Calgary Board of Education Energy Efficiency Project

Offset Project Report for BOARD OF EDUCATION ENERGY EFFICIENCY PROJECT

ECI, Offset Project Report - 1

Calgary Board of Education Energy Efficiency Project

Offset Project Report for CALGARY BOARD OF EDUCATION ENERGY EFFICIENCY PROJECT

PROJECT DOCUMENT INFORMATION

Project Title: Offset Project Report for CALGARY BOARD OF EDUCATION ENERGY EFFICIENCY PROJECT

Date: December 19, 2011 Reporting Period: August 1st, 2003 – July 31st, 2011

PROJECT SCOPE AND PROJECT DESCRIPTION

The project title is Calgary Board of Education Energy Efficiency Project

The project’s purpose and objective(s) are: The purpose and objective of this project is to identify Offsets attributable to the project activities and either:

a. Forward sell (Ex-Ante) the potential Offsets and at later date, Verify and settle the difference, or b. Verify the Offsets and sell them (Ex-Post) on the spot market, or c. some combination of a. and b. above.

The Project Proponent, ECI, will distribute funds resulting from the sale of the Offsets to project participants in accordance with written agreements.

Date when the project began: The project start date is 1 August, 2003. The project is the result of actions taken on or after 1 January, 2002.

Expected lifetime of the project The expected lifetime of this project is eight years.

Credit start date The start date for credit generation is planned to be 1 August, 2003.

Credit duration period The credit duration period is eight years from 1 August, 2003 through 31 July, 2011. Although some Buildings are expected to enter the project at significantly different times during the eight year period, the end date for all Buildings in this project is the same.

ECI, Offset Project Report - 2 December 19 - 2011

Calgary Board of Education Energy Efficiency Project

Actual emissions reductions This project has resulted in the reduction of 90,198 tCO2e.

Quantification Protocol The Project Proponent elected to use the Specified Gas Emitters Regulation, Quantification Protocol for Energy Efficiency in Commercial and Institutional Buildings, Version 1.0, quantification Option C – Whole Facility, Simple Approach, published October 2010, for this project.

Protocol Justification This is an Emission Reductions (ER) Project that upgrades numerous static fossil fuel burning systems and numerous electrical systems in Calgary Board of Education School Buildings. This project includes a number of emission reduction technologies of varying size that are difficult to measure on an individual basis but whose overall effect can be measured with accuracy at the building electrical and gas utility meters. This has lead the proponent to select the Quantification Protocol for Energy Efficiency in Commercial and Institutional Buildings, quantification Option C, Whole Facility, Simple Approach as it catered to the multitude of technologies implemented by this project in a total manner rather than on an individually metered basis which was considered uneconomical. Option C, the whole building approach, offers an economical, measureable, complete, consistent, accurate, transparent and conservative methodology to record the fossil fuel and electricity energy savings attributable to the technology upgrades that could be used to determine the Emission Reduction Offsets.

Had these project technologies not been installed there would not have been a decrease in the use of electricity and fossil fuels resulting in emission reductions. The decrease in emissions is additional to what would have happened in absence of this project.

ECI, Offset Project Report - 3 December 19 - 2011

Calgary Board of Education Energy Efficiency Project

Legal land description of the project or the unique latitude and longitude A list of the locations of the specific schools participating in this Project, by address and legal land description, is provided in Annex A to this report.

Ownership The Project Developer is able to demonstrate a clear, legal claim of the greenhouse gas reductions achieved from the offset project by way of Legal Land Titles and/or Lease Agreements in those instances where school buildings were located on land not owned by the Calgary Board of Education.

Reporting and verification details The Project Proponent, by way of this Offset Project Report, is confirming that the project has been completed as of July 31, 2011.

The Project Proponent has selected an accredited Verifier who has demonstrated:

a) competence in the area being verified b) independence c) third party status d) is willing to sign a statement of non-conflict and e) meets additional requirements that may be imposed by the AOS at the time of verification.

Project activity This project meets the eligibility criteria for the Offset System due to the following facts:

a. This project occurs and the offsets are generated in Calgary, Alberta where the Calgary Board of Education operates its school facilities. b. The offsets generated result from actions not required by law, are beyond business as usual practices and are beyond sector common practices at the time of the project. c. The offsets generated result from actions taken after 1 January, 2002 and the offsets generated occur on or after January 1, 2002 because the equipment that generated the offsets was not installed until after January 1st 2002. d. The offsets generated were real because:

 they were measured from metered data,

ECI, Offset Project Report - 4 December 19 - 2011

Calgary Board of Education Energy Efficiency Project

 they were demonstrable and quantifiable since they could be determined using techniques provided in the protocol,  they were verifiable since the techniques, and data could be recorded and reviewed by a competent trained third party.

e. The offsets have clear ownership outlined in a legally binding contractual document signed by all project participants. f. The offsets are counted once for compliance purposes. g. The offsets are implemented according to a Government of Alberta Approved quantification protocol as identified earlier in this document. h. The offsets shall be registered on the Alberta Emissions Offset Registry. i. The offsets generated as a result of this project plans shall be verified by a verification entity that meets the requirement for a third party auditor under section 18 of the Specified Gas Emitters Regulation and the verifier shall be required to issue statements supporting their eligibility under this criteria.

PROJECT CONTACT INFORMATION

Project Developer Environmental Compliance Inc Contact Information Don Diduck President #102, 9333 – 47 Street Alberta T6B 2R7 Canada Phone: 780 910 8639 Fax: 780 468 4181 Email: [email protected] Website: www.offsetcompliance.com Authorized Project MECH and ASSOCIATES Corporation Contact Andre MECH and ASSOCIATES Principal One First Canadian Place Suite 2510 100 King St W M5X 1A4 Phone: 416 427 7616 Fax: 905 842 9139

ECI, Offset Project Report - 5 December 19 - 2011

Calgary Board of Education Energy Efficiency Project

Email: [email protected] Website: www.mechandassociates.com Verifier Williams Engineering Ltd Julia Beresford Sustainability Lead 10010-100 Street Edmonton Alberta T5J 0N3 Phone: 780 424 2393 Fax: 780 425 1520 Email: [email protected] Website: www.williamsengineering.com

PROJECT DESCRIPTION AND LOCATION

The Calgary Board of Education Energy Efficiency Project is an energy efficiency emission reduction project owned by Environmental Compliance Inc. (ECI). Contracts for the assignment and transfer of emission reduction credits give ECI the legal right and title to the emission reduction credits from the Calgary Board of Education. Proceeds from the sale of emission reduction credits resulting from this project shall be shared amongst participating parties in accordance with contractual agreements. The project is located in Calgary, Alberta, Canada. The specific locations of school buildings in which the energy efficiency upgrades were carried out was provided in Annex A to the Offset Project Plan.

This project achieved GHG Emission Reductions through the application of two classes of technologies that decreased the schools consumption of fossil fuels and decreased the schools use of electricity. Technologies used to decrease the schools consumption of fossil fuels were the upgrading heating systems, reprogramming system controllers, the resealing building envelopes and the upgrading water heating systems. Technologies used to decrease the schools consumption of electricity consisted of the installation of more efficient lighting, motion sensors, programmable controllers and the use of light sensors.

The project used the IPMVP “Whole Building” approach as outlined in the AOS Quantification Protocol for Energy Efficiency in Commercial and Institutional Buildings, Version 1.0, dated October 2010, Option C, Simple Approach to develop baselines and project improvements. Specifics are presented in the Offset Project Plan. Emission Reduction Offsets generated in this manner were multiplied by a factor of 0.9 to comply with the “Whole Building” approach methodology selected.

ECI, Offset Project Report - 6 December 19 - 2011

Calgary Board of Education Energy Efficiency Project

Baseline information was collected using existing system data and utility bills for a consecutive 12 month period in accordance with IPMVP1 guidelines. Baselines were normalized for degree heating days, were presented and discussed in the Offset Project Plan.

Improvements to electrical and fossil fuel burning systems were implemented in the schools after the baseline period and prior to the project start period on an individual school basis. Some schools had not even entered the baseline phase when others had already entered the project phase. This was done so that the baseline was in the period just prior to the project start date.

Project information was collected using utility bills from August 1st, 2003 to July 31st, 2011 in accordance with IPMVP guidelines. Project information was normalized to degree heating days.

This project met the principles of relevance, completeness, consistency, accuracy, transparency and conservativeness.

GHG sources for this project are relevant. They were selected using criteria and guidance from the AOS Commercial and Institutional Buildings Energy Efficiency Protocol (CIBEE), Version 1, Dated October 2010 and ISO 14064-Part 2 and the International Performance Measurement and Verification Protocol (IPMVP). In addition, GHG sources selected through the application of these criteria and guidance were reviewed by the project team who have demonstrated competence in emission reduction project work. The project team determined that the GHG sources are intuitively relevant adding that:

There are no GHG sinks or GHG reservoirs in this project. This is consistent with historical energy efficiency projects.

Data used for this project originated from utility meters. This data is relevant because it was gathered in accordance with specific guidance provided by Option 3 of the CIBEE Protocol and IPMVP which states that utility meter data is considered 100% accurate and can be used.

The CIBEE methodology refers to the use of IPMVP and it is consistent with the project, energy efficiency measures made to Canadian schools which are classified as institutional buildings.

There were no project specific deviations from the selected CIBEE methodology, Option 3, Whole Building Approach.

All relevant GHG SSRs were properly quantified and included within the project documentation. Proper justification and rationale was provided for all relevant GHG

1 IPMVP is the International Performance Measurement and Verification Protocol recommended in the AOS Quantification Protocol for Energy Efficiency in Commercial and Institutional Buildings Version 1.0 October 2010.

ECI, Offset Project Report - 7 December 19 - 2011

Calgary Board of Education Energy Efficiency Project emissions and removals as per the methodology used for the project. All elements of the CIBEE methodology, Option C, Whole Building Approach were applicable to the project and used in the project.

This project is consistent. The consistently applied the methodology during all phases of the project:

 To gather and assess baseline data during the baseline phase;  To gather and assess project data during the project phase;  To review and analyze baseline and project data during the analysis phase; and,  To determine routine adjustments, non-routine adjustments and non- surplus adjustments.

Consistency allowed the Project Proponent to create meaningful comparisons of the data with a high level of accuracy thus increasing the accuracy of the derived Emission Reductions. Data analysis tools were used to normalize the data in accordance with the methodology for, degree heating days, to ensure that accurate comparisons were made between baseline and project scenarios. Non-routine and non-surplus adjustments to the baseline and project scenarios were considered in accordance with the CIBEE Protocol and IPMVP guidelines thereby enhancing consistency. The use of these techniques determined that the level of service provided by the baseline and project scenario was consistent and equivalent.

This project is accurate. Bias and uncertainties inherent in this project were reduced as far as practical through the application of the CIBEE Protocol, Option 3, Whole Building Approach and IPMVP techniques. Option 3 Whole Building Approach makes use of utility meter data. IPMVP states clearly that utility meter data is considered 100% accurate.

This project is transparent. The project proponent disclosed and was open and transparent about all sources of information, calculations, data, and assumptions in the GHG Report and the GHG assertion contained therein. This provided intended users with sufficient information to make decisions with reasonable confidence. Project documentation included references to data sources and calculation methodology to allow for understanding and/or reproduction of the calculations by the intended user. Information sources, calculations, data, and assumptions used in this GHG Report shall be retained on file for a period of seven years following this GHG Project as outlined further on in this report.

GHG emission reductions derived from this project are conservative and not over estimated for the following reasons:

 Emission reductions developed from this project were derived from application of the approved CIBEE Protocol and the use of approved IPMVP techniques;  Emission reductions were not counted twice;  Emission reductions that were difficult to measure but intuitively existed, such as emission reductions related to reduced maintenance activities or emission

ECI, Offset Project Report - 8 December 19 - 2011

Calgary Board of Education Energy Efficiency Project

reductions created from a mid-month commissioning, are not counted but are retired to the environment as positive leakage;  Emission reductions determined from this project have been multiplied by a factor of 0.9 to provide an additional 10% positive leakage; and,  This project also used emission factor values published in the approved CIBEE Protocol to ensure that GHG emission reductions were not over estimated.

PROJECT DETAILS

Project improvements were made to school facilities by the Calgary Board of Education. ECI formally became the Project Proponent for Calgary Board of Education by legal agreement on August 19th, 2010.

The level of service was confirmed for the Baseline and Project periods. Level of service remained consistent throughout the Baseline and Project periods.

Routine adjustments were reviewed for the Project periods. Routine adjustments were applied to normalize the fossil fuel utility data for degree heating days through regression analysis. No routine adjustments were made to electrical utility data as changes to the electrical system for this project were not affected by weather or other routine factors. The normalization activity was consistent with action taken for the fossil fuel baselines and the electrical baselines.

No situations that could generate a non-routine adjustment were identified for the project period.

School occupancy, operation and schedule were consistent during the baseline and project periods and school authorities provided supporting statements and attestations. The Project Proponent reviewed occupancy, operation and schedule data with the school authorities and agreed that non routine adjustments due to changes in occupancy, operation or schedule were not required.

The fact that no situations that could generate a non-routine adjustment, for the project period or baseline period, was flagged as a risk area for verification. School occupancy, operation and schedule were also flagged as risk areas for verification.

ECI, Offset Project Report - 9 December 19 - 2011

Calgary Board of Education Energy Efficiency Project

REPORTING PERIODS

The emission reductions of carbon dioxide equivalents claimed for both electricity and natural gas displacement (controlled, related emission reductions) for this reporting period are from August 1st, 2003 to July 31st, 2011.

Aggregate Calgary Board of Education GHG Emissions Savings in Tonnes CO2e

Electricity* Natural Gas Whole Calendar Whole Whole Facility** Year Facility** Facility** Tonnes Claimed Tonnes Claimed Total Claimed kWh CO2e Tonnes GJ C02e Tonnes tCO2e Tonnes 2003 637,887 414.6 373.2 48,809 2,483.1 2234.8 2,897.7 2,607.0 2004 5,064,694 3,292.1 2,962.8 20,300 1,032.7 929.4 4,324.8 3,892.0 2005 8,400,453 5,460.3 4,914.3 86,105 4,380.4 3942.4 9,840.7 8,856.0 2006 4,689,939 3,048.5 2,743.6 105,018 5,342.5 4808.3 8,391.0 7,551.0 2007 9,328,537 6,063.5 5,457.2 138,435 7,042.5 6338.3 13,106.0 11,795.0 2008 8,437,957 5,484.7 4,936.2 164,768 8,382.1 7543.9 13,866.8 12,480.0 2009 10,546,903 6,855.5 6,169.9 166,527 8,471.6 7624.4 15,327.1 13,794.0 2010 16,086,120 10,456.0 9,410.4 145,421 7,397.9 6658.1 17,853.9 16,068.0 2011 10,459,238 6,798.5 6,118.7 153,699 7,819.0 7037.1 14,617.5 13,155.0 73,651,728 47,874 43,086.3 1,029,081 52,353 47117.7 102,723 90,198

* Factors of 0.65kg CO2e per kWh electricity and 50.872 kg CO2e per GJ of natural gas were used in this calculation. Some figures may not total exactly because of rounding.

