Nigerian Erosion and Watershed Management Project Health and Environment

Total Page:16

File Type:pdf, Size:1020Kb

Nigerian Erosion and Watershed Management Project Health and Environment Hostalia ConsultaireE2924 NigerianNigerian Erosion Erosion and Watershed Managementand Watershed Project Management Health and EnvironmentProject NEWMAP Public Disclosure Authorized Environmental and Social Management Public Disclosure Authorized Framework (ESMF) FINAL REPORT Public Disclosure Authorized Public Disclosure Authorized 1 Hostalia Consultaire Nigerian Erosion and Watershed Management Project Health and Environment ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK Nigerian Erosion and Watershed Management Project NEWMAP FINAL REPORT SEPTEMBER 2011 Prepared by Dr. O. A. Anyadiegwu Dr. V. C. Nwachukwu Engr. O. O. Agbelusi Miss C.I . Ikeaka 2 Hostalia Consultaire Nigerian Erosion and Watershed Management Project Health and Environment Table of Content Contents EXECUTIVE SUMMARY..............................................................................15 Background ..........................................................................................................................15 TRANSLATION IN IBO LANGUAGE..........................................................22 TRANSLATION IN EDO LANGUAGE.........................................................28 TRANSLATION IN EFIK...............................................................................35 CHAPTER ONE..............................................................................................43 INTRODUCTION AND BACKGROUND TO NEWMAP.............................43 1.0 Background to the NEWMAP...................................................................................43 1.1 Purpose of the ESMF ................................................................................................43 1.2 Objectives of the Environmental and Social Management Framework....................43 1.3 Rational for the Environmental and Social Management Framework......................45 1.4 Application of the ESMF...................................................................................45 1.5. Technical Approach and Methodology.....................................................................45 1.6 Project Strategy .........................................................................................................45 1.6.1 Literature Review ..................................................................................................46 1.6.2 Field Visits.............................................................................................................46 1.6.3 Interactive Discussions..............................................................................................46 3 Hostalia Consultaire Nigerian Erosion and Watershed Management Project Health and Environment CHAPTER TWO.............................................................................................49 POLICY, LEGAL AND REGULATORY FRAMEWORK.............................49 2.0 Introduction...............................................................................................................49 2.1 Relevant Regulatory Policies of Nigeria...................................................................49 2.1.1 The National Policy on the Environment (NPE) of 1989......................................50 2.1.2 Environmental Impact Assessment Act No. 86, 1992 (FMEnv)...........................50 2.1.3 The National Guidelines and Standards For Environmental Pollution Control In Nigeria 50 2.1.4 The National Effluents Limitations Regulation.....................................................50 2.1.5 The NEP (Pollution Abatement In Industries And Facilities Generating Waste) Regulations...........................................................................................................................50 2.1.6 The Management of Solid and Hazardous Wastes Regulations............................51 2.1.7 National Guidelines on Environmental Management Systems (1999) .................51 2.1.8 National Guidelines for Environmental Audit.......................................................51 2.1.9 National Policy on Flood and Erosion Control 2006 ............................................51 2.1.10 National Air Quality Standard Decree No. 59 of 1991 .........................................51 2.1.11 The National Environmental Standards and Regulations Enforcement Agency Act 2007 ...............................................................................................................................51 2.1.12 The National Oil Spill Detection and Response Agency Act 2005.......................51 2.1.13 Land Use Act of 1978............................................................................................52 2.1.14 Forestry Act ...........................................................................................................52 4 Hostalia Consultaire Nigerian Erosion and Watershed Management Project Health and Environment 2.1.15 Criminal Code........................................................................................................52 2.1.16 Inland Waterways Authority .................................................................................53 2.2 State Legislations .....................................................................................................53 2.2.1 Anambra State Policy on Environment .................................................................53 2.2.2 Anambra State Flood and Erosion Control and Soil Conservation.......................54 2.2.3 Anambra State Flood Control and Water Conservation........................................54 2.2.4 Anambra Riverine Area Management Policy........................................................54 2.2.5 Anambra State Watershed Management Policy....................................................54 2.2.6 Anambra State Flood and Erosion Control Management Support System ...........54 2.2.7 Anambra State Environmental Protection Agency Law........................................54 2.2.8 Enugu State Environmental Protection Agency Law............................................54 2.2.9 Imo State Environmental Protection Agency Law................................................54 2.2.10 Abia State Environmental Protection Law ............................................................54 2.2.11 Edo State Environmental & Waste Management Law..........................................54 2.2.12 Enugu State Waste Management Authority Law ..................................................54 2.2.13 Imo State Bureau For Sanitation & Transport Law...............................................54 2.2.14 Imo State Environmental Protection Agency Amendment Law ...........................54 2.3 International Laws and Regulations..........................................................................54 2.3.1 Summary of some relevant World Bank Environmental and Social Safeguard Policies 55 5 Hostalia Consultaire Nigerian Erosion and Watershed Management Project Health and Environment 2.4 Nigeria EIA Guidelines and World Bank EA Guidelines.........................................58 2.4.1 NEWMAP - Adequacy of Legal Instruments for Environmental & Social Issues59 2.5 Other International Laws and Regulations................................................................59 2.5.1 Convention on Biological Diversity......................................................................60 2.5.2 Convention Concerning the Protection of the World Cultural and Natural Heritage Sites ...............................................................................................................................60 2.5.3 United Nations Framework Convention on Climate Change................................60 2.5.4 International Environmental Agreements..............................................................60 2.5.5 Basel Convention on the control of hazardous wastes and their disposal.............60 CHAPTER THREE .........................................................................................61 PROJECT DESCRIPTION..............................................................................61 3.1 Introduction...............................................................................................................61 3.2 Components of the NEWMAP.......................................................................................61 3.3 Project Scope of Works.............................................................................................63 3.4 ESMF Implementation Arrangement........................................................................64 3.5 ESMF Implementation Budget..................................................................................64 CHAPTER FOUR ...........................................................................................65 DESCRIPTION OF THE PROJECT STATES ................................................65 4.0 Introduction...............................................................................................................65 4.1 Baseline Data for each state ......................................................................................65 6 Hostalia Consultaire Nigerian Erosion and Watershed Management Project Health and Environment 4.1.1 Abia State: .............................................................................................................65 4.1.2 Anambra state........................................................................................................66 4.1.3 Cross River state....................................................................................................68
