Lawton Road / Alsager / Cheshire St7 2Df

Total Page:16

File Type:pdf, Size:1020Kb

Lawton Road / Alsager / Cheshire St7 2Df FOR SALE / TO LET HIGH QUALITY HEADQUARTERS OFFICE BUILDING 32,601 SQ FT (3,028.6 SQ M) POTENTIAL FOR ALTERNATIVE USE, SUBJECT TO PLANNING LAWTON ROAD / ALSAGER / CHESHIRE ST7 2DF DESCRIPTION VAT Linley Point is a 2-storey modern self-contained office building of steel portal frame construction with brick All prices quoted are elevations beneath a pitched tiled roof. exclusive of, but may Built in 1992 Linley Point provides 2 floors of high quality flexible office accommodation. Each floor comprises be liable to, VAT at the circa 16,000 sq ft with a mixture of open plan and partitioned office space serviced from a central core. prevailing rate. The specification includes: · Full access raised floors · Passenger lift EPC · Comfort cooling in part · Landscaped environment · Suspended ceiling · Extensive on-site car parking An EPC is available on · Full-height glazed reception entrance request. The building has an EPC rating of D. ALTERNATIVE USE The premises could be potentially adapted for alternative uses, such as residential care / nursing home, subject to the necessary planning permission. PRICE/TERMS BUILDING The freehold interest in the property is available, price INSURANCE on application. The Landlord will insure the building and Alternatively the accommodation is available as a recover the premium from the Tenant. whole or on a floor by floor basis by way of a new full repairing and insuring lease on full terms to be agreed. Indicative car parking plan subject to planning. ACCOMMODATION The premises have been measured in accordance with the RICS property measurement (incorporating IPMS) 1st Edition, May 2015. All floor areas have been calculated on a Net Internal basis. SQ FT SQ M Ground Floor 16,044 1,490.4 First Floor 16,557 1,538.1 TOTAL 32,601 3,028.6 GROUND FLOOR FIRST FLOOR LOCATION Alsager is situated approximately 9 miles to the north west of Stoke-on-Trent and 6 miles to the east of Crewe. It has good communication links to the M6 motorway some 2 miles to the west with junction 16 to the south and junction 17 to the north. Linley Point is found to the east of Alsager town centre at the junction of Lawton Road (B5077) and Linley Lane (A5011) which is close to the interchange with the A50. The A50 runs north to the M6 or south to the A500 which in turn links with Stoke-on-Trent. Alsager is served by Alsager Railway Station on the Crewe to Derby Line. There is a direct footpath from the premises to the station. Three bus routes pass directly outside the entrance which service the wider community, connecting with Crewe, Congleton, Sandbach and Nantwich. 24 SAT NAV: ST723 2DF 2 MANCHESTER Salford 1 3 22 M62 6 11 7 M60 M62 9 BUSINESS RATES LEGAL COSTS Sale 9 Stockport 12 7 Warrington 21 Cheadle The property currently forms part of a larger rating Each party to be responsible for their own legal costs Lymm 5 assessment that will need to be split. incurred in any transaction. Widnes Altrincham 20 6 7 M56 10 Wilmslow 11 VIEWINGS B5077 D A Runcorn 19 A 5 David Laws 12 Knutsford N RO AWTO 0 L 1 Strictly by appointment with the agents. E: [email protected] M56 7 1 07 Frodsham B5 ALSAGER Macclesfield David Newman Steve Brittle 14 TOWN CENTRE L Northwich I E: [email protected] E: [email protected] S N A N L TO M6 D E M6 B Alsager Y JCT 16 A C L H A Holmes R N O E Chapel A Middlewich 18 D Winsford S O U T Tarporley Congleton H Sandbach 17 Biddulph Leek Crewe Alsager Kidsgrove 16 Nantwich STOKE-ON-TRENT DISCLAIMER Matthews & Goodman as agent and for the Vendors/Lessors of this property give notice that 1) These particulars have been checked and are understood to be materially correct at the date Newcastle- of publication. The content however, is given without responsibility and should not, in any circumstances, be relied upon as representations of fact. Intending purchasers/lessees should satisfy under-Lyme themselves as to their correctness and as to the availability to the property, prior to arranging viewings of the property. 2) These particulars are a guide only and do not form part of an offer or contract. 3) Matthews & Goodman, their employees, nor the Vendors/Lessors make or give any representation or warranty in relation to the property. 4) No representation or warranty LAWTON ROAD / ALSAGER / CHESHIRE ST7 2DF is given in respect of any part, equipment or services at the property. 5) Unless otherwise stated, prices, rents or other prices quoted are exclusive of VAT. Intending purchaser/lessees must Whitchurch 15 satisfy themselves independently as to the incidence of VAT in respect of any transaction relating to this property. 6) All floor areas have been measured and calculated in accordance with the RICS property measurement (incorporating IPMS) 1st Edition, May 2015, Office space has been measured to IPMS 3 - Office, unless otherwise stated. 7) Date of Publication: January 2017. Designed and Produced by Creativeworld. Tel: 01282 858200..