** Whole Facility Approach using Simple Method is calculated using a factor of 0.9X the CO2e generated from energy reductions. Whole Facility Approach follows the AOS Quantification Protocol for Energy Efficiency in Commercial and Institutional Buildings Version 1.0 - October 2010.

This OPR identifies 102,723 tCO2e achieved during the reporting period and, after applying the 0.9 factor due to the selection of the whole building simple approach, asserts 90,198 tCO2e.

GREENHOUSE GAS CALCULATIONS

The calculation of the greenhouse gas emission reductions is based on Alberta Environments Quantification Protocol “AOS Quantification Protocol for Energy Efficiency in Commercial and Institutional Buildings, Version 1.0, dated October 2010”. The Project addressed building Energy Conservation Measures (ECMs) and Building Maintenance and Operations, controlled and related, project and baseline emissions.

Where:

2 Emission Reductions = [Emissions Baseline – Emissions Project] x 0.9

And where:

2 A factor of 0.9 is applied to the resulting emission reduction in accordance with the Whole Building Simple Approach defined in the AOS CIBEE Protocol.

ECI, Offset Project Report - 10 December 19 - 2011

Calgary Board of Education Energy Efficiency Project

Emissions Baseline = (Emissions Building Energy Consumption + Emission Maint and Ops) (without ECMs)

Emissions Project = (Emissions Building Energy Consumption + Emissions Maint and Ops ) (with ECMs)

The project generated greenhouse gas emission reductions through the introduction of eligible energy conservation measures which affected the greenhouse gas emission output of the project sources and sinks. Eligible energy savings were comprised of energy reductions achieved through the implementation of project technologies and not through a decrease in operating capacity. Outlined below is the general approach to quantifying greenhouse gas emission reductions as stated in the CIBEE Protocol.

Where:

Emissions Baseline = sum of the emissions under the baseline condition

Emissions Building Energy Consumption (without ECMs) = Emissions Under [SS B8 Building Energy Consumption + SS B9 Building Maintenance and Operations Energy

Consumption] (without energy conservation measures)

And where:

Emissions Project = sum of the emissions under the project condition

Emissions Building Energy Consumption (with ECMs) = Emissions Under [SS P8 Building Energy Consumption + SS P9 Building Maintenance and Operations Energy Consumption] (with energy conservation measures)

Where:

SS B8/P8 Building Energy Consumption = Electricity Consumption + Natural Gas Consumption And:

Electricity Consumption = EF Electricity x kWh Natural Gas Consumption = EF Natural Gas x GJ

And:

EF Electricity = 0.65 kg CO2e/kWh EF Natural Gas = 50.872 kg CO2e/GJ

Emission reductions for the ECMs were quantified using IPMVP Option C, the Whole Facility Simple Approach, from the AOS Protocol selecting SS B8 and P8. Non routine adjustments were flagged by Environmental Compliance for verification.

ECI, Offset Project Report - 11 December 19 - 2011

Calgary Board of Education Energy Efficiency Project

GREENHOUSE GAS ASSERTION

st A Spatial Locator Table summarizing Emission Reduction Offsets in tCO2e starting August 1 , 2003 and ending July 31st, 2011 is provided as a separate document. The summary of the Emission

Reduction Offsets is reported in the Aggregate GHG Emissions Savings in the Tonnes CO2e Table that appeared in a previous section of this Offset Project Report.

This OPR asserts a total of 90,198 tCO2e for the Calgary Board of Education Energy Efficiency Project for the reporting period from August 1st, 2003 through July 31st, 2011.

PFC HFC SF6 CO2 CH4 N2O CO2e Total tCO2e tCO2e tCO2e tCO2e tCO2e tCO2e tCO2e tCO2e 2003 2221.07 0.91 12.74 2234.70 2,607.0 2004 923.76 0.38 5.30 929.40 3,892.0 2005 3918.24 1.61 22.48 3942.30 8,856.0 2006 4778.89 1.97 27.42 4808.30 7,551.0 2007 6299.54 2.59 36.14 6338.30 11,795.0 2008 7497.83 3.08 43.02 7543.90 12,480.0 2009 7577.88 3.12 43.48 7624.50 13,794.0 2010 6617.44 2.72 37.97 6658.10 16,068.0 2011 6994.13 2.88 40.13 7037.10 13,155.0

NOTE: The specific reductions of GHG species of CO2, CH4 and N2O, are calculated for Natural Gas only. CO2e reductions from electricity use a coefficient of 0.65 kg/kWhr and does not break out GHG species of CO2, CH4 and N2O. The Total tCO2e is the total of both Natural Gas and Electricity emission reductions and correspond with the Table: Aggregate Calgary Board of Education GHG Emissions Savings in Tonnes CO2e on Page 10 of this Report.

PROJECT DEVELOPER SIGNATURES

I am a dully authorized corporate officer of the Project Developer mentioned above and have personally examined and am familiar with the information submitted in this Offset Project Report and the associated Project Plan including the accompanying GHG Assertion on which it is based. Based upon reasonable investigation, including my inquiry of those individuals responsible for obtaining the information, I hereby warrant and believe, that all matters affecting the validity of the emission reduction claim or the protocol upon which it is based have been fully disclosed. I understand that any false statement made in the submitted information may result in deregistration and de-serialisation of credits and may be punishable as a criminal offence in accordance with provincial or federal statutes.

The project developer has executed this Offset Project Report as of the 19th day of December, 2011.

CALGARY BOARD OF EDUCATION ENERGY EFFICIENCY PROJECT

Environmental Compliance Inc.

Signature: ______

Date: December 19, 2011

Name: Don Diduck

Title: President

ECI, Offset Project Report - 12 December 19 - 2011

Calgary Board of Education Energy Efficiency Project ______Offset Project Plan

CALGARY BOARD OF EDUCATION ENERGY EFFICIENCY PROJECT

Prepared in accordance with Quantification Protocol For Energy Efficiency in Commercial and Institutional Buildings Version 1.0 dated October 2010 Posted under the Government of Alberta Specified Gas Emitters Regulation

Prepared by:

Environmental Compliance Inc., And MECH and ASSOCIATES

For:

Alberta Offset System December 2011

Andre Mech BEng, PEng, MBA, CMVP, rmc Principal MECH and ASSOCIATES

Third Party Disclaimer

This document was prepared in response to a specific request for service from the client identified above. The contents of this document are not intended for the use of, nor intended to be relied upon, by any person, firm or corporation other than the client of MECH and ASSOCIATES. MECH and ASSOCIATES denies any liability whatsoever to other parties for damages or injury suffered by such third parties arising from the use of this document without the express prior written authority of MECH and ASSOCIATES and its client who has commissioned this document.

This document contains assumptions, forward-looking statements, projections and predictions. Future results are impossible to predict. Opinions and estimates offered in this document constitute the judgement of MECH and ASSOCIATES and are subject to change without notice, as are statements about market trends, which are based on current market conditions. These materials include statements that represent opinions, estimates and projections which may not be realized. We believe the information provided herein is reliable as of the date hereof and do not warrant its accuracy or completeness. In preparing these materials we have relied upon and assumed without independent verification the accuracy and completeness of all information available from pubic sources.

1 Calgary Board of Education Energy Efficiency Project ______Table of Contents

Section Title Page

1. Project Scope 4 2. Project Site Definition 5 3. Inventory of Sources and Sinks 5 4. Identification and Justification of Baseline 7 5. Quantification Plan a. Quantification Approach 10 b. Eligible Energy Savings 12 c. Greenhouse Gas Emission Factors 13 6. Monitoring Plan, Record Keeping 14 7. QA/QC Plan 15 8. Liability 16 9. Reporting the Offset Project 16

List of Tables

Table Title Page

Table 1.0 Inventory of Sources and Sinks for this Project 6 Table 2.0 Greenhouse Gas Emission Factors 13

List of Annex

ANNEX A Project Location ANNEX B Alberta Boiler Safety Association Narrative and Letter ANNEX C Building Energy Consumption Baselines ANNEX D Maintenance and Operation Baselines ANNEX F Calgary Board of Education Non Routine Adjustments of Baseline Letter ANNEX G Andre Mech, Statement of CMVP Qualification

2 Calgary Board of Education Energy Efficiency Project ______

List of Reference Publications

Publication Title

Specified Gas Emitters Regulation Specified Gas Reporting Regulation Alberta’s 2008 Climate Change Strategy Technical Guidance for Offset Project Developers Specified Gas Emitters Regulation, Quantification Protocol for Energy Efficiency in Commercial and Institutional Buildings Version 1.0 October 2010 ISO 14064 Part 2

LIST OF ABBREVIATIONS AND ACRONYMS

Abbreviation Description

AOS Alberta Offset System CBE Calgary Board of Education CEM Certified Energy Manager CH4 Methane CIBEE Commercial and Institutional Building Energy Efficiency CMVP Certified Measurement and Verification Professional CO2 Carbon Dioxide CO2e Carbon Dioxide Equivalent ECI Environmental Compliance Inc ER Emission Reduction g grams GHG Greenhouse Gas ISO International Standards Organization IPMVP International Performance Measurement and Verification Protocol L litre m3 cubic metre MWh Mega Watt hour N2O Nitrous Oxide OPP Offset Project Plan OPR Offset Project Report PP Project Proponent Regs Regulations t Tonnes (metric)

3 Calgary Board of Education Energy Efficiency Project ______Offset Project Plan CALGARY BOARD OF EDUCATION ENERGY EFFICIENCY PROJECT

1. Project Scope

a. Describing the Project

i. General Description and Type of Project

1. This is an Emission Reductions (ER) Project upgrading static fossil fuel burning and electrical systems in schools located in the Calgary Board of Education. The project shall result in a decrease in the use of electricity and or fossil fuels that would not have decreased in absence of the project. This project shall provide ERs that shall be used to determine Offsets.

2. The Project Proponent elected to apply quantification Option C – Whole Facility1, Simple Approach2 presented in the Alberta Offset System Quantification Protocol for Energy Efficiency in Commercial and Institutional Buildings. This option was selected as it catered to the multitude of technologies implemented by this project and was considered the best way to record the fossil fuel and electricity energy savings that were then used to determine the Emission Reduction Offsets. Since the Simple Approach was used, the Project Proponent will claim only 0.9 of Emission Reduction Offsets determined.

1 Quantification Protocol for Energy Efficiency in Commercial and Institutional Buildings, Version 1.0, October 2010, Table 4.2: Site Savings Determination Options, IPMVP Option C. 2 Quantification Protocol for Energy Efficiency in Commercial and Institutional Buildings, Version 1.0, October 2010, Para 1.3, 1., c. and 1.3, 2., a. 4 Calgary Board of Education Energy Efficiency Project ______

ii. Project Purpose and Objective

1. The purpose and objective of this project is to identify Offsets attributable to the project activities and either:

a. Forward sell (Ex-Ante) the potential Offsets and at later date, Verify and settle the difference, or b. Verify the Offsets and sell them (Ex-Post) on the spot market, or c. some combination of a. and b. above.

2. The Project Proponent, ECI, will distribute funds resulting from the sale of the Offsets to project participants in accordance with written agreements.

b. Project Participants

i. Project Developer Environmental Compliance Inc ii. Project Operator Calgary Board of Education

iii. Authorized Project Contact MECH and ASSOCIATES Corporation iv. Project Verifier Williams Engineering Inc v. Data Manager Prabhu Palanivelu . 2. Project Site Definition

a. Project Location, Geographic and Physical Information allowing the unique identification and delineation of the specific extent of the project

i. Offsets generated from this project are attributable to the Calgary Board of Education Schools in Alberta, Canada. A list of the school locations of the specific schools participating in this Project, by address and legal land description, is provided in Annex A to this report.

3. Inventory of Sources and Sinks

a. Sources and Sinks relevant to the Baseline and Project Scenarios were identified using AOS Quantification Protocol for Energy Efficiency in Commercial and Institutional Buildings, Version 1.0, dated October 2010, Section 3.0, Identification of Sources and Sinks for the Project and study of the School District facilities being considered for the project.

5 Calgary Board of Education Energy Efficiency Project ______

b. Areas of study considered to determine Sources and Sinks for this energy efficiency project were:

i. On site fuel burning. ii. Transportation of equipment. iii. Electricity production (on-site or purchased from grid), fossil fuel production and delivery to the site. iv. Maintenance, operation, construction and decommission (energy consumed during these activities).

c. Sources and Sinks for this energy efficiency project are:

i. Building Energy Consumption (with/without Energy Conservation Measures) and ii. Maintenance and Operations

TABLE 1.0: Inventory of Sources and Sinks for this Project

Identified Baseline Project Included Justification SS’s (C, R, A) (C, R, A) or Excluded On Site SS’s Building Controlled Controlled Included The difference in Energy emissions from the Consumption baseline to the project (with/without period are mainly due to Energy implemented Energy Conservation Conservation Measures Measures) Maintenance Controlled Controlled Included Emissions from and maintenance/operational Operations changes in baseline and (with/without project period must be Energy tracked in order to claim Conservation emission reductions. Measures)

6 Calgary Board of Education Energy Efficiency Project ______

4. Identification and Justification of the Baseline

a. Identification of the Baseline

i. The baseline for this project was the most appropriate and best estimate of greenhouse gas emissions that would have occurred in the absence of the project. In this project, Identification of the baseline scenario is presented for “retrofits to existing facilities” and does not include new facilities. The Baseline Condition of school buildings prior to project implementation included:

1. the use of existing lighting and electric equipment that met with existing and expected building codes and local laws. Lighting and electrical equipment were in good working condition and did not require replacement due to age, building or electrical code nor was replacement legislated or expected during the performance or extended performance period of this project. Since no upgrade to lighting and electrical equipment was contemplated, planned or budgeted the Project Proponent claims that any upgrade to electrical systems be considered additional to what would have happened in absence of the project The baseline was established by recording electricity use from electrical meters for the whole building in accordance with IPMVP 3 in advance of equipment upgrades;

2. the use of existing static fossil fuel burning equipment that met with existing and expected building codes, local and provincial laws and had not been flagged for replacement by the Alberta Boiler Safety Association. Static fossil fuel burning equipment was in good working condition at the time of project start and did not require replacement due to age, building code or as a result of inspection by the Alberta Boiler Safety Association nor as a result of legislation, or was replacement expected to be legislated during the performance period or extended performance period of the planned project. At the start of this Project the School Board was not required to replace any of the boiler equipment considered in this Project.

