
PUBLIC WORKS DEPARTMENT AP, ITANAGAR STATUS OF DISTRICT SECRETARIAT BUILDINGS AT DIFFERENT LOCATIONS AS ON 30-09-2017 UNDER EASTERN ZONE PUBLIC WORKS DEPARTMENT AP, ITANAGAR STATUS OF DISTRICT SECRETARIAT BUILDINGS AT : ROING TEZU NAMSAI CHANGLANG KHONSA PUBLIC WORKS DEPARTMENT AP, ITANAGAR (Financial figures in lakhs) Progressive Achievement Cumulative S Sanctio UC Cumulati Scope of Work Achievement upto Target 2017-18 during 2017- Achievement upto l. Name of n No. Status/ ve Funds 3/17 18 upto 9/17 9/2017 N Project with Remark released o. Amount s Phy. Fin Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. SPA 2012-13 10100.55 UC Building sqm Submitt ed: No. 500.00 SPWD/ Constructi PE- Rs. on of 07/SPA/ Compou 100% Compou 438.00 District 1 TC/201 500.00 500.00 nd wall in 62.00 of -- nd wall in 62.00 lakhs Secretariat 3-14/61 Boundar progress Block I progress kept in at Roing 740 mtr Dtd. y Wall Pt V. (PH-I) 23/01/20 Land 15 not availabl e. Work held up. SPA 2015-16 No. SPWD/ PE- UC: 26/SPA/ 497.00 TC/201 - - 4-15/718 497.5 Tender 497.5 Rs. 2 Phase II 497.50 -do- - Do - 497.50 Tender -do- -- Dtd. 0 Awarded 0 497.50 Awarded 17/11/20 lakhs 15 for kept in Rs. Pt-V 497.50 Lacs PUBLIC WORKS DEPARTMENT AP, ITANAGAR Boundary wall in progress Construction of District Secretariat at Roing in Lower Dibang Valley (Ph-I) PUBLIC WORKS DEPARTMENT AP, ITANAGAR (Financial figures in lakhs) Progressive Achievement Cumulative Sl Cumula UC Sanction Scope of Work Achievement upto Target 2017-18 during 2017-18 Achievement upto . Name of tive Status/ No. with 3/17 upto 9/17 9/2017 N Project Funds Remark Amount o. released s Phy. Fin Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. SPA 2012-13 Block-A Block-A casting of casting of No. SPWD/ slab for slab for UC Construct Building Block PE- ground & ground & submitt ion of 500.00 9200.26 st 500.00 I 300.00 st 500.00 03/SPA/ 1 floor 1 floor ed: District sqm 100% 1 TC/2013- 500.00 comp. comp. 500.00 Secretaria 14/1484 column column t at Tezu nd nd Dtd. for 2 for 2 (PH-I) 04/02/2014 Boundary wall 140.00 mtr SPA 2015-16 UC No. SPWD/ Submitt PE- ed: 25/SPA/ 497.50 TC/2014- -Do-(PH- -- do -- 2 15/641 Dtd. 497.50 2500.00 - Do - 497.50 -do- - Do - 497.50 II) Rs. 02/11/2015 146.50 for Rs. is kept 2500.00 in Part- Lacs V PUBLIC WORKS DEPARTMENT AP, ITANAGAR Construction of District Secretariat at Tezu in Lohit District PUBLIC WORKS DEPARTMENT(Financial figures in lakhs) AP, ITANAGAR Progressive Achievement Cumulative Sl Cumulat Target 2017- Scope of Work Achievement upto during 2017-18 Achievement . Name of Sanction No. ive 18 UC Status/ N Project with Amount Funds 3/17 upto 9/17 upto 9/2017 Remarks o. released Phy. Fin Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. SPA 2010-11 No. SPWD/ PE- C/O District 