Recommended publications
  • Interim Capacity Building for Operators of Microfinance Banks
    Central Bank of Nigeria INTERIM CAPACITY BUILDING WORKSHOP FOR OPERATORS OF MICROFINACE BANKS IN NIGERIA The Central Bank of Nigeria (CBN) is organizing a capacity building workshop for operators of licensed Microfinance Banks in Nigeria. There will be four runs of 3 days each from 1st to 13th September, 2008. The workshop will be held concurrently in eight centres as detailed below: AWKA CENTRE: Venue: Choice Hotel, 71, Arthur Eze Avenue, Awka, Anambra State. Institutions: S/N NAME OF MFB ADDRESS STATE ADAZI ANI TOWN HALL, ADAZI ANI, ANAOCHA LGA, 1 AACB MFB ANAMBRA STATE ANAMBRA NKWOR MARKET SQUARE, ADAZI-ENU, ANAOCHA 2 ADAZI-ENU MFB LGA, ANAMBRA STATE ANAMBRA AKPO JUNCTION, AKPO AGUATA LGA, ANAMBRA 3 AKPO MFB STATE ANAMBRA CIVIC CENTRE COMPLEX, ADAZI-ENU, ANAOCHA 4 BESTWAY MFB LGA, ANAMBRA STATE ANAMBRA NO 1 MISSION ROAD EKWULOBIA P.M.B.24 AGUTA, 5 EKWULOBIA MFB ANAMBRA ANAMBRA 1 BANK ROAD UMUCHU, AGUATA L.G.A, ANAMBRA 6 EQUINOX MFB STATE ANAMBRA AFOR IGWE UMUDIOKA, DUNUKOFIA LGA, ANAMBRA 7 EZEBO MFB STATE ANAMBRA KM 6, ONITHSA OKIGWE RD., ICHI, EKWUSIGO LGA, 8 ICHI MFB ANAMBRA STATE ANAMBRA NNOBI/EKWULOBIA ROAD, IGBOUKWU, ANAMBRA 9 IGBO-UKWU MFB STATE ANAMBRA 10 IHIALA MFB BANK HOUSE, ORLU ROAD, IHIALA, ANAMBRA STATE ANAMBRA EKWUSIGO PARK, ISUOFIA-NNEWI ROAD, ISUOFIA, 11 ISUOFIA MFB ANAMBRA STATE ANAMBRA ZONE 16, NO.6-9, MAIN MARKET, NKWO-NNEWI, 12 MBAWULU MFB ANAMBRA STATE ANAMBRA STATE SECRETARIAT, GOVERNMENT HOUSE, AWKA, 13 NDIOLU MFB ANAMBRA STATE ANAMBRA NGENE-OKA MARKET SQ., ALONG AMAWBIA/AGULU 14 NICE MFB ROAD, NISE, AWKA SOUTH
    [Show full text]
  • Environmental and Social Impact Assessment
    Final Environmental and Social Impact Assessment Report for the Proposed 100MW Solar Independent Power Plant and 18 KM Transmission Line Project, Ganjuwa Local Government Area, Bauchi State by Nigerian Solar Capital Partners/Globeleq/ARM- Harith June 2017 100 MW Independent Solar Power Plant, Bauchi State Environmental and Social Impact Assessment Table of Contents List of Tables iii List of Figures iv List of Acronyms and Abbreviations v List of ESIA Preparers viii Executive Summary ix Chapter One: Introduction 1.1 Background 1-1 1.2 Overview 1-2 1.3 Project Scope 1-2 1.4 Project Location 1-3 1.5 Study Objectives and Terms of Reference 1-6 1.6 Report Structure 1-6 Chapter Two: Policy, Legal and Administrative Framework 2.1 Applicable National Policies 2-8 2.2 Applicable National Regulations 2-10 2.3 Institutional Framework 2-14 2.4 Applicable International Agreements and Policies 2-19 2.5 Permit Requirements 2-21 Chapter Three: Project Description 3.1 Project Overview 3-23 3.2 Project Requirements 3-23 3.3 Project Components 3-24 3.4 Operation and Maintenance 3-34 3.5 Project Activities 3-35 3.5.1 Construction 3-35 3.6 Implementation Schedule 3-35 Chapter Four: Description of the Project Environment 4.1 General 4-38 4.2 Study Area and Location 4-38 4.2.1 Reconnaissance Field Visit 4-38 4.2.2 Baseline Data Acquisition 4-38 4.2.3 Sampling Design 4-45 4.2.4 Field Sampling Methods 4-45 4.2.5 Laboratory Methods 4-47 4.3 Bio-Physical Environmental Baseline Condition 4-47 4.3.1 Climate and Meteorology 4-47 4.3.2 Ambient Air Quality 4-52 4.3.2.1
    [Show full text]
  • World Bank Document