3 IPMVP, International Performance Measurement and Verification Protocol referenced in the Quantification Protocol for Energy Efficiency in Commercial and Institutional Buildings 7 Calgary Board of Education Energy Efficiency Project ______

o Since static fossil fuel burning equipment (boiler) end of life data was not available in any documentation or posted on the internet for the static fossil fuel burning equipment (boilers) replaced, “Equipment Service Life” was determined in accordance with the results of regular or emergency Alberta Boiler Safety Association inspections and mandate. A narrative and letter are presented in Annex B. The Project Proponent demonstrated that in absence of the Project, the existing technologies would have remained in place for longer than the project period and extended project period and the emission reductions would simply not have occurred;

o since, as a result of ABSA boiler inspections, no boiler upgrade was required, the Project Proponent claims found that no replacement to static fossil fuel burning equipment (boilers) was required and the Project Proponent claims that any upgrade to static fossil fuel burning equipment was and is additional to what would have happened in absence of the Project. The baseline was established by recording static fossil fuel use and normalizing it to degree heating days in accordance with IPMVP4 in advance of equipment upgrades; and replacements.

3. the energy used in maintaining the buildings so that they met with existing and expected building codes and local laws. No decreased maintenance activities were contemplated, planned or budgeted but maintenance activities were expected to increase as existing un-retrofitted lighting and static fossil fuel burning equipment aged. The baseline for maintenance activities was established by discussing and recording maintenance activities with building operators.

ii. Routine adjustments for weather were applied to the baseline for fossil fuel use. The baseline for fossil fuel use data was normalized to degree heating days using

4 IPMVP, International Performance Measurement and Verification Protocol referenced in the Quantification Protocol for Energy Efficiency in Commercial and Institutional Buildings 8 Calgary Board of Education Energy Efficiency Project ______regression analysis techniques recommended in EECIB Protocol5. No weather related routine adjustments were applied to electricity use as the planned project changes related to electricity are expected to be lighting retrofits. Lighting in schools is a function of use and since use is expected to remain consistent, no routine adjustment to electricity applies.

iii. Non routine adjustments shall be applied to the project after non routine events. There were no non routine events during the baseline period that affected the baseline.

iv. Twelve consecutive months of data was used to determine the baseline for each individual building. Baseline data was taken for a 12 month period immediately preceding the project changes.

v. The Baselines for the school buildings addressed in this project are presented in Annex C, Building Energy Consumption Baselines.

b. Justification of the Baseline

i. Baseline Conditions were determined by reviewing historical electrical, static fossil fuel burning equipment, fuel use and maintenance practice records, and applying IPMVP guidance referenced in the EECIB Protocol that:

1. Represented all operating modes of the facility for a period of over a year. This period studied spanned a full operating cycle from maximum energy use to minimum and covering occupancy conditions. A study period of over a year was selected in order to fully understand the facility and develop credible Baselines in accordance with IPMVP. Maximum and minimum energy use that repeated consistently from one year to the other in a pattern during the study period indicated that the baselines were consistent. Complete twelve month consecutive data sets were used to determine relevant baselines;

2. Fairly represent all operating conditions of a normal operating school cycle;

5 Quantification Protocol for EECIB Table 4.2, C. Whole Facility, How Savings Are Calculated. 9 Calgary Board of Education Energy Efficiency Project ______3. Only used time periods for which all fixed and variable energy-governing facts were known about the facility. Routine and non-routine adjustments were considered and applied as presented later in this document; and,

4. Coincided with the period immediately before the commitment to undertake the retrofit.

5. Quantification Plan

a. Quantification Approach

i. The project will generate greenhouse gas emission reductions through the introduction of energy conservation measures that affect the greenhouse gas emission output of the project sources and sinks. Eligible energy savings are comprised of energy reductions achieved through the implementation of a project, and not through a decrease in operating capacity or other factor. The project applies the general approach to quantifying greenhouse gas emission reductions.

6 Emission Reduction = [(Emissions) Baseline – (Emissions) Project] x 0.9

Where

Emissions Baseline = ∑(Building Energy Consumption) Baseline + ∑(Maintenance and Operation) Baseline

And

Emissions Project = ∑(Building Energy Consumption) Project + ∑(Maintenance and Operation) Project

And

Emissions Reduction = ∑(Eligible Energy Savings x Emission Factor)

Where

Eligible Energy Savings and Emission Factors are defined below.

ii. (Emissions) Baseline

6 A factor of 0.9 is applied to the resulting emission reduction in accordance with the Whole Building Simple Approach defined in the AOS EECIB Protocol. 10 Calgary Board of Education Energy Efficiency Project ______

1. ∑(Building Energy Consumption) Baseline

a. Building Energy Consumption data for the baseline scenario is presented in Annex B to this report.

2. ∑(Maintenance and Operation) Baseline

a. Maintenance and Operation energy consumption for the baseline scenario is presented in Annex C to this report.

3. Routine and Non Routine Adjustments to the Baseline are defined as follows:

a. Routine Adjustments are adjustments made due to any energy governing factor expected to change routinely during the reporting period such as weather. Routine Adjustments for this project shall be made for weather by normalizing baseline and project data for degree heating days.

b. Non Routine Adjustments are adjustments made due to any energy governing factor that is not expected to change during the reporting period such as facility size, design and operation of installed equipment or occupancy. Non Routine Adjustments for this project would be a change in school size, change in school operating times or a change in the school population. The Project Proponent found that no Non Routine Adjustments were required for the baseline data set. The Project Proponent discussed the issue of Non Routine Adjustments with the CBE and the CBE issued a letter to the Project Proponent, attached as Annex E, revealing that no energy governing factor occurred during the baseline phase that would require Non Routine Adjustments to the Baseline.

c. Non Routine Adjustments for the Project phase shall be reported in the Offset Project Report. Should an energy governing factor arise that could result in a Non Routine Adjustment then the Project Proponent shall discuss the materiality of the energy governing factor in 11 Calgary Board of Education Energy Efficiency Project ______the Offset Project Report and flag the energy governing factor as a known risk area for verification.

iii. (Emissions) Project

1. ∑(Building Energy Consumption) Project

a. Building Energy Consumption data for the project scenario shall be presented in an Offset Project Report for Verification.

2. ∑(Maintenance and Operation) Project

a. Maintenance and Operation energy consumption for the project scenario shall be presented in an Offset Project Report for Verification.

3. Routine, Non Routine and Non-Surplus Adjustments to the Project shall be discussed in an Offset Project Report for Verification. Should the Project Proponent feel that there are issues that may be material in nature, they will be flagged as a known risk area for verification.

b. Eligible Energy Savings

i. Eligible Energy Savings are those that can be used to generate Offsets. For this project Eligible Energy Savings are defined as:

Baseline Energy +/- Routine Adjustments – Project Energy +/- Non-Routine Adjustments

ii. The Project period is planned to be from 1 August 2003 to 31 July 2011. Although some Buildings and different technologies are expected to enter the project at significantly different times the end date for all Buildings in this project is the same.

iii. Utilities are required by law to ensure the accuracy of billing amounts based on energy consumption and these amounts can be adjusted over a 9-month period following the energy consumption date. This has direct implications on offset projects that follow the Energy Efficiency for Commercial and Institutional Buildings Protocol and the associated international measurement standards. In order

12 Calgary Board of Education Energy Efficiency Project ______to comply with the protocol and the principles of accuracy, conservativeness and consistency it is necessary to rely on verifiable data. In some instances may not be possible to process data until final billing is received which may be up to nine months after the project end date. In some instances a power bill issued in December of 2011 may not have the final billing and consumption levels available until September of 2012.

iv. We plan to report the first period of 1 August 2003 through 31 July 2011 by December 2011. This meets the principles and requirements of the Protocol and international measurement techniques referenced therein.

c. Greenhouse Gas Emission Factors

i. This project used Greenhouse Gas Emission Factors presented in Table A.1 of AOS Commercial and Institutional Buildings Energy Efficiency Protocol; Version 1.0 dated October 2010 to calculate Offsets from Eligible Energy Savings. A modified reference table is reproduced as Table 2.0, Greenhouse Gas Emission Factors, below. The modification consists of the addition of an Emission Factor for Natural Gas that was approved by the Alberta Offset System by email.

Table 2.0: Greenhouse Gas Emission Factors

Emission Value Factor Electricity Alberta 0.650 [t CO2e/MWh] Electricity Grid

Combustion Fuel Natural gas 50.8724 Kg / GJ7 CO2 CH4 N2O CO2e Natural gas 1891[g 0.037[g 0.035[g 0.001903[t 3 3 3 3 CO2/m ] CH4/m ] N2O/m ] CO2e/m ] #2 Fuel Oil 2725[g 0.026[g 0.031[g 0.002735 [t CO2/L] CH4/L] N2O/L] CO2e/L] Diesel 2663[g 0.133[g 0.4[g N2O/L] 0.002790 [t CO2/L] CH4/L] CO2e/L]

7 The emission factor of 50.7824 Kg/GJ is sourced from Alberta Environment and it use was approved by the Alberta Offset System by email. 13 Calgary Board of Education Energy Efficiency Project ______

6. Monitoring Plan, Record Keeping

a. Monitoring Plan

i. Fuel and electricity use in the project school buildings shall be monitored during the project period by collecting fuel use records, electrical records, changes in static factors, such as building expansion or changes in use or any relevant deviation from the baseline and independent variables such as degree heating days, occupancy and any other relevant deviation. Data collected and recorded, with the exception of data addressed in the next paragraph, includes for all parameters measured:

1. Purpose of measurement, type of meter, units of measure, physical location, frequency of measurement 2. Frequency of regular reading or polling of the sensor 3. Frequency of calibration, calibration method 4. Monitoring/measurement roles and responsibilities

ii. Under IPMVP, the use of electrical and fossil fuel utility meter data, Option C, Whole Facility, Simple Approach, addresses all requirements and is considered to be 100% accurate for determining savings.8 This project uses and shall use electrical and fossil fuel utility meters for baseline and project measurements as utility meters meet all the above criteria and a record of consumption has been and can be retained.

iii. Fuel and electricity use records were put into Metrix 4.0®, an industry accepted energy performance contracting software tool, to compile and assess at a minimum for degree heating days and non-weather sensitive loads. Metrix 4.0® was used to conduct statistical correlations to provide an accurate energy analysis for the baseline. The same process will be followed for the project scenario.

b. Record Keeping

i. The Project Proponent shall keep the information listed below that is relevant to this project and shall make available the information listed below to the verifier and/or an authorized government auditor upon request.

8 IPMVP Framework and Options, September 2010, Para 4.9.5 Option C: Metering 14 Calgary Board of Education Energy Efficiency Project ______Kept for 7 Years After Project Crediting Period Raw baseline and project period energy data, independent variable data, and static factors within the measurement boundary. A record of all adjustments made to raw baseline data with justifications. All analysis of baseline data used to create mathematical model(s). Efficiency standards or common practices relevant to each energy conservation measurement on the date of project commitment. A record of changes in static factors and non-surplus characteristics along with all calculations for non-routine adjustments. All calculations of energy savings, emission factors and greenhouse gas emission reductions. Verification records and audit results. All records outlining ownership of the offset credits.

7. Quality Assurance/Quality Control Plan

a. The Project Proponent shall follow these Quality Assurance/Quality Control (QA/QC) procedures to add confidence to the measurements and calculations to ensure that they have been made correctly and to ensure that only valid measurements are used to determine Offsets. The QA/QC procedures include but are not limited to:

i. Protecting records of monitored data (electronic storage); ii. Checking data integrity on a regular and periodic basis (manual assessment, comparing redundant metered data, and detection of outstanding data/records); iii. Comparing current estimates with previous estimates as a ‘reality check’; and iv. Performing recalculations to make sure no mathematical errors have been made.

b. The Project Proponent has included as part of its selection criteria the requirement that the Offset Project Plan and Project Report be written or reviewed by a Certified Measurement and Verification Professional (CMVP)9 with at least 3 years of experience in implementing and quantifying energy efficiency projects. The Project Proponent has retained the services of Andre Mech of MECH and ASSOCIATES who is a CMVP, No. 1040, who has in excess of 3 years experience in implementing and quantifying energy efficiency projects. A statement of CMVP Qualification is included as Annex F.

9 CMVP is an Association of Energy Engineers professional designation 15 Calgary Board of Education Energy Efficiency Project ______

8. Liability

a. This Offset Project shall be implemented according to AOS Commercial and Institutional Buildings Energy Efficiency Protocol, Version 1.0, dated October 2010, and in accordance with government regulations. The Project Proponent recognizes that Alberta Environment reserves the right to audit Offset Credits and associated projects submitted to Alberta Environment for compliance under the Specified Gas Emitters Regulation and may request corrections based on audit findings.

9. Reporting the Offset Project

a. This Offset Project shall result in an Offset Project Report that shall include but not be limited to the following information and any additional requirements identified by the Alberta Offset System at the time of Offset Project Reporting:

Project Principles  Relevance  Completeness  Consistency  Accuracy  Transparency  Conservativeness Project Document Information  Project Developer  Project Operator  Name of the Authorized Project Contact  Project Verifier  Key Project Participants  Project Title  Date  Version Project Description and Location  Intended Use and User of the Offset Report  Purpose and Objectives  Statement That This OPR Conforms to the Alberta Offset System for Commercial and Institutional Buildings Energy Efficiency Protocol, Version 1.0, dated October 2010  Statement that this Offset Project subscribes to the Alberta Offset System  Statements indicating how the project supports the principles identified above  Type of GHG Project  Project Location 16 Calgary Board of Education Energy Efficiency Project ______ Conditions Prior to Project Initiation  Project Initiation Date and other Key Project Dates  Frequency of Monitoring  Relevant Project Activities in Each Step of the Project Cycle Project Details  Project Technologies, Services and Expected Level of Activity Reporting Periods  Time Period Covered Aggregate GHG Emissions Savings in Tonnes CO2e  Size of Project, Aggregate GHG Emission Reductions Stated in Tonnes CO2e  Relevant Project GHG Sources – Statement of Aggregate GHG Emissions by GHG Sources for the Project Scenario in Tonnes CO2e for the Relevant Time Period – Annual, Cumulative to Date, Total GHG Calculation  How the Project will Achieve GHG Emission Reductions Including a General Description of the Criteria and Procedures Used as a Basis for the Calculation of Project GHG Emission Reductions  Discussion of Permanence GHG Assertion  GHG Emission Reductions Assertion Stated in Tonnes of CO2e for Verification Project and Project Proponent Information  Contact Information Project Developer Signatory Authorization  Statement of authorization by Project Developer

17 Calgary Board of Education Energy Efficiency Project ______

ANNEX A

Project Location

18 Calgary Board of Education Energy Efficiency Project ______

Calgary Board of Education

Energy Efficiency Project Properties The following Table lists ALL school facilities involved in the project. Building ownership is substantiated by Title, Lease Agreements and Insurance Documents from the Calgary Board of Education.

