Srikalahasthi Pipes Limited

Srikalahasthi Pipes Limited

Updated & Revised Form – I Submitted to MoEF, New Delhi for SRIKALAHASTHI PIPES LIMITED (Formerly Lanco Industries Ltd.) at Rachagunnari Village of Srikalahasti Mandal, Merlapaka & Chindepalli Village of Yerpedu Mandal, Chittoor District, Andhra Pradesh [REQUEST FOR EXTENSION OF VALIDITY & AMENDMENT IN ENVIRONMENTAL CLEARANCE ISSUED VIDE NO. J-11011/914/2007-IA II (I) dated 25-07-2008] Prepared by: ISO 9001: 2008 Certified Accredited by NABET - QCI 6-3-652 | Flat # 7-3 | Dhruvatara Apartments | Amrutha Estates | Erramanjil | Somajiguda | Hyderabad- 500082 APPENDIX I (See paragraph – 6) FORM 1 Sr. No (I) BASIC INFORMATION 1. Name of the project LANCO INDUSTRIES LTD 2. S. No. in the schedule 1 (d) and 3 (a) & (b) 3. Proposed capacity/area/length/tonnage to Name of the product Proposed expansion be handled/command area/lease capacity area/number of wells to be drilled Pig iron 3,50,000 TPA Ductile iron Spun pipes 2,80,000 TPA Slag cement 3,00,000 TPA Coke oven plant 3,00,000 TPA Captive power generation 20 MW & 6.0 MW 4. New/Expansion/Modernization The present proposal is to request the Ministry for Extension of validity of the Environmental Clearance to complete the unimplemented portion of the Expansion project & Amendment in Environmental Clearance. 5. Existing capacity/Area etc. Name of the product Existing capacity Pig iron 1,75,000 TPA Ductile iron Spun pipes 1,20,000 TPA Slag cement 90,000 TPA Coke oven plant 1,62,000 TPA Captive power generation 12 MW & 2.5 MW Status of the Expansion project The following are the capacities after expansion for which Environmental clearance was obtained vide order No. J-11011 / 914 / 2007 – IA II (I) dated 25-07-2008 S.NO. NAME OF THE EXISTING PROPOSED TOTAL CAPACITY PRODUCT CAPACITY EXPANSION AFTER PROPOSED CAPACITY EXPANSION 1. Ductile Iron Pipes 1,20,000 TPA 2,80,000 TPA 4,00,000 TPA 2. Pig Iron 1,75,000 TPA 3,50,000 TPA 5,25,000 TPA 3. LAM Coke 1,62,000 TPA 3,00,000 TPA 4,62,000 TPA Page | 1 4. Captive Power 12.0 MW 20.0 MW & 6.0 40.5 MW generation & 2.5 MW MW 5. Slag Cement 90,000TPA 3,00,000 TPA 3,90,000 TPA The following is the implementation status of the expansion project S.No. NAME OF EXISTING PROPOSED TOTAL CAPACITY STATUS OF THE CAPACITY EXPANSION AFTER IMPLEMENTA PRODUCT CAPACITY PROPOSED TION EXPANSION 1. Ductile Iron 1,20,000 TPA 2,80,000 TPA 4,00,000 TPA 1,05,000 has Pipes been implemented 2. Pig Iron 1,75,000 TPA 3,50,000 TPA 5,25,000 TPA 1,00,000 TPA has been implemented 3. LAM Coke 1,62,000 TPA 3,00,000 TPA 4,62,000 TPA 75,000 has been implemented 4. Captive 12.0 MW 20.0 MW & 6.0 40.5 MW Pending Power & 2.5 MW MW generation 5. Slag Cement 90,000TPA 3,00,000 TPA 3,90,000 TPA Pending We also would like to bring to your kind notice that, due to improvement in market scenario for some of our products, we are planning to implement some of the unimplemented units which could not be taken up during the validity period of Environmental clearance. Our bankers are also insisting for extension of Environmental Clearance certificate for sanctioning of loan for those units. Amendment in Environment clearance Amendment in treatment system for effluent generated is sought as per Annexure (a) 6. Category of project i.e. ‘A’ or ‘B’. A 7. Does it attract the general condition? If yes, No please specify. Page | 2 8. Does it attract the specific condition? If yes, No please specify. 9. Location Plot/Survey/Khasra No. 274,279/1,281 etc. Villages Rachagunnaeri, Merlapaka & Chindepalli Tehsil Srikalahasti & Yerpedu Mandal District Chittoor State Andhra Pradesh 10. Nearest railway station/airport along with Railway Station : Rachagunneri - 0.5 Km distance in kms. Airport : Renigunta (15.0 Kms.) 11. Nearest Town, city, District Headquarters Nearest Town: Srikalahasti (7.3 Kms) along with distance in Nearest City: Tirupathi. Kms District Head quarter : Tirupathi 12. Village Panchayats,Zilla Parishad, Municipal Village panchayat : Rachagunneri, Merlapka & corporation, Local body(complete postal Chindepalli addresses with telephone nos. to be given) Zilla Parishad : Srikalahasti Municipal Corporation: Tirupathi 13. Name of the applicant Srikalahasthi Pipes Ltd. (formerly Lanco Industries Ltd. ) 14. Registered Address Rachagunneri (V) & (PO) Srikalahasti (Mandal), Chittor District, Andhra Pradesh 15. Address for correspondence: Name M. R. RAMESH BAPU Designation(owner/partner/CEO) Sr.General Manager (Business Development) Address Rachagunneri (V) & (PO) Srikalahasti (Mandal), Chittor District, Andhra Pradesh Pin code 517641 E-Mail [email protected] Telephone No. 08578-286650-55 Fax No. 08578-286657 16. Details of Alternative sites examined, if Present proposal is request for extension of Page | 3 any. Location these sites should be shown validity of Environmental clearance & on a topo sheet Amendment in Environmental Clearance only. 17. Interlinked Projects No 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves No approval/clearance under; if yes, details of the same and their status to be given. (a) The Forest (conservation)Act,1980 (b) The Wildlife (protection)Act,1972 (c) The C.R.Z Notification, 1991? 