    ESMP for Nguzu Edda (Afikpo South LGA Headquarters) Gully Erosion site in Ebonyi State Public Disclosure Authorized ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP) (Final Draft Report) For NGUZU EDDA (AFIKPO SOUTH LOCAL GOVERNMENT HEADQUARTERS) GULLY EROSION INTERVENTION SITE, EBONYI STATE Public Disclosure Authorized UNDER Public Disclosure Authorized THE NIGERIA EROSION & WATERSHED MANAGEMENT PROJECT (NEWMAP) WORLD BANK ASSISTED By EBONYI STATE -NIGERIA EROSION & WATERSHED MANAGEMENT PROJECT (EBS-NEWMAP) ABAKALIKI, EBONYI STATE Public Disclosure Authorized Public Disclosure Authorized June, 2014 ESMP for Nguzu Edda (Afikpo South LGA Headquarters) Gully Erosion site in Ebonyi State ESMP for Nguzu Edda (Afikpo South LGA Headquarters) Gully Erosion site in Ebonyi State Table of Contents Content Page Cover Page i Table of Contents ii List of Tables v List of Figures vi List of Maps vi List of Boxes vi List of Abbreviations/ Acronyms vii Definition of Terms ix Executive Summary x CHAPTER 1: GENERAL INTRODUCTION 1 1.1 Background 2 1.2 The proposed Intervention Work 3 1.3 Need for ESMP for the Proposed Intervention Work 4 1.4 Objectives of this Environmental and Social Management Plan 4 1.5 Scope/Terms of Reference of the ESMP and Tasks 4 1.6 Approaches for Preparing the Environmental and Social Management Plan 4 1.6.1 Literature Review 4 1.6.2 Interactive Discussions/Consultations 4 1.6.3 Field Visits 4 1.6.4 Identification of Potential Impacts and Mitigation Measures 4 CHAPTER 2: INSTITUTIONAL AND LEGAL FRAMEWORK FOR ENVIRONMENTAL MANAGEMENT
    [Show full text]
  • Abia State No
    ABIA STATE NO. NAME STATUS ADDRESS 1 ABIA FIRST II DRIVING SCHOOL APPROVED NO 140 UMULE RD. BY UKWUAKPU OSISIOMA ABA. 2 AJAE DRIVING SCHOOL APPROVED NO 53 AWOLOWO SGBY UMUWAYA ROAD UMUAHIA 3 BASIC DRIVING SCHOOL APPROVED OPPOSITE VISION AFRICA RADIO UMUAHIA 4 BENSON DRIVING SCHOOL APPROVED UBAKALA STREET BY CO-OPERATIVE UMUAHIA 5 BOBOS DRIVING SCHOOL APPROVED NO. 105 ABA OWEERI ROAD, ABIA STATE 6 CAREFUL DRIVING SCHOOL APPROVED 111/113 AZIKWE ROAD ABA 7 CHIBEST DRIVING SCHOOL APPROVED NO 7 INDUSTRIAL LAYOUT OSISIOMA NGWA LOCAL GOVT AREA 8 CHIBEST DRIVING SCHOOL UMUAHIA APPROVED 34A POWA SHOPPING PLAZA UMUAHIA, NORTH LGA, ABIA STATE 9 CHINEDUM PRIVATE DRIVING APPROVED NO 2 AZIKWE OCHENDU CLOSE 10 DIAMOND HEART INTERNATIONAL APPROVED NO.10 BCA ROAD UMUAHIA DRIVING SCHOOL 11 DIVINE DRIVING SCHOOL APPROVED AHIAEKE NDUME IBEKU OFF UMUSIKE ROAD UMUAHIA 12 DRIVE-WELL SCHOOL OF MOTORING, APPROVED 27 BRASS ST. ABA ABIA STATE. 13 ENG AMOSON DRIVING SCH APPROVED 95 FGC ROAD EBEM OHAFIA 14 EXPERTS DRIVING SCH APPROVED 133 IKOT- EKPENE ROAD OGBORHILL ABA, ABA NORTH LGA, ABIA STATE. 15 FLUX DRIVING SCHOOL APPROVED OPPOSITE VISION AFRICA F.M RADIO ALONG SECRETARIAT ROAD, OGURUBE LAYOUT UMUAHIA 16 GIVENCHY DRIVING SCHOOL APPROVED NO 60 WARRI BY BENDER ROAD UMUAHIA, ABIA STATE. 17 HALLMARK DRIVING SCHOOL APPROVED SUITE 4, 44-55 OSINULO SHOPPING COMPLEX ISI COURT UMUOBIA OLOKORO, UMUAHIA, ABIA STATE 18 IFEANYI DRIVING SCHOOL APPROVED AMAWOM OBORO IKWUANO LGA 19 IJEOMA DRIVING SCHOOL APPROVED NO.3 CHECHE CLOSE AMANGWU, OHAFIA, ABIA STATE 20 INTERNATIONAL DRIVING SCHOOL APPROVED NO. 2 MECHANIC LAYOUT OFF CLUB ROAD UMUAHIA.
    [Show full text]
  • SIGNIFICANCE of ANIMAL MOTIFS in INDIGENOUS ULI BODY and WALL PAINTINGS Nkiruka Jane Uju Nwafor Department of Fine and Applied A
    Mgbakoigba, Journal of African Studies. Vol. 8, No. 1. June 2019 SIGNIFICANCE OF ANIMAL MOTIFS IN INDIGENOUS ULI BODY AND WALL PAINTINGS… Nkiruka Jane Uju Nwafor SIGNIFICANCE OF ANIMAL MOTIFS IN INDIGENOUS ULI BODY AND WALL PAINTINGS Nkiruka Jane Uju Nwafor Department of Fine and Applied Arts Nnamdi Azikiwe University, Awka. [email protected] This article explores the significance of animal motifs in traditional Uli body and wall paintings. A critical assessment and understanding of the philosophical import of animals in African concept of existence is vital for an in-depth appreciation of their (animals’) symbols in indigenous African artworks. This paper attempts to a draw parallel between traditional beliefs concerning certain animals among the Igbo of south-eastern Nigeria and motifs derived from indigenous Uli body and wall painting. In essence, the article sees animal motifs in Uli body and wall paintings as playing an aesthetic as well as metaphysical roles. Hence I argue that local nuances of religiosity and spirituality have historically imbued the animals with a heightened sense of sacredness in some Igbo communities thus allowing the animals to occupy a mystical space in Igbo cosmology. Introduction The pre-colonial system of knowledge transmission in Africa was not only through oral literature but also through the varied artistic traditions that survived from one generation to the other. The rich heritage of ancient Egyptian arts (including the hieroglyphs), the numerous Neolithic rock paintings and engravings found in Northern Africa, which dates back to 5000 and 2000 BCE respectively were mainly symbolic of vital occurrences of the past, documented through art (Getlein 2002: 335).
