Status of District Secretariat Buildings at Different Locations As on 30-09-2017 Under Eastern Zone Public Works Department Ap, Itanagar

Total Page:16

File Type:pdf, Size:1020Kb

Status of District Secretariat Buildings at Different Locations As on 30-09-2017 Under Eastern Zone Public Works Department Ap, Itanagar PUBLIC WORKS DEPARTMENT AP, ITANAGAR STATUS OF DISTRICT SECRETARIAT BUILDINGS AT DIFFERENT LOCATIONS AS ON 30-09-2017 UNDER EASTERN ZONE PUBLIC WORKS DEPARTMENT AP, ITANAGAR STATUS OF DISTRICT SECRETARIAT BUILDINGS AT : ROING TEZU NAMSAI CHANGLANG KHONSA PUBLIC WORKS DEPARTMENT AP, ITANAGAR (Financial figures in lakhs) Progressive Achievement Cumulative S Sanctio UC Cumulati Scope of Work Achievement upto Target 2017-18 during 2017- Achievement upto l. Name of n No. Status/ ve Funds 3/17 18 upto 9/17 9/2017 N Project with Remark released o. Amount s Phy. Fin Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. SPA 2012-13 10100.55 UC Building sqm Submitt ed: No. 500.00 SPWD/ Constructi PE- Rs. on of 07/SPA/ Compou 100% Compou 438.00 District 1 TC/201 500.00 500.00 nd wall in 62.00 of -- nd wall in 62.00 lakhs Secretariat 3-14/61 Boundar progress Block I progress kept in at Roing 740 mtr Dtd. y Wall Pt V. (PH-I) 23/01/20 Land 15 not availabl e. Work held up. SPA 2015-16 No. SPWD/ PE- UC: 26/SPA/ 497.00 TC/201 - - 4-15/718 497.5 Tender 497.5 Rs. 2 Phase II 497.50 -do- - Do - 497.50 Tender -do- -- Dtd. 0 Awarded 0 497.50 Awarded 17/11/20 lakhs 15 for kept in Rs. Pt-V 497.50 Lacs PUBLIC WORKS DEPARTMENT AP, ITANAGAR Boundary wall in progress Construction of District Secretariat at Roing in Lower Dibang Valley (Ph-I) PUBLIC WORKS DEPARTMENT AP, ITANAGAR (Financial figures in lakhs) Progressive Achievement Cumulative Sl Cumula UC Sanction Scope of Work Achievement upto Target 2017-18 during 2017-18 Achievement upto . Name of tive Status/ No. with 3/17 upto 9/17 9/2017 N Project Funds Remark Amount o. released s Phy. Fin Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. SPA 2012-13 Block-A Block-A casting of casting of No. SPWD/ slab for slab for UC Construct Building Block PE- ground & ground & submitt ion of 500.00 9200.26 st 500.00 I 300.00 st 500.00 03/SPA/ 1 floor 1 floor ed: District sqm 100% 1 TC/2013- 500.00 comp. comp. 500.00 Secretaria 14/1484 column column t at Tezu nd nd Dtd. for 2 for 2 (PH-I) 04/02/2014 Boundary wall 140.00 mtr SPA 2015-16 UC No. SPWD/ Submitt PE- ed: 25/SPA/ 497.50 TC/2014- -Do-(PH- -- do -- 2 15/641 Dtd. 497.50 2500.00 - Do - 497.50 -do- - Do - 497.50 II) Rs. 02/11/2015 146.50 for Rs. is kept 2500.00 in Part- Lacs V PUBLIC WORKS DEPARTMENT AP, ITANAGAR Construction of District Secretariat at Tezu in Lohit District PUBLIC WORKS DEPARTMENT(Financial figures in lakhs) AP, ITANAGAR Progressive Achievement Cumulative Sl Cumulat Target 2017- Scope of Work Achievement upto during 2017-18 