCRIPTION
Goyang Rolling Stock Depot incoming transfer System 08.11 ~ 09.07 Daewoo Engineering Elect. Works
08.08 ~ 09.08 Samsung Engineering Goyang Rolling Stock Depot Tramways Construction
09.05 ~ 11.12 Samsung Engineering Signal Electrical works for Pyongnae Rolling Stock Depot
Korea Rail Network 12.12 ~ 13.12 Cheongla Rolling Stock Depot Instrument Works Authority Korea Rail Network 13.05 ~ 14.04 Busan-Ulsan Double Track Railway Communication Works Authority Korea Rail Network 14.10 ~ 16.11 Metro Railway Suseo-Dongtan Power Equipment Works Authority
46 3. Major Accomplishments
◈ Railway Construction
Busan-Ulsan Double Track Railway Communication Works
Metro Railway Suseo-Dontan Power Equipment Works 3. Major Accomplishments
◈ Renewable Energy
온양 V-PJT 신축공사현장 3MW Wind Power station(Yang San)
40MW Wind Power Station(Yeong Am)
PERIOD CAPACITY PROJECT DESCRIPTION
07.06 ~ 11.10 3.0 MW(1.5MW X 2) Yang San Wind Power Station E.P.C.O
10.10 ~ 13.12 40MW(2MW X 20) Yeong Am Wind Power Station E.P.C.O
13.01 ~ 15.12 19MW(3.15MW X 6) Gowon Wind Power Station E.P.C.O
14.03 ~ 20MW(2.5MW X 8) Po Hang Wind Power Station E.P.C.O
14.07 ~ 18MW(2.5MW X 8) Geo Chang Wind Power Station E.P.C.O
14.11 ~ 36MW Yeomsan Wind Power Station E.P.C.O
14.11 ~ 20MW Dongdaesan Wind Power Station E.P.C.O
14.09 ~ 15.12 12.5MW(2.5MW X 5) Gwangsan-gu Fuel Cell Smart Grid Project 4. Sketch Map of Head Office
Dogok-dong Gaepo-dong
Gangnam Yangjae St. Gangnam-daero Seongnam St.
Seoch-gu
Office Yangjae
ro
- daero
Citizen’s Forest - Hyundai Motor Group
DMGEC
Yangjae Yangjaecheon
Hannam Seocho IC Gyeongbu Expy Yangjae IC Suwon Bridge
Korean Educational Development Institute
Sadang Gwacheon
Head Office : 10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea TEL: +82-2-2182-3902 FAX: +82-2-2182-3986 E-mail: [email protected] Home page : http://www.dmgec.com Copyright(c) DaeMyoung Global Engineering & Construction. All rights reserved. Head Office : 10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea TEL: +82-2-2182-3902 FAX: +82-2-2182-3986 E-mail: [email protected] Home page: http://www.dmgec.com Copyright(c) DaeMyoung Global Engineering & Construction. All rights reserved.