Srikalahasthi Pipes Limited

Total Page:16

File Type:pdf, Size:1020Kb

Srikalahasthi Pipes Limited Updated & Revised Form – I Submitted to MoEF, New Delhi for SRIKALAHASTHI PIPES LIMITED (Formerly Lanco Industries Ltd.) at Rachagunnari Village of Srikalahasti Mandal, Merlapaka & Chindepalli Village of Yerpedu Mandal, Chittoor District, Andhra Pradesh [REQUEST FOR EXTENSION OF VALIDITY & AMENDMENT IN ENVIRONMENTAL CLEARANCE ISSUED VIDE NO. J-11011/914/2007-IA II (I) dated 25-07-2008] Prepared by: ISO 9001: 2008 Certified Accredited by NABET - QCI 6-3-652 | Flat # 7-3 | Dhruvatara Apartments | Amrutha Estates | Erramanjil | Somajiguda | Hyderabad- 500082 APPENDIX I (See paragraph – 6) FORM 1 Sr. No (I) BASIC INFORMATION 1. Name of the project LANCO INDUSTRIES LTD 2. S. No. in the schedule 1 (d) and 3 (a) & (b) 3. Proposed capacity/area/length/tonnage to Name of the product Proposed expansion be handled/command area/lease capacity area/number of wells to be drilled Pig iron 3,50,000 TPA Ductile iron Spun pipes 2,80,000 TPA Slag cement 3,00,000 TPA Coke oven plant 3,00,000 TPA Captive power generation 20 MW & 6.0 MW 4. New/Expansion/Modernization The present proposal is to request the Ministry for Extension of validity of the Environmental Clearance to complete the unimplemented portion of the Expansion project & Amendment in Environmental Clearance. 5. Existing capacity/Area etc. Name of the product Existing capacity Pig iron 1,75,000 TPA Ductile iron Spun pipes 1,20,000 TPA Slag cement 90,000 TPA Coke oven plant 1,62,000 TPA Captive power generation 12 MW & 2.5 MW Status of the Expansion project The following are the capacities after expansion for which Environmental clearance was obtained vide order No. J-11011 / 914 / 2007 – IA II (I) dated 25-07-2008 S.NO. NAME OF THE EXISTING PROPOSED TOTAL CAPACITY PRODUCT CAPACITY EXPANSION AFTER PROPOSED CAPACITY EXPANSION 1. Ductile Iron Pipes 1,20,000 TPA 2,80,000 TPA 4,00,000 TPA 2. Pig Iron 1,75,000 TPA 3,50,000 TPA 5,25,000 TPA 3. LAM Coke 1,62,000 TPA 3,00,000 TPA 4,62,000 TPA Page | 1 4. Captive Power 12.0 MW 20.0 MW & 6.0 40.5 MW generation & 2.5 MW MW 5. Slag Cement 90,000TPA 3,00,000 TPA 3,90,000 TPA The following is the implementation status of the expansion project S.No. NAME OF EXISTING PROPOSED TOTAL CAPACITY STATUS OF THE CAPACITY EXPANSION AFTER IMPLEMENTA PRODUCT CAPACITY PROPOSED TION EXPANSION 1. Ductile Iron 1,20,000 TPA 2,80,000 TPA 4,00,000 TPA 1,05,000 has Pipes been implemented 2. Pig Iron 1,75,000 TPA 3,50,000 TPA 5,25,000 TPA 1,00,000 TPA has been implemented 3. LAM Coke 1,62,000 TPA 3,00,000 TPA 4,62,000 TPA 75,000 has been implemented 4. Captive 12.0 MW 20.0 MW & 6.0 40.5 MW Pending Power & 2.5 MW MW generation 5. Slag Cement 90,000TPA 3,00,000 TPA 3,90,000 TPA Pending We also would like to bring to your kind notice that, due to improvement in market scenario for some of our products, we are planning to implement some of the unimplemented units which could not be taken up during the validity period of Environmental clearance. Our bankers are also insisting for extension of Environmental Clearance certificate for sanctioning of loan for those units. Amendment in Environment clearance Amendment in treatment system for effluent generated is sought as per Annexure (a) 6. Category of project i.e. ‘A’ or ‘B’. A 7. Does it attract the general condition? If yes, No please specify. Page | 2 8. Does it attract the specific condition? If yes, No please specify. 9. Location Plot/Survey/Khasra No. 274,279/1,281 etc. Villages Rachagunnaeri, Merlapaka & Chindepalli Tehsil Srikalahasti & Yerpedu Mandal District Chittoor State Andhra Pradesh 10. Nearest railway station/airport along with Railway Station : Rachagunneri - 0.5 Km distance in kms. Airport : Renigunta (15.0 Kms.) 11. Nearest Town, city, District Headquarters Nearest Town: Srikalahasti (7.3 Kms) along with distance in Nearest City: Tirupathi. Kms District Head quarter : Tirupathi 12. Village Panchayats,Zilla Parishad, Municipal Village panchayat : Rachagunneri, Merlapka & corporation, Local body(complete postal Chindepalli addresses with telephone nos. to be given) Zilla Parishad : Srikalahasti Municipal Corporation: Tirupathi 13. Name of the applicant Srikalahasthi Pipes Ltd. (formerly Lanco Industries Ltd. ) 14. Registered Address Rachagunneri (V) & (PO) Srikalahasti (Mandal), Chittor District, Andhra Pradesh 15. Address for correspondence: Name M. R. RAMESH BAPU Designation(owner/partner/CEO) Sr.General Manager (Business Development) Address Rachagunneri (V) & (PO) Srikalahasti (Mandal), Chittor District, Andhra Pradesh Pin code 517641 E-Mail [email protected] Telephone No. 08578-286650-55 Fax No. 08578-286657 16. Details of Alternative sites examined, if Present proposal is request for extension of Page | 3 any. Location these sites should be shown validity of Environmental clearance & on a topo sheet Amendment in Environmental Clearance only. 17. Interlinked Projects No 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves No approval/clearance under; if yes, details of the same and their status to be given. (a) The Forest (conservation)Act,1980 (b) The Wildlife (protection)Act,1972 (c) The C.R.Z Notification, 1991? 