PT. PLN REGION HAS FIVE BRANCHES (LOCATED IN PAPUA PROVINCE & PROVINCE),: 1. 2. BIAK 3. 4. MERAUKE 5. 1. JAYAPURA BRANCH CONSIST OF : Jayapura Municipality, Jayapura , , Sinagma & Walesi Regency, , , .

2. BIAK BRANCH CONSIST OF : Biak Regency, Yapen Waropen Regency. 3. SORONG BRANCH CONSIST OF : Sorong Municipality, , Fak-Fak Regency, Werba Regency, Regency. 4. MERAUKE BRANCH CONSIST OF : . 5. MANOKWARI BRANCH CONSIST OF : , Regency, & . 1. JAYAPURA BRANCH Installed Capacity = 113,252 kW Capable Capacity = 67.006 kW Peak Load = 59,355 MW Energy Production = 345,392.326 kWh Electrification Ratio = 26.94 % 2. BIAK BRANCH Installed Capacity = 20,925 kW Capable Capacity = 13.515 kW Peak Load = 11,981 kW Energy Production = 69,668.611 kWh Electrification Ratio = 44,22 % 3. SORONG BRANCH Installed Capacity = 42,116 kW Capable Capacity = 28.342 kW Peak Load = 25,921 kW Energy Production = 159,775.738 kWh Electrification Ratio = 40.22 % 4. MERAUKE BRANCH Installed Capacity = 25,693 kW Capable Capacity = 12.979 kW Peak Load = 11,078 kW Energy Production = 62,465.423 kWh Electrification Ratio = 29.07 % 5. MANOKWARI BRANCH Installed Capacity = 38,842 MW Capable Capacity = 22.161 MW Peak Load = 16,853 MW Energy Production = 105,541.868 kWh Electrification Ratio = 19.57 %

TOTAL ELECTRICITY GENERATION Installed Capacity = 240,827 kW Capable Capacity = 144.003 kW Peak Load = 125,188 kW Energy Production = 742,843.966 kWh Electrification Ratio = 28.94 % INSTALLED CAPACITY (240,827 kW) Jayapura Biak Sorong ) Merauke Manokwari

16% 11% 47%

17%

9% CAPABLE CAPACITY (144,003 kW) Jayapura Biak Sorong Merauke Manokwari

15%

9% 47%

20%

9% PEAK LOAD (125,188 kW) Jayapura Biak Sorong Merauke Manokwari

13% 9% 47%

21%

10% ENERGY PRODUCTION (742,843,966 kWh)

Jayapura Biak Sorong Merauke Manokwari

14% 8% 47%

22%

9% ELECTRIFICATION RATIO (28.94 %) Jayapura Biak Sorong Merauke Manokwari

12% 17%

18%

28%

25% 1. Social = 3,369,170 kWh 2. Household = 45,893,113 kWh 3. Commercial = 34,927,178 kWh 4. Industry = 379,950 kWh 5. Government Office = 9,527,598 kWh 6. Street Lighting = 2, 264,294 kWh

Total = 96,361,303 kWh ENERGY CONSUMER GROUPS JAYAPURA MUNICIPALITY IN 2008 Social Household Commercial Industry Government Street Lighting 2% 4% 0% 10%

48% 36% 1. Social = 3,959,405 kWh 2. House Hold = 47,981,769 kWh 3. Commercial = 39,505,553 kWh 4. Industry = 396,710 kWh 5. Government Office = 11,293,504 kWh 6. Street Lighting = 2, 102,696 kWh

Total = 103,196,941 kWh ENERGY CONSUMER GROUPS JAYAPURA MUNICIPALITY IN 2009 Social Household Commercial Industry Government Street Lighting 2% 0% 11% 4%

46% 37% I. GOAL :

“Local EnergyAutonomy that’s Environment Friendly go in the direction of Bright Papua” II. PROGRAMS :

1. Zero Fossil Emision 2. Knowledge and Skill Upgrading Persons In charge on Energy Field 3. International Cooperation in Energy Field 4. Urumuka Hydro Power Plant 300 MW 6. Energy Pilot Project for Autonomous Village 7. 3,000 Solar Power Plants for Autonomous Villages 8. Local Energy Regulations 9. Local Energy Council 10. Capacity Building of Energy Field THANK YOU