Recommended publications
  • Sedgwick Associates Chartered Town Planners
    Sedgwick Associates Chartered Town Planners 24 Queensbrook, Spa Road, Bolton BL1 4AY. Tel 01204 522236 E-mail: [email protected] . Planning Statement In support of an application by Hollins Strategic Land LLP for outline planning permission for the erection of up to 70No. dwellings at land off Crewe Road, Alsager June 2014 sa/ms/4458/PS CONTENTS Section Page 1 Introduction 2 2 The Application Site and its Setting 3 3 Relevant Town Planning History 8 4 Planning Policies 9 5 Consultation 15 6 Evaluation 18 7 Conclusions 25 sa/ms/4458/PS Sedgwick Associates 1 1. INTRODUCTION 1.1. This Statement is written on behalf of Hollins Strategic Land LLP in support of an application for outline planning permission (all matters reserved other than access) for the erection of up to 70No. dwellings at land off Crewe Road, Alsager. Town planning considerations that are relevant to determining the application are reviewed and the statement identifies important considerations which support the proposals. 1.2. The Council has a shortage of deliverable housing land. The proposals would make a valuable contribution towards reducing the deficit in a sustainable manner. The proposals comply with the policies of NPPF as a whole and will result in economic, social and environmental benefits which are not significantly and demonstrably outweighed by any adverse impacts. 1.3. These benefits include, and are not limited to, significantly enhancing existing features of ecological interest and promoting biodiversity gain by pond and habitat creation with substantial landscaping; the creation of public open space (POS) that will provide opportunities for leisurely walks, responding directly to a recognised need in Alsager; and, providing development in a highly sustainable and accessible location, as recognised by the Inspector who examined the Congleton Local Plan.
    [Show full text]
  • Agenda Reports Pack (Public) 14/07/2010, 14:00
    Public Document Pack Strategic Planning Board Agenda Date: Wednesday, 14th July, 2010 Time: 2.00 pm Venue: The Capesthorne Room - Town Hall, Macclesfield SK10 1DX The agenda is divided into 2 parts. Part 1 is taken in the presence of the public and press. Part 2 items will be considered in the absence of the public and press for the reasons indicated on the agenda and at the foot of each report. Please note that members of the public are requested to check the Council's website the week the Strategic Planning Board meeting is due to take place as Officers produce updates for some or for all of the applications prior to the commencement of the meeting and after the agenda has been published. PART 1 – MATTERS TO BE CONSIDERED WITH THE PUBLIC AND PRESS PRESENT 1. Apologies for Absence To receive any apologies for absence 2. Declarations of Interest/Pre-Determination To provide an opportunity for Members and Officers to declare any personal and/or prejudicial interests and for Members to declare if they have made a pre- determination in respect of any item on the agenda 3. Minutes of the Previous Meeting (Pages 1 - 4) To approve the minutes of the meeting held on 23 June 2010 4. Public Speaking A total period of 5 minutes is allocated for each of the planning application for Ward Councillors who are not members of the Strategic Planning Board. A period of 3 minutes is allocated for the each of the planning application for the following individuals/groups: For any apologies or requests for further information, or to arrange to speak at the meeting Contact : Sarah Baxter Tel: 01270 686462 E-Mail: [email protected] • Members who are not members of the Strategic Planning Board and are not the Ward Member • The relevant Town/Parish Council • Local Representative Group/Civic Society • Objectors • Supporters • Applicants 5.
