International Handbook of Occupational Therapy Interventions Ingrid Söderback Editor
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Brick Installation Instructions DESIGNED by NATURE
Brick Installation Instructions DESIGNED BY NATURE. PERFECTED BY BOULDER CREEK.® 8282 Arthur Street NE Minneapolis , MN 55432 • 763-786-7138 • Fax 763-786-7276 • www.bouldercreekstone.com Getting Started INSTRUCTIONS BRICK INSTALLATION Congratulations on your decision to enhance the look of your home with Boulder Creek Brick products. Boulder Creek Brick products are made from a lightweight concrete material that replicates the look and texture of natural brick, and offers the benefit of being able to be installed directly to any surface. Calculating Materials Necessary If you haven’t already purchased your materials, you may be wondering how much Boulder Creek Brick will be necessary to complete your project. • First, measure the square footage of the total area to be covered by brick. • If you will be using corners on your project, plan for Example: each linear foot of corner pieces to cover ¾ square Total Surface Area= 100 sf foot of area. Corner Height = 8 ft. 8 ft. corner • Example: If you had a 100 square foot wall with an 8 8 x ¾ sf = 6 sf foot corner, the corner pieces would cover 6 square (Coverage by corners) 100 sf area feet of the wall. So, subtracting 6 from 100, you would 100 sf - 6 sf = 94 sf need 94 square feet of flat brick to cover the face of the wall, and 8 linear feet of corner pieces. Tips Some things to keep in mind before, during and after the installation process: Keep the Brick Clean During Installation Check Local Building Codes • Keep your hands clean. • Building codes vary from area to area. -
Stone Installation Instructions ESR-3111
Stone Installation Instructions ESR-3111 Step 1: Preparing the Surface Water Resistive Barrier (WRB) If you will be installing the stone on an exterior non-masonry surface, it is recommended to apply a WRB such as an “All Weather” 15# Asphalt Saturated Felt paper meeting ASTM D4869 (Grade D paper) on top of house wrap. First, install a weep screed (optional – local building code may not require but supersedes these instructions) no more than 4” above concrete or paved surfaces or right where framing meets foundation, then apply WRB starting with the bottom edge at the lip of Overlap the weep screed continuing upward in a shingle like fashion. Overlap WRB a paper and lath top minimum of 2” on horizontal seams and 6” on vertical seams. (optional – sealing sheets over WRB with caulk or tape to corner boards or window jams may be required by local bottom building code and supersedes these instructions) Wire Lath Fold paper •Directly over WRB, or directly over the sheeting on an interior project, cover the area and lath around with metal wire lath. Cambridge recommends using a 2.5 lb/sq yd self-furring corners diamond metal lath meeting ASTM C847. •Install the lath horizontally overlapping a minimum of 2” the horizontal seams and House Wrap (Tyvek ™) 6” on the vertical seams. •The lath should feel smooth as you run your hand down over the lath and rough as 15# Felt you run your hand up over the lath. Fasten lath on both •Use fasteners (nails, staples, etc. meeting ASTM C1063 sec.7.10.2) that will penetrate Metal Lath sides of corner the framing or OSB a minimum of 1 inch. -
Thin Cut Installation
“Natural Stone for any place and every space.” In addition to our line of full veneer, Semco StoneR also offers our ThinCutTM Natural Stone Veneer. ThinCutTM is available in depths that average one inch thick and is only one quarter the weight of full veneer. The reduced weight allows this veneer to be installed where full veneer cannot be used or is too difficult, such as dormers, gables, and existing interior and exterior structures. ThinCutTM can be applied to any structurally sound surface, including any masonry surface, concrete block, brick, cement, wallboard, plywood, paneling or metal buildings. ThinCutTM is durable, beautiful, and adds value