Achievement . Name of Sanction No. ive 18 UC Status/ N Project with Amount Funds 3/17 upto 9/17 upto 9/2017 Remarks o. released Phy. Fin Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. SPA 2010-11 No. SPWD/ PE- C/O District 72/SPA/ Secretariat JC/2010-11/912 UC Rs. 398.00 1 at 398.00 395.00 100% 398.00 100% 398.00 Dtd. 09/12/2011 lakhs Changlang for Rs. 398.00 Phase I Lakhs SPA 2011-12 First Block No. SPWD/ PE- Office bldg : 44/SPA/ 3867 sq m JC/2012-13/929 Ret Wall 80 UC Rs. 360.00 2 Phase II 360.00 360.00 100% 360.00 100% 360.00 Dtd. 25/12/2012 Mtr lakhs for Rs. 360.00 Compound Lacs March/2015 Wall 170 Mtr SPA 2013-14 No. SPWD/ PE- UC Rs. 497.50 63/SPA/ lakhs JC/2013-14/ 3566 3 Phase III 497.50 500.00 100% 438.83 100% 438.83 Dtd. 05/12/2014 Rs. 58.67 in for Rs. 500.00 Part-V lakhs PUBLIC WORKS DEPARTMENT AP, ITANAGAR Progressive Achievement Cumulative Sl Cumulat Target 2017- Scope of Work Achievement upto during 2017-18 Achievement . Name of Sanction No. ive 18 UC Status/ N Project with Amount Funds 3/17 upto 9/17 upto 9/2017 Remarks o. released Phy. Fin Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. SPA 2015-16 No. SPWD/ PE- Second Block 23/SPA/ UC Rs. 497.50 OfficeBuildin Work JC/2014-15/642 Work in 4 Phase IV 497.50 g 1509 Sq 500.00 497.50 50% in 497.50 Dtd. 02/11/2015 prog. Rs. 497.50 in mtrs prog. for Rs. 500.00 Part-V Lacs 5 Phase-V In process 556.00 -- -- -- -- -- -- -- -- -- -- PUBLIC WORKS DEPARTMENT AP, ITANAGAR C/o D.C. Office Complex / Mini Secretariate at Changlang District of Arunachal Pradesh (Ph:-I) PUBLIC WORKS DEPARTMENT AP, ITANAGAR FIRST BLOCK DISTRICT SECRETARIAT AT CHANGLANG PUBLIC WORKS DEPARTMENT AP, ITANAGAR (Financial figures in lakhs) Progressive Achievement Cumulative S Cumula Scope of Work Achievement upto Target 2017-18 during 2017- Achievement upto Status l. Name of Sanction No. tive 3/17 18 upto 9/17 9/2017 of UC/ N Project with Amount Funds Remark Fin o. released Phy. Fin Phy. Fin. Phy. Fin. Phy. Phy. Fin. s . SPA 2012-13 No. SPWD/ Constructi PE-04/SPA/ on of JC/2013- Office District 14/1821 Dtd. Building 1 500.00 2500.00 500.00 - 500.00 500.00 Secretariat 25/03/2014 8396.02 at Khonsa for Rs. sqm (PH-I) 2500.00 lakhs 1st Block 1st Block 100%; 2nd 100%; SPA 2014-15 2nd Block 2nd Block Block 50% 50% 20% No. SPWD/ PE-24/SPA/ JC/2014- 2nd 15/719 Dtd. - Do - 2 Phase II 497.50 2500.00 497.50 Block 400.00 497.50 497.50 17/11/2015 100% for Rs. 2500.00 lakhs PUBLIC WORKS DEPARTMENT AP, ITANAGAR DISTRICT SECRETARIAT AT KHONSA (BLOCK – C) PUBLIC WORKS DEPARTMENT AP, ITANAGAR DISTRICT SECRETARIAT AT KHONSA (BLOCK – B) PUBLIC WORKS DEPARTMENT AP, ITANAGAR DISTRICT SECRETARIAT AT KHONSA (2nd BLOCK) PUBLIC WORKS DEPARTMENT AP, ITANAGAR DISTRICT SECRETARIAT AT KHONSA (3rd BLOCK) PUBLIC WORKS DEPARTMENT AP, ITANAGAR (Financial figures in lakhs) S Sancti Progressive Achievement Name Cumula