    [Show full text]
  • The Igbo Traditional Food System Documented in Four States in Southern Nigeria
    Chapter 12 The Igbo traditional food system documented in four states in southern Nigeria . ELIZABETH C. OKEKE, PH.D.1 . HENRIETTA N. ENE-OBONG, PH.D.1 . ANTHONIA O. UZUEGBUNAM, PH.D.2 . ALFRED OZIOKO3,4. SIMON I. UMEH5 . NNAEMEKA CHUKWUONE6 Indigenous Peoples’ food systems 251 Study Area Igboland Area States Ohiya/Ohuhu in Abia State Ubulu-Uku/Alumu in Delta State Lagos Nigeria Figure 12.1 Ezinifite/Aku in Anambra State Ede-Oballa/Ukehe IGBO TERRITORY in Enugu State Participating Communities Data from ESRI Global GIS, 2006. Walter Hitschfield Geographic Information Centre, McGill University Library. 1 Department of 3 Home Science, Bioresources Development 5 Nutrition and Dietetics, and Conservation Department of University of Nigeria, Program, UNN, Crop Science, UNN, Nsukka (UNN), Nigeria Nigeria Nigeria 4 6 2 International Centre Centre for Rural Social Science Unit, School for Ethnomedicine and Development and of General Studies, UNN, Drug Discovery, Cooperatives, UNN, Nigeria Nsukka, Nigeria Nigeria Photographic section >> XXXVI 252 Indigenous Peoples’ food systems | Igbo “Ndi mba ozo na-azu na-anwu n’aguu.” “People who depend on foreign food eventually die of hunger.” Igbo saying Abstract Introduction Traditional food systems play significant roles in maintaining the well-being and health of Indigenous Peoples. Yet, evidence Overall description of research area abounds showing that the traditional food base and knowledge of Indigenous Peoples are being eroded. This has resulted in the use of fewer species, decreased dietary diversity due wo communities were randomly to household food insecurity and consequently poor health sampled in each of four states: status. A documentation of the traditional food system of the Igbo culture area of Nigeria included food uses, nutritional Ohiya/Ohuhu in Abia State, value and contribution to nutrient intake, and was conducted Ezinifite/Aku in Anambra State, in four randomly selected states in which the Igbo reside.
    [Show full text]
  • Nigeria's Constitution of 1999
    PDF generated: 26 Aug 2021, 16:42 constituteproject.org Nigeria's Constitution of 1999 This complete constitution has been generated from excerpts of texts from the repository of the Comparative Constitutions Project, and distributed on constituteproject.org. constituteproject.org PDF generated: 26 Aug 2021, 16:42 Table of contents Preamble . 5 Chapter I: General Provisions . 5 Part I: Federal Republic of Nigeria . 5 Part II: Powers of the Federal Republic of Nigeria . 6 Chapter II: Fundamental Objectives and Directive Principles of State Policy . 13 Chapter III: Citizenship . 17 Chapter IV: Fundamental Rights . 20 Chapter V: The Legislature . 28 Part I: National Assembly . 28 A. Composition and Staff of National Assembly . 28 B. Procedure for Summoning and Dissolution of National Assembly . 29 C. Qualifications for Membership of National Assembly and Right of Attendance . 32 D. Elections to National Assembly . 35 E. Powers and Control over Public Funds . 36 Part II: House of Assembly of a State . 40 A. Composition and Staff of House of Assembly . 40 B. Procedure for Summoning and Dissolution of House of Assembly . 41 C. Qualification for Membership of House of Assembly and Right of Attendance . 43 D. Elections to a House of Assembly . 45 E. Powers and Control over Public Funds . 47 Chapter VI: The Executive . 50 Part I: Federal Executive . 50 A. The President of the Federation . 50 B. Establishment of Certain Federal Executive Bodies . 58 C. Public Revenue . 61 D. The Public Service of the Federation . 63 Part II: State Executive . 65 A. Governor of a State . 65 B. Establishment of Certain State Executive Bodies .