to any home or business. CALCULATING NECESSARY MATERIALS: SCRATCH COAT, MORTAR & GROUT: Begin by guring the square footage of the area Example: Dry mix the sand and the cement together to you plan to cover with stone. If your project avoid creating clumps in the mixture. Add water Total Surface Area = 100 sq. ft. includes corner stones, deduct .75 square foot slowly to the mixture a little at a time, continually Corner Height = 9’ mixing until you have achieved the consistency of for each linear foot of corners that you will (9 x .75 = 6.75) utilize. Semco’s ThinCutTM Natural Stone Veneer a paste or whipped potatoes. Mix a minimum of 5 100 sq. ft. minutes. is packaged assuming a 1/2” mortar joint. If - 6.75 sq. ft. your joint will vary from this number you must 9’ Corner 93.25 sq. ft. MIXING AND APPLYING THE SCRATCH COAT: adjust your quantities accordingly. Scratch Coat: 1 part Type S Masonry Cement to 93.25 sq. -
Obituaries Buffalo News 2010 by Name
Obituaries as found in the Buffalo News: 2010 Date of Place of Date, Page of Last Name/Maiden First Name M.I. Age Death Death/Birth/Residence Date, Page detailed obit Abbarno Vincent "Lolly" A. 9/26/2010 Kenmore, NY 9-30-2010: C4 Abbatte/Saunders Murielle A. 87 1/11/2010 1-13-2010: B4 Abbo Joseph D. 57 5/31/2010 Lewiston, NY 6-3-2010: B4 Brooksville, FL; formerly of Abbott Casimer "Casey" 12/19/22009 Cheektowaga, NY 4-18-2010: C6 Abbott Phillip C. 3/31/2010 4-3-2010: B4 Abbott Stephen E. 7/6/2010 7-8-2010: B4 Abbott/Pfoetsch Barbara J. 4/20/2010 5-2-2010: B4 Abeles Esther 95 1/31/2010 2-4-2010: C4 Abelson Gerald A. 82 2/1/2010 Buffalo, NY 2-3-2010: B4 Abraham Frank J. 94 3/21/2010 3-23-2010: B4 Abrahams/Gichtin Sonia 2/10/2010 died in California 2-14-2010: C4 Abramo Rafeala 93 12/16/2010 12-19-2010: C4 Abrams Charlotte 4/6/2010 4-8-2010: B4 Abrams S. "Michelle" M. 37 5/21/2010 Salamanca, NY 5-23-2010: B4 Abrams Walter I. 5/15/2010 Basom, NY 5-19-2010: B4 Abrosette/Aksterowicz Sister Mary 6/18/2010 6-19-2010: C4 Refer to BEN 2-21-2010: B6/7/8 for more possible Abshagen Charles, Jr. L. 73 2/19/2010 North Tonawanda, NY 2-22-2010: B8 information Acevedo Miguel A. 10/6/2010 Buffalo, NY 10-27-2010: B4 Achkar John E. -
The German Surname Atlas Project ± Computer-Based Surname Geography Kathrin Dräger Mirjam Schmuck Germany
Kathrin Dräger, Mirjam Schmuck, Germany 319 The German Surname Atlas Project ± Computer-Based Surname Geography Kathrin Dräger Mirjam Schmuck Germany Abstract The German Surname Atlas (Deutscher Familiennamenatlas, DFA) project is presented below. The surname maps are based on German fixed network telephone lines (in 2005) with German postal districts as graticules. In our project, we use this data to explore the areal variation in lexical (e.g., Schröder/Schneider µtailor¶) as well as phonological (e.g., Hauser/Häuser/Heuser) and morphological (e.g., patronyms such as Petersen/Peters/Peter) aspects of German surnames. German surnames emerged quite early on and preserve linguistic material which is up to 900 years old. This enables us to draw conclusions from today¶s areal distribution, e.g., on medieval dialect variation, writing traditions and cultural life. Containing not only German surnames but also foreign names, our huge database opens up possibilities for new areas of research, such as surnames and migration. Due to the close contact with Slavonic languages (original Slavonic population in the east, former eastern territories, migration), original Slavonic surnames make up the largest part of the foreign names (e.g., ±ski 16,386 types/293,474 tokens). Various adaptations from Slavonic to German and vice versa occurred. These included graphical (e.g., Dobschinski < Dobrzynski) as well as morphological adaptations (hybrid forms: e.g., Fuhrmanski) and folk-etymological reinterpretations (e.g., Rehsack < Czech Reåak). *** 1. The German surname system In the German speech area, people generally started to use an addition to their given names from the eleventh to the sixteenth century, some even later. -
How Was It Made?