    [Show full text]
  • East Midlands Rail Franchise Stakeholder Briefing Document and Consultation Response
    East Midlands Rail Franchise Stakeholder Briefing Document and Consultation Response Driving Growth in the East Midlands June 2018 Stakeholder Briefing Document | East Midlands Rail Franchise Stakeholder Briefing Document | East Midlands Rail Franchise The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website in English and Welsh. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard, please contact the Department: Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website: www.gov.uk/government/organisations/department-for-transport General enquiries: https://forms.dft.gov.uk © Crown copyright 2018 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit http://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ or write to The Information Policy Team, The National Archives, Kew, London TW9 4DU. Further contact details are available on http://apps.nationalarchives.gov.uk/Contact/ Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Stakeholder Briefing Document | East Midlands Rail Franchise Stakeholder Briefing Document | East Midlands Rail Franchise Contents 1. Foreword Foreword by the Secretary of State 3 2. Introduction What is this document for? 7 3.
    [Show full text]
  • Click to Enter Document Title
    Local Transport Plan (2018 – 2023) Draft for Public Consultation www.cheshireeast.gov.uk Document control sheet Version 01; September 2017 Project: Cheshire East LTP Refresh Client: Cheshire East Council Document title: Version 1 – Final for Public Consultation Originated by Checked by Reviewed by NAME NAME NAME ORIGINAL Martin Baierl / Laura Oliver Dan Sheppard Dan Sheppard Approved by NAME As Project Manager I confirm INITIALS John Davies that the above document(s) JMD have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE 15/09/17 Document status: working draft for comment REVISION NAME NAME NAME Martin Baierl / Laura Oliver Dan Sheppard Dan Sheppard Approved by NAME As Project Manager I confirm INITIALS John Davies that the above document(s) JMD have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE 22/11/17 Document status: Draft for comment REVISION NAME NAME NAME Dan Sheppard Dan Sheppard John Davies Approved by NAME As Project Manager I confirm INITIALS John Davies that the above document(s) JMD have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE 27/02/18 Document status: Final for Public Consultation Jacobs U.K. Limited This document has been prepared by a division, subsidiary or affiliate of Jacobs U.K. Limited (“Jacobs”) in its professional capacity as consultants in accordance with the terms and conditions of Jacobs’ contract with the commissioning party (the “Client”). Regard should be had to those terms and conditions when considering and/or placing any reliance on this document.
    [Show full text]
  • Agenda Reports Pack (Public) 14/09/2010, 10:30
    Public Document Pack Environment and Prosperity Scrutiny Committee Agenda Date: Tuesday, 14th September, 2010 Time: 10.30 am Venue: Committee Suite 1,2 & 3, Westfields, Middlewich Road, Sandbach CW11 1HZ The agenda is divided into 2 parts. Part 1 is taken in the presence of the public and press. Part 2 items will be considered in the absence of the public and press for the reasons indicated on the agenda and at the foot of each report. PART 1 – MATTERS TO BE CONSIDERED WITH THE PUBLIC AND PRESS PRESENT 1. Apologies for Absence 2. Declarations of Interest/Whipping Declarations To provide an opportunity for Members and Officers to declare any personal and/or prejudicial interests in any item on the agenda 3. Public Speaking Time/ Open Session A total period of 15 minutes is allocated for members of the public to make a statement(s) on any matter that falls within the remit of the Committee. Individual members of the public may speak for up to 5 minutes, but the Chairman will decide how the period of time allocated for public speaking will be apportioned, where there are a number of speakers 4. Minutes of Previous Meeting (Pages 1 - 4) To approve the minutes of the meeting held on 6 July 2010 as a correct record. 5. Strategic Housing - Audit Commission Inspection For any apologies or requests for further information, or to give notice of a question to be asked by a member of the public Contact : Katie Smith Tel: 01270 686465 E-Mail: [email protected] To receive a presentation outlining what has been submitted to the Audit Commission in relation to the Self Assessment, the Housing Vision, local priorities and the production of a local housing strategy.