Building Name/Identifier Street Address City/Town Postal Code Legal Land Description A.E. Cross 3445 37 Street SW Calgary T3E 3C2 Plan 6795AC Block O Abbeydale 320 Abergale Drive NE Calgary T2A 6W2 Plan 8910518 Block 8 Lot 71SR Acadia 9603 5 Street SE Calgary T2J 1K4 Plan 2303ID Block A Albert Park 1317 27 Street SE Calgary T2A 0Y2 Plan 7910344 Block 1 Alexander Ferguson 1704 26 Street SW Calgary T3C 1K5 Plan 5536R Block 4 Alex Munro 427 78 Avenue NE Calgary T2K 0R9 Plan 6604JK Block RC Altadore 4506 16 Street SW Calgary T2T 4H9 Plan 1420JK Block 3 Andrew Davidson 9603 5 Street SE Calgary T2J 1K4 Plan 2303ID Block A Andrew Sibbald 1711 Lake Bonavista Dr SE Calgary T2J 2K9 Plan 8910486 Block 8 Lot 94SR Annie Foote 6320 Temple Drive NE Calgary T1Y 5V5 Plan TPC 7711406 Block 27 Lot R3 Annie Gale 577 Whiteridge Way NE Calgary T1Y 4S8 Plan 7610067 Block 16 Lot R 33 Arbour Lake Middle 27 Arbour Crest Dr. NW Calgary T3G 4H3 Plan 0112962 Block 1 Lot 2MSR Balmoral Bungalow 220 18 Avenue NW Calgary T2M 0T1 Plan 21290 Block 8 Lots 37-40 Balmoral 220 16 Avenue NW Calgary T2M 0H4 Plan 21290 Block 8 Lots 9-10 Banff Trail 3232 Cochrane Road NW Calgary T2M 4J3 Plan 4694HW Block 16 Banting and Best 1819 66 Avenue SE Calgary T2C 2K5 Plan 8010417 Block 1MSR Battalion Park 369 Sienna Park Drive SW Calgary T3H 4S2 Plan 9511576 Block 5 Lot 1MSR Beaverbrook 9019 Fairmount Drive SE Calgary T2H 0Z4 Plan 3520AJ Block 84 Beddington Heights 95 Bermuda Road NW Calgary T3K 2J6 Plan 8011130 Block 51 Lot 2MSR Belfast 1229 17A Streeet NE Calgary T2E 4V4 Plan Belfast Calgary 6852HL Block B Belvedere Parkway 4631 85 Street NW Calgary T3B 2R8 Plan 1531JK Block A Bishop Pinkham 3304 63 Avenue SW Calgary T3E 5K1 Plan 805JK Portion of Lot A Bob Edwards 4424 Marlborough Drive NE Calgary T2A 2Z5 Plan 8910514 Block 1 Lot 1SR Bowcroft 3940 73 Street NW Calgary T3B 2L9 Plan 2501GN Block E Bowness 4627 77 Street NW Calgary T3B 2N6 Plan 44700IC Block A Braeside 1747 107 Avenue Calgary T2W 0C3 Plan 8910513 Block 17 Lot 51SR Branton 2103 20 Street NW Calgary T2M 3W1 Plan 9110GI Block 13 Lot 17 Brentwood 1231 Northmount Drive NW Calgary T2L 0C9 Plan Brentwood Calgary 1623IB Block 1 Briar Hill 1233 21 Street NW Calgary T2N 2L8 Plan 1161GJ Block 11 Buchanan 3717 Centre Street North Calgary T2E 2Y2 Plan 3674S Block 19 Lots 35-58 C.N. Gunn 6625 4 Street NE Calgary T2K 5C7 Plan 8910502 Block 1 Lot 1SR Cambrian Heights 640 Northmount Drive NW Calgary T2K 3J5 Plan 5971HB Block 4 Lot 22 Canyon Meadows 395 Canterbury Drive SW Calgary T2W 1J1 Plan 8910523 Lot 3SR Capitol Hill 2210 18 Street NW Calgary T2M 3T4 Plan 2864AF Block 27 Lots 1-40 Cappy Smart 5808 Madigan Drive NE Calgary T2A 4P5 Plan Marlborough Park Calgary 7410024 Block 11 Lot R37 Captain John Palliser 1484 Northmount Drive NW Calgary T2L 0G6 Plan Brentwood Calgary 1629JK Block A Cecil Swanson 4820 Rundlewood Dr NE Calgary T1Y 5V9 Plan 7510610 Block 27 Lot R2 Cedarbrae 10631 Oakfield Drive SW Calgary T2W 2T3 Plan 7410349 Block 5 Lot R23

19 Calgary Board of Education Energy Efficiency Project ______

Building Name/Identifier Street Address City/Town Postal Code Legal Land Description Centennial High 55 Sun Valley Blvd. SE Calgary T2X 3W7 Plan 8210056 Block 14 Lot 1MSR Central Memorial 5111 21 Street SW Calgary T3E 1R9 Plan 5436JK Block A Chaparral 480 Chaparral Drive SE Calgary T2X 3X8 Plan 0411377 Block 20 Lot 190MSR Chief Justice Milvain 3428 42 Street NW Calgary T1Y 6A3 Plan 8910485 Block 1 Lot 1SR Chinook Park 1312 75 Avenue SW Calgary T2V 0S9 Plan 7861HR Block C Chris Akkerman 5004 Marbank Drive NE Calgary T2A 3J6 Plan 132LK Block 11 Lot R34 Christine Meikle 1090, 64 12 Street NE Calgary T2E 4P4 Plan 2518BG Lot 7 Citadel Park 808 Citadel Drive NW Calgary T3G 4B8 Plan 9811847 Block 6 Lot 34MSR Clarence Sansom 5840 24 Avenue NE Calgary T1Y 6G4 Plan 9212109 Block 21 Lot 23SR Clinton Ford 5003 20 Street SW Calgary T2T 5A5 Plan 3749S Block 5 Colonel Irvine 412 Northmount Drive NW Calgary T2K 3H6 Plan 1106HA Block 5 Portion of Lot 14 Colonel J. Fred Scott 171 Whitehorn Road NE Calgary T1Y 3C4 Plan 7410438 Block 16 Lot R19 Colonel Macleod 1610 6 Street NE Calgary T2E 3Y9 Plan 4221GL Block 21 Colonel Sanders 226 Northmount Drive NW Calgary T2K 3G2 Plan 9212201 Block 1 Lot 1SR Colonel Walker 1921 9 Avenue SE Calgary T2G 0V3 Plan 1894AC Block 20 Collingwood 3826 Collingwood Drive NW Calgary T2L 0R6 Plan 1528HP Block 3 Connaught 1121 12 Avenue SW Calgary T2R 0J8 Plan A1 Block 82 Lots 1-40 Coventry Hills Senior 12350 Coventry Hill Way NE Calgary T3K 5S9 Plan 0611768 Block 30 Lot 91MSR Crescent Heights 1019 1 Street NW Calgary T2M 2S2 Plan 3946N Block 18 All of Lane Crossing Park 500 Martindale Blvd NE Calgary T3J 4W8 Plan 9411374 Block 19 Lot 1MSR Dalhousie 4440 Dallyn Street NW Calgary T3A 1K3 Plan 5579JK Block 10 Lot A David D. Oughton 1511 34 Street SE Calgary T2A 1A2 Plan 2870JK Block 4 Portion of Lot B David Thompson 9320 Arbour Crescent SE Calgary T2J 0X8 Plan 2303ID Block A Deer Run 2127 146 Avenue NE Calgary T2J 6P8 Plan 9212206 Block 4 Lot 101SR Douglas Harkness 6203 24 Avenue NE Calgary T1Y 2C5 Plan 9212109 Block 9 Lot 23MSR Douglasdale 400 Douglas Park Blvd. SE Calgary T2Z 4A3 Plan 9310383 Block 52 Lot 1MSR Dr. Carl Safran 930 13 Avenue SW Calgary T2R 0L4 Plan 0714774 Block 84 Lot 43 Dr. E.P. Scarlett 220 Canterbury Drive SW Calgary T2W 1H4 5;1;23;9; NW Dr. E.W. Coffin 5615 Barrett Drive NW Calgary T2L 1W4 5;1;5;6;NW Dr. Gordon Higgins 155 Rundlehill Drive NE Calgary T1Y 2W9 Plan 7611338 Block 12 Lot R90 Dr. Gladys McKelvie Egbert 6033 Madigan Drive NE Calgary T2A 5G9 Plan 7410861 Block RE Dr. J.K. Mulloy 7440 10 Street NW Calgary T2K 1H6 Plan 9212322 Block 27 Lot 1SR Earl Grey 845 Hillcrest Avenue SW Calgary T2T 0Z1 Plan 179R Block 22 Lots 2-3 ED Centre 1221 8 Street SW Calgary T2R 0L4 Plan Calgary 5498JK Block 32 Edgemont 55 Edgevalley Circle NW Calgary T3A 4X1 Plan 9111450 Block 1 Lot 1SR Elbow Park 721 38 Avenue SW Calgary T2T 2H8 Plan 5584R Block 25 Lots 1-48 Elboya 4804 6 Street SW Calgary T2S 2N3 Plan 6153AC Block 33 Lot 21 Emily Follensbee 5139 14 Street SW Calgary T2T 3W5 Plan 569JK Block 2 Erin Woods 25 Erin Park Drive SE Calgary T2B 2Z9 Plan 9011700 Block 28 Lot 17SR Erlton 24 28 Avenue SW Calgary T2S 1Y1 Plan 2865AC Block 2 Lot 33 20 Springborough Blvd. SW Calgary T3H 0N7 Plan Calgary 1066JK Block A Ernest Morrow 1212 47 Street SE Calgary T2A 1R3 Plan 6439JK Block 2 Ethel M. Johnson 255 Sackville Drive SW Calgary T2W 0W7 Plan 4950JK Block A Eugene Coste 10 Hillgrove Crescent SW Calgary T2V 3K7 Plan 4704HL Block N F.E. Osborne 5315 Varsity Drive NW Calgary T3A 1A7 Plan 4263JK Block P Fairview 7840 Fairmount Drive SE Calgary T2H 0Y1 Plan 3323HR Block A

20 Calgary Board of Education Energy Efficiency Project ______

Building Name/Identifier Street Address City/Town Postal Code Legal Land Description Falconridge 1331 Falconridge Drive NE Calgary T3J 1T4 Plan 8011556 Block 5 Lot 69MSR Fish Creek 1039 Suncastle Drive SE Calgary T2X 2Z1 Plan 8910750 Block 65 Lot 2SR Forest Lawn 1304 44 Street SE Calgary T2A 1M8 Plan 6439JK Block 2 Fred Seymour 809 Willingdon Blvd. SE Calgary T2J 2B7 Plan 5585JK Block 14 Lot 9 Georges P. Vanier 509 32 Avenue NE Calgary T2E 2H3 Plan 6724GU Block 3 G.W. Skene 6226 Penbrooke Drive SE Calgary T2A 6M7 Plan 905LK Block 55 Lot R14 Glamorgan 50 Grafton Drive SW Calgary T3E 4W3 Plan 1731HM Block B Glenbrook 4725 33 Avenue SW Calgary T3E 3V1 Plan 4009EM Block V Portion of Lot 5 Glendale 2415 Kelwood Drive SW Calgary T3E 3Z8 Plan 1350GV Block 16 Glenmeadows Sub 4931 Grove Hill Road SW Calgary T3E 4G4 Plan 6182HM Block 9 Grant MacEwan 180 Falshire Drive NE Calgary T3J 3A5 Plan 8310391 Block 9 Lot 122MSR Greenview 211 McKnight Blvd NE Calgary T2E 5S7 Plan 5873GT Lot 24 Guy Weadick 5612 Templehill Road NE Calgary T1Y 4W7 Plan 7711406 Block 30 Lot R1 Harold Panabaker 23 Sackville Drive SW Calgary T2W 0W3 Plan 3860IB Block 15 H.D. Cartwright 5500 Dalhart Road NW Calgary T3A 1V6 Plan 8910496 Block 31 Lot 3MSR Hamptons 10330 Hamptons Blvd NW Calgary T3A 6G2 Plan 0110636 Block 8 Lot 208MSR Harold W. Riley 3743 Dover Ridge Drive SE Calgary T2B 2E1 Plan 8248JK Block 12 Lot R1 Haultain Memorial 605 Queensland Drive SE Calgary T2J 4S8 Plan 7410109 Block 13 Lot R75 Hawkwood 650 Hawkwood Blvd NW Calgary T3G 2V7 Plan 8811798 Block 22 Lot 65MSR Haysboro 1123 87 Avenue SW Calgary T2V 0W2 Plan 311HN Block F Henry Wise Wood 910 75 Avenue SW Calgary T2V 0S6 Plan 699HO Block A Hidden Valley 10959 Hidden Valley Drive NW Calgary T3A 6J2 Plan 0113227 Block 14 Lot 52MSR Highfield 3610 9 Street SE Calgary T2G 3C5 Plan 6426HT Block 1 Lot 1 Highwood 11 Holmwood Avenue NW Calgary T2K 2G5 Plan 1106HA Block 5 Lot 14 Hillhurst 1418 7 Avenue NW Calgary T2N 0Z2 Plan 5179O Block 6 Lots 1-36 Huntington Hills 820 64 Avenue NW Calgary T2K 0M5 Plan 9212256 Lot 20SR Ian Bazalgette 3909 26 Avenue SE Calgary T2B 0C6 Plan 5676HQ Block A John G. Diefenbaker 6620 4 Street NW Calgary T2K 1C2 Plan 8210277 Block 1 Jack James 5105 8 Avenue SE Calgary T2A 4M1 Plan 8111007 Block X Lot 1 James Fowler 4004 4 Street NW Calgary T2K 1A1 Plan 7810215 Block A James Short 6333 5 Avenue SE Calgary T2A 3V7 Plan 905LK Block 55 Lot R14 Janet Johnstone 224 Shawnessy Drive SE Calgary T2Y 1M1 Plan 8110052 Block 5 Lot 80MSR Jennie Elliot 3031 Lindsay Drive SW Calgary T3E 6A9 Plan 1086JK Block 13 Lot 14 John Ware 10020 19 Street SW Calgary T2V 1R2 5;1;23;17;NE Keeler 4807 Forego Avenue SE Calgary T2A 2C4 Plan 7913HU Block 13 Portion of Lot 1 Kensington Road 120 23 Street NW Calgary T2N 2P1 Plan 371O Block 39 Lot 1-6 & 9-40 Killarney 3008 33 Street SW Calgary T3E 2T9 Plan 732GN Block S King Edward 1720 30 Avenue SW Calgary T2T 1P5 Plan 4479P Block 30 Lots 1-40 King George 2108 10 Street Calgary T2M 3M4 Plan 3150P Block 30 Lots 4-7, 13-29 Kingsland 7430 5 Street SW Calgary T2V 1B1 Plan 3215HG Block C Knobhill 2036 20 Avenue SW Calgary T2T 0M2 Plan 6704GJ Block 2 Lot 13 Lester B. Pearson 3020 52 Street NE Calgary T1Y 5P4 Plan 7510782 Block 32 Lot 7 Lake Bonavista 1015 120 Avenue SW Calgary T2J 2L1 Plan 9212626 Block 3 Lot 59MSR Langevin 107 6A Street NE Calgary T2E 0B7 Plan 4647V Blocks 101 & 102 Le Roi Daniels 47 Fyffe Road SE Calgary T2H 1B9 Plan 3323HR Block A Louis Riel 9632 Oakfield Drive Calgary T2V 0V1 Plan 8026JK Block 4 Lot R36B