22. Whether there is any a government No order/policy relevant/relating to the site? 23. Forest land involved(hectares) Nil 24. Whether there is any litigation pending No litigation is pending against the project and / against the project and/or land in which or land in which the expansion project is propose the project is propose to be set up? to be set up (a)Name of the court (b)Case No. (c) Orders/directions of the court, if any and its relevance with the proposed project. Page | 4 (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities S.No. Information/Checklist confirmation Yes/No /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land Yes Present use of land is Industrial. Existing use, land cover or topography including plant is already under operation and part of increase in intensity of land use (with the expansion project has been respect to local land use plan) implemented and is under operation. Some topographical changes have occurred due to the excavations, construction activities pertaining to the existing and expansion units under implementation. Hence there is no adverse significant impact due to the change in land use pattern due to the expansion project activities. 1.2 Clearance of existing land, vegetation No Part of the expansion project was and buildings? implemented in the vacant area available in the existing plant premises. Unimplemented expansion project activities will be taken up in the vacant area available. However as a part of greenbelt development, 85 acres of Greenbelt (including expansion project) has been developed in the Plant premises. 1.3 Creation of new land uses? Yes Present use of land is already converted for the industrial purpose. 1.4 Pre-construction investigations e.g. No Investigations have been carried out for soil bore houses, soil testing? and water in the area where construction of the expansion project is planned 1.5 Construction works? Yes Construction activities have been completed only part of the expansion project planned. Keeping in view of improvement in market scenario for some of our products, we are planning to take up construction activities pertaining to unimplemented units after obtaining extension of Environmental Clearance. Page | 5 All necessary precautions have been taken to prevent dust pollution during construction of existing project and similar practice will be carried out during construction of unimplemented expansion project activities. 1.6 Demolition works? No No demolition work is involved for implementing the remaining expansion project activities as it will be taken up in the vacant area available in the site premises 1.7 Temporary sites used for construction No Construction workers will be taken from works or housing of construction local areas and from other areas. Temporary workers? Labor colony housing will be envisaged for non-local construction workers 1.8 Above ground buildings, structures or Yes Most of the structures in remaining earthworks including linear structures, expansion project activities will be above cut and fill or excavations the ground. However excavations are involved for foundations in construction and cut will be used for filling within the site. 1.9 Underground works including mining or No No mining and tunneling is involved in tunneling? remaining expansion project activities 1.10 Reclamation works? No No reclamation works are envisaged in remaining expansion project activities 1.11 Dredging? No No dredging activity is involved in remaining expansion project activities 1.12 Offshore structures ? No No offshore structures are envisaged in remaining expansion project activities 1.13 Production and manufacturing Yes The detailed process description of all units processes? is attached as Annexure (b). 1.14 Facilities for storage of goods or Yes Raw materials such as iron ore, coke, materials? Limestone and Dolomite are being stored in open yards. Quartz and Manganese is being stored in closed shed. Fines generated will be stored in silos only. Hence there will not be any adverse impact on environment due to the proposed expansion. 1.15 Facilities for treatment or disposal of Yes There will be no effluent generation in the solid waste or liquid effluents? Sinter plant, Cement plant and Annealing furnaces, as closed circuit cooling system will be adopted.