Cumulative Achievement Status l on No. Scope of Work Achievement upto Target 2017-18 during 2017- of tive upto 9/2017 of UC/ . with 3/17 18 upto 9/17 Projec Funds Remar N Amou t released ks o nt Phy. Fin Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. SPA 2011-12 No. SPWD / PE- 03/SP A/ Constru TC/20 UC for ction of 12- Office Building Rs. District 13/900 8655 Sq mtr 100 450.00 1 Secretar 450.00 450.00 500.00 Dtd. Boundary Wall % lakhs iat at 19/12/2 740 mtr Namsai 012 for (Ph-I) Rs. B/Wall- 450.00 630.00 Mtr, B/Wall-630.00 lakhs Block-A Mtr, Block-A March Bldg.100% Bldg.100% 947.50 947.50 /2015 compltd compltd with with pinth pinth area of SPA 2015-16 area of 3800 sq mtr 3800 sq mtr UC for Rs. 497.50 lakhs - Do - - Do - 100 2 497.50 497.50 (PH-II) % Rs. 73.54 lakhs kept in Part-V PUBLIC WORKS DEPARTMENT AP, ITANAGAR Front view C/o District Secretariat building at Namsai (First Block) PUBLIC WORKS DEPARTMENT AP, ITANAGAR C/o District Secretariat building at Namsai (First Block) PUBLIC WORKS DEPARTMENT AP, ITANAGAR STATUS OF DISTRICT CC ROAD AT DIFFERENT LOCATIONS AS ON 30-09-2017 UNDER EASTERN ZONE PUBLIC WORKS DEPARTMENT AP, ITANAGAR STATUS OF CC ROAD AT : ROING TEZU CHANGLANG KHONSA LONGDING PUBLIC WORKS DEPARTMENT AP, ITANAGAR (Financial figures in lakhs) Achieveme Progressive Cumulative Cumula Target 2017- nt during Sl. Sanction Scope of Work Achievement upto Achievement UC Name of tive 18 2017-18 N No. with 3/17 upto 9/2017 Status/Re Project Funds upto 9/17 o. Amount marks released Phy. Fin. Phy. Fin. Phy. Fin. Phy Fin. Phy. Fin. SPA 2012-13 No. CC SPWD/ Pavement 5.02 PE- with width Km Construction 06/SPA/ UC 5.50 Mtr of RCC road TC/2013- Submitte with 14/ 1622 1000.0 d: 1 1000.00 1111.00 100% 1000.00 - - 100% Drainage at Dtd. 1.75 0 1000.00 CC Drain Roing (PH- 04/03/201 Km Work I) 4 for Rs. Compltd 1111.00 Slab 18 Lacs / culvert Nos March- PUBLIC WORKS DEPARTMENT AP, ITANAGAR GSB Works DLC Works PQC Works Drain Works C/o RCC Road with drainage at Roing in Lower Dibang Valley District of Arunachal Pradesh under SPA-2012-13 (Ph-I) PUBLIC WORKS DEPARTMENT AP, ITANAGAR Culvert Widening of culvert C/o RCC Road with drainage at Roing in Lower Dibang Valley District of Arunachal Pradesh under SPA-2012-13 (Ph-I) PUBLIC WORKS DEPARTMENT AP, ITANAGAR (Financial figures in lakhs) Cumulat Progressive Achievement Cumulative Sl. Sanction Target UC Name of ive Scope of Work Achievement upto during 2017-18 Achievement upto N No. with 2017-18 Status/Re Project Funds 3/17 upto 9/17 9/2017 o. Amount marks released Phy. Fin Phy. Fin. Phy Fin Phy. Fin. Phy. Fin. SPA 2011-12 Widening 5.75 Km Pavement (3.75 m) WBM-III 4.125 Km No. SPWD/ DLCC 4.125 Km PE-71/SPA/ UC JC/2012- C/o CC road CC Submitte 13/331 Dtd. 4.125 Km with drainage Pavement d for : 1 09/03/2013 810.00 810.00 100% 810.00 -- -- 100% 810.00 at Khonsa 810.00 for Rs.