    [Show full text]
  • Journalistic Slanting of the Governor Chris Ngige and Chris Uba Prebendal Political Conflict in South-Eastern Nigeria, 2004-2006
    un omm ica C tio s n s Popoola, J Mass Communicat Journalism 2014, 4:9 a & M J o f u DOI: 10.4172/2165-7912.1000218 o Journal of r l n a a n l r i s u m o J ISSN: 2165-7912 Mass Communication & Journalism Research Article OpenOpen Access Access Journalistic Slanting Of the Governor Chris Ngige and Chris Uba Prebendal Political Conflict in South-Eastern Nigeria, 2004-2006 Muyiwa Popoola* Department of Communication and Media Studies, Ajayi Crowther University, P.M.B. 1066, Oyo town Oyo State, Nigeria Abstract Prebendal political conflicts are crises of the ruling and political class, owing to disagreement in respect of appropriation and sharing of resources and wealth of a nation state, as personal needs and entitlements, Prebendalism, which is a strong concomitant of political godfatherism, has disturbed Nigeria’s democracy. The period between 2004 and 2006 has recorded a ruinous prebendal political conflict in the South-Eastern geo-political zone of Nigeria. The conflict, which involved an erstwhile Governor of Anambra State, Dr. Chris Ngige and a political chieftain in the state, Chief Chris Uba, occurred with attendant violence. However, empirical studies on the role played by the press in this type of conflict situation are faint in political communication literature. This study therefore was conducted to investigate how selected newspapers reported the Ngige and Uba prebendal political conflict in South-Eastern Nigeria between 2004 and 2006. Four Nigerian national newspapers were chosen for the study, namely: Daily Champion, Daily Trust, Nigerian Tribune and The Guardian. Purposive sampling was used to select 84 journalistic genres out of 72 editions of the newspapers.
    [Show full text]
  • The Aim of the Project Is to Carry out Integrated Studies of the Anambra
    Preliminary Integrated Hydrocarbon Prospectivity Evaluation of the Bida Basin in North Central Nigeria By N. G. Obaje1, D. O. Balogu1, A. Idris-Nda2, I. A. Goro2, S. I. Ibrahim1, M. K. Musa1, S. H. Dantata2, I. Yusuf1, N. Mamud-Dadi1, I. A. Kolo1+ Abstract The Bida Basin is a NW-SE trending intracratonic structure extending from slightly south of Kontagora in Niger State in the north to the area slightly beyond Lokoja (Kogi State) in the south. All geological maps available on the Bida Basin had lumped the sediments in the basin as one undifferentiated Nupe Sandstone, making it impossible to infer the prospectivity of the basin for hydrocarbon exploration. The delineation of inferred boundaries between the formations in the basin is a significant initial criterion in evaluating the hydrocarbon prospectivity. The formations deposited in the Bida Basin comprise the Bida Sandstone at the base, followed successively upward by the Sakpe, Enagi and Batati Formations in the Northern/Central Bida Basin while the Lokoja, Patti and Agbaja Formations constitute lateral equivalents in the Southern Bida Basin. An institutional research project of the Ibrahim Badamasi Babangida University Lapai (IBBUL), supported by the Niger State Government, has carried out preliminary geological mapping and completed a prospectivity map for the Bida Basin. Geochemical analysis of samples from drilled shallow wells (at Agaie and Kudu) and outcrops was also undertaken along with interpretation of geophysical aeromagnetic data. From the preliminary geological map prepared, prospective areas, ranked as Less Prospective, Prospective and More Prospective are discernable. Geochemical data show that mainly gas and some oil would have been generated within the Prospective and More Prospective sections in the basin.