Recommended publications
  • Territorial Jurisdiction of Criminal Courts
    TERRITORIAL JURISDICTION OF CRIMINAL COURTS I. JURISDICTION OF DISTRICT COURT AND ADDITIONAL DISTRICT COURTS AT CHITTOOR. S.No Court Name Name of Police Stations 1. Insecticides Act 1968 the Seed Act 1966 and Fertilizer (Control) Order 1985 (Special Court), entire Chittoor District. 2. Chittoor Mahila. 3. Chittoor Traffic. 4. Chittoor Taluk. 5. G.D Nellore. 6. N.R. Pet. 7. Palasamudram. 8. Puthalappattu . 9. Bangarupalem P.S. 10. DVC Cases (Spl. Court at Ctr). 11. C.C.S., 12. Chittoor, I Town. 13. Chittoor II Town P.S. 14. Gudipala. 15. Yadamari. i. District and Sessions Court, Chittoor. 16. Kanipakam. 17. Thavanampalle. 18. CBCID Cases. ii. I Additional District and Sessions Court, 19. Factories Act. Chittoor. 20. Food Adulteration Act and Drugs & Cosmetics Act. 21. Forest East and West, 1. Tirupati-APSEB, iii. VIII Additional District and Sessions Court , 22. Theft Squad Chittoor. 23. All Excise cases from Chittoor (Urban and Rural). 24. Bangarupalem. iv. IX Additional District and Sessions Court, 25. Yadamari. Chittoor. 26. Gudipala. 27. Thavanampalle. 28. Puthalapat. 29. G.D.Nellore. 30. Karvetinagaram. 31. Penumur. 32. Irala. 33. Pakala PS & Excise. 34. Kallur PS 35. Palamaner. 36. Gangavaram. 37. Palamaner Excise. 38. Palamaner FRO. 39. Baireddipalle . 40. V. Kota. 41. Kuppam. 42. Gudipalle. 43. Rallabudur. 44. Kuppam FRO. 45. Kuppam Excise. 46. Ramakuppam. II. JURISDICTION OF ADDITIONAL DISTRICT COURTS AT MADANAPALLE. S.No Court Name Name of Police Stations 1. Madanapalle Taluk. 2. Madanapalle I Town. 3. MadanapalleII Town, 4. Mudivedu. 5. Nimmanapalle. 6. B. Kothakota. 7. Madanapalle Excise. i. II Additional District & Sessions Court, 8. Madanapalle FRO Madanapalle 9.
    [Show full text]
  • Are You Suprised ?