Recommended publications
  • Lohit District GAZETTEER of INDIA ARUNACHAL PRADESH LOHIT DISTRICT ARUNACHAL PRADESH DISTRICT GAZETTEERS
    Ciazetteer of India ARUNACHAL PRADESH Lohit District GAZETTEER OF INDIA ARUNACHAL PRADESH LOHIT DISTRICT ARUNACHAL PRADESH DISTRICT GAZETTEERS LOHIT DISTRICT By S. DUTTA CHOUDHURY Editor GOVERNMENT OF ARUNACHAL PRADESH 1978 Published by Shri M.P. Hazarika Director of Information and Public Relations Government of Amnachal Pradesh, Shillong Printed by Shri K.K. Ray at Navana Printing Works Private Limited 47 Ganesh Chunder Avenue Calcutta 700 013 ' Government of Arunachal Pradesh FirstEdition: 19781 First Reprint Edition: 2008 ISBN- 978-81-906587-0-6 Price:.Rs. 225/- Reprinted by M/s Himalayan Publishers Legi Shopping Corqplex, BankTinali,Itanagar-791 111. FOREWORD I have much pleasure in introducing the Lohit Distri<^ Gazetteer, the first of a series of District Gazetteers proposed to be brought out by the Government of Arunachal Pradesh. A'Gazetteer is a repository of care­ fully collected and systematically collated information on a wide range of subjects pertaining to a particular area. These information are of con­ siderable importance and interest. Since independence, Arunachal Pra­ desh has been making steady progress in various spheres. This north-east frontier comer of the country has, during these years, witnessed tremen­ dous changes in social, economic, political and cultural spheres. These changes are reflected in die Gazetteers. 1 hope that as a reflex of these changes, the Lohit District Gazetteer would prove to be quite useful not only to the administrators but also to researdi schplars and all those who are keen to know in detail about one of the districts of Arunachal Pradesh. Raj Niwas K. A. A. Raja Itanagar-791 111 Lieutenant Governor, Arunachal Pradesh October 5, i m Vili I should like to take this opportunity of expressing my deep sense of gratitude to Shri K; A.
    [Show full text]
  • Prospectus-2019.Pdf
    TEZPUR UNIVERSITY PROSPECTUS Autumn 2019 Tezpur University Napaam, Sonitpur Assam, INDIA 784028 www.tezu.ernet.in Contents Section I General Information about the University…………..…………… 3-16 Section II Programmes, Intake and Eligibility for Admission……………. 17-29 Section III Admission Procedure……………………………………………………… 30-38 Section IV Departments/ Centres………………………………………………………. 39-165 Section V Important Dates, Fee Structure, Forms and Contact Details… 166-178 SECTION- I General Information about the University 1.1 Introduction 1.2 Awards/Accolades 1.3 Facilities and Services 1.4 Training and Placement Cell 1.5 List of Academic Programmes 1.6 Curricula 1.7 Evaluation System 1.8 Important academic Rules 1.9 Important Rules GENERAL INFORMATION ABOUT THE UNIVERSITY 1.1 : Introduction Tezpur University was established on January 21, 1994 by an Act of Parliament of India, The Tezpur University Act, 1993 (Act No. 45 of 1993), as a non-affiliating and residential Central University. The University is located at Napaam, about 15 km east of Tezpur town in the Sonitpur District of Assam. The serene and green University Campus of about 262 acres provides an excellent ambience including modern infrastructure conducive for learning and dedicated research. The academic programmes, offered in the University, have a distinct focus on Science, Technology, Management, Humanities, and Social Sciences, reflecting the objectives of the University. At present, the University offers a number of Programmes of Under-Graduate Degree/Diploma/Certificate, Integrated Programmes, Post-Graduate Degree/Diploma and Doctor of Philosophy Degree in various Disciplines. The University offers Add-on courses on Yoga and Violin too. During the last 25 years of its existence, the University has engaged itself in the process of capacity building, both in terms of infrastructure and human resource development.
    [Show full text]
  • Histrical Background Changlang District Covered with Picturesque Hills Lies in the South-Eastern Corner of Arunachal Pradesh, Northeast India
    Histrical Background Changlang District covered with picturesque hills lies in the south-eastern corner of Arunachal Pradesh, northeast India. It has an area of 4,662 sqr. Km and a population of 1,48,226 persons as per 2011 Census. According to legend the name Changlang owes its origin to the local word CHANGLANGKAN which means a hilltop where people discovered the poisonous herb, which is used for poisoning fish in the river. Changlang District has reached the stage in its present set up through a gradual development of Administration. Prior to 14th November 1987, it was a part of Tirap District. Under the Arunachal Pradesh Reorganization of Districts Amendment Bill, 1987,the Government of Arunachal Pradesh, formally declared the area as a new District on 14th November 1987 and became 10th district of Arunachal Pradesh. The legacy of Second World War, the historic Stilwell Road (Ledo Road), which was constructed during the Second World War by the Allied Soldiers from Ledo in Assam, India to Kunming, China via hills and valleys of impenetrable forests of north Burma (Myanmar) which section of this road is also passed through Changlang district of Arunachal Pradesh and remnant of Second World War Cemetery one can see at Jairampur – Nampong road. Location and Boundary The District lies between the Latitudes 26°40’N and 27°40’N, and Longitudes 95°11’E and 97°11’E .It is bounded by Tinsukia District of Assam and Lohit District of Arunachal Pradesh in the north, by Tirap District in the west and by Myanmar in the south-east.