HOW WAS IT MADE? HURRICANE SANDY DAMAGE CUBA RECOVERY IN THE EASTERN REGION SYSTEMATIZATION EXPERIENCES Compilers Erly Arner Reyes/ Universidad de Oriente/ Alkaid Benítez Pérez/ Universidad de Holguín/ OIKOS/ Proyecto “Asistencia de emergencia en la rehabilitación de viviendas y reducción de riesgos en los mu- nicipios Mayarí y Rafael Freyre”/ Andrés Olivera Ranero/ Universidad Central de Las Villas/ Marilyn Fernández Pérez/ ONU-Hábitat Cuba Colaborators Francisco R. Grajales Lira/ Asociación Cubana de Producción Animal (ACPA) / Santiago de Cuba/ Proyecto ACPA y WELTHUNGERHILFE (Alemania): “AYUDA HUMANITARIA PARA FAMILIAS NECESITADAS Y REHABILITACION DE LA PRODUCCION AGRICOLA EN AREAS RURALES AFECTADAS POR EL HURACAN SANDY”/Guillermo Tasé Cámbara/ Asociación Cubana de Producción Animal (ACPA) /Ugo Puccio/ GVC – Holguín/ Proyecto “Recuperación de los medios de subsistencia familiar, de la vivienda rural y de los servicios al medioambiente, afectados por el huracán Sandy” - ECHO/CUB/BUD/2012/91006/ Raúl Figueredo Reyes/ UNAICC Holguín/ Raúl Solozano Guerrero /CARE – UNAICC– UPIV Holguín/ Progra- ma de Asistencia de Emergencia a los afectados por el Huracán Sandy en la provincia de Holguín/ María de los Ángeles Romero Chirino/ Unidad Provincial Inversionista de la Vivienda Santiago de Cuba/ Wal- do Andrés Vicente Hernández/ Unidad Provincial Inversionista de la Vivienda Santiago de Cuba/ José Angel Despaigne Quesada/ Unidad Municipal Inversionista de la Vivienda, Palma Soriano, Santiago de Cuba/ Sergio Peña Macías/ Cruz Roja Cubana Provincial Santiago de Cuba/ Juan Manuel Pascual Menéndez/ Profesor Titular Facultad de Construcciones Universidad de Oriente/ Beatriz Hadad Pérez/ Profesora Instructora Facultad de Construcciones Universidad de Oriente/ Aris Arias Batalla/ Cruz Roja Cubana Provincial Santiago de Cuba/ Mayté Wong Rodríguez/ UPIV Holguín. -
Product Users Guide
MOUNTAIN STONE® Products PRODUCT USERS GUIDE Mountain Stone® Products P.O. Box 20308 42102 4301 Industrial Road Bowling Green, KY. 42101 (270) 796-6123 (270) 796-6131 (800) 781-0277 Local Fax Nationwide Product Users Guide 1 STONE TEST RESULTS BY Mountain Stone® Products 4301 Industrial Road Bowling Green, KY. 42101 Product Testing Results The following tests were performed by: ATEC Associates (The American Testing and Engineering Corporation) located in Nashville, Tennessee. Absorption Test- ASTM C-67 Flexural Strength - ATSM C-348 Absorption Percentage Average=3.3% Flexural Strength ( psi) –average - 117 Compressive Strength – ASTM C- 67 Freeze -Thaw - ASTM C- 67-83 Compressive Strength Average = 3260 psi *No noticeable cracking occurred. Thermal Properties Efflorescence Test - ATSM C-67 sec.10 Thickness (inches) = 1.587 *Not efflorescenced Density (pcf) = 63.17 R-factor ** = 1.38 **R factor is based on the thickness in accordance with ASTM C 177-71. Average thickness may vary, which will result in R-factors varying. The insulative quality is equal to 6” of common brick. Other Tests •= Non-combustible stone, showed zero flame spread and no smoke developed. •= Colorfastness: During testing of stone no undesirable change in color was noted. Installation Procedures 1. PREPARING THE SURFACE Due to its light weight, Mountain Stone can be applied to any structurally sound surface, (except Sheet Rock) and needs no special structural foundation alteration or additions. Apply Mountain Stone directly to the surface of concrete, block, brick, and other masonry surfaces only if the surfaces are clean, unpainted, unsealed, and untreated. All other surfaces must be covered with a 2.5# Galvanized Diamond metal lath. -
MASTER CATALOG Tools for the Remodeling, Restoration and Building Trades