72/SPA/ Secretariat JC/2010-11/912 UC Rs. 398.00 1 at 398.00 395.00 100% 398.00 100% 398.00 Dtd. 09/12/2011 lakhs Changlang for Rs. 398.00 Phase I Lakhs SPA 2011-12 First Block No. SPWD/ PE- Office bldg : 44/SPA/ 3867 sq m JC/2012-13/929 Ret Wall 80 UC Rs. 360.00 2 Phase II 360.00 360.00 100% 360.00 100% 360.00 Dtd. 25/12/2012 Mtr lakhs for Rs. 360.00 Compound Lacs March/2015 Wall 170 Mtr SPA 2013-14 No. SPWD/ PE- UC Rs. 497.50 63/SPA/ lakhs JC/2013-14/ 3566 3 Phase III 497.50 500.00 100% 438.83 100% 438.83 Dtd. 05/12/2014 Rs. 58.67 in for Rs. 500.00 Part-V lakhs PUBLIC WORKS DEPARTMENT AP, ITANAGAR Progressive Achievement Cumulative Sl Cumulat Target 2017- Scope of Work Achievement upto during 2017-18 Achievement . Name of Sanction No. ive 18 UC Status/ N Project with Amount Funds 3/17 upto 9/17 upto 9/2017 Remarks o. released Phy. Fin Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. SPA 2015-16 No. SPWD/ PE- Second Block 23/SPA/ UC Rs. 497.50 OfficeBuildin Work JC/2014-15/642 Work in 4 Phase IV 497.50 g 1509 Sq 500.00 497.50 50% in 497.50 Dtd. 02/11/2015 prog. Rs. 497.50 in mtrs prog. for Rs. 500.00 Part-V Lacs 5 Phase-V In process 556.00 -- -- -- -- -- -- -- -- -- -- PUBLIC WORKS DEPARTMENT AP, ITANAGAR C/o D.C. Office Complex / Mini Secretariate at Changlang District of Arunachal Pradesh (Ph:-I) PUBLIC WORKS DEPARTMENT AP, ITANAGAR FIRST BLOCK DISTRICT SECRETARIAT AT CHANGLANG PUBLIC WORKS DEPARTMENT AP, ITANAGAR (Financial figures in lakhs) Progressive Achievement Cumulative S Cumula Scope of Work Achievement upto Target 2017-18 during 2017- Achievement upto Status l. Name of Sanction No. tive 3/17 18 upto 9/17 9/2017 of UC/ N Project with Amount Funds Remark Fin o. released Phy. Fin Phy. Fin. Phy. Fin. Phy. Phy. Fin. s . SPA 2012-13 No. SPWD/ Constructi PE-04/SPA/ on of JC/2013- Office District 14/1821 Dtd. Building 1 500.00 2500.00 500.00 - 500.00 500.00 Secretariat 25/03/2014 8396.02 at Khonsa for Rs. sqm (PH-I) 2500.00 lakhs 1st Block 1st Block 100%; 2nd 100%; SPA 2014-15 2nd Block 2nd Block Block 50% 50% 20% No. SPWD/ PE-24/SPA/ JC/2014- 2nd 15/719 Dtd. - Do - 2 Phase II 497.50 2500.00 497.50 Block 400.00 497.50 497.50 17/11/2015 100% for Rs. 2500.00 lakhs PUBLIC WORKS DEPARTMENT AP, ITANAGAR DISTRICT SECRETARIAT AT KHONSA (BLOCK – C) PUBLIC WORKS DEPARTMENT AP, ITANAGAR DISTRICT SECRETARIAT AT KHONSA (BLOCK – B) PUBLIC WORKS DEPARTMENT AP, ITANAGAR DISTRICT SECRETARIAT AT KHONSA (2nd BLOCK) PUBLIC WORKS DEPARTMENT AP, ITANAGAR DISTRICT SECRETARIAT AT KHONSA (3rd BLOCK) PUBLIC WORKS DEPARTMENT AP, ITANAGAR (Financial figures in lakhs) S Sancti Progressive Achievement Name Cumula Cumulative Achievement Status l on No. Scope of Work Achievement upto Target 2017-18 during 2017- of tive upto 9/2017 of UC/ . with 3/17 18 upto 9/17 Projec