    [Show full text]
  • Executive Engineer, Tezu
    ANNUAL ADMINISTRATIVE REPORT OF TEZU DIVISION P.W.D. TEZU FOR THE YEAR 2006-07 I N D E X. 1. STATUS OF PRELIMINARY ESTIMATE : ANNEXURE-A & A(1) 2. STATUS OF REVISED ESTIMATE : ANNEXURE-B & B(1) UNDER PWD HEAD. 3. PHYSICAL TARGETS AND ACHIEVEMENTS : ANNEXURE-C UNDER PWD HEADS AND NON PWD HEADS. 4. HEADWISE ALLOTMENT AND EXPENDITURE : ANNEXURE-D. 5. LIABILITIES STATEMENT : ANNEXURE-E. 6. C.S.S.A BILLS (OUT GOING) : ANNEXURE-F. 7. C.S.S.A BILLS (IN COMING ) : ANNEXURE-G. 8. POSITION OF WORKCHARGED & CASUAL STAFF : ANNEXURE-H 9. POSITION OF REGULAR STAFF : ANNEXURE-I 10. POSITION OF TOOLS & PLANTS : ANNEXURE-J ADMINISTRATIVE REPORT OF TEZU DIVISION P.W.D., A.P FOR THE YEAR 2006-07 INTRODUCTION :- Tezu P.W. Division, is one of the oldest divisions in Arunachal Pradesh and it covers the 44- Tezu Assembly Constituency segment. This division was established initially as Lohit Frontier Division with its head-quarters at Sadiya in Assam in 1947. It was later renamed as Lohit C.P.W Division and its head-quarters were shifted to Tezu. Afterwards it was further renamed as Tezu P.W. Division. The jurisdiction of this division starts from the Arunachal-Assam boundary near Sunpura and extends upto the boundary of Lohit and Anjaw districts. To the South, its jurisdiction extends to the Lohit river and to the boundary of Lohit and Lower Dibang Valley districts to the North. At present this division has two P.W.Sub-divisions viz Tezu Sub-division and Sunpura P.W.Sub-division.
    [Show full text]
  • Arunachal Pradesh
    Base For Official Use WASTELAND MAP 2 0 0 3 Anini Arunachal Pradesh LEGEND Pasighat Tezu Gullied and / or Degraded pasture ravinous (1) and grazing land (9) Land with scrub Degraded Bomdila (2) plantation crops(10) Itanagar Tirap Land without Sand - Inland Anini scrub (3) / coastal (11) Waterlogged and Mining / Industrial marshy (4) waste (12) Watershed Saline / Alkaline Barren rocky / (5) Stony waste (13) Shifting cultivation Steep sloping (14) 3B4D2 Pasighat - Abandoned (6) Tezu 3A5D5 3A5C1 3B4C7 Shifting cultivation Snow covered - Current (7) and / Glacial (15) 3B4B5 3A4C5 3A5B4 3A4B8 Degraded forest (8) 3A2D2 3B4A4 3A3B2 3A4A2 OTHERS 3B3F5 Bomdila 3A3A4 Water bodies Sand (tank 3B3E4 Itanagar (river, tank, Settlement / river bed) Tirap reservoir) Intern. Boundary Major Roads State Boundary Railway Line Administrative Dist. Boundary River Anini Taluk Boundary AREA STATISTICS 14% Source: Wasteland Maps - 2003 on 1:50,000 scale (Based on IRS Satellite LISS - III Imagery, Wasteland Maps (1986 - 2000), limited field check, Revenue Records / Maps. Pasighat Tezu 2 Prepared by: 3 14% Arunachal Pradesh State Remote Sensing Centre 15 6 AP Council of Science & Technology Bomdila Itanagar, 791 113, Arunachal Pradesh Itanagar 57% Tirap 9 3% 7 Co-ordinated by: Sponsored by: 13 6% Land Use Division, RS & GIS AA Dept. of Land Resources Total Geog. Area (TGA) :83743.00 sq. km. 2% National Remote Sensing Agency Min. of Rural Development 4% Total Wasteland Area : 18175.95 sq. km. Dept. of Space, Govt. of India, G - Wing, Nirman Bhawan, Wasteland Area
    [Show full text]
  • Kibithoo Can Be Configured As an Entrepôt in Indo- China Border Trade