21 Calgary Board of Education Energy Efficiency Project ______

Building Name/Identifier Street Name City/Town Postal Code Legal Land Description Maple Ridge School 10203 Maplemont Road SE Calgary T2J 1W3 Plan 4542JK Block 5 Lot 1 Marion Carson 5225 Varsity Drive NW Calgary T3A 1A7 Plan Varsity Acres Calgary 4263JK Block B Marlborough 4711 Maryvale Drive NE Calgary T2A 3A1 Plan Marlborough Park Calgary 7410024 Block 11 Lot R37 Mayland Heights 2324 Maunsell Drive NE Calgary T2E 6A2 Plan 3629JK Block B Mckay Road 2012 Mackay Road NW Calgary T3B 1C7 Plan 2440JK Block E McKenzie Lake 16210 McKenzie Lake Way SE Calgary T2Z 1L7 Plan 9010819 Block 16 Lot 31MSR Melville Scott 1723 33 Street SW Calgary T3C 1P4 Plan 1066JK Block A Midnapore 44 Midpark Close SE Calgary T2X 1S4 Plan 8010333 Block 28 Lot 1MSR MidSun 660 Sunmills Drive SE Calgary T2X 3R5 Plan 8910750 Block 65 Lot 1MSR Monterey Park 7400 California Blvd. NE Calgary T1Y 6R2 Plan 9210184 Block 10 Lot 2MSR Montgomery 2116 MacKay Road NW Calgary T3B 1C7 Plan 2440JK Block E Mount Royal 2234 14 Street SW Calgary T2T 3T3 Plan 179R Block 52 Mount View 2004 4 Street NE Calgary T2E 3T8 Plan 9212433 Block 7 Lot 2SR Mountain Park 312 Mt. Douglas Close SE Calgary T2Z 4Y1 Plan 9911163 Block 6 Lot 1MSR N.E. Substation 2120 22 Street NE Calgary T3B 1C7 Plan 8310180 Block 8 Nellie McClung 2315 Palliser Drive SW Calgary T2V 3S4 Plan 5600JK Block 16 Nickle 2500 Lake Bonavista Drive SE Calgary T2J 2Y6 Plan 9212367 Block 1 Lot 97MSR North Haven 4922 North Haven Drive NW Calgary T2K 2K2 Plan 9211662 Block 8 Lot 24MSR O.S. Geiger 100 Castlebrook Drive NE Calgary T3J 2J4 Plan 8010517 Block 7 Lot 63MSR Oakley Centre 3904 20 Street SW Calgary T2T 4Z9 Plan 6058S Block Z Ogden 1919 76 Avenue SE Calgary T2C 0G8 Plan 900JK Block A Olympic Heights 875 Strathcona Drive SW Calgary T3H 2Z7 Plan 8011396 Block 1 Lot 1MSR Parkdale 728 32 Street NW Calgary T2N 2V9 Plan 8321AF Block W Patrick Airlie 1520 39 Street SE Calgary T2A 1H9 Plan 2700AH Block 12 Penbrooke Meadows 5645 Pensacola Crescent SE Calgary T2A 2G4 Plan 7315JK Block 11 Lot R4 Pineridge 1927 61 Street NE Calgary T1Y 4W6 Plan 9212109 Block 4 Lot 60SR Prince of Wales 253 Parkland Way SE Calgary T2J 3Y9 Plan 9212346 Block 8 Lot 114MSR Queen Elizabeth 1096, 512 18 Street NW Calgary T2N 2G5 Plan 6219L Block Y Queensland Downs 199 Queen Charlotte Way SE Calgary T2J 4H9 Plan 7410109 Block 24 Lot R1 R.T. Alderman 725 Mapleton Drive SE Calgary T2J 1S1 Plan 4542JK Block 5 Lot 1 Radisson Park 2805 Radcliffe Drive SE Calgary T2A 0C8 Plan 7710234 Block 10 Lot R1 Ramsay 2223 Spiller Road SE Calgary T2G 4G9 Plan 6260AM Block Z Ranchlands 610 Ranchlands Blvd NW Calgary T3G 2C5 Plan Ranchlands Calgary 7910993 Block 13 Lot 13MSR R.B. Bennett 6305 33 Avenue NW Calgary T3B 1K8 Plan 9211739 Block X Lot 1 Richmond 2701 22 Street SW Calgary T2T 5G5 Plan 8997GC Block 5 Lot B Rideau Park 829 Rideau Road SW Calgary T2S 0S2 Plan 310AK Lot OT Riverbend 65 Rivervalley Drive SE Calgary T2C 3Z7 Plan 9012574 Block 17 Lot 86MSR Riverside Bungalow 711 2 Avenue NE Calgary T2E 7W8 Plan 4647V Blocks 101 and 102 Robert Warren 12424 Elbow Drive SW Calgary T2W 1H2 Plan 3480JK Block 28 5958 4 Avenue NE Calgary T2A 4B1 Plan 7410861 Block RD Rosedale 905 13 Avenue NW Calgary T2M 0G3 Plan 383FR Block 3 Lot 1, 2,4 - 11 Rosemont 19 Rosevale Drive NW Calgary T2K 1N6 Plan Rosemont Calgary 5488HM Block 1 Lot 1 Rosscarrock 1406 40 Street SW Calgary T3C 1W7 Plan 795FK Block A Rundle 4120 Rundlehorn Drive NE Calgary T1Y 4W9 Plan 7610016 Block 12 Lot R50 Sam Livingston 12011 Bonaventure Dr. SE Calgary T2J 3G7 Plan 9212253 Lot 20SR Scenic Acres 50 Scurfield Way NW Calgary T3L 1T2 Plan 9010429 Block 1 Lot 2SR

22 Calgary Board of Education Energy Efficiency Project ______

Building Name/Identifier Street Name City/Town Postal Code Legal Land Description Senator Patrick Burns 2155 Chilcotin Road NW Calgary T2L 0X2 Plan Charleswood Calgary 1129HU Block C Shawnessy Middle 115 Shannon Drive SW Calgary T2Y 0K6 Plan 9111331 Block 34 Lot 51SR Sherwood 2011 66 Avenue SE Calgary T2C 1J4 Plan 5637HE Block Z Lot 2 Silvers Springs Elementary 7235 Silvermead Road NW Calgary T3B 3V1 Plan Silver Springs Calgary 731494 Block R43 Simon Fraser 5215 33 Street NW Calgary T2L 1V3 Plan 3968JK Block C Simons Valley 375 Sandarac Drive NW Calgary T3K 4B2 Plan 9110492 Block 27 Lot 100SR Sir John Franklin 2215 8 Avenue NE Calgary T2E 0T7 Plan 3629JK Block B Sir J. Lougheed 3519 36 Avenue SW Calgary T3E 1C2 Plan 9212347 Lot 21MSR Sir Winston Churchill 5220 Northland Drive NW Calgary T2L 2J6 Plan Calgary 5114R Block B Lots 2 & 3 Sir 819 32 Street SE Calgary T2A 0Y9 Plan 7710234 Block 10 Lot R1 Sir John A. Macdonald 6600 4 Street NW Calgary T2K 1C2 Plan 5036JK Block A Somerset 150 Somerset Manor SW Calgary T2Y 4S2 Plan 9813575 Block 5 Lot 117SR Stanley Jones 950 6 Street NE Calgary T2E 8M3 Plan 6133GA Block 19 Sunalta 536 Sonora Avenue SW Calgary T3C 2J9 Plan 5889AR Block 244 Lots 11-19 Sundance 200 Sunmills Drive SE Calgary T2X 2N9 Plan 8211250 Block 23 Lot 1MSR Sunnyside 211 7 Street NW Calgary T2N 1S2 Plan 1948P Block 17 Lots 1-2 Thomas B. Riley 3915 69 Street NW Calgary T3B 2J9 Plan 5023HV Block N Terrace Road 2103 46 Street NW Calgary T3B 1B3 Plan 7810845 Block R2 Terry Fox 139 Falshire Drive NE Calgary T3J 1P7 Plan 8011556 Block 5 Lot 69MSR Thorncliffe 5646 Thornton Road NW Calgary T2K 3B9 Plan 383FR Block 3 Lots 1, 2, 4-11 Tom Baines 250 Edgepark Blvd NW Calgary T3A 3S2 Plan 8411271 Block 14 Lot 40MSR Tuscany 990 Tuscany Drive NW Calgary T3L 2T4 Plan 0212109 Block 36 Lot 56MSR Tuxedo Park 130 28 Avenue NE Calgary T2E 2A8 Plan 3980AM Block 40 Lots 1-4 University 3035 Utah Drive NW Calgary T2N 3Z9 Plan 1440JK Block 7 Valley Creek 10951 Hidden Valley Drive NW Calgary T3A 6J2 Plan 9410711 Block 10 Lot 33MSR Valley View 4105 26 Avenue SE Calgary T2B 0C6 Plan 5676HQ Block A Van Horne 2215 Uxbridge Drive NW Calgary T2N 4Y3 Plan 1440JK Block 7 Varsity Acres 4255 40 Street NW Calgary T3A 0H7 Plan 5895JK Block S Vincent Massey 939 45 Street SW Calgary T3C 2B9 Plan 2768HH Block H Viscount Bennett 2519 Richmond Road SW Calgary T3E 4M2 Plan 8598GF Block B Vista Heights 2411 Vermillion Street NE Calgary T2E 6J3 Plan 4347JK Block 11 Lot A W.O. Mitchell 511 Silvergrove Drive NW Calgary T3B 4R9 Plan 7610683 Block R101 West Dalhousie 6502 58 Street NW Calgary T2A 3C8 Plan 731699 Block R8 West Dover 3113 30 Avenue SE Calgary T2B 0G9 Plan 9212324 Lot 20MSR Western Canada High 641 17 Avenue SW Calgary T2S 0B5 Plan 4453L Block 10A Westgate 150 Westminster Drive SW Calgary T3C 2T3 Plan 4994HN Block J Wildwood 120 45 Street SW Calgary T3C 2B3 Plan 8819HA Block 17 William Reid 1216 36 Avenue SW Calgary T2T 2E9 Plan 127AG Block 39 Lots 1-21 Willow Park 343 Willow Park Drive SE Calgary T2J 0K7 Plan 3035JK Block D Wilma Hansen 963 Queensland Drive SE Calgary T2J 5E5 Plan 7610474 Block 23 Lot R97 Windsor Park 5505 4A Street SW Calgary T2V 0Z7 Plan 1693AF Block 22 Lot C 3009 Morely Trail NW Calgary T2M 4G9 Plan 907GS Block 1 Woodbine 27 Woodfield Way SW Calgary T2W 5E1 Plan 7910309 Block 4 Lot 30MSR Woodlands Elementary 88 Woodgreen Drive SW Calgary T2W 4W9 Plan 7710714 Block R15 Woodman 8706 Elbow Drive SW Calgary T2V 1L2 Plan 8911515 Block 1

23 Calgary Board of Education Energy Efficiency Project ______

ANNEX B

Alberta Boiler Safety Association Narrative and Letter

24 Calgary Board of Education Energy Efficiency Project ______Alberta Safety and Maintenance Regs - Life Cycle of Boilers

The Alberta Boiler Safety Association (ABSA) is the provincial authority responsible for the administration of all boiler and pressure vessel safety programs in Alberta. ABSA has its roots in the province going back over 100 years when steam engines and boilers began to be used on the Canadian Prairies. In 1912, the new Boilers Act was passed by the Government of Alberta and, under the auspices of the American Society of Mechanical Engineers (ASME), the Boiler Design and Construction Code was developed. In 1994 The Safety Codes Act replaced the Boilers and Pressure Vessels Act. In 1995, ABSA was incorporated under the Societies Act and had been granted the authority, on behalf of the province, to enforce regulations under the Safety Codes Act.

The questions “What is Business as Usual and what is the life cycle of boilers in commercial and institutional buildings in Alberta and what are the circumstances where the replacement of boiler equipment is considered necessary” define boiler equipment end of life.

ABSA has the ongoing responsibility to regularly inspect and ensure that all boiler equipment is maintained properly and meets the standards set out by provincial regulation. It is the ABSA position that the replacement of boiler equipment is not considered ‘business as usual’ unless the equipment operator can no longer comply with the regulations ABSA enforces on behalf of the Government of Alberta. It is the norm for boilers to last numerous decades and to continue to operate satisfactorily given the highly robust nature of equipment, frequency of inspections (annual) and regular maintenance requirements dictated by ABSA to which manufacturers must adhere to meet provincial regulations. In the rare instance where boiler operators are out of compliance at the time of the ABSA inspection, inspectors formally advise the boiler operators and identify the measures necessary to bring the equipment into compliance with regulations. Thus, the life expectancy of boiler equipment is defined by the ability of boiler equipment operators to comply with existing safety regulations otherwise the equipment must be replaced.

ABSA responded to ECI that boiler equipment operators will, when significant financial resources permit, replace boiler equipment with more efficient boiler equipment. Their experience is that boiler equipment replacement rarely occurs out of step with building replacement except in the very infrequent case where equipment was found to be unsafe or was unmaintained and ABSA does not allow the equipment to operate.

Boiler equipment operators recognise that they must always ensure that existing boiler equipment complies with the regulations set out in the Safety Codes Act.