22. Whether there is any a government No order/policy relevant/relating to the site? 23. Forest land involved(hectares) Nil 24. Whether there is any litigation pending No litigation is pending against the project and / against the project and/or land in which or land in which the expansion project is propose the project is propose to be set up? to be set up (a)Name of the court (b)Case No. (c) Orders/directions of the court, if any and its relevance with the proposed project. Page | 4 (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities S.No. Information/Checklist confirmation Yes/No /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land Yes Present use of land is Industrial. Existing use, land cover or topography including plant is already under operation and part of increase in intensity of land use (with the expansion project has been respect to local land use plan) implemented and is under operation. Some topographical changes have occurred due to the excavations, construction activities pertaining to the existing and expansion units under implementation. Hence there is no adverse significant impact due to the change in land use pattern due to the expansion project activities. 1.2 Clearance of existing land, vegetation No Part of the expansion project was and buildings? implemented in the vacant area available in the existing plant premises. Unimplemented expansion project activities will be taken up in the vacant area available. However as a part of greenbelt development, 85 acres of Greenbelt (including expansion project) has been developed in the Plant premises. 1.3 Creation of new land uses? Yes Present use of land is already converted for the industrial purpose. 1.4 Pre-construction investigations e.g. No Investigations have been carried out for soil bore houses, soil testing? and water in the area where construction of the expansion project is planned 1.5 Construction works? Yes Construction activities have been completed only part of the expansion project planned. Keeping in view of improvement in market scenario for some of our products, we are planning to take up construction activities pertaining to unimplemented units after obtaining extension of Environmental Clearance. Page | 5 All necessary precautions have been taken to prevent dust pollution during construction of existing project and similar practice will be carried out during construction of unimplemented expansion project activities. 1.6 Demolition works? No No demolition work is involved for implementing the remaining expansion project activities as it will be taken up in the vacant area available in the site premises 1.7 Temporary sites used for construction No Construction workers will be taken from works or housing of construction local areas and from other areas. Temporary workers? Labor colony housing will be envisaged for non-local construction workers 1.8 Above ground buildings, structures or Yes Most of the structures in remaining earthworks including linear structures, expansion project activities will be above cut and fill or excavations the ground. However excavations are involved for foundations in construction and cut will be used for filling within the site. 1.9 Underground works including mining or No No mining and tunneling is involved in tunneling? remaining expansion project activities 1.10 Reclamation works? No No reclamation works are envisaged in remaining expansion project activities 1.11 Dredging? No No dredging activity is involved in remaining expansion project activities 1.12 Offshore structures ? No No offshore structures are envisaged in remaining expansion project activities 1.13 Production and manufacturing Yes The detailed process description of all units processes? is attached as Annexure (b). 1.14 Facilities for storage of goods or Yes Raw materials such as iron ore, coke, materials? Limestone and Dolomite are being stored in open yards. Quartz and Manganese is being stored in closed shed. Fines generated will be stored in silos only. Hence there will not be any adverse impact on environment due to the proposed expansion. 1.15 Facilities for treatment or disposal of Yes There will be no effluent generation in the solid waste or liquid effluents? Sinter plant, Cement plant and Annealing furnaces, as closed circuit cooling system will be adopted.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    33 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us