    ISSN (Online) - 2349-8846 Kibithoo Can Be Configured as an Entrepôt in Indo- China Border Trade JAJATI K PATTNAIK Jajati K. Pattnaik ([email protected]) is an Associate Professor, at the Department of Political Science, Indira Gandhi Government College, Tezu (Lohit District), Arunachal Pradesh Vol. 54, Issue No. 5, 02 Feb, 2019 Borders are the gateway to growth and development in the trajectory of contemporary economic diplomacy. They provide a new mode of interaction which entails de-territorialised economic cooperation and free trade architecture, thereby making the spatial domain of territory secondary in the global economic relations. Taking a cue from this, both India and China looked ahead to revive their old trade routes in order to restore cross-border ties traversing beyond their political boundaries. Borders are the gateway to growth and development in the trajectory of contemporary economic diplomacy. They provide a new mode of interaction which entails de-territorialised economic cooperation and free trade architecture, thereby making the spatial domain of territory secondary in the global economic relations. Taking a cue from this, both India and China looked ahead to revive their old trade routes in order to restore cross-border ties traversing beyond their political boundaries. The reopening of the Nathula trade route in 2016 was realised as a catalyst in generating trust and confidence between India and China. Subsequently, the success of Nathula propelled the academia, policymakers and the civil society to rethink the model in the perspective of Arunachal Pradesh as well. So, the question that automatically arises here is: Should we apply this cross-border model in building up any entrepôt in Arunachal Pradesh? The response is positive and corroborated by my field interactions at the ground level.
    [Show full text]
  • Pre-Feasibility Report
    PRE-FEASIBILITY REPORT CHAPTER - 1 EXECUTIVE SUMMARY Project Identification and The Kharsang Oil Field (KOF) is located in the state of Arunachal Pradesh, Background about 50 Km east of Digboi Refinery and is part of the Assam-Arakan Basin. The field was discovered in 1975 by M/s Oil India Ltd. (OIL) and was put into regular production in 1983. In 1995, Government of India awarded the Kharsang Field to a Consortium comprising of the following partners under a 25 years Production Sharing Contract (PSC) dated 16th June, 1995, Oil India Limited (40%) Geopetrol International Inc (25%) Jubilant Energy Pvt. Ltd. (25%) GeoEnpro Petroleum Ltd. (10%) GeoEnpro was designated as the Operator of the KOF. Petroleum Mining Lease (PML) was executed between Government of Arunachal Pradesh (GoAP) & JV Consortium on 21.10.1997 effective from 16.06.1995 for a period of 20 years (extension of the same has already been applied and currently under process). KOF has a total Mining Lease area of 11 Sq.Km. MOEF vide letter no. F.No. J-11011 /389/2006-IA II (I), dated November 15, 2007 granted the EC for drilling of 40 wells. After obtaining the EC in 2007, the consortium has drilled 29 development wells till date, under different drilling phases, at the Kharsang Oil Field out of the 40 wells for which EC was granted. At present, total well count at Kharsang Oil Field is 70 wells and present crude oil production is around 1500 BOPD and gas production of around 50,000 m3/day. Brief Description of the To further augment the oil and gas production from the field and test the Project deeper prospects, Tipam and Barail, GeoEnpro plan to carry out the below activities, Development Well Drilling: To drill additional 40 Development wells, in a phased manner, within the KOF over the coming years so as to further increase the field oil and gas productivity.