25 Calgary Board of Education Energy Efficiency Project ______

26 Calgary Board of Education Energy Efficiency Project ______

27 Calgary Board of Education Energy Efficiency Project ______

Annex C

Building Energy Consumption Baselines

28 Calgary Board of Education Energy Efficiency Project ______Calgary Board of Education Twelve Month Consecutive Baseline Identification Table

Facility Electricity/Gas Utility Account Baseline Period

A.E. CROSS Electricity Account : 20002356876 30-07-2002 until 29-07-2003 A.E. CROSS Natural Gas Account : 3017859553 01-02-2006 until 31-01-2007 ABBEYDALE Electricity Account : 20003414544 23-08-2002 until 20-08-2003 ABBEYDALE Natural Gas Account : 3683181016 21-11-2001 until 20-11-2002 ACADIA Electricity Account : 20005175408 22-11-2006 until 30-11-2007 ACADIA Natural Gas Account : 3441045018 30-08-2001 until 29-08-2002 ALBERT PARK Electricity Account : 20002322460 09-10-2002 until 09-10-2003 ALBERT PARK Natural Gas Account : 3449680816 08-11-2001 until 07-11-2002 ALEX FERGUSON Electricity Account : 20002322825 13-10-2004 until 20-10-2005 ALEX FERGUSON Electricity Account : 20002322812 09-04-2005 until 22-04-2006 ALEX FERGUSON Natural Gas Account : 3441029217 14-08-2007 until 08-08-2008 ALEX MUNRO Electricity Account : 20002356200 08-11-2002 until 05-11-2003 ALEX MUNRO Natural Gas Account : 3441034518 03-11-2006 until 06-11-2007 ALTADORE Electricity Account : 20002356905 03-01-2003 until 30-12-2003 ALTADORE Natural Gas Account : 3441038615 16-04-2001 until 17-04-2002 ANDREW DAVISON Natural Gas Account : 3441045018 28-07-2000 until 27-07-2001 ANDREW SIBBALD Electricity Account : 20002357541 16-04-2007 until 30-04-2008 ANDREW SIBBALD Natural Gas Account : 3441052618 14-09-2007 until 24-08-2008 ANNIE FOOTE Electricity Account : 20003409978 27-07-2002 until 27-07-2003 ANNIE FOOTE Natural Gas Account : 3688309615 21-07-2006 until 18-07-2007 ANNIE GALE Electricity Account : 20001375554 28-02-2007 until 29-02-2008 ANNIE GALE Natural Gas Account : 3838321818 25-01-2002 until 29-01-2003 ARBOUR LAKE Electricity Account : 20005935367 01-10-2007 until 30-09-2008 ARBOUR LAKE Natural Gas Account : 3023786734 20-06-2008 until 30-06-2009 BALMORAL Electricity Account : 20002356290 20-12-2002 until 19-12-2003 BALMORAL Natural Gas Account : 3441061218 11-09-2003 until 08-09-2004 BALMORAL Bungalow Electricity Account : 20002322341 11-01-2006 until 10-01-2007 BANFF TRAIL Electricity Account : 20002356434 04-05-2007 until 31-05-2008 BANFF TRAIL Electricity Account : 20002356421 04-05-2007 until 31-05-2008 BANFF TRAIL Natural Gas Account : 3441062516 12-09-2003 until 14-09-2004 BANTING & BEST Electricity Account : 20003370643 13-09-2006 until 30-09-2007 BANTING & BEST Natural Gas Account : 3627627714 29-06-2000 until 26-06-2001 BATTALION PARK Electricity Account : 20005953127 01-03-2008 until 28-02-2009 BATTALION PARK Electricity Account : 20004973354 22-09-2006 until 30-09-2007 BATTALION PARK Natural Gas Account : 3990480411 02-08-2003 until 31-07-2004 BEAVERBROOK Electricity Account : 20002358160 09-10-2002 until 08-10-2003 BEAVERBROOK Natural Gas Account : 3022922051 01-02-2006 until 31-01-2007 BEDDINGTON HGTS Electricity Account : 20003388273 13-08-2002 until 07-08-2003 BEDDINGTON HGTS Natural Gas Account : 3655275618 01-12-2000 until 03-01-2002 BELFAST Electricity Account : 20002322397 01-02-2008 until 31-01-2009 BELFAST Electricity Account : 20002322384 20-08-2005 until 14-08-2006 BELFAST Natural Gas Account : 3449681010 31-01-2009 until 28-01-2010 BELVEDERE PKWY Electricity Account : 20002356447 30-08-2005 until 26-08-2006 BELVEDERE PKWY Natural Gas Account : 3441065417 30-08-2000 until 23-08-2001 BISHOP PINKHAM Electricity Account : 20002357010 19-07-2007 until 31-07-2008 BISHOP PINKHAM Natural Gas Account : 3441068216 26-09-2003 until 30-09-2004 BOB EDWARDS Electricity Account : 20002357201 16-01-2004 until 16-01-2005