HydeCatalog 9/7/07 11:14 AM Page 1 MASTER CATALOG Tools for the Remodeling, Restoration and Building Trades For a better finish, start with HYDE™. HydeCatalog 9/7/07 11:14 AM Page 2 by memorable merchandising product strength and durability Serious and advertising directly to are often backed by a lifetime Tools for your customers. guarantee. America’s Favorite Brand Tap into the loyal following PAINT & SURFACE PREP 5 Serious Our brand strength has never Hyde Tools has been building for Spray Tools, Paint Shields, Scrapers, Putty been stronger in paint and wall- generations. Stock HYDE® brand Knives, Multi-use Tools, Cleaning Brushes Sales covering hand tools. HYDE® is tools and you can be sure your REPAIR 35 America’s favorite brand in these customers will come back RePairs™ Value Packs, Wall Repair Tools, Caulk categories, chosen two to one by frequently and buy often. Repair Tools, Glass Repair Tools Growth contractors over any other brand DRYWALL 45 HYDE® is the brand of choice for for scraping, patching, taping Are You Serious About ® Joint Knives, Taping Knives, Corner Tools, retailers and wholesalers who and coating surfaces. Whether Sales? Get HYDE Pointing Knives, Hawks, Mixers, Mud Pans, are serious about growing sales. purchased by professionals or Call our customer service Saws, Joint Tape Our high-quality tools are com- homeowners, our tools are department at 800-USA-HYDE MASONRY & CONCRETE 67 petitively priced and supported considered “serious tools for (872-4933) or 508-764-4344 Concrete, Cement and Brick Tools: Trowels, serious users.” Our superior for details. Pointers, Edgers, Groovers, Floats WALLCOVERING 75 Scoring Tool, Shavers, Scrapers, Shears, Brushes, Guides, Smoothing Tools, Rollers Every label bears the distinctive HYDE® branding. -
1986 Surname
Surname Given Age Date Page Maiden Note Abegg Missel 88 15-Dec C-8 Abernathy Manuel 79 1-Jan C-5 Abner Tom 71 24-Jun B-7 Abraham Aloysius J. 77 24-Jul C-2 Abram Harold Glenn 75 14-Sep D-2 Abramson Frances L. 46 28-Dec C-7 Levine Ackerman Mary 79 16-Sep B-7 Adam Paul T. 76 10-Sep C-5 Adams Claude 78 20-Jan A-5 Adams Gloria L. 48 23-Sep D-6 Adams Irene 77 21-Aug C-3 Adams Martha 72 3-Nov C-1 Adank Gerald C. 65 1-Dec C-8 Veteran of World War II Adkins Johnnie Lee 78 13-Feb B-9 Adley Daisy A. 93 2-Sep D-7 Ahlborn Raymond W. 73 2-May C-1 Aird Gordon R. 77 21-Nov D-1 See article, p. D-1 Aitken Marion 70 1-Jul B-7 Aksentijevic Martha 56 17-Sep B-8 Alamillo Nora 75 4-Feb C-1 Albert Lester E. 65 30-Sep B-7 Albrecht Victoria A. 84 3-Jan A-7 Aldrin Raymond E. 71 11-Aug B-5 Aleksandrovic Ivan 76 11-Dec B-13 Aleksandrovic Jelena 79 2-Dec C-1 Ales Francis J. 69 31-Mar B-8 Alexander Janet 49 28-Jul C-1 Alexander Penny C. 60 24-Mar C-1 Alexander Terry 53 9-Dec C-1 Alexander Vera (Cook) 2-Dec C-1 Alexander William A. 50 27-Dec C-2 Alfaro Mark A. 21 5-Feb D-1 Alger Kenneth H. -
Inca Project No
1 FINAL REPORT INCA PROJECT NO. 223 THE BIOLOGICAL IMPORTANCE OF COPPER A Literature Review June, 1990 INCA PROJECT 223 Preface In 1973 the International Copper Research Association initiated a grant to review the literature dealing with the biological importance of copper in marine and estuarine environments. This was followed by a second review in 1978. It was then apparent that there was a very large number of publications concerning copper in the marine environment. As a result, an annual review was initiated. Reviews prior to 1984 considered copper only in marine and estuarine environments. However, events occurring on land and in freshwater were often mentioned because chemical and biological factors and processes pertinent to one environment could often be applied to the others. As a result, the review became larger, covering not only freshwater, saltwater and terrestrial environments but also agriculture and medicine. These broad reviews pointed out the broad application of concepts about the biological importance of copper. The present review includes literature for the period 1987-1988 although a number of earlier references are included and, where appropriate, a few appearing in 1989 have been used. Many of the earlier references are from Eastern Europe and Asia because this literature takes time to appear in the North American data review bases. References were obtained in major part through literature search programs available through the Woodward Biomedical Library at the University of British Columbia. Mr. Brian Moreton, the European INCA Director, kindly provided the metals section of the Marine Pollution Research Titles as a source of European as well as North American References. -