    [Show full text]
  • Ground Water Information Booklet Lohit District, Arunachal Pradesh
    Technical Report Series: D No: 11/2011-12 Ground Water Information Booklet Lohit District, Arunachal Pradesh Central Ground Water Board North Eastern Region Ministry of Water Resources Guwahati September 2013 1 LOHIT DISTRICT AT A GLANCE Sl ITEMS Statistics No 1. GENERAL INFORMATION i) Geographical area (sq. km) 5212 ii) Administrative Divisions (As on 31st March 2013) No. of Sub-divisions 2 No. of Block 4 No.of Villages 223 iii) Population (As per 2011 Census) 143,527- iv) Average Annual Rainfall (mm) 5179 2. GEOMORPHOLOGY Major physiographic units Alluvial plain Major Drainages Lohit, Tenga Pani, Kamlong 3. LAND USE (sq. km) 2010-2011 Net area sown 191.63 Cultivable area 217.59 4. MAJOR SOIL TYPES Older alluvium, Silt and Low level 5. AREA UNDER PRINCIPAL CROPS (2010-2011), ha Paddy-10412, Maize-8585, Pulses- 1904, Oil seeds - 10411 6. IRRIGATION BY DIFFERENT SOURCES (Area and Number of Structures) Dug Wells / Tube Wells/ Tanks/ Ponds / Canals / - Other Sources Net irrigated area 1243 ham Gross irrigated area 1244 ham 7. NUMBER OF GROUND WATER MONITORING WELLS OF CGWB (As on 31-3-2013) No of Dug Wells 1 No of Piezometers Nil 8. PREDOMINENT GEOLOGICAL FORMATIONS 9. HYDROGEOLOGY Major Water bearing formation Alluvium Pre- monsoon Depth to water level during 2011 3.58 2 Post- monsoon Depth to water level during 2011 3.52 10. GROUND WATER EXPLORATION BY CGWB (As on 31-03-2013) No of wells drilled (EW, OW, PZ, SH, Total) EW : 5 Depth Range (m) 54 to74 Discharge (litres per second) 10 to 15 Drawdown (m) 1 to 21 Transmissivity (m2/day) 33 to 1732 11.
    [Show full text]
  • Arunachal Pradesh
    Census of India 2011 ARUNACHAL PRADESH PART XII-B SERIES-13 DISTRICT CENSUS HANDBOOK ANJAW VILLAGE AND TOWN WISE PRIMARY CENSUS ABSTRACT (PCA) DIRECTORATE OF CENSUS OPERATIONS ARUNACHAL PRADESH ARUNACHAL PRADESH DISTRICT ANJAW H KILOMETRES 5 0 5 10 15 I I K Ta C T a m l l B a o p n R R . N . D u E r I t e t n Kala o n R g R. N. * K a zo Go M m K iyu hu u u o C Ch m r Th i T an D A e M N a c . h i . CHAGLAGAM D i R la e D KIBITHOO i I T o achi . r M a a R r u K a a H I N D Thu D shi I A R. S METENGLIANG Se Ti GOILIANG Y t a rei R. p B ak Ti WALONG J R a T n g S N h . N e - t n HAYULIANG u T T d i a u D m a G n u R d n T i T id T i d i i . n N g i R. U I A T h a H R S c - a li a e c C a Chik m u MANCHAL T h H i b T i L T oh l i i a t or i T m ellu T R . T Kam i i P u n T u n . g R la Ti L g HAWAI M n a w O o g Ti T an ith a K R.
    [Show full text]
  • Annual Operating Plan 2009-10 Outlay and Expenditure of Centrally Sponsored Schemes Including Fully Funded by Govt
    GOVERNMENT OF ARUNACHAL PRADESH ANNUAL OPERATING PLAN 2009 - 10 INDEX SL.NO CONTENTS PAGE-NO. 1 Basic features i - v 2 Abstract of Outlay and Expenditure 1 - 2 3 Outlay and Expinditure on Direction and Administration under Plan 3 4 Specific schemes with various components 4 5 District wise break up of Outlay 5 6 Physical Targets and Achievement 6 7 District wise break up of Physical targets and Achievement 7 8 Achievement of tenth Plan and Targets for Annual plan 2009-10 8 9 Statement of staff strength of the Department 9 - 10 10 Statement on proposal for New Posts 11 - 12 11 Expenditure and Outlays for salaries and wages 13 12 Statement on Vehicles 14 13 Details of on going scheme 15-35 14 Proposal for new schemes / services 36-70 15 Outlay & Expenditure of loan linked schemes 71-74 16 Earmarked schemes by Planning Commissioning 75-78 17 Centrally Sponsored Schemes (Financial) 79-83 18 Centrally Sponsored Schemes (Physical) 84-89 19 Furnishing information relaeted NEC, NLCPR scheme 90-92 20 On-going incomplete Projects funded under PM's Package 93-97 21 Details of Assets 98-99 GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF POWER ANNUAL OPERATING PLAN FOR 2009 – 10 BASIC FEATURES The Plan Outlay of the Department of Power as allocated by State Planning Department for the financial year 2009-10 is Rs 5000.00 lakh (Rupees Five Thousand Lakh ) only including the earmarked schemes. The projected minimum resource requirement of the Department of Power for 2009-10 is Rs.37079.04 (Rupees Thirty Seven Thousand Seventy Nine Lakh and Four Thousand) only.