29 Calgary Board of Education Energy Efficiency Project ______BOB EDWARDS Natural Gas Account : 3449681214 20-06-2006 until 19-06-2007 BOWCROFT Electricity Account : 20002356510 25-08-2006 until 25-08-2007 BOWCROFT Natural Gas Account : 3441073610 28-06-2000 until 27-06-2001 BOWNESS Electricity Account : 20002358011 29-04-2005 until 24-04-2006 BOWNESS Electricity Account : 20002358007 23-04-2007 until 30-04-2008 BOWNESS Natural Gas Account : 3018352354 01-02-2006 until 31-01-2007 BOWNESS SUB-ST Electricity Account : 20002374933 01-08-2002 until 30-07-2003 BOWNESS SUB-ST Natural Gas Account : 3403408610 01-01-2009 until 31-12-2009 BRAESIDE Electricity Account : 20002357172 08-01-2003 until 06-01-2004 BRAESIDE Natural Gas Account : 3441075714 29-08-2000 until 28-08-2001 BRANTON Electricity Account : 20002356345 01-07-2009 until 30-06-2010 BRANTON Natural Gas Account : 3441081218 29-09-2000 until 27-09-2001 BRENTWOOD Electricity Account : 20005159123 05-06-2007 until 31-05-2008 BRENTWOOD Natural Gas Account : 3441081311 27-06-2000 until 26-06-2001 BRIAR HILL Electricity Account : 20002356286 01-11-2008 until 31-10-2009 BRIAR HILL Electricity Account : 20002356273 31-07-2004 until 03-08-2005 BRIAR HILL Natural Gas Account : 3441084212 02-12-2000 until 03-01-2002 BUCHANAN Electricity Account : 20002356154 21-09-2002 until 22-09-2003 BUCHANAN Electricity Account : 20002356141 11-08-2006 until 23-08-2007 BUCHANAN Natural Gas Account : 3441088216 10-10-2001 until 08-10-2002 C.N.GUNN Electricity Account : 20002356226 01-08-2008 until 31-07-2009 C.N.GUNN Natural Gas Account : 3441095714 02-03-2002 until 07-03-2003 CAMBRIAN HGTS. Electricity Account : 20002356451 09-10-2002 until 06-10-2003 CAMBRIAN HGTS. Natural Gas Account : 3441088318 10-05-2008 until 30-04-2009 CANYON MEADOWS Electricity Account : 20002357040 16-01-2007 until 31-01-2008 CANYON MEADOWS Natural Gas Account : 3441089310 28-07-2000 until 27-07-2001 CAPITOL HILL Electricity Account : 20002356362 31-07-2004 until 03-08-2005 CAPITOL HILL Electricity Account : 20002356358 03-11-2006 until 30-11-2007 CAPITOL HILL Natural Gas Account : 3441091617 13-01-2004 until 13-01-2005 CAPPY SMART Electricity Account : 20002356082 28-02-2007 until 29-02-2008 CAPPY SMART Natural Gas Account : 3606895310 18-11-2000 until 19-11-2001 CAPT J.PALLISER Electricity Account : 20002356596 10-03-2006 until 08-03-2007 CAPT J.PALLISER Natural Gas Account : 3441092618 15-08-2003 until 19-08-2004 CECIL SWANSON Electricity Account : 20003414663 29-09-2006 until 30-09-2007 CECIL SWANSON Natural Gas Account : 3688306510 23-08-2000 until 22-08-2001 CEDARBRAE Electricity Account : 20002357125 16-05-2006 until 15-05-2007 CEDARBRAE Natural Gas Account : 3441095816 27-02-2002 until 26-02-2003 CENTENNIAL HIGH Electricity Account : 20005600025 10-11-2006 until 30-11-2007 CENTRAL MEM Electricity Account : 20002358054 01-11-2007 until 31-10-2008 CENTRAL MEM Natural Gas Account : 3018490852 01-12-2005 until 30-11-2006 CHAPARRAL SCHOOL Electricity Account : 20006023775 09-12-2006 until 31-12-2007 CHAPARRAL SCHOOL Natural Gas Account : 3031244742 31-10-2006 until 13-11-2007 CHIEF JUSTICE MILVAIN Electricity Account : 20003508903 28-02-2007 until 29-02-2008 CHIEF JUSTICE MILVAIN Natural Gas Account : 3808721313 25-01-2002 until 29-01-2003 CHINOOK PARK Electricity Account : 20002357053 17-10-2006 until 31-10-2007 CHINOOK PARK Natural Gas Account : 3441119216 27-06-2000 until 27-06-2001 CHRIS AKKERMAN Electricity Account : 20002357600 31-08-2006 until 28-08-2007 CHRIS AKKERMAN Natural Gas Account : 3449710518 18-08-2000 until 20-08-2001 CHRIS. MEIKLE Electricity Account : 20002356230 04-05-2007 until 31-05-2008 CHRIS. MEIKLE Natural Gas Account : 3449736218 30-11-2000 until 31-12-2001 CHRIS. MEIKLE Natural Gas Account : 3449728517 30-06-2001 until 27-06-2002 CITADEL PARK SCHOOL Electricity Account : 20005881440 01-12-2007 until 30-11-2008 CITADEL PARK SCHOOL Natural Gas Account : 3020182228 28-12-2006 until 19-12-2007 CLARENCE SANSOM Electricity Account : 20003658860 01-05-2009 until 30-04-2010 30 Calgary Board of Education Energy Efficiency Project ______CLARENCE SANSOM Natural Gas Account : 3824642011 30-05-2009 until 28-05-2010 CLINTON FORD Electricity Account : 20002322337 21-06-2006 until 22-06-2007 CLINTON FORD Natural Gas Account : 3441125518 20-01-2004 until 18-01-2005 COL. IRVINE Electricity Account : 20002356536 02-06-2006 until 03-06-2007 COL. IRVINE Natural Gas Account : 3441131811 28-11-2001 until 27-11-2002 COL. J.F.SCOTT Electricity Account : 20002357936 31-10-2006 until 31-10-2007 COL. J.F.SCOTT Natural Gas Account : 3449753614 16-05-2007 until 16-05-2008 COL. MACLEOD Electricity Account : 20002322592 01-11-2005 until 02-11-2006 COL. MACLEOD Natural Gas Account : 3449763410 30-11-2002 until 05-01-2004 COL. SANDERS Electricity Account : 20002322796 22-03-2003 until 17-03-2004 COL. SANDERS Electricity Account : 20002322783 17-12-2004 until 06-01-2006 COL. SANDERS Natural Gas Account : 3441138215 30-08-2000 until 06-09-2001 COL. WALKER Electricity Account : 20002357320 11-11-2005 until 03-11-2006 COLLINGWOOD Electricity Account : 20002356477 06-06-2006 until 04-06-2007 COLLINGWOOD Natural Gas Account : 3441128317 29-08-2000 until 13-09-2001 CONNAUGHT Natural Gas Account : 3441148614 22-10-2003 until 20-10-2004 COVENTRY HILLS Electricity Account : 20005755492 04-04-2006 until 25-04-2007 COVENTRY HILLS Natural Gas Account : 3016183985 24-02-2006 until 22-02-2007 CRESCENT HGTS Electricity Account : 20002357940 08-08-2005 until 02-08-2006 CRESCENT HGTS Natural Gas Account : 3018664956 01-02-2006 until 31-01-2007 CROSSING PARK Electricity Account : 20005316721 30-12-2005 until 04-01-2007 CROSSING PARK Natural Gas Account : 3623398662 25-02-2006 until 26-02-2007 DALHOUSIE Electricity Account : 20002356612 28-08-2002 until 21-08-2003 DALHOUSIE Natural Gas Account : 3441166714 14-07-2005 until 14-07-2006 DAVID D.OUGHTON Electricity Account : 20002357257 10-10-2002 unti 08-10-2003 DAVID D.OUGHTON Natural Gas Account : 3449782316 09-10-2003 until 31-10-2004 DAVID THOMPSON Electricity Account : 20002357405 07-09-2005 until 14-09-2006 DAVID THOMPSON Natural Gas Account : 3441168512 28-11-2002 until 27-11-2003 DEER RUN Electricity Account : 20003571540 10-11-2006 until 30-11-2007 DEER RUN Natural Gas Account : 3666410810 01-05-2001 until 29-04-2002 DOUGLAS HARKNESS Electricity Account : 20002356095 07-09-2006 until 30-09-2007 DOUGLAS HARKNESS Natural Gas Account : 3449782418 25-08-2000 until 23-08-2001 DOUGLASDALE ELEM Natural Gas Account : 3045359625 01-08-2006 until 01-08-2007 DR CARL SAFRAN Electricity Account : 20002357571 09-12-2006 until 31-12-2007 DR E.P.SCARLETT Electricity Account : 20002357567 16-04-2007 until 30-04-2008 DR E.P.SCARLETT Natural Gas Account : 3018705056 01-10-2005 until 30-09-2006 DR E.W.COFFIN Electricity Account : 20002356685 10-08-2006 until 20-08-2007 DR E.W.COFFIN Natural Gas Account : 3441181310 27-06-2000 until 26-06-2001 DR G.HIGGINS Electricity Account : 20002356171 30-04-2007 until 30-04-2008 DR G.HIGGINS Natural Gas Account : 3449830016 22-11-2001 until 21-11-2002 DR G.M.EGBERT Electricity Account : 20003922724 24-09-2002 until 21-09-2003 DR G.M.EGBERT Natural Gas Account : 3449822612 28-01-2009 until 28-01-2010 DR J.K.MULLOY Electricity Account : 20002356332 02-11-2006 until 30-11-2007 DR J.K.MULLOY Natural Gas Account : 3441184313 07-01-2003 until 06-01-2004 EARL GREY Electricity Account : 20002356820 03-06-2003 until 29-06-2004 ED CENTRE Electricity Account : 20002357554 01-08-2008 until 30-06-2009 ED CENTRE Natural Gas Account : 3019574352 01-12-2005 until 30-11-2006 EDGEMONT Electricity Account : 20003886007 01-02-2009 until 31-01-2010 EDGEMONT Natural Gas Account : 3834749812 29-07-2000 until 30-07-2001 ELBOW PARK Electricity Account : 20002322490 25-08-2006 until 26-08-2007 ELBOW PARK Natural Gas Account : 3441191811 26-07-2004 until 30-06-2005 ELBOYA Electricity Account : 20002356948 09-11-2006 until 30-11-2007 ELBOYA Natural Gas Account : 3441197511 20-08-2000 until 31-08-2001 EMILY FOLLENSBE Electricity Account : 20002322842 27-06-2002 until 30-06-2003 31 Calgary Board of Education Energy Efficiency Project ______EMILY FOLLENSBE Natural Gas Account : 3672371316 26-07-2008 until 30-06-2009 ERIN WOODS Electricity Account : 20003595765 05-12-2002 until 30-11-2003 ERIN WOODS Natural Gas Account : 3824310615 13-02-2004 until 08-02-2005 ERLTON Electricity Account : 20002322528 30-07-2004 until 02-08-2005 ERLTON Natural Gas Account : 3441203311 23-09-2003 until 22-09-2004 ERNEST MANNING Electricity Account : 20002358024 09-09-2005 until 19-09-2006 ERNEST MANNING Natural Gas Account : 3019890651 01-10-2005 until 30-09-2006 ERNEST MORROW Electricity Account : 20003816394 13-01-2007 until 31-01-2008 ERNEST MORROW Electricity Account : 20002357244 11-11-2005 until 13-11-2006 ERNEST MORROW Natural Gas Account : 3449830211 23-03-2002 until 26-03-2003 ETHEL M.JOHNSON Electricity Account : 20002357185 23-08-2006 until 22-08-2007 ETHEL M.JOHNSON Natural Gas Account : 3441212217 24-07-2008 until 30-06-2009 EUGENE COSTE Electricity Account : 20002357142 24-08-2006 until 24-08-2007 EUGENE COSTE Natural Gas Account : 3441213311 27-10-2006 until 25-10-2007 F.E. OSBORNE Electricity Account : 20002356570 30-12-2004 until 01-12-2005 F.E. OSBORNE Electricity Account : 20002356566 01-08-2002 until 29-07-2003 F.E. OSBORNE Natural Gas Account : 3441221411 28-04-2001 until 29-04-2002 FAIRVIEW Electricity Account : 20002357363 07-09-2005 until 17-09-2006 FAIRVIEW Natural Gas Account : 3020026950 01-03-2006 until 28-02-2007 FALCONRIDGE Electricity Account : 20003406062 30-10-2006 until 31-10-2007 FALCONRIDGE Natural Gas Account : 3683148413 30-01-2003 until 28-01-2004 FISH CREEK Electricity Account : 20004015224 16-10-2003 until 12-10-2004 FISH CREEK Natural Gas Account : 3859892212 18-02-2004 until 09-02-2005 FOREST LAWN Electricity Account : 20002358097 04-10-2002 until 02-10-2003 FOREST LAWN Natural Gas Account : 3021289754 01-12-2005 until 30-11-2006 FRED SEYMOUR Natural Gas Account : 3441260512 26-10-2001 until 28-10-2002 G.P. VANIER Electricity Account : 20002356124 01-02-2009 until 31-01-2010 G.P. VANIER Natural Gas Account : 3449849814 08-08-2007 until 08-08-2008 G.W. SKENE Electricity Account : 20004028142 07-05-2007 until 31-05-2008 G.W. SKENE Natural Gas Account : 3449849712 16-02-2004 until 11-02-2005 GLAMORGAN Electricity Account : 20002356918 28-12-2002 until 23-12-2003 GLAMORGAN Natural Gas Account : 3441264618 29-08-2000 until 13-08-2001 GLENBROOK Electricity Account : 20002356880 30-07-2002 until 28-07-2003 GLENBROOK Natural Gas Account : 3441269215 10-11-2001 until 12-11-2002 GLENDALE Electricity Account : 20002356935 15-04-2003 until 14-04-2004 GLENDALE Electricity Account : 20002356922 14-05-2003 until 11-05-2004 GLENMEADOWS SUB Electricity Account : 20002322545 15-01-2003 until 13-01-2004 GLENMEADOWS SUB Natural Gas Account : 3441275211 10-01-2003 until 08-01-2004 GRANT MAC EWAN Electricity Account : 20003736012 01-01-2008 until 30-11-2008 GRANT MAC EWAN Natural Gas Account : 3853582218 28-02-2002 until 27-02-2003 GREENVIEW Electricity Account : 20002356184 03-10-2006 until 30-11-2007 GREENVIEW Natural Gas Account : 3449862714 03-04-2001 until 04-04-2002 GUY WEADICK Electricity Account : 20002356052 29-08-2002 until 25-08-2003 GUY WEADICK Natural Gas Account : 3639456318 26-01-2002 until 27-01-2003 H. PANABAKER Electricity Account : 20002357168 23-08-2002 until 20-08-2003 H. PANABAKER Natural Gas Account : 3441293218 01-01-2009 until 31-12-2009 H.D. CARTWRIGHT Electricity Account : 20002356655 19-09-2005 until 25-09-2006 H.D. CARTWRIGHT Natural Gas Account : 3441290215 15-02-2004 until 11-02-2005 HAMPTONS Electricity Account : 20004521046 26-07-2003 until 26-07-2004 HAMPTONS Natural Gas Account : 3967311510 28-02-2002 until 25-02-2003 HAROLD W RILEY Electricity Account : 20002357274 06-07-2002 until 07-07-2003 HAULTAIN MEM Electricity Account : 20003421023 23-08-2002 until 20-08-2003 HAULTAIN MEM Natural Gas Account : 3638440815 28-06-2000 until 27-06-2001 HAWKWOOD Electricity Account : 20004017392 16-02-2005 until 22-02-2006 32 Calgary Board of Education Energy Efficiency Project ______HAYSBORO Electricity Account : 20002357096 22-12-2005 until 15-12-2006 HAYSBORO Natural Gas Account : 3441301911 28-06-2000 until 28-06-2001 HENRY WISE WOOD Electricity Account : 20002358071 12-08-2002 until 11-08-2003 HENRY WISE WOOD Natural Gas Account : 3022022671 01-10-2005 until 30-09-2006 HIDDEN VALLEY Electricity Account : 20005340075 05-12-2003 until 02-12-2004 HIDDEN VALLEY Natural Gas Account : 3673148947 06-01-2007 until 09-01-2008 HIGHFIELD Natural Gas Account : 3049733328 01-01-2009 until 31-12-2009 HIGHWOOD Electricity Account : 20002356583 09-08-2002 until 08-08-2003 HIGHWOOD Natural Gas Account : 3441302513 07-04-2001 until 09-04-2002 HILLHURST Electricity Account : 20002322588 16-08-2002 until 14-08-2003 HILLHURST Electricity Account : 20002322575 07-03-2007 until 31-03-2008 HILLHURST Natural Gas Account : 3441310214 01-11-2001 until 05-11-2002 HUNTINGTON HILL Electricity Account : 20002356698 03-10-2006 until 31-10-2007 HUNTINGTON HILL Natural Gas Account : 3441315210 04-07-2003 until 31-05-2004 IAN BAZALGETTE Electricity Account : 20006288217 01-02-2009 until 31-01-2010 IAN BAZALGETTE Natural Gas Account : 3449895216 24-10-2001 until 28-10-2002 J.G.DIEFENBAKER Electricity Account : 20006266496 01-08-2009 until 31-07-2010 J.G.DIEFENBAKER Electricity Account : 20002356213 07-04-2003 until 01-04-2004 J.G.DIEFENBAKER Natural Gas Account : 3022515457 01-08-2006 until 31-07-2007 JACK JAMES Electricity Account : 20003433925 08-01-2007 until 31-01-2008 JACK JAMES Natural Gas Account : 3044496152 01-12-2005 until 30-11-2006 JAMES FOWLER Electricity Account : 20002357996 20-09-2002 until 21-09-2003 JAMES FOWLER Natural Gas Account : 3022060550 01-12-2005 until 30-11-2006 JAMES SHORT MEM Electricity Account : 20002357231 08-09-2006 until 30-09-2007 JAMES SHORT MEM Natural Gas Account : 3449895318 16-11-2001 until 15-11-2002 JANET JOHNSTONE Electricity Account : 20003618767 13-10-2006 until 31-10-2007 JANET JOHNSTONE Natural Gas Account : 3668023414 01-01-2009 until 31-12-2009 JENNIE ELLIOTT Electricity Account : 20002357023 27-08-2004 until 29-08-2005 JENNIE ELLIOTT Natural Gas Account : 3441320613 27-07-2000 until 06-07-2001 JOHN WARE Electricity Account : 20002357155 02-12-2003 until 30-11-2004 JOHN WARE Natural Gas Account : 3441324218 27-04-2001 until 26-04-2002 KEELER Electricity Account : 20002357214 05-12-2002 until 02-12-2003 KEELER Natural Gas Account : 3449897710 15-05-2003 until 19-05-2004 KENSINGTON RD Electricity Account : 20002356302 03-04-2006 until 05-04-2007 KENSINGTON RD Natural Gas Account : 3441350316 03-11-2000 until 02-11-2001 KILLARNEY Electricity Account : 20002356846 19-05-2007 until 31-05-2008 KILLARNEY Electricity Account : 20002356833 21-02-2007 until 29-02-2008 KILLARNEY Natural Gas Account : 3441379817 13-07-2005 until 12-07-2006 KING EDWARD Electricity Account : 20002356850 02-11-2002 until 03-11-2003 KING EDWARD Natural Gas Account : 3441388018 13-03-2002 until 14-03-2003 KING GEORGE Electricity Account : 20005163601 03-04-2007 until 30-04-2008 KING GEORGE Natural Gas Account : 3441400018 09-11-2001 until 08-11-2002 KINGSLAND Electricity Account : 20002358084 16-06-2007 until 30-06-2008 KINGSLAND Natural Gas Account : 3441400213 29-01-2003 until 28-01-2004 KNOB HILL Natural Gas Account : 3441408314 15-11-2001 until 14-11-2002 L B PEARSON Electricity Account : 20003863208 01-08-2002 until 31-07-2003 L B PEARSON Natural Gas Account : 3010474353 01-10-2005 until 30-09-2006 LAKE BONAVISTA Electricity Account : 20002357507 16-05-2007 until 31-05-2008 LAKE BONAVISTA Natural Gas Account : 3441416813 28-09-2001 until 27-09-2002 LANGEVIN Electricity Account : 20002356018 21-02-2003 until 18-02-2004 LANGEVIN Electricity Account : 20002356005 03-11-2006 until 30-11-2007 LANGEVIN Natural Gas Account : 3449908014 25-01-2002 until 29-01-2003 LE ROI DANIELS Electricity Account : 20002357333 24-08-2006 until 25-08-2007 LE ROI DANIELS Natural Gas Account : 3441419213 26-05-2000 until 28-05-2001 33 Calgary Board of Education Energy Efficiency Project ______LOUIS RIEL Electricity Account : 20002357112 04-04-2006 until 29-03-2007 LOUIS RIEL Electricity Account : 20002357108 17-01-2007 until 31-01-2008 LOUIS RIEL Natural Gas Account : 3441421316 29-08-2006 until 29-08-2007 MAPLE RIDGE Electricity Account : 20002357511 20-09-2002 until 20-09-2003 MAPLE RIDGE Natural Gas Account : 3441427211 29-08-2003 until 31-08-2004 MARION CARSON Electricity Account : 20002356388 01-08-2002 until 29-07-2003 MARION CARSON Natural Gas Account : 3441435812 27-07-2007 until 28-07-2008 MARLBOROUGH Electricity Account : 20002356022 01-03-2008 until 28-02-2009 MARLBOROUGH Natural Gas Account : 3449908218 21-06-2007 until 18-06-2008 MAYLAND HEIGHTS Electricity Account : 20002357877 21-08-2002 until 20-08-2003 MAYLAND HEIGHTS Natural Gas Account : 3449910210 08-04-2003 until 07-04-2004 MCKAY ROAD Electricity Account : 20002356392 31-12-2002 until 30-12-2003 MCKAY ROAD Natural Gas Account : 3441438815 29-09-2000 until 17-09-2001 MCKENZIE LAKE Electricity Account : 20004200876 17-10-2002 until 14-10-2003 MCKENZIE LAKE Natural Gas Account : 3895429711 20-11-2001 until 19-11-2002 MELVILLE SCOTT Natural Gas Account : 3441440018 21-04-2001 until 15-04-2002 MIDNAPORE Electricity Account : 20002358156 18-11-2005 until 09-11-2006 MIDNAPORE Natural Gas Account : 3612621517 28-12-2001 until 27-12-2002 MIDNAPORE SUB-ST Electricity Account : 20003298006 16-03-2005 until 14-03-2006 MIDNAPORE SUB-ST Natural Gas Account : 3638736215 28-09-2000 until 27-09-2001 MIDSUN Electricity Account : 20004387270 14-12-2002 until 10-12-2003 MIDSUN Natural Gas Account : 3923709312 12-07-2008 until 30-06-2009 MONTEREY PARK Electricity Account : 20005447908 28-10-2005 until 29-10-2006 MONTEREY PARK Natural Gas Account : 3524307412 28-08-2003 until 24-08-2004 MONTGOMERY Electricity Account : 20002356417 30-08-2006 until 25-08-2007 MOUNT ROYAL Electricity Account : 20002356816 03-01-2003 until 02-01-2004 MOUNT ROYAL Natural Gas Account : 3403337211 19-05-2001 until 21-05-2002 MOUNT VIEW Electricity Account : 20002322621 21-09-2004 until 28-09-2005 MOUNTAIN PARK Electricity Account : 20005970095 10-11-2006 until 30-11-2007 MOUNTAIN PARK Natural Gas Account : 3019917126 15-12-2006 until 19-12-2007 N.E. SUB STATION Electricity Account : 20003694483 10-01-2003 until 08-01-2004 N.E. SUB STATION Natural Gas Account : 3837641715 04-11-2000 until 05-11-2001 NELLIE MCCLUNG Electricity Account : 20002357066 01-04-2004 until 06-04-2005 NELLIE MCCLUNG Natural Gas Account : 3441447517 27-05-2003 until 31-05-2004 NICKLE Electricity Account : 20002357350 20-11-2002 until 16-11-2003 NICKLE Natural Gas Account : 3441456915 28-12-2002 until 30-12-2003 NORTH HAVEN Electricity Account : 20002356642 24-09-2002 until 23-09-2003 NORTH HAVEN Natural Gas Account : 3441457016 28-07-2000 until 08-08-2001 O.S.GEIGER Electricity Account : 20003669950 29-10-2002 until 23-10-2003 O.S.GEIGER Natural Gas Account : 3832061518 29-11-2001 until 29-11-2002 OAKLEY CENTRE Electricity Account : 20002356893 25-07-2006 until 24-07-2007 OAKLEY CENTRE Natural Gas Account : 3441188716 18-11-2003 until 17-11-2004 OGDEN Natural Gas Account : 3441472818 27-02-2002 until 26-02-2003 OLYMPIC HEIGHTS Electricity Account : 20003906600 20-04-2007 until 30-04-2008 OLYMPIC HEIGHTS Natural Gas Account : 3843432315 27-07-2000 until 04-07-2001 PARKDALE Electricity Account : 20002356260 04-06-2003 until 02-06-2004 PATRICK AIRLIE Electricity Account : 20002322473 01-07-2008 until 30-06-2009 PATRICK AIRLIE Natural Gas Account : 3449988311 11-10-2003 until 12-10-2004 PEN. MEADOWS Electricity Account : 20002357316 08-09-2006 until 30-09-2007 PEN. MEADOWS Natural Gas Account : 3449988413 16-07-2000 until 16-07-2001 PINERIDGE Electricity Account : 20002356078 01-11-2007 until 31-10-2008 PINERIDGE Natural Gas Account : 3606935513 23-07-2000 until 24-07-2001 PRINCE OF WALES Electricity Account : 20002357482 21-10-2004 until 13-10-2005 PRINCE OF WALES Natural Gas Account : 3441477916 28-06-2000 until 27-06-2001 34 Calgary Board of Education Energy Efficiency Project ______QUEEN ELIZ. EL. Electricity Account : 20002356256 01-10-2004 until 04-10-2005 QUEEN ELIZ. EL. Electricity Account : 20002356243 31-12-2004 until 09-01-2006 QUEEN ELIZ. EL. Natural Gas Account : 3441478917 03-11-2001 until 05-11-2002 QUEEN ELIZ. SNR Natural Gas Account : 3026225983 01-10-2005 until 30-09-2006 QUEENSLAND DOWN Electricity Account : 20002357478 22-07-2004 until 20-07-2005 QUEENSLAND DOWN Natural Gas Account : 3441494811 27-02-2007 until 27-02-2008 R.T.ALDERMAN Electricity Account : 20002357465 21-09-2002 until 18-09-2003 R.T.ALDERMAN Natural Gas Account : 3441550713 28-06-2000 until 27-06-2001 RADISSON PARK Electricity Account : 20005991626 02-10-2006 until 31-10-2007 RAMSAY Electricity Account : 20002322664 13-10-2006 until 31-10-2007 RAMSAY Natural Gas Account : 3441507516 24-09-2003 until 23-09-2004 RANCHLANDS Electricity Account : 20003393013 23-11-2002 until 18-11-2003 RANCHLANDS Natural Gas Account : 3651399518 01-02-2009 until 28-01-2010 RB BENNETT Natural Gas Account : 3441497016 22-01-2003 until 19-01-2004 RICHMOND Electricity Account : 20002322723 01-11-2007 until 31-10-2008 RICHMOND Electricity Account : 20002322710 20-04-2007 until 30-04-2008 RIDEAU PARK Electricity Account : 20002356863 04-01-2005 until 18-01-2006 RIDEAU PARK Natural Gas Account : 3441519212 23-01-2002 until 22-01-2003 RIVERBEND Electricity Account : 20004200880 15-04-2003 until 11-04-2004 RIVERBEND Natural Gas Account : 3895437310 25-10-2001 until 28-10-2002 RIVERSIDE BUNGALOW Electricity Account : 20002322694 11-05-2006 until 03-05-2007 ROBERT WARREN Electricity Account : 20002357036 15-11-2006 until 30-11-2007 ROLAND MICHENER Electricity Account : 20002357613 28-02-2007 until 29-02-2008 ROLAND MICHENER Natural Gas Account : 3449998914 22-08-2000 until 20-07-2001 ROSEDALE Electricity Account : 20002322706 05-10-2006 until 31-10-2007 ROSEDALE Natural Gas Account : 3441534912 30-11-2002 until 28-11-2003 ROSEMONT Electricity Account : 20002322681 01-10-2008 until 30-09-2009 ROSEMONT Electricity Account : 20002322677 06-01-2005 until 09-01-2006 ROSEMONT Natural Gas Account : 3441546617 11-01-2003 until 12-01-2004 ROSSCARROCK Electricity Account : 20002356787 14-01-2005 until 25-01-2006 ROSSCARROCK Natural Gas Account : 3441547618 08-03-2002 until 07-03-2003 RUNDLE Electricity Account : 20003966643 01-09-2008 until 31-08-2009 RUNDLE Natural Gas Account : 3614073317 22-11-2001 until 21-11-2002 SAM LIVINGSTON Electricity Account : 20002357524 07-04-2002 until 20-04-2003 SAM LIVINGSTON Natural Gas Account : 3441555217 27-04-2002 until 28-04-2003 SCENIC ACRES ELEM. Electricity Account : 20005130518 22-07-2005 until 28-07-2006 SEN. P.BURNS Electricity Account : 20002356481 03-10-2003 until 30-09-2004 SEN. P.BURNS Natural Gas Account : 3403342614 29-05-2001 until 28-05-2002 SHAUGHNESSY Electricity Account : 20002358067 28-12-2002 until 31-12-2003 SHAUGHNESSY Natural Gas Account : 3027100455 01-01-2006 until 31-12-2006 SHERWOOD Electricity Account : 20002932238 09-01-2007 until 31-01-2008 SHERWOOD Natural Gas Account : 3441578211 29-11-2007 until 22-11-2008 SILVER SPRINGS Electricity Account : 20002356714 26-01-2007 until 31-01-2008 SILVER SPRINGS Natural Gas Account : 3441580314 28-07-2000 until 23-07-2001 SIMON FRASER Electricity Account : 20002356668 04-10-2002 until 01-10-2003 SIMON FRASER Natural Gas Account : 3441580518 24-02-2006 until 23-02-2007 SIMONS VALLEY Electricity Account : 20003917601 26-04-2007 until 30-04-2008 SIMONS VALLEY Natural Gas Account : 3846152210 02-02-2007 until 04-02-2008 SIR J.A. MACDONALD Electricity Account : 20002356701 02-10-2006 until 31-10-2007 SIR J.A. MACDONALD Natural Gas Account : 3441587915 23-06-2006 until 25-06-2007 SIR J.FRANKLIN Natural Gas Account : 3600043811 28-08-2003 until 31-08-2004 SIR J.LOUGHEED Electricity Account : 20002322740 26-08-2006 until 25-08-2007 SIR J.LOUGHEED Electricity Account : 20002322736 01-11-2007 until 31-10-2008 SIR J.LOUGHEED Natural Gas Account : 3441583317 29-08-2000 until 14-08-2001 35 Calgary Board of Education Energy Efficiency Project ______SIR W.CHURCHILL Electricity Account : 20006138855 01-02-2008 until 31-01-2009 SIR W.CHURCHILL Electricity Account : 20002356672 02-10-2002 until 01-10-2003 SIR W.CHURCHILL Natural Gas Account : 3027719050 01-10-2005 until 30-09-2006 SIR W.LAURIER Electricity Account : 20002357227 08-01-2007 until 31-01-2008 SIR W.LAURIER Natural Gas Account : 3600051317 27-11-2004 until 18-11-2005 SOMERSET Electricity Account : 20005476410 15-03-2007 until 31-03-2008 SOMERSET Natural Gas Account : 3198504086 26-08-2003 until 31-07-2004 STANLEY JONES Electricity Account : 20002356048 03-11-2006 until 30-11-2007 STANLEY JONES Natural Gas Account : 3600051512 25-01-2002 until 29-01-2003 SUNALTA Electricity Account : 20002356761 11-12-2002 until 09-12-2003 SUNALTA Natural Gas Account : 3441618210 16-01-2004 until 17-01-2005 SUNDANCE Electricity Account : 20003602362 13-09-2006 until 30-09-2007 SUNDANCE Natural Gas Account : 3669202316 26-05-2000 until 26-05-2001 SUNNYSIDE Electricity Account : 20002322770 13-09-2002 until 12-09-2003 SUNNYSIDE Electricity Account : 20002322766 04-11-2006 until 30-11-2007 SUNNYSIDE Natural Gas Account : 3441629313 31-05-2008 until 29-05-2009 T.B.RILEY Electricity Account : 20002356506 31-10-2002 until 27-10-2003 T.B.RILEY Natural Gas Account : 3441631017 21-11-2000 until 20-11-2001 TERRACE ROAD Electricity Account : 20002356375 25-08-2006 until 28-08-2007 TERRACE ROAD Natural Gas Account : 3441630916 22-06-2006 until 22-06-2007 TERRY FOX Electricity Account : 20004142692 01-07-2008 until 30-06-2009 TERRY FOX Natural Gas Account : 3914020617 29-07-2000 until 30-07-2001 THORNCLIFFE Electricity Account : 20002322808 06-04-2007 until 30-04-2008 THORNCLIFFE Natural Gas Account : 3441631212 30-08-2000 until 10-09-2001 TOM BAINES Electricity Account : 20004285868 26-09-2002 until 23-09-2003 TOM BAINES Natural Gas Account : 3902669813 28-02-2002 until 27-02-2003 TUSCANY Electricity Account : 20005908832 16-09-2006 until 30-09-2007 TUSCANY Natural Gas Account : 3021286157 28-02-2009 until 25-02-2010 TUXEDO PARK Electricity Account : 20002322324 08-05-2006 until 03-05-2007 UNIVERSITY Electricity Account : 20002356404 27-06-2002 until 26-06-2003 UNIVERSITY Natural Gas Account : 3441641713 16-02-2002 until 18-02-2003 VALLEY CREEK Electricity Account : 20005340164 01-07-2008 until 30-06-2009 VALLEY CREEK Natural Gas Account : 3990223017 30-09-2003 until 31-08-2004 VALLEY VIEW Electricity Account : 20002357303 03-08-2004 until 04-08-2005 VALLEY VIEW Natural Gas Account : 3600065015 11-03-2002 until 12-03-2003 VAN HORNE Electricity Account : 20002357966 28-10-2003 until 24-10-2004 VARSITY ACRES Electricity Account : 20002356540 31-12-2002 until 30-12-2003 VINCENT MASSEY Electricity Account : 20002356757 14-11-2002 until 11-11-2003 VINCENT MASSEY Natural Gas Account : 3030496052 01-10-2005 until 30-09-2006 VISCOUNT BENNETT Electricity Account : 20002358037 20-10-2006 until 31-10-2007 VISCOUNT BENNETT Natural Gas Account : 3030672454 01-03-2006 until 28-02-2007 VISTA HEIGHTS Electricity Account : 20002356167 02-11-2006 until 30-11-2007 VISTA HEIGHTS Natural Gas Account : 3600087017 02-04-2008 until 31-03-2009 W.O.MITCHELL Electricity Account : 20002924333 23-02-2007 until 29-02-2008 W.O.MITCHELL Natural Gas Account : 3616060514 21-01-2004 until 19-01-2005 WEST DALHOUSIE Electricity Account : 20002356625 25-05-2007 until 31-05-2008 WEST DALHOUSIE Natural Gas Account : 3441674215 16-03-2002 until 14-03-2003 WEST DOVER Electricity Account : 20002357291 13-09-2006 until 30-09-2007 WEST DOVER Natural Gas Account : 3600087212 08-12-2001 until 09-12-2002 WESTERN CANADA Electricity Account : 20002356791 17-05-2007 until 31-05-2008 WESTERN CANADA Natural Gas Account : 3030674651 01-03-2006 until 28-02-2007 WESTGATE Electricity Account : 20002356744 26-08-2006 until 27-08-2007 WESTGATE Natural Gas Account : 3441679814 26-07-2000 until 10-07-2001 WILDWOOD Electricity Account : 20002356727 15-11-2002 until 13-11-2003 36 Calgary Board of Education Energy Efficiency Project ______WILDWOOD Natural Gas Account : 3441683316 29-08-2000 until 08-08-2001 WILLIAM REID Electricity Account : 20002322753 08-08-2002 until 02-08-2003 WILLOW PARK Electricity Account : 20005620526 19-08-2004 until 20-07-2005 WILLOW PARK Natural Gas Account : 3441693418 24-01-2001 until 23-01-2002 WILMA HANSEN Electricity Account : 20003676438 22-10-2002 until 19-10-2003 WILMA HANSEN Natural Gas Account : 3672414810 28-07-2000 until 27-07-2001 WINDSOR PARK Electricity Account : 20002322868 16-08-2006 until 25-08-2007 WINDSOR PARK Natural Gas Account : 3441698618 20-11-2001 until 19-11-2002 WM. ABERHART Electricity Account : 20002357983 01-09-2008 until 31-08-2009 WM. ABERHART Natural Gas Account : 3031036555 01-10-2005 until 30-09-2006 WOODBINE Electricity Account : 20003590416 14-05-2007 until 31-05-2008 WOODBINE Natural Gas Account : 3667989413 28-07-2000 until 26-07-2001 WOODLANDS Electricity Account : 20003438654 19-09-2006 until 30-09-2007 WOODLANDS Natural Gas Account : 3648160314 25-12-2004 until 23-12-2005 WOODMAN Electricity Account : 20002357083 10-12-2002 until 04-12-2003 WOODMAN Natural Gas Account : 3031935155 01-02-2006 until 31-01-2007