    Chapter 2 Physical features 2.1 Geographical Disposition The Pennar (Somasila) – Palar - Cauvery (Grand Anicut) link canal off takes from the existing Somasila reservoir located across the Pennar River near Somasila village in Nellore district of Andhra Pradesh state. The link canal is proposed to pass through the Kaluvaya, Rapur, Dakkili, Venkatagiri mandals of Nellore district; Srikalahasti, Thottambedu, Pitchattur and Nagari mandals of Chittoor district of Andhra Pradesh state, Tiruttani taluk of Tiruvallur district; Arakonam taluk of Vellore district; Cheyyar and Vandavasi taluks of Tiruvannamalai district; Kancheepuram, Uthiramerur taluks of Kancheepuram district; Tindivanam, Gingee, Villupuram, Tirukoilur taluks of Villupuram district; Ulundurpettai, Vridhachalam, Tittagudi taluks of Cuddalore district; Udaiyarpalayam, Ariyalur taluk of Perambalur district; and Lalgudi taluk of Tiruchchirappalli district of Tamil Nadu state.The link canal alignment passes through Pennar basin, Streams between Pennar and Palar basins, Palar basin and streams between Palar and Cauvery basins. The link canal takes off from the right flank of Somasila dam with a full supply level of 95.420 m. and runs parallel on right side of the Kandaleru flood flow canal, upto RD 10 km. The canal generally runs in south direction till it out-falls into Grand Anicut across Cauvery River at RD 529.190 km. The major rivers that would be crossed by the canal are Swarnamukhi, Arani Ar, Nagari, Palar, Cheyyar, Ponnaiyar, and Vellar. The districts that would be benefited by the link canal through enroute irrigation are Nellore, Chittoor of Andhra Pradesh state and Tiruvallur, Kancheepuram, Vellore, Tiruvannamalai, Villupuram, Cuddalore districts of Tamil Nadu state and Pondicherry (U.T).
    [Show full text]
  • Data Base of Chittoor District
    DATA BASE OF CHITTOOR DISTRICT. The district is categorized under Southern Agro Climatic Zone of Andhra Pradesh based on soil type, rainfall and altitude. There are 66 mandals, 1540 revenue villages and 1394 Panchayats in the district. In dry farming tracts of the zone groundnut is the main crop where as under tanks, wells and bore wells double cropping is practiced with Rice. After Groundnut and Paddy, Sugarcane occupies 3rd place in Chittoor District. At present year, the area under maize and Sunflower is increasing gradually in the district. Information is being collected regularly pertaining to Area, Production and Productivity of Agriculture, Horticulture, Sericulture, Animal husbandry and other related disciplines, updated and computerized systematically CHITTOOR DISTRICT Agricultural lands of the district comprise Red Soils - 57% Sandy loams - 34% Mixed Soils - 9% LAND UTILIZATION PATTERN IN THE DISTRICT (Area in ha) S. Particulars Area No. 1. Forest 4,51,345 2. Barren & Uncultivable land 1,64,265 3. Land Put to Non-Agril. Uses 1,57,000 4. Permanent Pastures & Other grazing lands 36,521 5. Miscellaneous tree crops & Groves not included in net area sown. 25,173 6. Cultivable waste 39,512 7. Other fallow lands 1,26,287 8. Current fallows 1,61,759 9. Net area sown 3,55,674 10. Total Geographical area 14,98,778 11. Total cropped area 4,08,000 12. Area sown more than once 36,283 CHITTOOR DISTRICT FARMING SITUATIONS S. No Farming Situation Total No.of Area (HA) Mandals 1. Medium Irrigation (Canal) Red Soils 15,216 14 2. Minor Irrigation (Tanks) Red Soils 42,368 61 3.