    [Show full text]
  • DECEMBER 2020 TIMETABLE CONSULTATION Major Changes – Have Your Say Contents Introduction 0 3 a Message from Julian Edwards, Managing Director, East Midlands Railway
    DECEMBER 2020 TIMETABLE CONSULTATION Major changes – have your say Contents Introduction 0 3 A message from Julian Edwards, Managing Director, East Midlands Railway. Summary of proposals 0 4 Our proposals for EMR Intercity, EMR Electrics and EMR Regional services. The Midland Main Line Upgrade – an overview 0 8 An overview of the £1.5 billion investment into the Midland Main Line. EMR Intercity 0 9 Our proposals for EMR Intercity, station by station. EMR Electrics 2 0 Our proposals for EMR Electrics, station by station. EMR Regional 2 7 Our proposals for EMR Regional, by line of route. FAQs 2 8 Questions about the timetable change, including what this means for Thameslink passengers. How you can respond 3 1 How to respond to the consultation and what happens next. 0 2 December 2020 Timetable Consultation Major changes in Hello and welcome to the public consultation into the December 2020 East Midlands Railway timetable. First of all, I would like to sincerely thank you for taking the time to read and feedback on these proposals. As we outlined when the East Midlands Railway franchise started in August, our proposals will help to support a thriving East Midlands and provide thousands more seats, faster journeys, additional regional services, more Sunday services, earlier and later trains during the week as well as better connections to airports. December 2020 is an important milestone for the East Midlands as it is the first time the additional seats and services made possible by the £1.5billion Midland Main Line Upgrade will be provided to passengers. This includes the introduction of EMR Electrics services between London and Corby as well as changes to our EMR Intercity timetable.
    [Show full text]
  • Local Development Framework Cheshire East
    MASTER LDF BROCHURE COVERS:Layout 1 26/10/2010 16:26 Page 9 Cheshire East Local Development Framework Local List of Historic Buildings Supplementary Planning Document Adopted October 2010 Contents 1 Introduction 4 2 Relevant Local Plan Policies 5 3 Criteria for the Selection of Buildings 6 4 Implications of Local Listing 7 5 Assessment of Proposals for Development Involving a Locally Listed Building 8 Demolition 8 Sustainability 8 The Setting of a Locally Listed Building 9 6 Guidance on Alterations and Extensions 10 Extensions 10 Roofs 10 Joinery 10 Research 10 Setting 10 Boundary Details 11 7 Application Checklist 12 8 Nominating Buildings for the Local List 13 Reviewing the List 13 Emergency Procedure 13 Formal Designation of Local List Buildings 13 9 Nominating a Building / Structure for the Local List of Historic Buildings 14 Appendix A 17 Adlington 17 Alderley Edge 17 Alsager 20 Arclid 22 Audlem 22 B 23 Betchton 23 Contents CHESHIRE EAST LOCAL DEVELOPMENT FRAMEWORK Local List SPD 1 Bollington 24 Bulkeley 28 C 29 Chelford 29 Cholmondeley 29 Chorley 30 Congleton 30 Crewe 36 Crewe Green 42 D 45 Disley 45 E 48 Egerton 48 G 49 Gawsworth 49 Goostrey 49 H 50 Handforth 50 Haslington 50 Henbury 55 High Legh 56 K 59 Knutsford 59 L 63 Langley 63 Lower Withington 63 M 64 Macclesfield 64 Millington 81 Moreton Cum Alcumlow 81 Mottram St Andrew 82 N 83 Nantwich 83 Contents 2 CHESHIRE EAST LOCAL DEVELOPMENT FRAMEWORK Local List SPD Nether Alderley 83 Newbold Astbury 84 Norbury 85 North Rode 85 O 86 Odd Rode 86 Ollerton 86 P 87 Peover (Over) 87 Pickmere 87 Plumley 88 Poynton 88 Prestbury 91 Peckforton 93 R 94 Rainow 94 Ridley 94 S 95 Sandbach 95 Shavington 95 Smallwood 97 Sutton 97 T 99 Tabley 99 Tytherington 99 W 101 Willaston 101 Wilmslow 102 Wirswall 111 Wistaston 111 Contents CHESHIRE EAST LOCAL DEVELOPMENT FRAMEWORK Local List SPD 3 1: Introduction 1.1 This Supplementary Planning Document encourages the retention and conservation of the Borough’s local heritage assets.