Competency Standards For
COMPETENCY STANDARDS FOR MASON Unit No Unit Title 1. Set-out building / structures 2. carry out brick work 3. Carry out block work 4. Lay damp proof course 5. Carry out concreting work 6. Carry out paving work 7. Plaster surfaces 8. Render floor surfaces 9. Carry out decorative plastering work 10. Fix door and window frames 11. Lay drains 12. Erect scaffolds 13. Carry out tiling work 14. Carry out arch work, decorative brick work, rubble and kabook structure work DESCRIPTION OF AN MASON Mason will be working front line of the construction industry. Masons who are competent in this standard will be able to perform skilled masonry work, building, altering and repairing brick, stones tile or ceramic structure and surfaces COMPETENCY STANDARD DEVELOPMENT PROCESS The competencies were determined based on the analysis of the tasks expected to be performed by the bar bender in the Maldives. The task analysis was based on the existing job descriptions used in both private and public sector. Competency standards used for similar type of training in other countries were also examined. 1 UNIT TITLE Set-out building / structures DESCRIPTOR This unit covers the competencies required to set out building and other related structures. It includes operations, which require basic tools, equipment and techniques other than Theodelite and Engineers level ensuring safety to self, others and property. CODE CON08S2U01VI Level 4 Credit 5 ELEMENTS OF COMPETENCE PERFORMANCE CRITERIA 1. Read and interpret 1.1. Notations, abbreviations, symbols, dimensions and drawings scales read, interpreted & drawings selected 1.2. Elevations, sectional elevations, detailed drawings & schedules interpreted & centre line dimensions calculated by adding or subtracting half of the width of the wall dimensions as shown in the drawing 2. -
California Prop 65 Notice
CALIFORNIA PROPOSITION 65 NOTIFICATIONS Proposition 65 is a California state law requiring warnings to California consumers when they may be exposed to chemicals known to the State of California to cause cancer, congenital disabilities, and/or reproductive harm. Because our products are sold in California, Hyde Tools complies with Proposition 65. To ensure compliance, we include the below warning on any of our products which contain chemicals known to the state of California to cause certain harms. WARNING: These products can expose you to chemicals that are known to the State of California to cause cancer and/or reproductive harm. Find more information here: https://www.p65warnings.ca.gov/. If you have any questions regarding Proposition 65 and Hyde Tools’ products, please contact our Customer Service Department by phone (1-800-872- 4933) or email ([email protected]) Hyde Item UPC Code Product Description Warning Chemicals/Materials Explanation Black & Silver® 1-1/4" 02080 079423020803 Lead Brass has a small amount of lead Stiff Chisel Putty, Brass ⚠ WARNING: Cancer Black & Silver® 1-5/16" 02215 079423022159 Lead Brass has a small amount of lead Stiff Chisel Putty, Brass ⚠ WARNING: Cancer Black & Silver® 2" Stiff 02320 079423023200 Lead Brass has a small amount of lead Putty, Brass ⚠ WARNING: Cancer Black & Silver® 3" Stiff 02420 079423024207 Lead Brass has a small amount of lead Chisel Scraper, Brass ⚠ WARNING: Cancer Black & Silver® 5-in-1, 02975 079423029752 Lead Brass has a small amount of lead Brass ⚠ WARNING: Cancer 6