Funds Remar N Amou t released ks o nt Phy. Fin Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. SPA 2011-12 No. SPWD / PE- 03/SP A/ Constru TC/20 UC for ction of 12- Office Building Rs. District 13/900 8655 Sq mtr 100 450.00 1 Secretar 450.00 450.00 500.00 Dtd. Boundary Wall % lakhs iat at 19/12/2 740 mtr Namsai 012 for (Ph-I) Rs. B/Wall- 450.00 630.00 Mtr, B/Wall-630.00 lakhs Block-A Mtr, Block-A March Bldg.100% Bldg.100% 947.50 947.50 /2015 compltd compltd with with pinth pinth area of SPA 2015-16 area of 3800 sq mtr 3800 sq mtr UC for Rs. 497.50 lakhs - Do - - Do - 100 2 497.50 497.50 (PH-II) % Rs. 73.54 lakhs kept in Part-V PUBLIC WORKS DEPARTMENT AP, ITANAGAR Front view C/o District Secretariat building at Namsai (First Block) PUBLIC WORKS DEPARTMENT AP, ITANAGAR C/o District Secretariat building at Namsai (First Block) PUBLIC WORKS DEPARTMENT AP, ITANAGAR STATUS OF DISTRICT CC ROAD AT DIFFERENT LOCATIONS AS ON 30-09-2017 UNDER EASTERN ZONE PUBLIC WORKS DEPARTMENT AP, ITANAGAR STATUS OF CC ROAD AT : ROING TEZU CHANGLANG KHONSA LONGDING PUBLIC WORKS DEPARTMENT AP, ITANAGAR (Financial figures in lakhs) Achieveme Progressive Cumulative Cumula Target 2017- nt during Sl. Sanction Scope of Work Achievement upto Achievement UC Name of tive 18 2017-18 N No. with 3/17 upto 9/2017 Status/Re Project Funds upto 9/17 o. Amount marks released Phy. Fin. Phy. Fin. Phy. Fin. Phy Fin. Phy. Fin. SPA 2012-13 No. CC SPWD/ Pavement 5.02 PE- with width Km Construction 06/SPA/ UC 5.50 Mtr of RCC road TC/2013- Submitte with 14/ 1622 1000.0 d: 1 1000.00 1111.00 100% 1000.00 - - 100% Drainage at Dtd. 1.75 0 1000.00 CC Drain Roing (PH- 04/03/201 Km Work I) 4 for Rs. Compltd 1111.00 Slab 18 Lacs / culvert Nos March- PUBLIC WORKS DEPARTMENT AP, ITANAGAR GSB Works DLC Works PQC Works Drain Works C/o RCC Road with drainage at Roing in Lower Dibang Valley District of Arunachal Pradesh under SPA-2012-13 (Ph-I) PUBLIC WORKS DEPARTMENT AP, ITANAGAR Culvert Widening of culvert C/o RCC Road with drainage at Roing in Lower Dibang Valley District of Arunachal Pradesh under SPA-2012-13 (Ph-I) PUBLIC WORKS DEPARTMENT AP, ITANAGAR (Financial figures in lakhs) Cumulat Progressive Achievement Cumulative Sl. Sanction Target UC Name of ive Scope of Work Achievement upto during 2017-18 Achievement upto N No. with 2017-18 Status/Re Project Funds 3/17 upto 9/17 9/2017 o. Amount marks released Phy. Fin Phy. Fin. Phy Fin Phy. Fin. Phy. Fin. SPA 2011-12 Widening 5.75 Km Pavement (3.75 m) WBM-III 4.125 Km No. SPWD/ DLCC 4.125 Km PE-71/SPA/ UC JC/2012- C/o CC road CC Submitte 13/331 Dtd. 4.125 Km with drainage Pavement d for : 1 09/03/2013 810.00 810.00 100% 810.00 -- -- 100% 810.00 at Khonsa 810.00 for Rs.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages35 Page
-
File Size-