    [Show full text]
  • Final 2018-2030 1 Table of Contents
    Final 2018-2030 1 Table of contents 3. Foreword from the Steering Group Chair 4. Scope of the Plan 5. A Short History of Alsager 6. Alsager Today 7. Vision for Alsager Objectives, Policies and Justification 8. Economy and Employment (EE) 16. Town Centre (TC) 26. Housing (H) 34. Natural and Built Environment (NBE) 42. Community and Wellbeing (CW) 45. Traffic, Transport and Services (TTS) 52 Appendices 1. Glossary 2. Green spaces list and analysis 3. Wildlife corridors map 4. Listed and significant buildings 5. Sports facilities and school playing fields 6. Community facilities 7. Map of public rights of way 8. Evidence and research base 9. Draft delivery plan 10. Acknowledgements. 2 Foreward from the Steering Group Chair This plan has been prepared by the Alsager Neighbourhood Plan Steering Group on behalf of Alsager Town Council after two years of study, research and consultation with the local community. We have also worked closely with Cheshire East Council. We have consulted with the community in a number of ways throughout the plan-making process and we believe that this Plan reflects the views of our community. A strong message emerging from the consultation process was that the local people enjoy living and working in the town and wish to retain its identity and character. This was key to developing the overarching Vision for Alsager which is set out below. The objectives and policies of the Plan have been driven by the views of the local community and by wider research into a range of issues, and we strongly believe that the policies in this plan are robust and, if formally adopted, will provide the necessary planning policy framework for the future of the town up to 2030.
    [Show full text]
  • (Public Pack)Agenda Document for Southern Planning Committee, 08
    Southern Planning Committee Agenda Date: Wednesday, 8th August, 2018 Time: 10.00 am Venue: Council Chamber, Municipal Buildings, Earle Street, Crewe CW1 2BJ Members of the public are requested to check the Council's website the week the Southern Planning Committee meeting is due to take place as Officers produce updates for some or all of the applications prior to the commencement of the meeting and after the agenda has been published. The agenda is divided into 2 parts. Part 1 is taken in the presence of the public and press. Part 2 items will be considered in the absence of the public and press for the reasons indicated on the agenda and at the foot of each report. It should be noted that Part 1 items of Cheshire East Council decision making and Overview and Scrutiny meetings are audio recorded and the recordings will be uploaded to the Council’s website. PART 1 – MATTERS TO BE CONSIDERED WITH THE PUBLIC AND PRESS PRESENT 1. Apologies for Absence To receive apologies for absence. 2. Declarations of Interest/Pre Determination To provide an opportunity for Members and Officers to declare any disclosable pecuniary and non-pecuniary interests and for Members to declare if they have pre- determined any item on the agenda. 3. Minutes of Previous Meeting (Pages 5 - 6) To approve the minutes of the meeting held on 4 July 2018. Please contact Julie Zientek on 01270 686466 E-Mail: [email protected] with any apologies or requests for further information [email protected] to arrange to speak at the meeting 4.