    [Show full text]
  • S.No Name Designation Mobile Mail Id
    S.no Name Designation Mobile Mail id 1 SK.Razia begum District Revenue Officer 9491077003 [email protected] 2 kodhndarami Reddy Revenue Divisional officer 9491077005 [email protected] 3 M.A. Jaleen Asst.Director.surey and land records.chittor 9866169511 [email protected] 4 Umamaheswar Dist.supply Officer,Chittoor 8008301423 [email protected] 5 E.N.Jayaramulu Dist.Manager,Civil Supplies,Chittoor 7702003533 [email protected] 6 G.Sreenivasulu Divl..Forest Officer,Chittoor 9440810136 [email protected] 7 K.L.Prabhakar rao District Panchayath Officer 9491071325 [email protected] 8 Madhavilatha Project director ,DWMA,Chittoor 9100966779 [email protected] 9 B.Raviprakash Reddy Project director ,DRDA,Chittoor 7675854309 [email protected] 10 Dhananjaya Project director ,Housing,Chittoor 7093930110 [email protected] 11 G.A.Ravichandran Dist.Co-Operative Officer,Chittoor 9100109216 [email protected] 12 K.Samuyelu Dist.Educational Officer,Chittoor 9849909110 [email protected] 13 P.Chandramouli DVEO,Tirupathi 9440816009 [email protected] 14 K.Munnaiah RIO.Intermideate,Tirupathi 9848309000 [email protected] 15 Lavanya Dist.Malariya Officer,chittoor 9849902383 [email protected] 16 G.venkata Prasad Dist.Leprocy officer,Chittoor 9819902375 [email protected] 17 surekha Dist.Blindness control Officer,chittoor 8008553649 [email protected] 18 M.Eswara Rao Dist.tribal welfare officer, Chittoor 9490957021 [email protected] 19 B.Raviprakash Reddy A.D.Disabled welfare officer,Chittoor 9000013617 addwctr@gmail. 20 S.Sreenivaskumar E.D,S.C.Corporation
    [Show full text]
  • Executive Summary February 2020
    ANDHRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION LIMITED Industrial Park at South Block, Srikalahasthi Node Executive Summary February 2020 C1182901 L&T Infrastructure Engineering Limited RP010, Rev.C L&T Infrastructure Engineering Ltd. Client: Andhra Pradesh Industrial Infrastructure Corporation Limited APIIC, Vijayawada Project: Project No.: DPR VCIC CTR Node (SB) C1182901 Title: Document No.: Rev.: Executive Summary RP010 C This document is the property of L&T Infrastructure Engineering Ltd. and File path: must not be passed on to any person or body not authorised by us to receive it l:\roads\2018\c1182901 - dpr vcic ctr node (sb)\working\reports\010- nor be copied or otherwise made use of either in full or in part by such person or executive summary\english\rb-english\ex summary vcic-ctr (sb) body without our prior permission in writing. 12.02.2020.docx Notes: 1. Revision Details: C 11.02.2020 Fourth Submission SNV SAP TKSS B 18.01.2020 Third Submission SNV Sd/- SAP Sd/- TKSS Sd/- A 06.12.2019 Second Submission SNV Sd/- SAP Sd/- TKSS Sd/- AAP 0 25.11.2019 First Submission Sd/- SAP Sd/- TKSS Sd/- SNV Init. Sign. Init. Sign. Init. Sign. Rev. Date Details Prepared Checked Approved DPR VCIC CTR Node (SB) C1182901 Executive Summary RP010 rev. C TABLE OF CONTENTS 1 Introduction .....................................................................................................................................1 2 Project Site ......................................................................................................................................1
    [Show full text]
  • Government of India Ministry of Commerce & Industry Department for Promotion of Industry and Internal Trade
    GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY DEPARTMENT FOR PROMOTION OF INDUSTRY AND INTERNAL TRADE RAJYA SABHA UNSTARRED QUESTION NO. 542. TO BE ANSWERED ON FRIDAY, THE 5TH FEBRUARY, 2021 DEVELOPMENT OF INDUSTRIAL NODES IN ANDHRA PRADESH 542 SHRI G.V.L. NARASIMHA RAO: Will the Minister of Commerce and Industry be pleased to state: (a) the places identified for development as industrial nodes or cities in Andhra Pradesh under different Industrial Corridors; (b) the status of proposed industrial nodes in (a) above, their investment and employment potential; (c) the present status of Visakhapatnam-Chennai Industrial Corridor (VCIC) and its planned implementation schedule; (d) the potential of VCIC in industrial development of Andhra Pradesh; (e) the potential for employment generation when VCIC is fully developed; (f) the reasons for delay in sanctioning Yerpedu-Srikalahasti industrial node under VCIC; And (g) the fate of National Investment Manufacturing Zone at Chittoor? ANSWER THE MINISTER OF STATE IN THE MINISTRY OF COMMERCE & INDUSTRY (SHRI SOM PARKASH) (a): Based on the prioritization by the State Government, the places identified for development as industrial nodes or cities in Andhra Pradesh under different Industrial Corridors are as follow: S.No. Name of the Industrial Corridor Node identified in Andhra Pradesh 1 Visakhapatnam Chennai Industrial (1) Chittoor (Srikalahasti), Corridor (VCIC) (2) Vishakhapatnam and (3) Kadappa 2 Chennai Bengaluru Industrial Corridor Krishnapatnam (CBIC) 3 Hyderabad Bengaluru Industrial Orvakal Corridor (HBIC) (b) The status of above identified nodes is as follows: Chittoor (Srikalahasti) and Visakhapatnam (VCIC): Consultant for master planning and preliminary engineering for Chittoor (Srikalahasti) Node has been appointed by National Industrial Corridor Development Corporation Ltd.