37 Calgary Board of Education Energy Efficiency Project ______Sample Baseline Table by School Facility - Electricity

38 Calgary Board of Education Energy Efficiency Project ______

Sample Baseline Table by School Facility - Gas

39 Calgary Board of Education Energy Efficiency Project ______

Summary of Baseline Energy Consumption Calgary Board of Education

Baseline Electricity Baseline Gas Year Baseline tCO2e Baseline tCO2e 2003 73,513,472 47,784 702,182 35,722 2004 72,933,320 47,407 662,273 33,691 2005 73,997,494 48,098 766,682 39,003 2006 78,331,686 50,916 953,810 48,523 2007 90,692,033 58,950 984,084 50,063 2008 87,948,044 57,166 1,054,643 53,652 2009 88,445,192 57,489 1,068,774 54,371 2010 88,232,757 57,351 949,433 48,300 2011 51,530,417 33,495 714,463 36,346 Total tCO2e 458,656 Total tCO2e 399,671 Electricity Gas

40 Calgary Board of Education Energy Efficiency Project ______

ANNEX D

Maintenance and Operation Baselines

41 Calgary Board of Education Energy Efficiency Project ______Calgary Board of Education Maintenance and Operations Baseline

The Calgary Board of Education Maintenance and Operations Baselines will be discussed in detail in the Offset Project Report. Given the routine nature of maintenance and operation activities conducted in the Calgary Board of Education schools, it is expected that maintenance and operation activities:

a) will be below the materiality threshold, and b) for the Project Scenario, the maintenance and operation activities required for the newer equipment, will be lower than the maintenance and operation activities required for the baseline scenario, which consisted mostly of older equipment.

42 Calgary Board of Education Energy Efficiency Project ______

ANNEX F

Calgary Board of Education Letter Non Routine Adjustments of Baseline

43 Calgary Board of Education Energy Efficiency Project ______

44 Calgary Board of Education Energy Efficiency Project ______

ANNEX G

Andre Mech

Statement of CMVP Qualification

45 Calgary Board of Education Energy Efficiency Project ______

MECH and ASSOCIATES Corporation One First Canadian Place Suite 2510 100 King Street West Toronto, Ontario M5X 1A4

Statement of CMVP Qualification

I, Andre Mech, Principal of MECH and ASSOCIATES, am a Certified Measurement and Verification Professional (CMVP), Certification No. 1040, registered with the CMVP registration authority, the Association of Energy Engineers (www.aeecenter.org).

One of the criteria required for CMVP accreditation is at least three years experience in implementing and quantifying energy efficiency projects. The accreditation indicates that I have at least three years experience in implementing and quantifying energy efficiency projects.

Andre Mech BEng, PEng, MBA, CMVP, rmc MECH and ASSOCIATES

December 2011

Date

46