    [Show full text]
  • Local Transport Plan Refresh
    Local Transport Plan (2018 – 2023) Draft for Public Consultation www.cheshireeast.gov.uk Document control sheet Version 010101;01 ; September 2012017777 Project: Cheshire East LTP Refresh Client: Cheshire East Council Document title: Version 1 – Final for Public Consultation Originated by Checked by Reviewed by NAME NAME NAME ORIGINAL Martin Baierl / Laura Oliver Dan Sheppard Dan Sheppard NAME INITIALS Approved by As Project Manager I confirm John Davies that the above document(s) JMD have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE 15/09/17 Document status: working draft for comment NAME NAME NAME REVISION Martin Baierl / Laura Oliver Dan Sheppard Dan Sheppard NAME INITIALS Approved by As Project Manager I confirm John Davies that the above document(s) JMD have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE 22/11/17 Document status: Draft for comment NAME NAME NAME REVISION Dan Sheppard Dan Sheppard John Davies NAME INITIALS Approved by As Project Manager I confirm John Davies that the above document(s) JMD have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE 27/02/18 Document status: Final for Public Consultation Jacobs U.K. Limited This document has been prepared by a division, subsidiary or affiliate of Jacobs U.K. Limited (“Jacobs”) in its professional capacity as consultants in accordance with the terms and conditions of Jacobs’ contract with the commissioning party (the “Client”). Regard should be had to those terms and conditions when considering and/or placing any reliance on this document.
    [Show full text]
  • Alsager July 2016 Contents
    Cheshire East Local Plan Site Selection Final Report: Alsager July 2016 Contents 1 Introduction 1 2 Spatial Distribution of Development 2 3 Strategy for Development in Alsager 3 4 Sites Considered in the Site Selection Process: Alsager 4 5 Sustainability Appraisal 6 6 Neighbourhood Plan 6 7 Sites Assessed and Recommendations 6 Site PSS300 6 Site PSS301 10 Site PSS302 13 Site PSS304 19 Site PSS306 25 Site PSS307 27 Site PSS308b 30 Site PSS308a 34 Site PSS309 38 Site PSS310 41 Site PSS303 44 Site PSS305 49 8 Sites Recommended for Inclusion in the LPS for Alsager 54 9 Overall Conclusions re Sites for Inclusion in the LPS for Alsager (Stage 9– Summary) 55 Appendices Appendix 1: Map showing all sites considered in the Site Selection Process 56 Appendix 2: Traffic Light Forms 58 Appendix 3: Vision and Strategic Priorities Forms 117 Appendix 4: Summary of Infrastructure Providers and Statutory Consultees Comments 159 Appendix 5: Green Belt Assessments 167 Cheshire East Local Plan Strategy: Final Site Selection Report Alsager 1. Introduction 1.1 The ‘Cheshire East Local Plan Strategy: Site Selection Report – Alsager’ was published as background evidence to the Cheshire East Local Plan Strategy Proposed Changes Version (LPS) consultation, which took place from 4 March to 19 April 2016. The Report documented the implementation of the Site Selection Methodology (SSM) for Alsager. 1.2 In response to the consultation, additional information was submitted in relation to a number of sites that had already been considered using the SSM. A number of new sites have also been proposed for consideration for inclusion in the LPS that have not previously been considered using the SSM.
    [Show full text]
  • 1. Introduction
    Congleton Borough Local Plan First Review (01/05) Introduction Page 1-1 1. INTRODUCTION WHAT IS A LOCAL PLAN? 1.1 The planning system, as established in the Town and Country Planning Acts, is intended to: • regulate the development and use of land in the interest of the general public: • balance the needs of development and conservation: and • secure the most efficient and appropriate use and development of land. 1.2 Development Plans play a key role in achieving the above mentioned objectives and provide an essential framework for planning decisions. In this area the development plan system is divided into two tiers: STRUCTURE PLAN : which is prepared by the County Council and sets out key strategic policies for the whole of the County on matters such as housing, employment and transport and provides a framework for Local Plans. LOCAL PLANS : which are in the main prepared by District Councils and set out more detailed policies to guide development within the whole of a local authority area including proposals for specific sites. 1.3 The main functions of a Local Plan are: • to interpret strategic policies contained in the Structure Plan at a detailed local level; • to provide policy guidelines for the consideration of all planning applications; • to provide a framework for coordinating development by public authorities; • to give the public the opportunity to comment upon and become involved in the resolution of local planning issues; • to ensure future development of the Borough is in accordance with, and to facilitate the broader objectives of, the Council as set out in its Corporate Strategy and 6 supporting Strategies.
    [Show full text]