    [Show full text]
  • Srikalahasti Assembly Andhra Pradesh Factbook
    Editor & Director Dr. R.K. Thukral Research Editor Dr. Shafeeq Rahman Compiled, Researched and Published by Datanet India Pvt. Ltd. D-100, 1st Floor, Okhla Industrial Area, Phase-I, New Delhi- 110020. Ph.: 91-11- 43580781, 26810964-65-66 Email : [email protected] Website : www.electionsinindia.com Online Book Store : www.datanetindia-ebooks.com Report No. : AFB/AP-168-0118 ISBN : 978-93-5293-018-0 First Edition : January, 2018 Third Updated Edition : June, 2019 Price : Rs. 11500/- US$ 310 © Datanet India Pvt. Ltd. All rights reserved. No part of this book may be reproduced, stored in a retrieval system or transmitted in any form or by any means, mechanical photocopying, photographing, scanning, recording or otherwise without the prior written permission of the publisher. Please refer to Disclaimer at page no. 175 for the use of this publication. Printed in India No. Particulars Page No. Introduction 1 Assembly Constituency at a Glance | Features of Assembly as per 1-2 Delimitation Commission of India (2008) Location and Political Maps 2 Location Map | Boundaries of Assembly Constituency in District | Boundaries 3-9 of Assembly Constituency under Parliamentary Constituency | Town & Village-wise Winner Parties- 2014-PE, 2014-AE, 2009-PE and 2009-AE Administrative Setup 3 District | Sub-district | Towns | Villages | Inhabited Villages | Uninhabited 10-18 Villages | Village Panchayat | Intermediate Panchayat Demographics 4 Population | Households | Rural/Urban Population | Towns and Villages by 19-20 Population Size | Sex Ratio
    [Show full text]
  • Rachagunneri, Mandal Yerpedu & Srikalahasthi, District Chittoor
    Monitoring Report Sub (i): Environmental Clearance to Expansion of Integrated Steel Complex (Pig Iron Plant (1,75,000 to 5,25,000 TPA), Ductile Iron Spun Pipes Plant (1,20,000 to 4,00,000 TPA), Slag Cement (90,000 to 3,90,000 TPA), Coke Oven Plant (1,62,000 to 4,62,000 TPA) and Captive Power Plant (14.5 MW to 40.5 MW) at Village Rachagunneri, Mandal Srikalahasti, District Chittoor, Andhra Pradesh by Srikalahasthi Pipes Ltd. (Formerly Lanco Industries Ltd.) vide MoEF's EC letter No.J-110111914/2007-IA.II (I) dated 2Sth July, 2008. Sub (ii): Environmental Clearance to Expansion of the Ductile Iron Pipe Plant b installing 4xlOO TPD Sponge Iron (1,30,000 TPA) Steel Making facility (1,25,000 TPA), 4X9 MVA Ferro Alloy (Fe-Si: 25,000 TPA or Si-Mn: 60,000 TPA or Fe-Mn: 75,000 TPA) along with 12 MW Captive Power Plant (8 MW WHRB and 4 MW FBC) at Villages Merlapaka & Rachagunneri, Mandal Yerpedu & Srikalahasthi, District Chittoor, Andhra Pradesh by Srikalahasthi Pipes Ltd. (Formerly Lanco Industries Ltd.) vide MoEF's EC letter No..J- 11011/1S8/2011-IA.II (I) dated 11thJanuary, 2013. Date of site inspection: 24th &2Sth November, 2016 PART I (In respect of two EC's mentioned above) DATA SHEET 1 Project Type Industry River valley / Mining / Industry / Thermal / Nuclear / Other Specify 2 Name of the project (i). Expansion of Integrated Steel Complex (Pig Iron Plant (1,75,000 to 5,25,000 TPA), Ductile Iron Spun Pipes Plant (1,20,000 to 4,00,000 TPA), Slag Cement (90,000 to 3,90,000 TPA), Coke Oven Plant (1,62,000 to 4,62,000 TPA) and Captive Power Plant (14.5 MW to 40.5 MW).