    [Show full text]
  • JOURNAL 2018 Arteast 2018
    1 JOURNAL 2018 ArtEast 2018 Art and Livelihood, Migration and Displacement Co-authored by Monica Banerjee and Kishalay Bhattacharjee. Organised by National Foundation for India (NFI) in collaboration with India International Centre, The Sasakawa Peace Foundation and New Imaginations, Jindal School of Journalism and Communication. 2 NEW IMAGINATIONS Jindal School of Journalism and Communication ArtEast Journal Vol 2 Second Issue Editor Kishalay Bhattacharjee Editorial Assistants: Ashima Sharma Khushi Gupta Published by National Foundation for India (NFI) Core 4 A, India Habitat Centre, Lodhi Road, New Delhi 110 003 91-11-24641864, 24641865 91-11-24648490, 24648491 [email protected] Design Aspire Design, New Delhi Printed at Aspire Design, New Delhi Cover Photo Standing in his bamboo house, a Nyishi headman checks his traditional headgear (now made of fiberglass and not of hornbill casque) before setting out for a meeting. Arunachal Pradesh, December 2011 by Arati Kumar Rao Back Cover Photo Umsning village, Mawkynrew, East Khasi Hills district, Meghalaya 2007 by Sudharak Olwe 05 06-12 13 16 Curator’s Note An Ode to Did you Dream a An Unseen Tunnel Kishalay Bhattacharjee Bamboo Fortune? Inside a Displaced Parasher Baruah Proletarian M.P. Ranjan Sukant Panigrahy & Sujatha Shankar Kumar Kaur Chimuk BamBoo Sumana Roy Exhibits Arati Kumar Rao Siddhartha Das Vijay Jodha 18 20 22-52 53 Black Clay Photo Gallery Intersections In the Pottery of the at ArtEast 2018 Neighbourhood Sung Valley The Other Silk Route: Sirawon Khathing Spookery, Trade and
    [Show full text]
  • Minutes of Review the Progress of Projects Under One Time ACA/SPA
    GOVERNMENT OF ARUNACHAL PRADESH PLANNING DEPARTMENT ITANAGAR Minutes of the meeting taken by the Development Commissioner & Commissioner (Finance) on 22nd September, 2009 to review the progress of projects under One Time ACA/SPA implemented from Annual Plan 2005-06 to Annual Plan 2008-09. Shri V.K. Dev, the Development Commissioner & Commissioner (Finance) took a meeting on 22nd September, 2009 at 1500 hrs. in the Conference Hall of Chief Secretary with the concerned Commissioners, Secretaries and Heads of Department to review the progress of projects under One Time ACA/SPA implemented from Annual Plan 2005-06 to Annual Plan 2008-09. 2. The list of participates is appended. 3. After threadbare deliberations, following Specific and time bound decisions were emerged for follow up action: (i) The concerned Commissioners and Secretaries will take critical review on the progress of works on monthly basis. Such monitoring should be linked with the review and problem solving mechanism. (ii) Timeliness and adequacy of information are two important aspects of an effective monitoring system. Therefore, all concerned departments should expedite submission of project-wise expenditure reports, utilization certificates and photographs in the initial period of execution, during execution period and after completion of each project. (iii) The concerned executing departments/ nodal departments shall appoint nodal officer for liaisoning with Planning Department and Finance Department. (iv) In case of deposit works, the concerned client departments shall review with the concerned executing departments at a regular interval. A copy of any correspondence made with the executing departments shall be endorsed to Planning Department for follow-up action/ corrective measures.
    [Show full text]