    [Show full text]
  • Affixes and Tone in Aguata Igbo: a Critical Appraisal
    IOSR Journal Of Humanities And Social Science (IOSR-JHSS) Volume 22, Issue 6, Ver.12 (June. 2017) PP 27-33 e-ISSN: 2279-0837, p-ISSN: 2279-0845. www.iosrjournals.org Affixes and Tone in Aguata Igbo: A Critical Appraisal Chinwe E. Obianika Department of Linguistics and Literary Studies, Ebonyi State University, Abakaliki. Abstract: This work sets out to investigate the behavior of tone in the affixes involved in the formation of three aspects in Aguata Igbo. The dialect group comprises of three main dialects; Amaiyi, Orumba and Aguata. Three respondents are selected to represent each dialect. The data are collected through personal interview and analyzed descriptively to find out how these aspects are realized in each dialect to ascertain their level of similarities and differences. In the findings, there are variations both in the affixes and in the tone patterns indicating that they are different (though related) dialects of the Igbo language, contrary to popular notion that they all speak the same dialect. Keywords: dialect, verb forms, tone, aspect, Igbo language I. INTRODUCTION Aguata is a geographical area that was mapped out as an administrative area in the pre-independent Nigeria and became a local government area during the Obasanjo regime of the 1970s. It is bounded on the north and west by the old Njikoka Local Government Area of Anambra State and on the east by Okigwe Local Government Area of Imo State. There are about forty nine autonomous communities that make up this region. They include but not limited to Ụmụuchu, Achina, Mkpologwu, Akpo, Enugwu-Ụmụọnyịa, Agbụdụ, Amesi, Ụmụọmakụ, Ụmụalaọma, Ekwuluọbịa, Oko, Isuọfịa, Igboukwu, Agụlụezechukwu, Nanka, Ụga, Ezinifite, Ụmụọna, Ikenga, One, Awgbụ, Ufuma, Ajali and so on.
    [Show full text]
  • Enugu State, Nigeria Out-Of-School Children Survey Report
    ENUGU STATE, NIGERIA OUT-OF-SCHOOLCHILDREN SURVEY REPORT October, 2014 PREFACE The challenge of school-aged children who for one reason or another did not enrol in school at all or enrolled and later dropped out for whatever reason has been a perennial challenge to education the world over. Nigeria alone is said to house over 10 million out of school children. This is in spite of the universal basic education programme which has been running in the country since 1999. For Enugu State, it is not clear what the state contributes to that national pool of children who are reported to be out of school. Given the effort of the State Government in implementing the universal basic education programme, it is easy to assume that all children in Enugu State are enrolled and are attending school. This kind of assumption might not give us the benefit of knowing the true state of things as they relate to out-of-school children in our State. This is even more so given the State’s development and approval of the Inclusive Education Policy, which has increased the challenge of ensuring that every child of school age, no matter his or her circumstance of birth or residence, has access to quality education; hence, the need to be concerned even for only one child that is out of school. It is, therefore, in a bid to ascertain the prevalence of the incidence of children who are outside the school system, whether public or private, that the Ministry of Education and Enugu State Universal Basic Education Board collaborated with DFID-ESSPIN and other stakeholders to conduct the out of school children’s survey.
    [Show full text]
  • Water Budget Analysis of Agulu Lake in Anambra State, Nigeria
    JASEM ISSN 1119-8362 Full-text Available Online at J. Appl. Sci. Environ. Mgt. September, 2006 Vol. 10 (3) 27 - 30 All rights reserved www.bioline.org.br/ja Water Budget Analysis of Agulu Lake in Anambra State, Nigeria 1EGBOKA, BCE; 2NFOR, BN; 3BANLANJO, EW 1,3Department of Geological Sciences, Nnamdi Azikiwe University, Nigeria 2Dept of Geology, Delta State University, Abraka, Nigeria ABSTRACT: The elements of water budget equation were analyzed for the Agulu lake area and underlying aquifers. The water budget implications for soil and gully erosion were evaluated in relation to the geological formations and hydrogeotechnics. Results show that rainfall constitutes the main source of precipitation. It ranges from 1714.04mm to 1995.53mm annually. The potential groundwater aquifer volume is 1.5 X 107m3. Discharge from aquifers contributes 7.4 X 107m3 water annually. The amount of 1.72 X 105m3 that is 60% of precipitation is lost to evaporation; 17 to 21% to infiltration. The quasi steady state of the lake water level and volume shows surface and groundwater continuity as explained by the small difference between total input and output values of the computed water budget of the lake and the aquifer. Flood studies indicate that 19.5% of the annual precipitation constitutes runoff, the main agent of gully and soil erosion, flooding and landslides. The other factors that control the distribution and location of gullies are lithologic and stratigraphical, while topography/geomorphology controls gully distribution within various geologic units. A typical gully is about 500m X 50m X 30m long, wide and deep respectively.
    [Show full text]