    [Show full text]
  • Office of the Development Commissioner, Sri City SEZ (Multi Product), Project Office, N
    Office of the Development Commissioner, Sri City SEZ (Multi Product), Project Office, N. H. 5, Tada – 524 401, Nellore District, A.P. MINUTES OF THE MEETING OF THE UNIT APPROVAL COMMITTEE FOR M/S. SRI CITY (P) LIMITED, MULTI PRODUCT SEZ. The Meeting of the Unit Approval Committee was held on 10.09.2014 at 02.30 PM at Business Centre, Sri City SEZ, Satyavedu Mandal, Chittoor District, A.P. Pin – 517 588. Members Present: 1) Shri V. Murugesan, ITS, Asst. DGFT., O/o the Addl. DGFT, South Zone, Shastri Bhavan, 4th Floor(Annexe), No. 26, Haddows Road, Chennai – 600 006. 2) Shri A. Ramalingeswara Raju, General Manager, District Industries Centre, Industries Department, Govt. of A. P., Chittoor District, Chittoor-517001 A.P. 3) Shri V.Madan Mohana Reddy, Dy. Environmental Engineer, A.P.P.C.B., Regl. Office, Narasimha Teertham Road, Tirupathi-517501. 4) Shri A. Gnanendra Prasad, Asst. Labour Officer, Govt. of A.P., Department of Labour, Srikalahasti, Chittoor District. A.P. 5) Shri K. V. Ramana, Specified Officer, Sri City SEZ, 6) Shri R. Nagarajan, C. F. O., M/s. Sri City Pvt. Ltd., (Rep. of the Developer) Shri A. K. Choudhary, ITS, Development Commissioner, Sri City SEZ (Multi Product) and Chairperson, Unit Approval Committee welcomed the Members and appraised them briefly about the proposals placed before the Committee for their consideration. The items listed in the Agenda and Supplementary Agenda were discussed and following decisions were taken. AGENDA Item No. 1: Ratification of the Minutes of the Meeting of the Unit Approval Committee held on 16.07.2014.
    [Show full text]
  • Meeseva Photos Quality-Aponline
    Authorized Sl.No Address E Mail Phone No Quality District Agent Id Opp:Indian Bank,Kallur 1 USDP-CTCO [email protected] 9912048036 Good Road,Sodam,Chittoor-517123 Chittoor Akula Bazaar Street, Ramasamudram, [email protected] 2 APO-CTR-KER 9441330274 Good Chittoor-517417 .in Chittoor H.No.6-122-5,ThimmareddY 3 USDP-CTSO [email protected] 9441574209 Good Complex,Kalikiri,Chittoor-517234 Chittoor H.No.1-292, Main Raod, Kalakada, 4 USDP-CTSC [email protected] 9966940669 Good Chittoor-517236 Chittoor D.No: 27-47-15-3, Gokul Circle, padmaja.mahesh@gmai 5 USDP-CTMM 9866767928 Good Punganur,Chittoor-517247 l.com Chittoor Raja ReddY Complex, Opp: SBI, 6 USDP-CTJA [email protected] 9963165353 Good Polakala(V&P), Irala, Chittoor-517130 Chittoor D.No: 4-127/1, Bazaar Street, [email protected] 7 USDP-CTRA 9948947926 Good Rompichrela, Chittoor-517192 m Chittoor Near Bus Stand, Gangadhara Nellore, gnpreddY_rsdp_ctr@Ya 8 APO-CTR-GNP 9985192450 Good Chittoor-517125 hoo.co.in Chittoor C-64/4, MBT Road, Angallu, [email protected] 9 APO-CTR-ESM 9441573950 Good Kurabalakota Mandal, Chittoor-517325 o.in Chittoor Patrapalli [email protected] 10 USDP-CTNN 9052852280 Good Thanda,mittachittavaripalli,pungnur m Chittoor S/o G Sreenivasulu, Post Office Street, [email protected] 11 USDP-CTOS Rallabudugur(V&P), Shanthipuram 9550986909 Good om Mandal., Chittor-517423 Chittoor D.No: 8-119, Main Bazaar, Main Road, 12 USDP-CTRR [email protected] 9701594124 Good PeddamandYam, Chittoor-517297 Chittoor 13 USDP-CTSN K V Palli, Chitoor-517213 [email protected] 9052092803 Good Chittoor Shop No: 5, B P K N Complex, M B T venkatchalla_5@Yahoo.
    [Show full text]
  • Introduction
    INTRODUCTION Srikalahasti is holy town and municipality in chittoor district of Andrapradesh. It is located besides the river swarnamukhi. It is present 38 kms distance from tirupati which had world famous Sri venkateswara swamy temple. It is covered under the Tirupati Urban Develoment Authority(TUDA). It is also called as Dakshina kailasam and Dakhshina kaasi. The total population of srikalahasti town is nearly 80056 as per 2011. It became municipality from 1958 and constitution from since 1978. It occupaid around 24 square kilometers. In Srikalahasti the lord shiva present as a Sri kalahastheeswara swamy and devi parvathi as Sri Gnanaprasunambika devi.This temple was famous for Rahu-kethu pooja. Several devotes comes from all around the world and done this pooja. This town was called as srikalahasti because the presence of Sri kalahasthiswara swamy. There is a story present behind this name. The three animals SRI(spider), KALA(snake),HASTI(elephant) praise the lord shiva and got the mukthi. This town is named as srikalahasti. It is one of the vayulingam from astalingas.God shiva presented here vayulingam. It means the air which is one of the panchaboothas. Srikalahasti is very famous for handcrafts like kalamkari. The kalamkari works only present two places of andrapradesh.those are Srikalahasti,and machilipatnam. Most of the people said that the birth place for kalamkari art. It is very near to top cities Chennai,Bengalore,and hyderebad. Climate Srikalahasti is elevated 68 mtr from the sea level.It was 45 kms distance from thesea Bay of Bengal. The average temparature is 28 oC.The lowest temparature is 24 oC and heighest is 34 oC.
    [Show full text]
  • TIRUPATI CHITTOOR DISTRICT- ANDHRA PRADESH. E-Procurement Tender Notice No:5/DM/2014-15/T.U.D.A
    TIRUPATI URBAN DEVELOPMENT AUTHORITY: TIRUPATI CHITTOOR DISTRICT- ANDHRA PRADESH. e-Procurement Tender Notice No:5/DM/2014-15/T.U.D.A. Dt: 6.12.2014. e-procurement Tender Notice For further details logon to https://www.tender.eprocurement.gov.in and bidders can download bid documents on / after bid document download start date or contact the Executive Engineer, TUDA, Tirupati for any clarification / details of the Tender Notice Estimate Sl. EMD in Time for Eligibility of IFB No. Name of the Work Amount Rs. No. Rs. Ps. Completion Contractors In Lakhs (1) (2) (3) (4) (5) (6) (7) 1 5 (1)/DM/ Providing Chain Link Mesh Fencing 23.20 23,200/- 4 Months Class IV & 2014-15/ Alround the site in Sy.No:185/P above of TUDA (Ayyalanadu Tank) of Srikalahasti Town Civil Contractors 5 (2)/DM/ Providing Pathway (walking track) along 12.40 12,400/- 3 Months Class IV & 2 * 2014-15/ the compound wall in Park in Sy.No:215 above of TUDA at Panagal in Srikalahasti Town Civil Contractors 3 5 (3)/DM/ Construction of Compound Wall on North 5.00 5,000/- 3 Months Class V & 2014-15/ Side (front side) for Park in Sy.No:215 at above of TUDA Panagal in Srikalahasti Town Civil Contractors 4 5 (4)/DM/ Construction of Balance Compound Wall 5.00 5,000/- 3 Months Class V & 2014-15/ on Western Side in Sy.No:185/29 above of TUDA (Ayyalanadu Tank) of Srikalahasti Town Civil Contractors 5 5 (5)/DM/ Providing BT Road from Kadirimangalam 24.80 24,800/- 4 Months Class IV & 2014-15/ Village to Arakkonam Road in above of TUDA Kadirimangalam G.P.
    [Show full text]